Loading...
HomeMy WebLinkAboutContract 55324-AR2 CSC No. 55324-AR2 FORS[' WORTH City of Fort Worth Construction Allowance Request Project Name[ Water and Sanitary Sewer Rehabilitation,Contract 101 City Sec No. r 55324 Project No.(s)l 56002-0700430-CO2722-CO1780 M&C: 21-0056 City Proj,No, 27 22 Project Description: Water,Sanitary Sewer and Paving improvements on Winton Terrace East and Winton Terrace West Conlraclod Wiliam J.Schultz,Inc.dba Circle C Const. Allowance No: Date: 812412022 City Project Mgr.l J.Chris Underwood City Inspector: I Stephen Martinez Phone Number:[ 817-392-2629 Phone Number: 682-432-5485 Dept. Water Sewer Paving Totals Original Contract Amount $1,333,263.00 $1,345,890.00 $336,025.00 $3,015,178.00 Previous Allowances Allocated $10,000.00 $20,000.00 $0.00 $30,000.00 Amount of Proposed Allocation $38,200.00 $47,600.00 $10,000.00 $95,800.00 Original Allowance Available for Allocation $60,000.00 $90,000.00 $20,000.00 $170,000.00 Remaining Funds Available for this Allocation $50,000.00 $70,000.00 $20,000.00 $140,000.00 JUSTIFICATION (REASONS) FOR ALLOWANCE Allowance No. 2 provides for the following: • Hand Excavation around large trees in the parkway to protect the roots and life of the trees during the installation of new water and sewer services. • Irrigation Repairs required in the parkway during the installation of new water services,new sewer services and curb and gutter replacement. • Retaining walls built around two manholes that are located in the parkway on a sloped surface. • Removal of trees that cannot be protected during sewer installation. • Extensive cleaning than typically necessary for a sewer pipe segment proposed to be rehabilitated via cured- in-place pipe method. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request, Contractor's Company Name Contractor Name C mctor Signature Date Wiliam J.Schultz,Inc,dba Circle C Const. Teri Skelly 2 Z Inspector Date Pro eaj;Manager Date D_irecfor Water Dept Date 4on7tructian Supervisor WaterMe t Date hristopher Hard (Aug 31,202215:58 CDT) Aug31,2022 Assistant City,Attorney Date Assistant C1 _Mana er Date lack772202u CCori Sep 2, 2022 ym3,,dh__:r; .A,iCL,�3�o-; Sep 4,2022 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT W"RTH City of Fort Worth Construction Allowance Request Project Name Water and Sanitary Sewer Rehabilitation, Contract 101 City Sec No. 55324 Project No.(s) 56002-0700430-0O2722-001780 M&C: 21 0056 City Proj. No. 2722 Project Water, Sanitary Sewer and Paving Improvements on Winton Terrace East and Winton Terrace West Description Contractor Wiliam J. Schultz, Inc.dba Circle C Const. Allowance No: 0 Date: 8/24/2022 City Project Mgr. J. Chris Underwood City Inspector Stephen Martinez UUN51 KUGT IUN ALLUWANGE ITEMS 1-0 6E ADDED ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 49 Hand Excavation to Protect Trees Water 4.00 EA $5,800.00 $23,200.00 50 Irrigation Repairs Water 3.00 EA $5,000.00 $15,000.00 55 Hand Excavation to Protect Trees Sewer 3.00 EA $5,800.00 $17,400.00 56 Irrigation Repairs Sewer 2.00 EA $5,000.00 $10,000.00 57 Retaining Wall Around Manhole Sewer 24.00 LF $175.00 $4,200.00 58 Tree Removal up to 24-inch Diameter Sewer 4.00 EA $2,000.00 $8,000.00 59 Heavy Cleaning for Cured In Place Pipe Rehabilitation Sewer 2.00 EA $4,000.00 $8,000.00 22 Irrigation Repairs Paving 2.00 EA $5,000.00 $10,000.00 Water $38,200.00 Sewer $47,600.00 Paving $10,000.00 Page 2 of 4 Additions Sub Total $95,800.00 FORT WORTH City of Fort Worth Construction Allowance Request Project Name F Water and Sanitary Sewer Rehabilitation, Contract 101 City Sec No. 55324 Project No.(s) 56002-0700430-CO2722-001780 M&C: 21 0056 City Proj. No. 2722 Project Description Water, Sanitary Sewer and Paving Improvements on Winton Terrace East and Winton Terrace West Contractor Wiliam J. Schultz, Inc.dba Circle C Const. Allowance No: E Date 1 8/24/2022 City Project Mgr. J. Chris Underwood City Inspector Stephen Martinez CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Water Sewer Paving Page 3 of 4 Deletions Sub Total MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Page 4 of 4 8/29/2022 CPN 2722 Water Sanitary Sewer Rehabilitation, Contract 101 Allowance Request 2 Notes Staff has reviewed the allowance request prices and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Sr6nature _ J��Pcs Name of Employee S12- Title ATTEST: pp��OR � O OOO000000 0 0 ette 5.Goodall(SeD 6,2022 09: DT) 1! 0 00 O P ° Jannette Goodall °00 0 ° 0 °000000° /, City Secretary 1 r*XAga�A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX