HomeMy WebLinkAboutContract 58063 CSC No. 58063
CITY OF FORT WORTH
JOB ORDER CONTRACTING SERVICES AGREEMENT
THE STATE OF TEXAS
KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT
This Agreement is made effective as of the date signed by the Assistant City Manager below., by and
between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and
existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11 th
day of December, A. D. 1924, under the authority (vested in said voters by the "Home Rule" provision) of
the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City
Council of said City, hereinafter called "Owner," and Mart, Inc. of the City of Irving, County of Dallas,
State of Texas, hereinafter called "Contractor."
AGREEMENT DOCUMENTS:
The Agreement documents shall include the following:
1. This Construction Contract for Job Order Contracting Services
2. General Conditions of the Contract for Construction, Lump Sum Contract
3. Contractors Proposal,dated;26 May 2022
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned to be
made and performed by the Owner, and under the conditions expressed in the bond bearing even date
herewith, the said Contractor hereby agrees with the said Owner to commence and complete the Job Order
Contract Services.
ARTICLE 1. DEFINITIONS
1.1 "Job Order Contract (JOC)" is a Firm Fixed Price, Indefinite Delivery/Indefinite Quantity
contract for facility improvements, such as, minor construction, repair, maintenance,
rehabilitation, or alteration of a City facility. Projects will be authorized by an individual
written Job Order on an as-needed-basis. Job Orders will be in support of maintenance,
repair, alteration, renovation, and new construction.
1.2 "Coefficient" means a numerical factor adjusting the marked up costs for the purpose of
this Contract. The Coefficient represents adjustments that are General Contractor's indirect costs or
profit. It is additional to the costs identified in the Unit Price Guide (UPG). The Coefficient includes
general and administrative and other indirect overhead costs, insurance and bonding costs, Project
Manager and estimator's wages, general clerical wages, contingencies such as changes in wage rates
and inflation, JOC contractor's profit, and all other indirect costs. Separate coefficients may be used for
normal working hours and non-normal working hours. The Contractor's Request for Proposal submittal for
the Coefficient and will be part of this Contract.
1.2.1 "Standard working hours" are 7:30 a.m. to 5:00 p.m., CST Monday through
Friday; unless alternate standard hours are agreed upon for an individual Job
Order.
1.2.2 "Non-standard working hours" are hours worked before 7:30 a.m. and after
5:00 p.m., CST Monday through Friday, and all hours worked on Saturdays,
Sundays, and recognized holidays that are ordered by the Owner on an individual
Job Order issued or as expected elsewhere in the contract documents.
1.3 "Non-pre-priced item (NPI)" means a necessary, but incidental, part of a job or project
ordered under a Job Order Contract that is not unit priced using the pre-priced tasks in the UPG. The
OFFICIAL RECORD
8
Job Order Contract,June 2017 CITY SECRETARY
FT. WORTH, TX
Coefficient applied to a pre-priced item shall not be applied to a non pre-priced item. The Owner may
negotiate items of work not covered in the UPG but within the scope and general intent of the contract at
any time during the contract term. Non pre-priced items (NPI) of work will be negotiated on an as-needed-
basis and will be incorporated into the contract. NPI work will be included as necessary for any Job Order.
1.4 "Statement of Work" means a description of a project to be ordered under a Job Order
Contract which contains sufficient detail to determine quantities and quality, and the time for performance.
1.5 "Work" means the maintenance, repair, alteration, renovation, new construction and/or
services required by the Job Order and Contract Documents, whether completed or partially completed,
and includes all labor, materials, equipment, plant and services provided or to be provided by the
Contractor to fulfill the Contractor's obligations to satisfy the Scope of Work.
1.6 "Unit Price Guide (UPG)" means a compilation of real property repair, rehabilitation,
alteration, maintenance, and new construction tasks, along with associated units of measure and unit
prices designated or provided by the Owner to be used in administration of this Contract. Unit prices
include direct material, labor, and equipment costs, but not indirect costs or profit. The Unit Price Guide
for this Contract is R. S. Means, Facilities Construction Cost Data. The current City Cost Index for the City
of Fort Worth will be used. The unit prices from the "including overhead and profit" column of the UPG,
with individual unit prices will be adjusted by the Average City Cost index for the City of Fort Worth prior to
adjusting the cost proposals by the Coefficient. For those job items not listed in the Specified R. S. Means
Facilities Construction Cost Data Book, pricing shall be determined by applying the same Coefficient as
utilized on the R. S. Means Facilities Construction Cost Data Book to other applicable current R. S. Means
publications.
1.7 "Contract Documents" means the Job Order, in accordance with the Statement of Work,
General Conditions, Special Conditions, Addenda, Specifications, and Drawings for each Job Order, the
Minority and Women Business Enterprise Plan, which collectively form the"Project Contract."
ARTICLE 2. SCOPE OF SERVICES
The Contractor shall furnish all of the materials and perform all of the work shown on the drawings and
described in the specifications associated with any Statement of Work provided by the Owner for a Job Order
hereunder. The Project Architect for each individual project shall be identified and specified in the individual
Job Order. The Contractor shall do everything required by the Contract Documents.
ARTICLE 3. INSURANCE REQUIREMENTS FOR DESIGN AND CONSTRUCTION
Insurance Requirements for Contractor's Design Professionals. The City may require that the
Contractor provide all architectural and engineering services required for individual Job Orders. Said design
services shall be obtained pursuant to Chapter 1001 and/or 1051 of Occupations Code. The architect and/or
engineers used by the Contractor must have a current professional license in the State of Texas and comply
with the following City insurance requirements:
The architect and/or engineer shall maintain the following insurance coverage with carriers acceptable to the
City, such insurance to be in at least the following amounts:
Commercial General Liability $1,000,000 Per Occurrence
$2,000,000 Aggregate
Workers Compensation
Coverage A: Statutory limits
Coverage B: Employer's Liability
$100,000 Each Accident
$500,000 Disease - Policy limit
$100,000 Disease- Each Employee
Business Automobile
Combination Single limits $1,000,000 Each Accident
Professional Liability Insurance
(Errors and Omissions) $1,000,000 Per Claim
$1,000,000 Aggregate
Contractor's Insurance Requirements. Contractor shall not commence work under a Job Order until it
has obtained all insurance required under the Project Contract, and such insurance has been approved by
the Owner.
Commercial General Liability Insurance: The Contractor shall procure and shall maintain during the life of the
JOC public liability insurance coverage in the form of a Commercial General Liability insurance policy to
cover bodily injury, including death and property damage at the following limits: $1,000,000 each occurrence
and $2,000,000 aggregate limit. The insurance shall be provided on a Job Order specific basis and shall be
endorsed accordingly. The insurance shall include, but not be limited to, contingent liability for independent
contractors,XCU coverage, and contractual liability.
Worker's Compensation Insurance:
Statutory limits
Employer's Liability $100,000 disease each employee
$500,000 disease policy limit
$100,000 each accident
Business Automobile Liability: $100,000 each accident. The policy shall cover any auto used in the course
of the Job Order project.
Builder's Risk or Installation Floater: This insurance shall be applicable according to the property risks
associated with the Job Order project and commensurate with the contractual obligations specified in the
contract documents.
Excess Liability Umbrella: $1,000,000 each occurrence and $2,000,000 aggregate limit. This insurance
shall provide excess coverage over each line of liability insurance required herein. The policy shall follow the
form(s) of the underlying policies.
Scope of Insurance and Special Hazard: The insurance required under the above paragraphs shall provide
adequate protection for the Contractor and its subcontractors, respectively, against damage claims which
may arise from operations under this contract, whether such operations be by the insured or by anyone
directly or indirectly employed by it, against any insurable hazards which may be encountered in the
performance of the Contract.
ARTICLE 4. TIME OF COMPLETION
For each Job Order, the Owner shall provide a written Notice-to-Proceed (NTP) in which a date for
commencement of the work shall be stated. The Contractor shall complete the work within the number of
calendar days specified in the Job Order after such commencement date. Approved Change Orders may
extend such completion dates. The time set forth for completion of the work for each Job Order is an
essential element of the Contract. The Contractor acknowledges that time completion will be of the essence
in the completion of any Job Order and that failure to complete the work within the stated number of calendar
days will result in the assessment of liquidated damages in an amount identified in the General Conditions
section 1-8, or unless specifically included on the Job Order.
ARTICLE 5. TERMS OF CONTRACT
The JOC shall commence as of the date it is legally executed by the parties (the"Effective Date") and shall
automatically expire one year after the Effective Date (the "Expiration Date"), if not terminated earlier, or
extended as described below, and no Job Order may be issued after the Expiration Date, except that the
terms of the JOC shall survive as to any work in progress, unfinished work, defective work, and warranty and
indemnification obligations of the Contractor on or after such expiration date. The JOC shall be renewable at
the Owner's option for up to three additional one-year terms. The Owner may exercise its option to renew by
written notice to the Contractor within ten (10) calendar days prior to the expiration of the JOC provided that
the Owner gives the Contractor a preliminary written notice of its intent to renew at least sixty (60) calendar
days before the JOC expires. The preliminary notice does not commit the Owner to a renewal. If the Owner
exercises a renewal option,the renewal shall be considered to include this option provision.
ARTICLE 6. CONTRACT SUM
Owner shall pay Contractor for performance of the Job Order Contract on an individual Job Order basis
based on the associated Statement of Work, subject to additions and deductions provided therein, and
make payment on account as hereinafter provided. The price for a job or project ordered by the Owner
under this JOC (the"Job Order Sum") shall be based on the Unit Price Guide and the Coefficient, and any
non pre-priced items. Non pre-priced items shall not exceed fifty percent (50%) of the value of the Job
Order. The Owner shall have the unconditional right to withdraw its Job Order at any time before or after
the Contractor has submitted its proposal for the Job Order. If the Job Order is withdrawn, Contractor
shall not be entitled to any compensation or reimbursement of any costs incurred by the Contractor of any
nature for the withdrawn Job Order. For a Job Order under this JOC to become effective, it must be (a)
signed by the Owner and the Contractor, (b) a fixed price, lump sum contract, and (c) based on a
Statement of Work incorporated into the Job Order. The City shall pay JOC an amount not to exceed
$1,500,000 for all services performed under this Contract.
ARTICLE 7. PAYMENT BOND AND PERFORMANCE BOND
For construction costs of individual Job Orders in excess of $25,000, the Contractor will be required to
give the Owner surety in a sum equal to the amount of the Job Order awarded. The form of the bond shall
be as herein provided and the surety shall be acceptable to the Owner. All bonds furnished hereunder
shall meet the requirements of Texas Government Code Section 2253, as amended.
In order for a surety to be acceptable to the Owner, the surety must (1) hold a certificate of authority from
the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under
federal law; or (2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is
authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority
from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required
under federal law. Satisfactory proof of any such reinsurance shall be provided to the Owner upon
request. The Owner, in its sole discretion, will determine the adequacy of the proof required herein.
No sureties will be accepted by the Owner that are at the time in default or delinquent on any bonds or
which are interested in any litigation against the Owner. Should any surety on the contract be determined
unsatisfactory at any time by the Owner, notice will be given to the contractor to that effect and the
contractor shall immediately provide a new surety satisfactory to the Owner.
If the construction cost for a Job Order is $25,000 or less, payment to the Contractor shall be made in one
lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been
competed and accepted by the Owner.
If the construction cost of the Job Order is in excess of$25,000, a Payment Bond shall be executed, in the
amount of the Job Order, solely for the protection of all claimants supplying labor and materials in the
prosecution of the work.
If the construction cost of the Job Order is in excess of $100,000, a Performance Bond shall also be
provided, in the amount of the Job Order, conditioned on the faithful performance of the work in
accordance with the plans, specification, and contract documents. Said bond shall be solely for the
protection of the Owner (City of Fort Worth).
ARTICLE 8. WAGE RATES
Not less than the prevailing wage rates must be paid for the specific Job Order project. On Job Orders
where special wage rates (e. g. Davis-Bacon) apply,then the Contractor must meet all requirements of
such programs.
ARTICLE 9. WORKERS COMPENSATION INSURANCE
Contractor will be required to demonstrate that Workers Compensation Insurance coverage is in effect at
time of issuance of each Job Order. A Certificate of Insurance or other proof will be required.
ARTICLE 10. TAXES
Equipment and materials not consumed by or incorporated into the work are subject to State sales taxes.
ARTICLE 11. PERMITS
Contractor shall apply for all City of Fort Worth Permits and for any other permits required by the specific
Job Order projects. City of Fort Worth Building and Trade Permit fees are waived. Separate permits may
be required for each work location.
ARTICLE 12. UTILITIES AND IMPACT FEES
The Owner will pay water and sewer utility tap fees and impact fees. Unless shown otherwise,the Owner will
coordinate and pay for water and sewer taps and meters to the property line. The Contractor will include all
remaining fees from the electrical and gas companies in the base bid. The Contractor will be responsible for
coordinating with City and utility companies for installation of utilities. Unless indicated otherwise on the
plans, the Contractor will be responsible for costs and installations from the building side of the water meter
and sewer tap.
ARTICLE 13. TESTING SERVICES
The Owner shall provide for, independently of the Contractor, the inspection services, the testing of
construction materials engineering, and the verification testing services necessary for the acceptance of the
construction work.
ARTICLE 14. WARRANTY OF CONSTRUCTION
The Contractor shall warrant that work performed conforms to the Job Order requirements and is free of
any defect in equipment, material, design furnished, or workmanship performed by the Contractor or any
of its design professionals, subcontractors or suppliers at any tier. All work provided by the Contractor
shall be warranted for a minimum period of one (1)year from the date of final acceptance of the Job Order
work.
ARTICLE 15. RELATIONSHIP OF PARTIES
Contractor shall perform all work and services hereunder as an independent contractor, and not as an
officer, agent, servant or employee of Owner. Contractor shall have exclusive control of, and the
exclusive right to control the details of work performed hereunder, and all persons performing same, and
shall be solely responsible for the acts and omissions of its officers, agents, employees and
subcontractors. Nothing herein shall be construed as creating a partnership or joint venture between
Owner and Contractor, its officers, agents, employees and sub consultants (or subcontractors), and
doctrine of respondent superior has no application as between the Owner and Contractor.
ARTICLE 16. NO THIRD PARTY BENEFICIARIES
The JOC shall inure only to the benefit of the Owner and Contractor and third persons not privy hereto shall
not, in any form or manner, be considered a third party beneficiary of this JOC. Each parry hereto shall be
solely responsible for the fulfillment of its own contracts or commitments.
ARTICLE 17. OWNER INSPECTION AND ACCEPTANCE
Inspection and acceptance shall be as stated in the specific Job Order, in accordance with the Contract
Documents defined in Article 1. Owner hereby reserves the right to perform inspections of the work and any
and all inspections performed by the Owner or by others for the Owner shall be for the sole benefit of the
Owner. The presence or absence of an Owner inspector does not relieve the Contractor from any contract
requirement, nor is the inspector authorized to change any term or condition of the Contract Documents
without the Owner's written authorization. Quality control for the work is the responsibility of Contractor.
Contractor shall, without charge, replace or correct work found by the Owner not to conform to the contract
requirements, unless in the public interest, the Owner consents to accept the work with an appropriate
adjustment in Job Order price.
ARTICLE 18. LIQUIDATED DAMAGES
For each consecutive calendar day after the completion period set forth in any Job Order issued that any
work, including the correction of deficiencies found during the final testing and inspection not completed,
but not including minor punch-list items, the amount stated in Section 1-8 of the General Conditions per
day, unless a different amount is specified in a particular Job Order, will be deducted from the money due
or which becomes due the Contractor for the Job Order, not as a penalty but as liquidated damages
representing the parties' estimate at the time of issuance of the Job Order of the damages which the
Owner will sustain for late completion.
ARTICLE 19. DELAYS AND EXTENSION OF TIME
Contractor may be granted an extension of time because of changes ordered in the Job Order, or
because of unforeseeable conditions deemed by the Owner as being beyond the Contractor's control,
which constitutes a justifiable delay. Requests for extensions of time must be made in writing no later
than twenty (20) calendar days after the occurrence of the delay or at the time of the next project
construction status meeting. Contractor may be allowed additional time at no cost to the Owner.
ARTICLE 20. CONTRACT PAYMENT
Contractor will receive payment for acceptable work-in-place based on payment schedule of values
submitted at the beginning of the project no-later-than thirty (30) days after receipt of the payment request
made to the Owner. Contractor will make payment to subcontractor's no-later-than ten (10) days after
receiving said progress payment from the Owner and subject to the sub-contractors compliance with the
terms of its subcontract with the Contractor. Contractor shall submit to the Owner a breakdown of the
Contract Sum for the various classification of the Work at the beginning of the project for approval, which
will be used for evaluation of progress payments. The progress payments will be made when the
Contractor has submitted the payment request for work-in-place and all required documentation required
by the contract.
ARTICLE 21. WAIVER
No waiver by either parry of any default of the other under the JOC shall operate as a waiver of any future or
other default,whether of a like or different character or nature.
ARTICLE 22. SEVERABILITY
If any part of the JOC is contrary to any federal, state, or local law, it is not applicable and such invalidity shall
not affect the other provisions or applications of this agreement which can be given effect without the invalid
provision or application and to that end the provisions of the JOC are declared to be severable.
ARTICLE 23. CONTRACT AMENDMENT
No other agreements, oral or written, shall constitute a part of the JOC, unless such be made in writing,
executed by the parties, and expressly made a part thereof, and approved in writing by the Owner.
ARTICLE 24. GOVERNING LAW AND VENUE
The JOC shall be governed by and construed and enforced in accordance with the laws of the State of
Texas. The parties agree that any action with respect to the JOC may only be brought in a court of
competent subject matter jurisdiction located in Tarrant County, Texas.
ARTICLE 25. INDEMNIFICATION
Contractor covenants and agrees to and does hereby indemnify, hold harmless and defend, at its own
expense, City, its officers, agents, servants and employees, from and against any and all claims or causes
of action arising out of the performance of the JOC, whether such claims arise out of contract or tort, suits
for property, whether real or personal, loss or damage, personal injury, including death, to any and all
persons, of whatsoever kind of character, whether real or asserted, arising out of or in connection with,
directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents,
employees, subcontractors, licensees or invitees, whether or not caused, in whole or in part, by the
alleged negligence of the officers, agents,servants, employees, contractors,subcontractors,
licensees and invitees of the City; and said Contractor does hereby covenant and agree to assume all
liability and responsibility of the City, its officers, agents, servants and employees for any and all claims or
suits for property loss or damage and/or personal injury, including death, to any and all persons, of
whatsoever kind of character, whether real or asserted, arising out of or in connection with, directly or
indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees,
subcontractors, licensees or invitees, whether or not caused, in whole or in part, by the alleged negligence
of the officers, agents, servants, employees, contractors, subcontractors, licensees and invitees of the
City. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless City
from and against any and all injuries, damage, loss or destruction to property of City during the
performance of any of the terms and conditions of this JOC, whether arising out of or in connection
with or resulting from, in whole or in part, any and all alleged acts or omissions officers, agents,
servants, employees, contractors,subcontractors, licensees, invitees of City.
Article 26.
IMMIGRATION NATIONALITY ACT: City actively supports the Immigration & Nationality Act (INA) which
includes provisions addressing employment eligibility, employment verification, and nondiscrimination.
Vendor shall verify the identity and employment eligibility of all employees who perform work under this
Agreement. Vendor shall complete the Employment Eligibility Verification Form (1-9), maintain photocopies
of all supporting employment eligibility and identity documentation for all employees, and upon request,
provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who
performs work under this Agreement. Vendor shall establish appropriate procedures and controls so that
no services will be performed by any employee who is not legally eligible to perform such services. Vendor
shall provide City with a certification letter that it has complied with the verification requirements required
by this Agreement. Vendor shall indemnify City from any penalties or liabilities due to violations of this
provision. City shall have the right to immediately terminate this Agreement for violations of this provision
by Vendor.
No Boycott of Israel. If Contractor has fewer than 10 employees or the Agreement is for less than
$100,000, this section does not apply. Contractor acknowledges that in accordance with Chapter 2270 of
the Texas Government Code, City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1) does not boycott
Israel; and (2)will not boycott Israel during the term of the contract. The terms "boycott Israel" and
"company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government
Code. By signing this Agreement, Contractor certifies that Contractor's signature provides written
verification to City that Contractor: (1) does not boycott Israel; and (2)will not boycott Israel during the
term of the Agreement.
Prohibition on Boycotting Energy Companies. Vendor acknowledges that in accordance with Chapter 2274
of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, §2), the City is
prohibited from entering into a contract for goods or services that has a value of$100,000 or more, which
will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time
employees) unless the contract contains a written verification from the company that it: (1) does not
boycott energy companies; and (2)will not boycott energy companies during the term of the contract. The
terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter
2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, §2). To the extent
that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement,
Vendor certifies that Vendor's signature provides written verification to the City that Vendor: (1) does not
boycott energy companies; and (2)will not boycott energy companies during the term of this Agreement.
Prohibition on Discrimination Against Firearm and Ammunition Industries. Vendor acknowledges that
except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021,
87th Leg., R.S., S.B. 19, § 1), the City is prohibited from entering into a contract for goods or services that
has a value of$100,000 or more which will be paid wholly or partly from public funds of the City, with a
company (with 10 or more full-time employees) unless the contract contains a written verification from the
company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a
firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract
against a firearm entity or firearm trade association. The terms"discriminate," "firearm entity" and "firearm
trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the
Government Code is applicable to this Agreement, by signing this Agreement, Vendor certifies that
Vendor's signature provides written verification to the City that Vendor: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and
(2)will not discriminate against a firearm entity or firearm trade association during the term of this
Agreement.
This Agreement is made effective as of the date signed by the Assistant City Manager below.
FORT WORTH:
City of Fort Worth Contract Compliance Manager:
By signing I acknowledge that I am the person
responsible for the monitoring and
era administration of this contract, including
By: Dana Burgh off(S P3,2D22 :21CDT) ensuring all performance and reporting
Name: Dana Burghdoff, AICP requirements.
Title: Assistant City Manager
Date: Sep 3, 2022 n
By: �•/w�. /S• �9�
Approval Recommended: Name: Brian Glass
Title: Assistant Director,
Property Management Dept.
By: Steve (Aug 213:46CDT) Approved as to Form and Legality:
Name: Steve Cooke
Title: Director, Property Management Dept.
Attest: By: 9�11 st��
Name: John B. Strong
Title: Assistant City Attorney
Tanner S. 600d ll
By: JannetteS.Good all(Sep 6,202209:41CDT Contract Authorization:
Name: Jannette Goodall M&C: 22-0577
Title: City Secretary aa4gFoRta
�0000000a0-y&
00
�d
0
�o �0
CONTRACTOR: P��000 00*rd
Mart, Inc. d Ay
Ex0,ba
7'44y p�actyt-
By: Tim Proctor(Aug 15,202214:10 CDT)
Name: Tim Proctor
Title: President
Date: Aug 15, 2022
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
8/12/22,7:08 AM M&C Review
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FORT Wo RT II
Create New From This MSC
DATE: 8/9/2022 REFERENCE **M&C 22- LOG NAME: 21 JOB ORDER CONTRACT
NO.: 0577 SERVICES CONTRACT
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT. (ALL) Authorize Execution of Job Order Contract Services Contracts with Basic IDIQ, Inc.,
The Mark IV Construction Group, LLC, F.H. Paschen, S.N. Nielsen & Associates, LLC,
Lemco Construction Services, L.P., SDB, Inc. d/b/a SDB Contracting Services, Inc., Mart,
Inc., and Lee Construction and Maintenance Company d/b/a LMC Corporation, for Fixed
Unit Price, Indefinite Delivery of Building Renovation and Construction Services, Each
Contract Having an Initial Two-Year Term and Three Optional One-Year Renewal Periods
in an Amount Not to Exceed $1,500,000.00 per Contractor for a Total Amount of
$10,500,000.00 During Any One-Year Period, for the Property Management Department,
Facilities Division
RECOMMENDATION:
It is recommended that the City Council authorize the execution of a Job Order Contract Services
contract for construction services for minor construction and renovation projects for the term of two
years with options to renew for three additional one-year periods at the City's option with the
aggregate amount of work orders not to exceed $1,500,000.00 per contractor for a total amount of
$10,500,000 during any one-year period with each of the following companies: Basic IDIQ, Inc., The
Mark IV Construction Group, LLC, F.H. Paschen, S.N. Nielsen &Associates, LLC, Lemco
Construction Services, L.P., SDB, Inc. d/b/a SDB Contracting Services, Inc., Mart, Inc., and Lee
Construction and Maintenance Company d/b/a LMC Corporation.
DISCUSSION:
The request for proposals for the Job Order Contract Services contract was advertised in the Fort
Worth Star-Telegram on April 28, 2022 and May 5, 2022. On May 30, 2022, the City received
proposals from 21 firms. These firms are Alpha Building Corporation, Basic IDIQ, Inc., Batson-Cook
Construction, Big Sky Construction Company, Inc., Core Construction, DevPro Commercial
Contractors, Inc., F.H. Paschen, S.N. Nielsen & Associates, LLC., Falkenberg Construction Company,
Inc., Florico, Inc., Joesta Construction, LLC, JonesCO General Contractors, LLC, Lee Construction
and Maintenance d/b/a LMC Corporation, Lemco Construction & Materials, LLC, The Mark IV
Construction Group, LLC, Mart, Inc., Post L Group, Reeder General Contractors, Inc., SDB, Inc. d/b/a
SDB Contracting Services, TFP Green Builders, Inc., TM Source Building Group, Inc., and Wesson
Construction Services, LLC.
On June 17, 2022, a Best Value Selection Committee reviewed and rated each of the 21 firms based
on the published weighted selection criteria. The four criteria and their respective weightings are: (1)
experience with job order contracts and similar indefinite delivery/indefinite quantity (IDIQ) contracts
(20 points); (2) project team members and their experience with job order contracts (20 points); (3)
price proposal coefficients (50 points); and (4) list of sub-contractors and suppliers (10 points). The
committee selected seven firms. The scores of the committee's selection are summarized below:
JOC Project Price Subcontractors,
Contractor Experience Team Coefficients Suppliers Total
Members
Basic IDIQ, 20 20 45 10 94
apps.cfwnet.org/council_packet/mc_review.asp?ID=30130&councildate=8/9/2022 1/4
8/12/22,7:08 AM M&C Review
Inc.
The Mark IV
Construction 18 20 44 10 92
Group, LLC
F.H.
Paschen,
S.N. Nielsen 18 18 39 10 85
Associates,
LLC
Lemco
Construction 10 15 50 10 85
Services,
L.P.
SDB, Inc.
d/b/a SDB 18 18 36 10 82
Contracting
Services
Mart, Inc. 18 18 35 10 81
Lee
Construction
and 20 20 26 10 76
Maintenance
d/b/a LMC
Corporation
Alpha
Building 8 16 38 10 72
Corporation
Core 15 15 31 10 71
Construction
JonesCo
General 15 15 35 5 70
contractors,
LLC
TM Source
Building 12 15 33 10 70
Group, Inc.
Falkenberg
Construction 17 15 27 10 69
Company,
Inc.
Post L Group 12 15 26 10 63
DevPro
Commercial 5 10 38 1 54
contractors,
Inc.
Wesson 12 10 15 10 47
Construction
Services,
LLC
apps.cfwnet.org/council_packet/mc_review.asp?ID=30130&c.uncildate=8/9/2022 2/4
8/12/22,7:08 AM M&C Review
Reeder
General 12 10 15 10 46
Contractors,
Inc.
Batson-Cook 15 15 4 10 44
Construction
Big Sky
Construction 15 15 11 10 41
Company,
Inc.
Joesta
Construction, 10 15 4 10 39
LLC
Florica, Inc. g g 6 10 32
TFP Green 8 g 10 1 27
Builders, Inc.
Projects completed under this contract are typically too small to bid through our normal
processes. The average project for the previous Job Order Contracts was approximately $50,000.00
to $100,000.00. This Job Order Contract has competitivity selected seven contractors to complete
projects on an as needed basis. Typically, each of these projects will be less than $500,000.00. with a
not to exceed limit of $1,500,000.00 per contractor for a total amount of $10,500,000, per year. The
Property Management Department will verify available funding for each project prior to issuing a job
order and starting the project.
It is recommended that the City Council waive Building and Trade Permit Fees for all
building renovation and construction services accomplished under this contract at city-owned or
leased facilities in accordance with Chapter 7, Article III, Section 7-1, Section 109.2.1 of the City Code.
Business Equity: DVIN, in conjunction with Property Management Department agreed upon a "pilot"
program to establish an Internal Department business equity goal of 20\%, based on the total number
of vendors selected, including prequalified certified M/WBEs listed in the rotation for opportunities to
receive work on this Job Order Contract. Seven (7) chosen vendors, and three (3) of the seven
vendors are certified M/WBEs. Therefore, Property Management's commitment is 43\% M/WBE
utilization of the number of certified M/WBEs selected. A waiver was approved for all offerors on this
project due to the nature of the project, i.e., unknown value and number of work orders issued. The
expectation is that this program will be more inclusive of business equity firms and increase spending
with these groups.
Management of the capacity of the Job Order Contract Services contracts will be the responsibility of
the Property Management Department. Other departments may use these contracts after first
requesting approval from the Property Management Department.
The project will serve Fort Worth residents in ALL COUNCIL DISTRICTS
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current operating and capital budgets,
as appropriated, of various funds to support the approval of the above recommendation and
execution of the Job Order Contact Services contract. Prior to any expenditure being incurred, the
Property Management Department has the responsiblity to validate the availability of funds on a
project-by-project basis.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year I(Chartfield 2)
apps.cfwnet.org/council_packet/mc_review.asp?ID=30130&councildate=8/9/2022 3/4
8/12/22,7:08 AM M&C Review
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year (Chartfield 2)
Submitted for City Manager's Office by_ Dana Burghdoff(8018)
Originating Department Head: Steve Cooke (5134)
Additional Information Contact:
ATTACHMENTS
Basic IDIQ 1295.pdf (CFW Internal)
F.H. Paschen 1295.pdf (CFW Internal)
LEMCO 1295 Certificate.pdf (CFW Internal)
LMC1295.pdf (CFW Internal)
MARK IV Construction- Form 1295.pdf (CFW Internal)
Mart, Inc. 1295.pdf (CFW Internal)
PMD2022-04 (Dept.)Waiver Job Order Contracts.pdf (CFW Internal)
SDB 1295.pdf (CFW Internal)
apps.cfwnet.org/council_packet/mc_review.asp?ID=30130&councildate=8/9/2022 4/4
City of Fort Worth, Texas
Property Management Department
Facilities Management Group/Architectural Services Division
GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION
LUMP SUM CONTRACT
SECTION A
DEFINITIONS,PROCEDURES AND INTERPRETATIONS
A-1 CONTRACT DOCUMENTS: By the term Contract Documents is meant all of the written and drawn documents setting
forth or affecting the rights of the parties, including but not necessarily limited to,the Contract, Notice to Bidders, Proposal, General
Conditions, Special Conditions, Specifications, Plans, Bonds and all Addenda,Amendments signed by all parties, Change Orders,
written Interpretations and any written Field Order for a minor change in the Work.
A-2 ENTIRE AGREEMENT: The Contract Documents represent the entire agreement between the Parties, and no prior or
contemporaneous, oral or written agreements, instruments or negotiations shall be construed as altering the terms and effects of
the Contract Documents. After being executed,the Contract Documents can be changed only by a written Amendment signed by
the Contractor and the Owner,or Change Order,or by a written Field Order for a minor change.
A-3 WORK: By the term Work is meant all labor,supervision, materials and equipment necessary to be used or incorporated
in order to produce the construction required by Contract Documents.
A-4 EXECUTION OF THE CONTRACT DOCUMENTS: The Contract Documents shall be executed in four originals, with all
required attachments, including required bonds and insurance certificates, by the Contractor and the Owner in such form as may be
prescribed by law and returned to the Owner within ten business days of notification to Contractor. Failure to execute contracts and
provide required enclosures will be grounds for revocation of award and taking of Bid Bond.
A-6 FAMILIARITY WITH PROPOSED WORK: Before filing a Proposal, the Contractor shall examine carefully the, plans,
specifications, special provisions, and the form of contract to be entered into for the work contemplated. They shall examine the
site of work and satisfy themselves as to the conditions that will be encountered relating to the character, quality and quantity of
work to be performed and materials to be furnished. The filing of a bid by the bidder shall be considered evidence that they have
complied with these requirements and has accepted the site as suitable for the work.
Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated by
the plans will not be allowed.
A-6 ONE UNIFIED CONTRACT: Insofar as possible, the Contract Documents will be bound together and executed as a
single unified Contract. The intention of the Contract Documents being to provide for all labor, supervision, materials, equipment
and other items necessary for the proper execution and completion of the Work. Words that have well-recognized technical or
trade meanings are used herein in accordance with such recognized meanings.
A-7 DIVISION OF WORK: The arrangement of Drawings and/or Specifications into Divisions, Sections, Articles, or other
Subdivisions shall not be binding upon the Contractor in dividing the work among Subcontractors or Trades.
A-8 INTERPRETATIONS: In the event of inconsistency in the contract documents,the following sequence for interpretation
shall be used in order of precedence: Change Orders and/or Field Orders (by date of issuance); Addenda (by date of issuance);
Drawings; Notes and dimensions on Drawings; Technical Specifications; Special Provisions; Supplementary General Conditions;
General Conditions;and Construction Contract.
The Architect will furnish such Interpretations of the Plans and Specifications as may be necessary for the proper execution or
progress of the work. Such Interpretations shall be furnished at the instance of the Architect or at the request of the Contractor, or
Owner, and will be issued with reasonable promptness and at such times and in accordance with such schedule as may be agreed
upon. Such Interpretations shall be consistent with the purposes and intent of the Plans and Specifications and may be effected by
Field Order. In the event of any dispute between any of the parties to the Contract and the Architect or each other involving the
interpretation of the Contract Documents,the evaluation of work or materials performed or furnished by the Architect Contractor, or
any subcontractor or materialsman, or involving any question of fault or liability of any party,the decision of the Owner shall be final
and binding.
A-9 CORRELATION AND INTENT: In general,the drawings indicate dimension, locations, positions, quantities,and kinds of
construction;the specifications indicate the quality and construction procedures required. Work indicated on the drawings and not
specified of vice-versa, shall be furnished as though set forth in both. Work not detailed, marked or specified shall be the same as
similar parts that are detailed, marked or specified. If the drawings are in conflict or conflict with the specifications the better quality
or greater quantity or work or materials shall be estimated and shall be furnished or included. Dimensions on drawings shall take
precedence over small-scale drawings. Drawings showing locations of equipment, piping, ductwork, electrical apparatus, etc., are
diagrammatic and job conditions may not allow installation in the exact location shown. Relocation shall not occur without the
Architects approval.
A-10 COPIES OF WORKING DRAWINGS AND SPECIFICATIONS: The Architect will furnish to Contractor electronic working
Drawings and Specifications. Contractor shall pay the cost of reproduction for all other copies of Drawings and Specifications
furnished to them.
All Drawings, Specifications and copies thereof furnished by the Owner or the Architect are and shall remain the property of the
Owner. They are not to be used on any other project and,with the exception of one Contract set for each Party to the Contract,are
to be returned to the Owner on request at the completion of the work.
A-11 AGE: In accordance with the policy ("Policy") of the Executive Branch of the federal government, Contractor covenants
that neither themselves nor any of their officers, members, agents, employees, program participants or subcontractors, while
engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in
connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except
on the basis of a bona fide occupational qualification, retirement plan or statutory requirement.
Contractor further covenants that neither themselves nor their officers, members, agents, employees, subcontractors, program
participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this
contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide
occupational qualification, retirement plan or statutory equipment.
Contractor warrants it will fully comply with the Policy and will defend, indemnify and hold City harmless against any claims or
allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or their subcontractors' alleged
failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement.
A-12 DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor
warrants that themselves and any and all of their subcontractors will not unlawfully discriminate on the basis of disability in the
provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for
employment with, or employees of Contractor or any of their subcontractors. Contractor warrants it will fully comply with ADA
provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnify and hold City
harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or
their subcontractors' alleged failure to comply with the above-referenced laws concerning disability discrimination in the
performance of this agreement.
SECTION B
IDENTITY OF ARCHITECT
B-1 CONTRACT ADMINISTRATION: The Architect is the person or person lawfully licensed to practice architecture
identified as such in the Agreement. The Architect is retained by the Owner to prepare the construction documents and represent
the Owner during the construction phase as directed by the Owner.
B-2 DUTIES OF THE ARCHITECT: As used herein, the term Architect means the Architect or their authorized
representative. Nothing contained in these Contract Documents shall create any privity of Contract between the Architect and the
Contractor.
B-3 ARCHITECT AS REPRESENTATIVE OF THE OWNER: The Architect will provide general administration of the Contract
on behalf of the Owner and will have authority to act as the representative of the Owner to the extent provided in the Contract
Documents unless changed in writing by the Owner. The Architect will be available for conferences and consultations with the
Owner or the Contractor at all reasonable times.
B-4 ACCESS TO JOB SITES: The Architect shall at all times have access to the Work whenever it is in preparation and
progress. The Contractor shall provide facilities for such access so the Architect may perform their assigned functions under the
Contract Documents.
The Architect will make periodic visits to the Site to familiarize themselves with the progress and quality of the work and to
determine if the work is proceeding in accordance with the Contract documents. On the basis of on-site observations,the Architect
will keep the Owner informed of the progress of the Work and will endeavor to guard the Owner against defects and deficiencies in
the Work of the Contractor. Based upon such observations and the Contractor's applications for payments,the Architect will make
determinations and recommendations concerning the amounts owing to the Contractor and will issue certificates for payment
amounts.
B-6 INTERPRETATIONS: The Architect will be, in the first instance, the interpreter of the requirements of the Plans and
Specifications and the judge of the performance thereunder by the Contractor,subject to the final decision of the Owner.
The Architect's decisions in matters relating to artistic effect will be final if consistent with the intent of the Contract Documents.
B-6 AUTHORITY TO STOP WORK: The Architect will have authority to reject work that does not conform to the Plans and
Specifications. In addition, whenever, in their reasonable opinion, the Architect considers it necessary or advisable in order to
insure the proper realization of the intent of the Plans and Specifications, the Architect will have authority to require the Contractor
to stop the Work or any portion thereof, or to require special inspection or testing of the Work whether or not such Work be then
fabricated, installed or completed.
B-7 MISCELLANEOUS
Shop Drawings, Submittals and Samples: The Architect will review Shop Drawings, Submittals and Samples. Two copies of each
approved Shop Drawing and submittal will be provided to the Owner by the Architect. Three copies will be returned to the
Contractor.
Change Orders: Change Orders, Owners Contingence Allowance forms, and Field Orders for Minor Changes in the work will be
issued by the Owner through the Architect.
Guarantees: The Architect will receive all written guarantees and related documents required of the Contractor. Upon completion of
the project the Contractor shall provide the Owner three copies of each guarantee.
Inspections: The Architect will conduct inspections for the purpose of determining and making their recommendations concerning
the dates of substantial completion and final completion. The Architect will conduct the final acceptance inspection and issue the
Certificate of Substantial Completion.
Operation and Maintenance Manuals: The Architect will receive on behalf of the Owner one hard copy and two digital copies of all
applicable equipment installation,operation,and maintenance brochures and manuals required of the Contractor.
B-8 TERMINATION OF THE ARCHITECT: In case of the termination of the employment of the Architect by the Owner,the
Owner shall either assume the duties of the Architect through the Director of the Property Management Department, or shall
appoint a successor Architect against whom the Contractor makes no reasonable objection.
SECTION C
OWNER
C-1 IDENTIFICATION: By the term Owner is meant the City of Fort Worth acting herein by their duly authorized
representatives in the manner provided by law. Authorized representatives include the City Manager,Assistant City Manager, and
Director of the Property Management Department and members of the Facilities Management Division. A designated
representative will be identified from within the Facilities Management Division to act as a point of contact for day-to-day contract
administration.
C-2 DUTIES OF THE OWNER: The Owner shall furnish surveys describing the physical characteristics, legal limits and
utility locations for the site of the Work; provided, however, that the Contractor hereby covenants that they have inspected the
premises and familiarized themselves therewith and that the locations of utilities and other obstacles to the prosecution of the Work
as shown on the Owner's survey are for information only,are not binding upon the Owner, and the Owner shall not incur any liability
for loss or damage by virtue of any inaccuracies or deficiencies in such surveys. The Owner shall secure and pay for title to the site
and all necessary permanent or construction easements. The Owner will cooperate with the Contractor in the prosecution of the
Work in such manner and to such extent as may be reasonable and shall furnish information under their control with reasonable
promptness at the request of the Contractor.
C-3 INSTRUCTIONS: The Owner shall issue all instructions to the Contractor through the Architect.
C-4 ACCESS TO JOB SITE: The Owner shall at all times have access to the Work whenever it is in preparation and
progress. The Contractor shall provide facilities for such access so the Owner may perform their assigned functions under the
Contract Documents.
C-6 PROGRESS INSPECTIONS: The Owner and Architect will make visits to the Site to familiarize themselves with the
progress and quality of the Work and to determine if the work is proceeding in accordance with the Contract Documents. On the
basis of on-site observations and reports concerning the progress and quality of the work,the Owner and Architect will approve and
authorize the Contractor's applications for payments.
C-6 AUTHORITY TO STOP WORK: The City will have authority to reject work that does not conform to the Plans and
Specifications. Whenever, in their reasonable opinion, the City considers it necessary or advisable in order to insure the proper
realization of the intent of the Plans and Specifications,the City will have authority to require the Contractor to stop the work or any
portion thereof, or to require special inspection or testing of the Work whether or not such Work be then fabricated, installed or
completed. The Contractor shall be responsible for the cost of special inspections and testing for work that is found not to comply
with the plans and specifications.
C-7 SUBSTANTIAL COMPLETION INSPECTION: Upon agreement of the Contractor and Architect that the Work is
substantially complete,the Owner will schedule a Substantial Completion Inspection to be conducted by the Architect and attended
by representatives of the Architect, Owner and Contractor. Items identified during this inspection as being incomplete, defective or
deficient shall be incorporated into a punch list and attached to the AIA document G704, which is to be prepared by the Architect
and signed by the Contractor,and accepted,approved and signed by the Owner.
C-8 RIGHT TO AUDIT: Contractor agrees that the City shall, until the expiration of three years after final payment under this
contract, have access to and the right to examine any directly pertinent books, documents, papers and records of the Contractor
involving transactions relating to this contract.
Contractor further agrees to include in all their subcontracts hereunder a provision to the effect that the subcontractor agrees that
the City shall, until the expiration of three years after final payment under the subcontract, have access to and the right to examine
any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract. The
term"subcontract"as used herein includes purchase orders.
Contractor agrees to photocopy such documents as may be requested by the city. The city agrees to reimburse Contractor for the
costs of copies at the rate published in the Texas Administrative Code.
C-9 TERMINATION AND SUSPENSION OF WORK: The Owner has the right to terminate the Project for any reason. If the
project is terminated,the Contractor shall:
a) Stop work under the Contract on the date and to the extent specified on the notice of termination.
b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminated.
c) Terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by the
notice of termination.
After termination as above, the City will pay the Contractor a proportionate part of the contract price based on the work completed;
provided, however, that the amount of payment on termination shall not exceed the total contract price as reduced by the portion
thereof allocable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor
shall submit their claim for amounts due after termination as provided in this paragraph within 30 days after receipt of such claim.
In the event of any dispute or controversy as to the propriety or allowability of all or any portion of such claim under this paragraph,
such dispute or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the
City Council of the City of Fort Worth shall be final and binding upon all parties to this contract.
SECTION D
CONTRACTOR
D-1 IDENTIFICATION: The Contractor is the person or organization identified as such in the Contract. The term Contractor
means the Contractor or their authorized representative.
D-2 INDEPENDENT CONTRACTOR: Contractor shall perform all work and services hereunder as an independent
contractor, not as agent, or employee of the City. Contractor shall have exclusive control of and the exclusive right to control the
details of the Work and services performed hereunder,and all persons performing same,and Contractor shall be solely responsible
for the acts of their officers, agents, and employees. Nothing herein shall be construed as creating a partnership or joint enterprise
between City and the Contractor,their officers,agents and employees,and the doctrine of respondent superior shall not apply.
D-3 REVIEW OF CONTRACT DOCUMENTS: The Contractor shall carefully study and compare the Agreement, Conditions
of the Contract, Drawings, Specifications,Addenda and modifications and shall at once report to the Owner and to the Architect any
error, inconsistency or omission they may discover. The Contractor shall do no work without approved Submittals, Drawings,
Specifications and Interpretations.
D-4 SUPERVISION: The Contractor shall supervise and direct the Work, using reasonable skill and attention. They shall be
solely responsible for all construction means, methods, safety, techniques, sequences and procedures and for coordinating all
portions of the Work under the Contract Documents.
D-6 LABOR AND MATERIALS: Unless otherwise specifically noted, the Contractor shall provide and pay for all labor,
materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation and other facilities and
services necessary for the proper execution and completion of the Work.
The Contractor shall at all times enforce strict discipline and good order among their employees, and shall not employ on the Work
any unfit person or anyone not skilled in the task assigned to them.
D-6 COMPLIANCE WITH AND ENFORCEMENT OF PREVAILING WAGE RATE
Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code
(Chapter 2258), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the
prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents.
Penalty for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the
City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the
prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset their administrative
costs, pursuant to Texas Government Code 2258.023.
Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker,
concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an
initial determination, before the 31 n day after the date the City receives the information, as to whether good cause exists to believe
that the violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of their initial
determination. Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated
Chapter 2258,the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and
wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final
determination of the violation.
Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government
Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the
Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any affected worker do
not resolve the issue by agreement before the 15th day after the date the City makes their initial determination pursuant to
paragraph (c)above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after
the date that arbitration is required,a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a
party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court
of competent jurisdiction.
Records to be Maintained. The Contractor and each subcontractor shall, for a period of three (3) years following the date of
acceptance of the Work, maintain records that show(i)the name and occupation of each worker employed by the Contractor in the
construction of the Work provided for in this contract; and (ii)the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall
pertain to this inspection.
Pay Estimates. With each partial payment estimate or payroll period, whichever is less, the Contractor shall submit an affidavit
stating that the Contractor has complied with the requirements of Chapter 2258,Texas Government Code.
Posting of Wage Rates. The Contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all
times.
Subcontractor Compliance. The Contractor shall include in their subcontracts and/or shall otherwise require all of their
subcontractors to comply with paragraphs(a)through(g)above.
On projects where special wage rates apply(e.g. Davis-Bacon)the Contractor agrees to meet all requirements of such programs.
D-7 WARRANTY: The Contractor warrants to the Owner and the Architect that all materials and equipment furnished under
this Contract will be new unless otherwise specified, and that all work will be of good quality, free from faults and defects, and in
conformance with the Contract Documents. All work not so conforming to these standards may be considered defective. If
required by the Architect or the Owner,the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and
equipment.
Prior to occupancy of the Project by the Owner,the Contractor warranties and obligations to correct defective Work exclude remedy
for damage or defect caused by (i) abuse by the Owner's separate contractors, or (ii) modifications made by the Owner or the
Owner's separate contractors. After occupancy of the Project by the Owner, the Contractor warranties and obligations to correct
defective Work exclude remedy for damage or defect caused by (i) abuse, (ii) modifications not executed by the Contractor, (iii)
improper or insufficient maintenance, (iv)improper operation,(v)normal wear and tear,or(vi)normal usage.
The warranty provided in this Section shall be in addition to and not in limitation of any other warranty or remedy provided by law or
the Contract Documents.
D-8 TAXES: The Contractor is exempt from State Sales Tax on material incorporated into the finished construction, Excise
and Use Tax. Equipment and materials not consumed by or incorporated into the work are subject to State sales taxes under
House Bill 11,enacted August 15, 1991.
D-9 LICENSES, NOTICES AND FEES: The Contractor shall obtain all Permits, Licenses, Certificates, and Inspections,
whether permanent or temporary, required by law or these Contract Documents. The City of Fort Worth Building and Trade Permit
fees are waived. Separate permits may be required for each work location. If the Contractor allows any permit to expire,they shall
be responsible for all renewals including any associated fees.
The Contractor shall give all Notices and comply with all Laws, Ordinances, Rules, Regulations and Orders of any public authority
bearing on the performance of the Work. If the Contractor observes or becomes aware that any of the Contract Documents are at
variance therewith in any respect, he shall promptly notify the Architect and Owner in writing and any necessary changes will be
made. If the Contractor performs any Work knowing that it is in violation of, or contrary to, any of such Laws, Statutes, Charter,
Ordinances, Orders or Directives, or Regulations without furnishing Notice to the Architect and Owner, the Contractor will assume
full responsibility therefore and bear all costs attributable thereto.
D-10 CASH ALLOWANCES: The Contractor shall include in the Contract Sum all allowances stated in the Contract
Documents. These allowances shall cover the net cost of the materials and equipment delivered and unloaded at the site, and all
applicable taxes. The Contractor's handling costs on the site, labor, installation costs, overhead, profit and other expenses
contemplated for the original allowance shall be included in the Contractor Sum and not in the allowance. The Contractor shall
cause the Work covered by these allowances to be performed for such amounts and by such persons as the Owner may direct, but
they will not be required to employ persons against whom they make a reasonable objection. If the cost,when determined, is more
than or less than the allowance, the Contract Sum shall be adjusted accordingly by Change Order which will include additional
handling costs on the site, labor, installation costs, field overhead, profit and other direct expenses resulting to the Contractor from
any increase over the original allowance.
D-11 SUPERINTENDENT: The Contractor shall employ a competent superintendent and necessary assistants who shall be in
attendance at the Project site during the progress of the Work. The superintendent shall be satisfactory to the Owner. The
superintendent shall represent the Contractor and all communications given to the superintendent shall be binding as if given to the
Contractor. Important communications will be confirmed in writing. Other communications will be so confirmed on written request in
each case.
D-12 RESPONSIBILITIES FOR EMPLOYEES AND SUB-CONTRACTORS: The Contractor shall be responsible to the Owner
for the acts and omissions of all employees and all Sub-contractors,their agents and employees, and all other persons performing
any of the Work under a contract with the Contractor.
D-13 FAILURE TO COMMENCE WORK: Should the Contractor fail to begin the Work herein provided for within the time
herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans,
Specifications and Contract Documents,then the Owner shall have the right to either demand the surety to take over the Work and
complete same in accordance with the Contract Documents or to take charge of and complete the Work in such a manner as it
may deem proper, and if, in the completion thereof,the cost to the said City shall exceed the contract price or prices set forth in the
said plans and specifications made a part hereof, the Contractor and/or their Surety shall pay said City on demand in writing,
setting forth and specifying an itemized statement of the total cost thereof,said excess cost.
D-14 PROGRESS SCHEDULE: The Contractor, immediately after being awarded the contract, shall prepare and submit for
the Architect's and Owner's approval, an estimated progress schedule for the Work. The progress schedule shall be related to the
entire Project and indicate critical path. This schedule shall indicate the dates for the starting and completion of the various states
of construction and shall be revised as required by the conditions of the Work, subject to the Architect's approval. It shall also
indicate the dates for submission and approval of shop drawings and submittals as well as the delivery schedule for major pieces of
equipment and/or materials.
The Contractor shall submit an updated progress schedule to the Architect and Owner at least monthly for approval along with the
Contractor's monthly progress payment requests.
D-16 DRAWINGS AND SPECIFICATIONS AT THE SITE: The Contractor shall maintain at the site for the Owner one copy of
all Drawings, Specifications, Addenda, approved Shop Drawings, Change Orders, and other Changes and Amendments in good
order and marked to record all changes made during construction. These shall also be available to the Architect. The Drawings,
clearly marked to record all changes made during construction, shall be delivered to the Architect upon completion of the Work.
The Architect will prepare,and provide to the Owner,one complete set of reproducible record drawings of the Work.
D-16 SHOP DRAWINGS AND SAMPLES: Shop Drawings are drawings, diagrams, illustrations, schedules, performance
charts, brochures and other data which are prepared by the Contractor or any Subcontractor, manufacturer, supplier or distributor,
and which illustrate some portion of the Work.These may be provided in an electronic format acceptable to the Architect.
Samples are physical examples furnished by the Contractor to illustrate materials, equipment or workmanship, and to establish
standards by which the Work will be judged.Three copies of all physical examples shall be provided.
The Contractor shall review, approve, and submit,with reasonable promptness and in orderly sequence so as to cause no delay in
the Work or in the work of any other contractor, normally within the first 90 days of the work,three copies of all shop Drawings and
Samples required by the Contract Documents or subsequently by the Architect as covered by changes or amendments. Shop
Drawings and Samples shall be properly identified as specified, or as the Architect may require. At the time of submission the
Contractor shall inform the Architect in writing of any deviation in the Shop Drawings or Samples from the requirements of the
Contract Documents.
By approving and submitting Shop Drawings and Samples, the Contractor thereby represents that they have determined and
verified all field measurements, field construction criteria, materials, catalog numbers and similar data, and that they have checked
and coordinated each shop drawing given in the Contract Documents.The Architect's approval of a separate item shall not indicate
approval of an assembly in which the item functions.
The Architect will review and approve Shop Drawings and Samples with reasonable promptness so as to cause no delay, but only
for conformance with the design concept of the Project and with the information given in the Contract Documents. The Architect's
approval of a separate item shall not indicate approval of an assembly in which the item functions. The Contractor shall make any
corrections required by the Architect and shall resubmit the required number of corrected copies of Shop Drawings or new Samples
until approved. The Contractor shall direct specific attention in writing or on resubmitted Shop Drawings to revisions other than the
corrections requested by the Architect on previous submissions.
The Architect's approval of Shop Drawings or Samples shall not relieve the Contractor of responsibility for any deviation from the
requirements of the Contract Documents unless the Contractor has informed the Architect in writing of such deviation at the time of
submission and the Architect has given written approval to the specific deviation. Architect's approval shall not relieve the
Contractor from responsibility for errors or omissions in the Shop Drawings or Samples.
No portion of the Work requiring a Shop Drawing or Sample submission shall be commenced until the Architect has approved the
submittal. All such portions of the Work shall be in accordance with approved Shop Drawings and Samples. Payment for Shop
Drawings will not be made until they are approved by the Architect or City.
D-17 SITE USE: The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the
Contract Documents and shall not unreasonably encumber the site with any materials or equipment. Until acceptance of the Work
by the City, the entire site of the Work shall be under the exclusive control, care and responsibility of the Contractor. Contractor
shall take every precaution against injury or damage to persons or property by the action of the elements or from any other cause
whatsoever. The Contractor shall rebuild, repair, restore and make good at their own expenses all injuries or damages to any
portions of the Work occasioned by any of the above,caused before acceptance.
D-18 CUTTING AND PATCHING OF WORK: The Contractor shall do all cutting, fitting or patching of their Work that may
require making several parts fit together properly, and shall not endanger any Work by cutting, excavating or otherwise altering the
Work or any part of it.
D-19 CLEAN UP: The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish.At
the completion of the Work the contractor shall remove all their waste materials and rubbish from and about the Project as well as
all their tools, construction equipment, machinery and surplus materials, and shall clean all glass surfaces and leave the Work
"Broom-clean" or equivalent, except at otherwise specified. In addition to removal of rubbish and leaving the buildings "broom-
clean", Contractor shall clean all glass, replace any broken glass, remove stains, spots, marks and dirt from decorated work, clean
hardware, remove paint spots and smears from all surfaces,clean fixtures and wash all concrete,tile and terrazzo floors.
If the Contractor fails to clean up,the Owner may do so,and the cost thereof shall be charged to the Contractor.
D-20 COMMUNICATIONS: The Contractor shall forward all communications to the Owner through the Architect.
D-21 CONTRACTOR REQUIREMENTS ON FEDERALLY FUNDED PROJECTS: Contractor shall observe and comply with
the requirements of the City of Fort Worth Fiscal Department, Intergovernmental Affairs and Grants Management as outlined in the
Supplemental Conditions contained in the Project Manual.
SECTION E
SUBCONTRACTORS
E-1 DEFINITION: A Subcontractor is a person or organization that has a direct contract with the Contractor to perform any of
the Work at the site. The term Subcontractor is referred to throughout the Contract Documents as if singular in number and
masculine in gender and means a Subcontractor or their authorized representative.
Nothing contained in the Contract, Documents shall create any contractual relation between the Owner and the Architect and any
subcontractor or any of their sub-subcontractors or materialmen.
E-2 AWARD OF SUBCONTRACTS: The Contractor shall furnish a list of the names of the subcontractors or other persons
or organizations (including those who are to furnish materials or equipment fabricated to a special design) proposed for such
portions of the Work as may be designated in the bidding requirements, or if none is so designated in the bidding requirements,the
names of the Subcontractors proposed for the principal portions of the Work. Prior to the award of the Contract,the Architect shall
notify the successful bidder in writing if either the Owner or Architect, after due investigation, has reasonable objection to any
person or organization on such list. Failure of the Owner and Architect to make an objection to any person or organization on the
list prior to the award of this Contract shall not constitute acceptance of such person or organization.
If, prior to the award of the Contract,the Owner or Architect has an objective to any person or organization on such list,and refuses
to accept such person or organization, the apparent low bidder may, prior to the award, withdraw their bid without forfeiture of bid
security. If such bidder submits an acceptable substitute,the Owner may,at their discretion,accept the bid or he may disqualify the
bid. If, after the award, the Owner or Architect objects in writing to any person or organization on such list, the Contractor shall
provide an acceptable substitute.
The Contractor shall not make any substitution for any Subcontractor or person or organization that has been accepted by the
Owner and the Architect, unless the substitution is also acceptable to the Owner and the Architect.
E-3 TERMS OF SUBCONTRACTS: All work performed for the Contractor by a Subcontractor shall be pursuant to an
appropriate agreement between the Contractor and the Subcontractor (and where appropriate between Subcontractors and Sub-
subcontractors)which shall contain provisions that:
1. Preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed
under the subcontract so that the subcontracting thereof will not prejudice such rights;
2. Require that such Work be performed in accordance with the requirements of the Contract Documents;
3. Require submission to the Contractor of applications for payment under each subcontract to which the Contractor is a party, in
reasonable time to enable the Contractor to apply for payment;
4. Require that all claims for additional costs, extensions of time, damages for delays or otherwise with respect to subcontracted
portions of the Work shall be submitted to the Contractor(via any Subcontractor or Sub-subcontractor where appropriate) in
the manner provided in the Contract Documents for like claims by the Contractor upon the Owner;
5. Waive all rights the contracting parties may have against one another for damages caused by fire or other perils covered by
the property insurance,except such rights, if any,as they may have to proceeds of such insurance held by the Owner,and,
6. Obligate each Subcontractor specifically to consent to the provisions of this Section
All of the provisions set out in this section shall be deemed to have been included in every subcontract,and every subcontract shall
be so construed and applied as to the Owner and the Architect,whether or not such provisions are physically included in the sub-
contract.
E-4 PAYMENTS TO SUBCONTRACTORS: The Contractor shall pay each Subcontractor, upon receipt of payment from the
Owner, an amount equal to the percentage of completion allowed to the Contractor on account of such Subcontractor's Work.The
Contractor shall also require each Subcontractor to make similar payments to their subcontractors.
If the Owner refuses to issue a Certificate for Payment for any cause which is the fault of the Contractor and not the fault of a
particular subcontractor,the Contractor shall pay that Subcontractor on demand, made at any time after the Certificate for Payment
would otherwise have been issued,for their Work to the extent completed, less the retained percentage.
The Contractor shall pay each Subcontractor a just share of any insurance monies received by the Contractor, and they shall
require each Subcontractor to make similar payments to their Subcontractors.
The Owner may, on request and at their discretion, furnish to any Subcontractor, if practicable, information regarding percentages
of completion certified to the Contractor on account of Work done by such Subcontractors.
Neither the Owner nor the Architect shall have any obligation to pay or to see to the payment of any monies to any Subcontractor.
E-5 SUBCONTRACTOR REQUIREMENTS FOR ECONOMIC DEVELOPMENT ADMINSTRATION (EDA) FUNDED
PROJECTS: The Contractor will cause appropriate provisions to be inserted in all subcontracts to bind subcontractors to FDA
contract requirements as contained herein and to 15 CFR 24 or OMB Circular A-110,as appropriate.
Each subcontractor must agree to comply with all applicable Federal, State, and local requirements in addition to those set forth in
this section.
No subcontractor will be employed on this Project, except as specifically approved by the City, who is contained in the listing of
contractors debarred, ineligible, suspended or indebted to the United States from contractual dealings with Federal government
departments. The work performed by any such contractor or subcontractor will be ineligible for reimbursement wholly or partially
from EDA grant fluids.
All subcontracts in excess of$10,000 shall include, or incorporate by reference, the equal opportunity clause of Executive Order
11246.
All subcontracts must contain a nondiscrimination clause.
Each subcontract must contain a requirement for compliance with the Davis-Bacon and related acts.
Each subcontractor must submit weekly each weekly payroll record and a weekly statement of compliance. These documents will
be submitted to the prime contractor who will compile them and submit to the City. The subcontractor can satisfy this requirement
by submitting a properly executed Department of Labor Form WH-347.
Each subcontract with every subcontractor must contain a clause committing the subcontractor to employment of local labor to the
maximum extent possible.
All subcontractors who employ more than 50 employees, and is a prime or first tier subcontractor, and has a subcontract or
purchase order of$50,000 or more must submit a completed Standard Form 100(Compliance Report)by March 30 of each year.
Subcontractors performing work in areas covered by published goals for minorities will be required to report monthly on Form CC-
257.
SECTION F
SEPARATE CONTRACTS
F-1 OWNER'S RIGHT: The Owner reserves the right to award separate contracts in connection with other portions of the
Work. When separate contracts are awarded for other portions of the Work, "the Contractor" in the Contract Documents in each
case shall be the contractor who signs each separate contract.
F-2 MUTUAL RESPONSIBILITY OF CONTRACTORS: The Contractor shall afford other contractors reasonable opportunity
for the introduction and storage of their materials and equipment and the execution of their work, and shall properly connect and
coordinate work with theirs.
If any part of the Contractor's Work depends for proper execution or results upon the work of any other separate contractor, the
Contractor shall inspect and promptly report to the Owner any apparent discrepancies or defects in such work that render it
unsuitable for such proper execution and results. Failure of the Contractor to inspect and report shall constitute an acceptance of
the other contractor's work as fit and proper to receive their Work, except as to defects which may develop in the other separate
contractor's work after the execution of the Contractor's Work.
Should the Contractor cause damage to the work or property of any separate contractor on the site,the Contractor shall, upon due
notice, settle with such other contractor by agreement, if he will so settle. If such separate contractor sues the Owner on account of
any damage alleged to have been so sustained, the Owner shall notify the Contractor who shall defend against such suit at the
Contractor's expense, and if any judgment against the Owner arises therefrom, the Contractor shall pay or satisfy such judgment
and shall reimburse the Owner for all attorney's fees, court costs and expenses which the Owner has incurred in connection with
such suit.
F-3 CUTTING AND PATCHING UNDER SEPARATE CONTRACTS: The Contractor shall do all cutting, fitting or patching of
work that may be required to fit it to receive or be received by the work of other contractors shown in the Contract Documents. The
Contractor shall not endanger any work or any other contractors by cutting, excavating or otherwise altering any work and shall not
cut or alter the work of any other contractor except with the written consent of the Architect.
Any costs caused by defective or ill-timed work shall be borne by the party responsible therefor.
F-4 OWNER'S RIGHT TO CLEAN UP: If a dispute arises between the separate contractors as to their responsibility for
cleaning up, the Owner may clean up and charge the cost thereof to the several contractors as the Director of the Project
Management Department shall determine to be just.
SECTION G
MISCELLANEOUS PROVISIONS
G-1 CONFLICT OF LAWS: The law of the place where the site is located shall govern the Contract. The Contractor must
familiarize themselves and strictly comply with all Federal, State, and County and City Laws, Statutes, Charter, Ordinances,
Regulations, or Directives controlling the action or operation of those engaged upon the work affecting the materials used. The
contractor shall indemnify and save harmless the City and all of their officers and agents against any claim or liability arising from or
based on the violation of any such Laws, Statutes, Charter, Ordinances, Regulations, or Directives, whether by themselves, their
employees,agents or subcontractors.
G-2 GOVERNING LAWS: It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with reference to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with
reference to and governing all matters affecting this Contract,and the Contractor agrees to fully comply with all the provisions of the
same.
G-3 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In performing their duties under the Statutes of the State of Texas and
the Charter and Ordinances of the City of Fort Worth in connection with this Contract,or in exercising any of the powers granted the
Owner herein, the officers, agents and employees of the City of Fort Worth are engaged in the performance of a governmental
function and shall not incur any personal liability by virtue of such performance hereunder, except for gross negligence or willful
wrong.
G-4 COMPLIANCE WITH LAWS: Contractor agrees to comply with all laws, Federal, state and local, including all
ordinances, rules and regulations of the City of Fort Worth, Texas. Materials incorporated into the finished Project are not subject
to State Sales Tax.
The Owner is responsible for obtaining the Building Permit. The Contractor and the appropriate subcontractor are responsible for
obtaining all other construction permits from the governing agencies. Contractor shall schedule all code inspections with the Code
Inspection Division in accordance with the permit requirements. Building, plumbing, electrical and mechanical building permits are
issued without charge. Water and sewer tap, impact & access fees will be paid by the City. Any other permit fees are the
responsibility of the Contractor.
G-6 INDEMNIFICATION: Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify,
hold harmless and defend,at their own expense,the Owner,their officers,servants and employees,from and against any
and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to
arise out of, the work and services to be performed hereunder by Contractor, their officers, agents, employees,
subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by
the negligence or alleged neplipence of Owner, their officers,servants, or employees. Contractor likewise covenants and
agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and
employees and any damage,loss or destruction to property of the Owner arising from the performance of any of the terms
and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence
or alleged negligence of Owner,their officers,servants or employees.
In the event Owner receives a written claim for damages against the Contractor or their subcontractors prior to final
payment,final payment shall not be made until Contractor either(a)submits to Owner satisfactory evidence that the claim
has been settled and/or a release from the claimant involved,or(b) provides Owner with a letter from Contractor's liability
insurance carrier that the claim has been referred to the insurance carrier.
The Director may, if deemed appropriate, refuse to whom a claim for damages is outstanding as a result of work
performed under a City Contract.
G-6 SUCCESSORS AND ASSIGNS: Except as provided in Paragraph E-2,this contract shall be binding upon and insure to
the benefit of the parties hereto,their Successors or Assigns. Contractor shall not assign or sublet all or any part of this Contract or
their rights or duties hereunder without the prior written consent of the Owner.Any such purported assignment or subletting without
the prior written consent of Owner shall be void.
G-7 WRITTEN NOTICE: Written Notice shall be deemed to have been duly served if delivered in person to the individual or
member of the firm or to an officer of the corporation for whom it was intended, or if delivered at or sent by registered or certified
mail to the last business address known to them who gives the notice.
G-8 SURETY BONDS: Surety Bonds are required on all City contracts in excess of$25,000. The Contractor agrees, on the
submittal of their Proposal to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful
performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished
in the prosecution of the Work,such bonds being as provided and required in Article 5160 of the Revised Civil Statutes of Texas,as
amended, in the form included in the Contract Documents, and such bonds shall be 100 percent of the total contract price, and the
said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City
Council of the City of Fort Worth.
Bonds shall be made on the forms furnished by or otherwise acceptable to the City. Each bond shall be properly executed by both
the Contractor and the Surety Company. Bonds required by the City shall be in compliance with all relevant local,state and federal
statutes.
To be an acceptable surety on the bond the name of the surety should be included on the current U. S. Treasury List of Acceptable
Securities [Circular 570], and must be authorized to do business in Texas. Sureties not listed in Circular 570 may write
performance and payment bonds on a project without reinsurance to the limit of 10 percent of their capital and surplus.
Such a surety must reinsure any obligation over 10 percent. The amount in excess of 10 percent must be reinsured by reinsurers
who are duly authorized,accredited,or trusteed to do business in the State of Texas.
Should any surety for the contracted project be determined unsatisfactory at any time during same, the Contractor shall
immediately provide a new surety bond satisfactory to the City.
If the contract amount is$25,000 or less, payment to the Contractor shall be made in one lump sum. Payment shall not be made
for a period of 45 calendar days from the date the work has been completed and accepted by the City.
G-9 OWNER'S RIGHT TO CARRY OUT THE WORK: If the Contractor defaults or neglects to carry out the Work in
accordance with the Contract Documents or fails to perform any provision of the Contract,the Owner may,without prejudice to any
other remedy they may have, enter the site and make good such deficiencies. In such case an appropriate Change Order shall be
issued deducting from the payments then or thereafter due the Contractor the cost of correcting such deficiencies, including the
cost of the Architect's additional services made necessary by such default, neglect or failure. If the payments then or thereafter due
the Contractor are not sufficient to cover such amount,the Contract shall pay the difference to the Owner.
G-10 ROYALTIES AND PATENTS: The Contractor shall pay all royalties and license fees.they shall defend all suits or claims
for infringement of any patent rights and shall save the Owner harmless from loss on account thereof and shall be responsible for
all such loss when a particular design, process or the product of a particular manufacturer or manufacturers is specified; however, if
the Contractor has reason to believe that the design, process or product specified is an infringement of a patent, they shall be
responsible for such loss unless they promptly give such information to Owner.
G-11 TESTS: If the Contract Documents, Laws, Ordinances, Rules, Regulations or Orders of any public authority having
jurisdiction require any Work to be inspected, tested or approved, the Contractor shall give the Owner timely notice of their
readiness and the date arranged so the Architect may observe such inspection,testing or approval. The Owner shall bear all costs
of such inspection,tests and approvals unless otherwise provided.
If after the commencement of the Work, the Owner determines that any work requires special inspection, testing or approval not
included above, the Architect, upon written authorization from the Owner, will instruct the Contractor to order such special
inspection, testing or approval, and the Contractor shall give notice as required in the preceding paragraph. If such special
inspection or testing reveals a failure of the Work to comply(1)with the requirements of the Contract Documents or(2)with respect
to the performance of the Work, with Laws, Statutes, Charter, Ordinances, Regulations or Orders of any public authority having
jurisdiction, the Contractor shall bear all costs thereof, including the Architect's additional services made necessary by such costs;
otherwise the Owner shall bear such costs,and an appropriate Change Order shall be issued.
The Contractor shall secure certificate of inspection,testing or approval, and three copies will be promptly delivered by them to the
Architect.The Architect will review the certificates and forward one copy of each with their recommendation(s)to the Owner.
If the Owner wishes to observe the inspections, tests or approvals required by this Section, they will do so promptly and, where
practicable,at the source of supply.
Neither the observations of the Architect or the Owner in their administration of the Construction Contract, nor inspections, tests or
approvals by persons other than the Contractor shall relieve the Contractor from their obligations to perform the Work in
accordance with the Contract Documents.
G-12 INTERRUPTION OF EXISTING UTILITIES SERVICES: The Contractor shall perform the Work under this Contract with
a minimum of outage time for all utilities. Interruption shall be by approved sections of the utility. In some cases, the Contractor
may be required to perform the Work while the existing utility is in service. The existing utility service may be interrupted only when
approved by the Owner. When it is necessary to interrupt the existing utilities, the Contractor shall notify the Owner in writing at
least ten days in advance of the time that they desire the existing service to be interrupted. The interruption time shall be kept to a
minimum. Depending upon the activities at an existing facility that requires continuous service from the existing utility, an
interruption may not be subject to schedule at the time desired by the Contractor. In such cases, the interruption may have to be
scheduled at a time of minimum requirements of demand for the utility. The amount of time requested by the Contractor of existing
utility services shall be as approved by the Owner.
G-13 LAYING OUT WORK: The Contractor shall verify dimensions and elevations indicated in layout of existing work.
Discrepancies between Drawings, Specifications, and existing conditions shall be referred to the Architect for adjustment before
work affected is performed. Failure to make such notification shall place responsibility upon Contractor to carry out work in
satisfactory workmanlike manner at the Contractor's sole expense.
The Contractor shall be held responsible for the location and elevation of all the construction contemplated by the Construction
Documents.
Prior to commencing work, the Contractor shall carefully compare and check all Architectural, Structural, Mechanical an Electrical
drawings; each with the other that in any affects the locations or elevation of the work to be executed, and should any discrepancy
be found, they shall immediately report the same to the Architect for verification and adjustment. Any duplication of work made
necessary by failure or neglect on their part to comply with this function shall be done at the Contractor's sole expense.
G-14 MEASUREMENTS: Before ordering any material or doing any work,the Contractor shall verify all measurements at the
site or at the building and shall be wholly responsible for the correctness of same.
No extra charge or compensation will be allowed on account of any difference between actual dimensions and dimensions
indicated on the drawings. Any difference that may be found shall be submitted to the Architect for consideration and adjustment
before proceeding with the project.
G-16 EXISTING OVERHEAD OR UNDERGROUND WORK: The Contractor shall carefully check the site where the project is
to be erected and observe any existing overhead wires and equipment. Any such work shall be moved, replaced or protected, as
required,whether or not shown or specified at the Contractor's sole expense.
Attention is directed to the possible existence of pipe and other underground improvements that may or may not be shown on the
Drawings. All reasonable precautions shall be taken to preserve and protect any such improvements whether or not shown on the
Drawings.
Location of existing underground lines, shown the Drawings are based on the best available sources, but are to be regarded as
approximate only. Exercise extreme care in locating and identifying these lines before excavation in adjacent areas.
G-16 ALIGNMENT OF JOINTS IN FINISH MATERIALS: It shall be the responsibility of the Contractor to make certain in the
installation of jointed floor,wall and ceiling materials that:
1. Preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed
under the subcontract so that the subcontracting thereof will not prejudice such rights;
2. Place joints to relate to all opening and breaks in the structure and be symmetrically placed wherever possible. This includes
heating registers, light fixtures,equipment,etc.
If because of the non-related sizes of the various materials and locations of openings, etc., it is not possible to accomplish the
above, the Contractor shall request the Architect to determine the most satisfactory arrangement. The Contractor shall establish
centerlines for all trades.
G-17 INTEGRATING EXISTING WORK: The Contractor shall protect all existing street and other improvements from
damages.
Contractor's operations shall be confined to the immediate vicinity of the new work and shall not in any interfere with or obstruct the
ingress or egress to and from existing adjacent facilities.
Where new site work is to be connected to existing work,special care shall be exercised by the Contractor not to disturb or damage
the existing work more than necessary.All damaged work shall be replaced, repaired and restored to original condition at no cost to
the Owner.
G-18 HAZARDOUS MATERIAL CERTIFICATION: It is the intent of the contract documents,whether expressly stated or not,
that nothing containing hazardous materials, such as asbestos, shall be incorporated in to the project. The Contractor shall
exercise every reasonable precaution to ensure that asbestos-containing materials are not incorporated into any portion of the
project, including advising all materials suppliers and subcontractors of this requirement. The Contractor shall verify that
components containing lead do not contact the potable water supply.
G-19 LOCATION OF EQUIPMENT AND PIPING: Drawing showing location of equipment, piping, ductwork, etc. are
diagrammatic and job conditions may not always permit their installation in the location shown.When this situation occurs, it shall
be brought to the Architect's attention immediately and the relocation determined in a joint conference. The Contractor will be held
responsible for the relocating of any items without first obtaining the Architect's approval. They shall remove and relocate such
items at their own expense if so directed by the Architect. Where possible; uniform margins shall be maintained between parallel
lines and/or adjacent wall,floor or ceiling surfaces.
G-20 OVERLOADING: The Contractor shall be responsible for loading of any part or parts of structures beyond their safe
carrying capacities by placing of materials, equipment, tools, machinery or any other item thereon. No loads shall be placed on
floors or roofs before they have attained their permanent and safe strength.
G-21 MANUFACTURER'S INSTRUCTIONS: Where it is required in the Specifications that materials, products, processes,
equipment, or the like be installed or applied in accordance with manufacturer's instructions, direction or specifications, or words to
this effect, it shall be construed to mean that said application or installation shall be in strict accordance with printed instructions
furnished by the manufacturer of the material concerned for use under conditions similar or those at the job site. Six copies of such
instructions shall be furnished to the Architect and their approval thereof obtained before work is begun.
G-22 CLEANING UP: The Contractor shall keep the premises free from accumulation of waste material or rubbish caused by
employees or as a result of the Work.
At completion of work,the General Contractor shall, immediately prior to final inspection of complete building,execute the following
final cleaning work with trained janitorial personnel and with material methods recommended by the manufactures of installed
materials.
1. Sweep and buff resilient floors and base,and vacuum carpeting.
2. Dust all metal and wood trim and similar finished materials.
3. Clean all cabinets and casework.
4. Dust all ceilings and walls.
5. Dust,and if necessary wash,all plumbing and electrical fixtures.
6. Wash all glass and similar non-resilient materials.
7. All hardware and other unpainted metals shall be cleaned and polished and all equipment and paint or decorated work shall be
cleaned and touched-up if necessary, and all temporary labels, tags, and paper coverings removed throughout the buildings.
Surfaces that are waxed shall be polished.
8. The exterior of the building,the grounds, approaches, equipment, sidewalks,streets,etc.shall be cleaned similar to interior of
buildings and left in good order at the time of final acceptance. All paint surfaces shall be clean and unbroken, hardware shall
be clean and polished,all required repair work shall be completed and dirt areas shall be scraped and cleared of weed growth.
9. Clean all glass surfaces and mirrors of putty, paint materials, etc., without scratching or injuring the glass and leave the work
bright,clean and polished. Cost of this cleaning work shall be borne by Contractor.
10. Cleaning, polishing, scaling, waxing and all other finish operations indicated on the Drawings or required in the Specifications
shall be taken to indicate the required condition at the time of acceptance of all work under the Contract.
11. Burning: Burning of rubbish on the premises will not be permitted.
G-23 DUST CONTROL: Precaution shall be exercised at all times to control dust created as a result of any operations during
the construction period. If serious problems or complaints arise due to air-borne dust, or when directed by the Architect,operations
causing such problems shall be temporarily discontinued and necessary steps taken to control the dust.
G-24 FIRE PROTECTION: The Contractor shall at all times maintain good housekeeping practices to reduce the risk of fire
damage or injury to workmen.All scrap materials, rubbish and trash shall be removed daily from in and about the building and shall
not be permitted to be scattered on adjacent property.
Suitable storage space shall be provided outside the immediate building area for storing flammable materials and paints; no
storage will be permitted in the building. Excess flammable liquids being used inside the building shall be kept in closed metal
container and removed from the building during unused periods.
A fire extinguisher shall be available at each location where cutting or welding is being performed.Where electric or gas welding or
cutting work is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and
hot metal. When temporary heating devices are used, a watchman shall be present to cover periods when other workmen are not
on the premises.
The Contractor shall provide fire extinguishers in accordance with the recommendations and NFPA Bulletins Nos. 10 and 241.
However,in all cases a minimum of two fire extinguishers shall be available for each floor of construction.
G-26 CUTTING AND PATCHING: Wherever cutting and removal of portions of the existing work is indicated, such work shall
be neatly sawed or cut by Contractor in a manner that will produce a neat straight line, parallel to adjacent surfaces or plumb for
vertical surfaces. Care should be exercised not to damage any work that is to remain.
At no time shall any structural members be cut without written consent from the Architect.-
G-26 PROJECT CLOSEOUT
Final Inspection, Record Drawings: Attention is called to General Conditions Section entitled, "Substantial Completion and Final
Payment".
Maintenance Manual: Sheets shall be 81/"x 11",except pull out sheets may be neatly folded to 8'/z"x 11". Manuals shall be bound
in plastic covered,3 ring, loose leaf binder with title of project lettered on front and shall contain:
1) Name,address and trade of all sub-contractors.
2) Complete maintenance instructions; name, address, and telephone number of installing Contractor, manufacturer's local
representative,for each piece of operative equipment.
3) Catalog data on plumbing fixtures, valves, water heaters, heating and cooling equipment, temperature control, fan, electrical
panels,service entrance equipment and light fixtures.
4) Manufacturer's name, type, color designation for resilient floors, windows, doors, concrete block, paint, roofing, and other
materials.
Submit two digital electronic copies and one hard copy of Maintenance Manuals, prior to request for final payment.
Operational Inspection and Maintenance Instruction: The Contractor shall provide at their expense, competent manufacturer's
representatives to completely check out all mechanical and electrical systems and items covered by the Drawings and
Specifications. This requirement shall be scheduled just prior to and during the initial start-up. After all systems are functioning
properly the representatives shall instruct maintenance personnel of the Owner in the proper operation and maintenance of each
item.
G-27 GUARANTEE AND EXTENDED GUARANTEE: Upon completion of the Project, prior to final payment, guarantees
required by technical divisions of Specifications shall be properly executed in quadruplicate by subcontractors and submitted
through the Contractor to Architect. Delivery of guarantees shall not relieve Contractor from any obligation assumed under
Contract.
The Contractor shall guarantee the entire Project for one year. In addition,where separate guarantees, for certain portions of work,
are for longer periods, General Contractor's guarantee shall be extended to cover such longer periods. Manufacturer's extended
warrantees shall be included in this contract.
Guarantees shall become valid and operative and commence upon issuance of Certificate of Inspection and Acceptance by Owner.
Guarantees shall not apply to work where damage is result of abuse, neglect by Owner or their successor(s)in interest.
The Contractor agrees to warrant their work and materials provided in accordance with this contract and the terms of the Technical
Specifications contained herein. Unless supplemented by the Technical Specifications or the manufacturer's normal extended
warrantees,the Contractor shall warrant all work materials, and equipment against defects for a period of one year from the date of
final acceptance. The Contractor further agrees to bear all costs of making good all work that is found to be defective or not
provided in accordance with the Contract Documents. Additionally if the facility or contents are damaged due to defective materials
or workmanship of the Contractor, the Contractor further agrees to bear all cost of repairing and/or replacing damaged items and
components to bring such items back to at least their original condition.
G-28 RECORD DRAWINGS: Upon completion of the Work and prior to application for final payment, one print of each of the
drawings accompanying this specification shall be neatly and clearly marked in red by the Contractor to show variations between
the construction actually provided and that indicated or specified in the Contract Documents. The annotated documents shall be
delivered to Architect. Where a choice of materials and/or methods is permitted herein and where variations in the scope or
character of the work from the entire work indicated or specified are permitted either by award of bidding items specified for that
purpose, or by subsequent change to the drawings, the record drawings shall define the construction actually provided. The
representation of such variations shall conform to standard drafting practice and shall include supplementary notes, legends and
details which may be necessary for legibility and clear portrayal of the actual construction. The record drawings shall indicate, in
addition,the actual location of all sub-surface utility lines,average depth below the surface and other appurtenances.
G-29 CONSTRUCTION FENCE: The Contractor shall provide a substantial chain-link construction fence around all or a part
of the site when required. The fences and gates must be maintained throughout the construction period. Remove the fences and
gates upon completion of the Project and restore the site to the required original or contract condition.
G-30 PRODUCT DELIVERY,STORAGE, HANDLING: The Contractor shall handle,store and protect materials and products,
including fabricated components, by methods and means which will prevent damage, deterioration and loss, including theft (and
resulting delays), thereby ensuring highest quality results as the work progresses. Control delivery schedules so as to minimize
unnecessary long-term storage at project site prior to installation.
G-31 REMOVAL OF SALVAGED MATERIAL: The Contractor shall remove salvaged material and equipment from the Project
site and dispose of it in accordance with the law. Equipment or material identified in the Specifications or Plans for Owner salvage
shall be carefully removed and delivered to the Owner at any location in within the City limits as directed by the City.
G-32 MANUFACTURER'S REFERENCE: Catalog, brand names, and manufacturer's references are descriptive, not
restrictive. Bids on brands of like nature and quality will be considered. Contractor shall inform the City of any substitutions
intended for the project within 5 business days of bid opening. Failure to inform the City of substitute projects will obligate the
Contractor to provide the specified material if awarded the contract. Within 14 days after bid opening and upon request of the
Contractor,the Contractor will submit a full sized sample and/or detailed information as required to allow the architect to determine
the acceptability of proposed substitutions. Where equipment has been listed as "no substitute accepted"; the City will accept no
alternates to the specified equipment.
SECTION H
CONTRACT TIME
H-1 DEFINITIONS
The Contract Time is the period of time allotted in the Contract Documents for completion of the Work and is the number of
calendar days elapsing between the date of commencement and the date of Substantial Completion plus additional days assessed
for failure to complete punch list items from the Final Inspection in a timely manner and additional weather days beyond what is
allotted in the contract.
The Date of Commencement of the Work is the date established in the Notice to Proceed.See attachment"A"for a sample Notice
to Proceed.
The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect with the approval
of the Owner that construction is sufficiently complete, in accordance with the Contract Documents, so the Owner may occupy the
Work or designated portion thereof for the use for which it is intended. Final acceptance of the completed work or any portion
thereof can be made only by the Owner,and no other form of acceptance will be binding upon the Owner.
A Calendar Day constitutes 24 hours of time and is any one of the seven days of a week, including Sunday,regardless of whether a
"Working Day" or not, and regardless of weather conditions or any situation which might delay construction. An extension of
contract time shall be in accordance with this Section. Extensions of time will be as recommended by the Architect with final
approval by City of Fort Worth.
A Working Day is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which weather or other
conditions not under the control of the Contractor permit the performance of work for a continuous period of not less than seven
hours between 7:00 a.m. and 6:00 p.m. However, nothing in these Contract Documents shall be construed as prohibiting the
Contractor from working on Saturdays if he so desires. Legal holidays for the City of Fort Worth are defined as being New Year's
Day, Independence Day, Labor Day, Thanksgiving Day, and the day after Thanksgiving, Christmas Day, Memorial Day and Martin
Luther King Jr. Day.
H-2 PROGRESS AND COMPLETION: All the time limits stated in the Contract Documents are of essence to the Contract.
The Contractor shall begin the Work on the date of commencement as defined in this Section. He shall carry the Work forward
expeditiously with adequate forces and shall complete it within the Contract Time.
H-3 CONSTRUCTION WORK: Noise created by construction work within three hundred(300)feet of an occupied residential
structure involving the erection, excavation, demolition, alteration, or repair of any building, structure, or flatwork is prohibited as
follows:
Before 7:00 a.m.or after 8:00 p.m. Monday-Friday
Before 9:00 a.m.or after 8:00 p.m.Saturday-Sunday
H-4 DELAYS AND EXTENSIONS OF TIME: If the Contractor is delayed at any time in the progress of the Work by any act
or neglect of the Owner or the Architect, or by any employee of the Owner, or by any separate contractor employed by the Owner,
or by changes ordered in the Work,or by labor disputes,fire, unusual delay in transportation, unavoidable casualties or any causes
beyond the Contractor's control, or by any cause which the Architect determines may justify the delay,then the contract time may
be extended by Change Order for such reasonable time as recommended by the Architect and approved by the Owner. When the
Contractor is delayed due to abnormal weather conditions, the weather table provided as WT-1 in these Contract Documents shall
be used as the basis for providing a fair and equitable adjustment of the contract time.
All claims for extension of time shall be made in writing to the Architect no more than fifteen days after the occurrence of the delay;
otherwise they shall be waived.
If no schedule or agreement is made stating the dates upon which written interpretations shall be furnished,then no claim for delay
shall be allowed on account of failure to furnish such interpretation until fifteen days after demand is made for them, and not then
unless such a claim is reasonable.
H-5 NO DAMAGE FOR DELAY: No payment, compensation or adjustment or any kind (other than the extensions of time
provided for) shall be made to the Contractor for damages because of hindrances or delays from an cause in the progress of the
work, whether such hindrances or delays be avoidable or unavoidable, and the Contractor agrees that they will make no claim for
compensation, damages or mitigation of liquidated damages for any such delays, and will accept in full satisfaction for such delays
said extension of time.
SECTION I
PAYMENTS AND COMPLETION
1-1 CONTRACT SUM: The Contract Sum is stated in the contract and is the total amount payable by the Owner to the
Contractor for the performance of the Work under the Contract Documents.
1-2 SCHEDULE OF VALUES: Before the first Applicable for Payment, the Contractor shall submit to the Architect a
Schedule of Values of the various portions of the Work, including quantities if required by the Architect, aggregating the total
Contract Sum, divided so as to facilitate payments to Sub-contractors, prepared in such form as specified or as the Architect and
the Contractor may agree upon, and supported by such data to substantiate correctness as the Architect may require. Each item in
the Schedule of Values shall include proper share of overhead and profit. This Schedule, when approved by the Architect and the
Owner,shall be used as a basis for the Contractor's Applications for Payment.
1-3 PROGRESS PAYMENTS: On the first day of each month after the first month's work has been completed, the
Contractor will make current estimates in writing for review by the Architect and Owner of materials in place complete and the
amount of work performed during the preceding month or period and the value thereof at the prices contracted for as shown on the
approved Schedule of Values and Progress Schedule.
If payments are to be made on account of materials or equipment not incorporated in the Work but delivered and suitably stored at
the site such payments shall be conditioned upon submission by the Contractor of bills of sale or such other procedures
satisfactory to the Owner to establish the Owner's title to such materials or equipment or otherwise protect the Owner's interest
including applicable insurance and transportation to the site.
The Contractor warrants and guarantees that title to all Work, materials and equipment covered by an Application for Payment,
whether incorporated in the Project or not, will pass to the Owner upon the receipt of such payment by the Contractor, free and
clear of all liens, claims, security interests or encumbrances hereinafter referred to as "liens'; and that no Work, materials or
equipment covered by an Application for Payment will have been acquired by the Contractor, or by any other persons performing
the Work at the site or furnishing materials and equipment for the Work, subject to an agreement under which an interest therein or
an encumbrance thereon is retained by the seller or otherwise imposed by the Contractor or such other person.
The Contractor shall prepare each application for payment on AIA Document G702, "Application and Certificate for Payment", and
attached thereto AIA Document G703, "Continuation Sheet", to indicate the progress made to date and the period or month for
which payment is requested for each Item listed in the Schedule of Values. A copy of the revised monthly work progress schedule
must be attached before the pay request can be accepted.
1-4 CERTIFICATES FOR PAYMENT: If the Contractor has made Application for Payment as above,the Architect will, with
reasonable promptness but not more than seven days after the receipt of the Application, prepare a Certificate of Payment,with a
copy to the Contractor,for such amount determined to be properly due,or state in writing reasons for withholding a Certificate.
The issuance of a Certificate for Payment will constitute a representation by the Owner, based on the Architect's observations at
the site and the data comprising the Application for Payment,that the Work has progressed to the point indicated;that the quality of
the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole upon
Substantial Completion, to the results of any subsequent tests required by the Contract Documents, to minor deviations from the
Contract Documents correctable prior to completion, and to any specific qualifications stated in the Certificate); and
recommendations to the Owner that the Contractor be paid in the amount certified. In addition, the Architect's approval of final
payment assures the Owner that the conditions precedent to the Contractor's being entitled to final payment as set forth in this
Section have been fulfilled.
After the Architect has issued a Certificate for Payment, the Owner shall approve or disapprove same within ten days after it has
been delivered to the Owner. For contracts less than $400,000, Owner shall pay 90% of the approved estimate to the Contractor
within seven days after approval, and the remaining 10% of each such estimate will be retained by the Owner until Substantial
Completion. For contracts in excess of$400,000,the Owner will retain only 5%of each estimate until Substantial Completion.
No Certificate for a progress payment, nor any progress payment, nor any partial or entire use or occupancy of the Project by the
Owner, shall constitute an acceptance of any Work not in accordance with the Contract Documents, or relieve the Contractor of
liability in respect to any warranties or responsibility for faulty materials or workmanship. The Contractor shall promptly remedy any
defects in the Work and pay for any damage to other work resulting therefrom that shall appear within a period of one year from the
date of final acceptance of the Work unless a longer period is specified.
1-5 PAYMENTS WITHHELD: The Architect may decline to approve an Application for Payment and may withhold the
Certificate in whole or in part if in their opinion they are unable to make the representations to the Owner as provided in this
Section.The Architect may also decline to approve any Applications for Payment or, because of subsequently discovered evidence
or subsequent inspections, may nullify the whole or any part of any Certificate for Payment previously issued to such extent as may
be necessary in their opinion to protect the Owner from loss because of:
1) Defective work not remedied;
2) Claims filed or reasonable evidence indicating probable filing of claims;
3) Failure of the Contractor to make payments properly to Subcontractors,or for labor, materials or equipment;
4) Reasonable doubt that the Work can be completed for the unpaid balance of the Contract Sum;
5) Damage to another contractor;
6) Reasonable indication that the Work will not be completed within the Contract Time;or
7) Unsatisfactory prosecution of the Work by the Contractor.
When such grounds for the refusal of payment are removed, payment shall be made for amounts withheld because of them. The
Owner reserves the right to withhold the payment of any monthly estimate, without payment of interest, if the Contractor fails to
perform the Work in accordance with the specifications.
1-6 LIQUIDATED DAMAGES: The parties agree and acknowledge that actual damages are uncertain and difficult to
ascertain because the Project relates to construction for a municipality. Normal damages of lost rent or profit are not applicable in
this circumstance because the City is a municipality and the Project will not receive rent and the City will not have lost profits.
Therefore, the parties agree that because City's actual damages are too difficult to ascertain that the liquidated damages stated
below are reasonable and a correct representation of actual damages to the City. The parties also agree that the liquidated
damages called for in this contract are not a penalty but an agreed upon damages calculation by two sophisticated parties. The
deduction for liquidated damages shall be as follows:
Amount of Contract Liquidated Damages per Day
$15,000 or less $45
$15,001 to $25,000 $63
$25,001 to $50,000 $105
$50,001 to $100,000 $154
$100,000 to $500,000 $210
$500,001 to$1,000,000 $315
$1,000,001to$2,000,000 $420
$2,000,001 to$5,000,000 $630
$5,000,001 to$10,000,000 $840
Over$10,000,000 $980
1-7 FAILURE OF PAYMENT: If, without fault on the part of the Contractor, the Architect should fail to issue any Certificate
for Payment within seven days after receipt of the Contractor's Application for Payment, if the Contractor's Application for Payment,
or if, without fault on the part of the Contractor,the Owner should fail to approve such estimate or to pay to the Contractor 90% or
95% (as applicable) of the amount thereof within the period of time specified, then the Contractor may, upon seven (7) days
additional written notice to the Owner and to the Architect,stop the Work until payment of the amount owing has been received.
1-8 SUBSTANTIAL COMPLETION AND FINAL PAYMENT: Prior to the request for final payment,the Contractor must meet
all provisions for Project Closeout.
When the Contractor determines that the Work is substantially complete, the City shall inspect the project with the Contractor and
the contractor will prepare a"Preliminary Punch List".
When the Architect, on the basis of a subsequent inspection, determines that the Work is substantially complete, they then will
prepare a Certificate of Substantial Completion (G704)which,when approved by the Owner,shall allow the Contractor to request a
Certificate of Occupancy which will establish the Date of Substantial Completion. The Certificate of Substantial Completion shall
state the responsibilities of the Owner and the Contractor for maintenance, heat, utilities, and insurance, shall set forth the
remaining work as a "final punch list". The Contractor shall complete the remaining work listed therein within 30 calendar days.
When the Certificate of Occupancy has been issued,the retainage may be reduced to 4%.
Upon completion of the work listed on the final punch list to the satisfaction of the City of Fort Worth,the retainage may be reduced
to 2.5%.
Should the Contractor fail to complete all contractual requirements of the contract, including submittals and final pay request within
the fixed time,the contract time will again commence. Should the Contractor fail to complete the work within the contract duration,
liquidated damages will be assessed
Upon receipt of written notice that the Work is ready for final inspection, the City will conduct a joint inspection and certify
completion of the final punch list by cosigning it with the Contractor.
The Contractor shall submit the following items to the City prior to requesting final payment:
1) Contractor's Affidavit of Payment of Debts and Claims (G706)stating that all payrolls, bills for materials and equipment, and
other indebtedness connected with the Work for which the Owner or their property might in any way be responsible, have been
paid or otherwise satisfied,
2) Consent of Surety to Final Payment(G707), if any,to final payment,
3) Contractor's Affidavit of Release of Liens(G706A),and,
4) Other data establishing payment or satisfaction of all such obligations, such as receipts, releases, and waivers of liens arising
out of the Contract,to the extent and in such form as may be designated by the Owner.
5) Contractor's Warranty
6) Statement that all outstanding work has been completed
7) Issuance of the Final Certificate of Substantial Completion
8) Final acceptance by the City of Fort Worth.
If any Subcontractor, materialman or laborer refuses to furnish a Contractors Affidavit of Release of Liens, the Contractor may, at
the election of the Owner,furnish a bond satisfactory to the Owner to indemnify them against any right,claim or lien which might be
asserted by such Subcontractor, materialman or laborer. If any such right, claim or lien remains unsatisfied after all payments are
made. The Contractor shall refund to the Owner all monies that the latter may be compelled to pay to discharging such right, claim
or lien, including all costs and reasonable attorney's fees.
The Contractor may then request final payment. The acceptance of final payment shall constitute a waiver of all claims by the
Contractor except those previously made in writing and still unsettled.
The Contractors one-year warranty will commence upon Substantial Completion of the Project. Trees will be warranted for a period
of two-years per City ordinance. Prior to the expiration of the one year warranty there will be a walk through attended by the Owner,
Architect, and Contractor to identify any items that need to be addressed. These items will be agreed upon by all parties and the
contractor will complete the work within 30 days.
The designated representative of the City of Fort Worth will make final acceptance and no other form of acceptance will be binding
upon the Owner.
1-9 FINAL PAYMENT FOR UN-BONDED PROJECTS: Final payment will not be made for a period of 30 calendar days and
until all requirements have been met,with the exception of Consent of Surety for Final Payment.
SECTION J
PROTECTION OF PERSONS AND PROPERTY
J-1 SAFETY PRECAUTIONS AND PROGRAMS: The Contractor shall be responsible for initiating, maintaining and
supervising all safety precautions and programs in connection with the Work.The Contractor shall designate a responsible member
of their organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's
superintendent unless otherwise designated in writing by the Contractor to the Architect.
J-2 SAFETY OF PERSONS AND PROPERTY: The Contractor shall take all reasonable precautions for the safety of, and
shall provide all reasonable protection to prevent damage, injury or loss to:
(1) All employees on the Work and all other persons who may be affected thereby;
(2) All the Work and all materials and equipment to be incorporated therein,whether in storage on or-off the site, under the care,
custody or control of the Contractor or any of their Subcontractors or Sub-contractors;and
(3) Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and
utilities not designated for removal, relocation or replacement in the course of construction.
Until acceptance of the Work, it shall be under the charge and care of the Contractor, and they shall take every precaution against
injury or damage to the Work by the action of the elements or from any other cause whatsoever,whether arising from the execution
or from the non-execution of the Work. The Contractor shall rebuild, repair, restore and make good, at his own expense,all injuries
or damages to any portion of the Work occasioned by any of the above,caused before completion and acceptance.
The Contractor shall comply with all applicable Laws, Ordinances, Rules, Regulations and Orders of any public authority having
jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. They shall erect and maintain, as
required by existing conditions and progress of the Work, all reasonable safeguards for safety and protection, including posting
danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent
utilities.
When the use or storage of explosives or other hazardous materials or equipment is necessary for the execution of the Work,the
Contractor shall exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel.
All damage or loss to any property referred to in the preceding paragraphs caused in whole or in part by the Contractor, any
Subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable,
shall be remedied by the Contractor, including damage or loss attributable to faulty Drawings or Specifications and acts or
omissions of the Architect or anyone employed by them or for whose acts they may be liable, and not attributable to the fault or
negligence of the Contractor or anyone claiming through the Contractor for such damage or loss.
The Contractor shall not load or permit any part of the Work to be loaded so as to endanger safety.
J-3 HARD HATS: Hard Hats will be required at all construction sites included in this Contract from start to completion of
work. Each Contractor, employee and visitor at any construction site included in the Contract will be required to wear a hard hat.
The Contractor shall enforce the wearing of hard hats by Contractor,employees and visitors. Contractor shall provide hard hats for
use by the consulting Architects and Engineers and visitors.
J-4 EMERGENCIES: In any emergency affecting the safety of persons or property, the Contractor shall act at their
discretion to prevent threatened damage, injury or loss.Any additional compensation or extension of time claimed by the Contractor
on account of emergency work shall be determined as provided in Changes in the Work.
J-6 SAFE WORK PRACTICES: The Contractor shall employ safe practices in handling materials and equipment used in
performing required work so as to insure the safety of their workmen, City employees and the public. The Contractor shall keep the
premise free at all times from accumulation of waste materials or rubbish. At the completion of the work, the Contractor shall
remove all their wastes and rubbish from and about the work area, as well as their tools,equipment and surplus materials and shall
leave the area as clean and free of spot,stains,etc.,as before the work was undertaken.
J-6 TRENCH SAFETY: The Contractor shall be responsible for all design and implementation of trench shoring and
stabilization to meet regulatory requirements. If the Proposal requires,the Contractor shall include a per-unit cost for trench safety
measures in their bid. If not included in the Proposal,the Contractor shall include a cost for trench safety measures for all trenches
over 5 feet in depth in their Schedule of Values.
SECTION K-INSURANCE
K-1 INSURANCE REQUIRED: The Contractor shall not commence work under this Contract until they have obtained all
insurance required under this Section and such insurance has been approved by the City of Fort Worth, nor shall the Contractor
allow any Subcontractor to commence work to be performed under this Contract until all similar insurance of the Subcontractor has
been so obtained and approved. The City of Fort Worth will be listed as an "additional insured" on all policies except Worker's
Compensation.
K-2 WORKERS'COMPENSATION INSURANCE
1) General:
a) Contractor's Worker's Compensation Insurance. Contractor agrees to provide to the Owner(City)a certificate showing
that it has obtained a policy of workers compensation insurance covering each of their employees employed on the
project in compliance with state law. No Notice to Proceed will be issued until the Contractor has complied with this
section.
b) Subcontractor's Worker's Compensation Insurance. Contractor agrees to require each and every subcontractor who will
perform work on the project to provide to it a certificate from such subcontractor stating that the subcontractor has a
policy of workers compensation insurance covering each employee employed on the project. Contractor will not permit
any subcontractor to perform work on the project until such certificate has been acquired. Contractor shall provide a copy
of all such certificates to the Owner(City).
c) By signing this Contract or providing or causing to be provided a certificate of coverage,the Contractor is representing to
the City that all employees of the Contractor who will provide services on the project will be covered by worker's
compensation coverage for the duration of the project, that the coverage will be based on proper reporting of
classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance
carrier or, in the case of a self-insured,with the Texas Worker's Compensation Commission's Division of Self-Insurance
Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal
penalties,civil penalties or other civil actions.
d) The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the
City to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of
breach from the City.
2) Definitions:
a) Certificate of Coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued
by the Texas Workers' Compensation Commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or
TWCC-84), showing statutory workers'compensation insurance coverage for the person's or entity's employees providing
services on a project,for the duration of the project.
b) Duration of the Project. Includes the time from the beginning of the work on the project until the Contractor's/person's
work on the project has been completed and accepted by the City.
c) Persons providing services on the project("subcontractor"in section 406.096)-includes all persons or entities performing
all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person
contracted directly with the Contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of
any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services"
include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or
other services related to a project. "Services"does not include activities unrelated to the project, such as food/beverage
vendors,office supply deliveries,and delivery of portable toilets.
3) Requirements:
a) The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of
any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all
employees of the Contractor providing services of the project,for the duration of the project.
b) The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract.
c) If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project,
the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the City showing that
coverage has been extended.
d) The Contractor shall obtain from each person providing services on a project,and provide to the City:
i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on
file certificates of coverage showing coverage for all persons providing services on the project;and
ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of
coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project.
e) The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter.
f) The Contractor shall notify the City in writing by certified mail or personal delivery, within ten (10) days after the
Contractor knew or should have known, of any change that materially affects the provision of coverage of any person
providing services on the project.
g) The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's
Compensation Commission, informing all persons providing services on the project that they are required to be covered,
and stating how a person may verify coverage and report lack of coverage.
h) The Contractor shall contractually require each person with whom it contracts to provide services on a project,to:
i) provide coverage, based on proper reporting on the classification codes and payroll amounts and filing of any
coverage agreements, which meets the statutory requirements of Texas labor Code, Section 401.011(44) for all of their
employees providing services on the project,for the duration of the project;
ii) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that
coverage is being provided for all employees of the person providing services on the project, for the duration of the
project;
iii) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of
coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project;
iv) obtain from each other person with whom it contracts,and provide to the Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the project;and
(2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the
coverage period shown on the current certificate of coverage ends during the duration of the project;
v) retain all required certificates of coverage on file for the duration of the project and for one year thereafter.
vi) notify the City in writing by certified mail or personal delivery,within ten (10)days after the person knew or should have
known, of any change that materially affects the provision of coverage of any person providing services on the project;
and
vii) contractually require each person with whom it contracts, to perform as required by paragraphs h-i) -vii), with the
certificates of coverage to be provided to the person for whom they are providing services.
4) Posting of Required Worker's Compensation Coverage:
a) The Contractor shall post a notice on each project site informing all persons providing services on the project that they
are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage.
This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other
Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type
and text in at least 19-point normal type, and shall be in both English and Spanish and any other language common to
the worker population. The text for the notices shall be the following text,without any additional words or changes:
"REQUIRED WORKER'S COMPENSATION COVERAGE
The law requires that each person working on this site or providing services related to this construction project
must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering
equipment or materials, or providing labor or transportation or other service related to the project, regardless of
the identity of their employer or status as an employee".
Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal
requirement for coverage, to verify whether your employer has provided the required coverage, or to report an
employer's failure to provide coverage."
K-3 LIABILITY INSURANCE: The Contractor shall procure and maintain during the term of this Contract such Liability
Insurance as shall protect them, the City of Fort Worth and any Subcontractor performing work covered by this Contract, from
claims of damage which may arise from operations under this Contract, including blasting, when blasting is done on, or in
connection with the Work of the Project, whether such operations be by themselves or by any Subcontractor or by anyone directly
or indirectly employed by either of them and the limits of such insurance shall be not less than the following:
1) Automobile Liability: $1,000,000 each accident or reasonably equivalent split limits for bodily injury and property damage.
Coverage shall be on "any auto" including leased, hired, owned, non-owned and borrowed vehicles used in connection with
this Contract.
2) Commercial General Liability: $1,000,000 each occurrence. Coverage under the policy shall be as comprehensive as that
provided in a current Insurance Services Office (ISO) policy form approved for use in Texas and the policy shall have no
exclusions by endorsement unless such are approved by the City.
3) Asbestos Abatement Liability Insurance:When the Project specifically requires the removal of Asbestos Containing Materials,
the Contractor,or subcontractor performing the removal, shall be required to maintain Asbestos Abatement Liability Insurance
as follows: $1,000,000 per occurrence; $2,000,000 aggregate limit. The coverage shall include any pollution exposure,
including environmental impairment liability, associated with the services and operations performed under this contract in
addition to sudden and accidental contamination or pollution liability for gradual emissions and clean-up costs.
K-4 BUILDER'S RISK INSURANCE: Unless stated otherwise in the Proposal or Invitation,the Contractor shall procure, pay
for and maintain at all times during the term of this Contract, Builder's Risk Insurance against the perils of fire, lightning,windstorm,
hurricane, hail, riot,explosion,civic commotion,smoke,aircraft, land vehicles,vandalism,and malicious mischief,at a limit equal to
100%of the Contract Sum.
The policy shall include coverage for materials and supplies while in transit and while being stored on or off site. If specifically
required in the Instructions to Bidders, the policy shall include coverage for flood and earthquake. Different sub-limits for these
coverages must be approved by the City.
Consequential damage due to faulty workmanship and/or design performed by the Contractor or their agents shall be covered.
Upon completion of the Work,the Contractor shall notify the City of Fort Worth in writing before terminating this insurance.
K-6 PROOF OF CARRIAGE OF INSURANCE: The Contractor shall provide a certificate of insurance documenting the
Property Management Department, City of Fort Worth as a "Certificate Holder", and noting the specific project(s) covered by the
Contractor's insurance as documented on the certificate of insurance. More than one certificate may be required of the Contractor
depending upon the agents and/or insurers for the Contractor's insurance coverages specified for the project(s).
K-6 OTHER INSURANCE RELATED REQUIREMENTS
1) The City of Fort Worth shall be an additional insured, by endorsement,on all applicable insurance policies.
2) Applicable insurance policies shall each be endorsed with a waiver of subrogation in favor of the City of Fort Worth.
3) Insurers of policies maintained by Contractor and their subcontractor(s), if applicable, shall be authorized to do business in the
State of Texas,or otherwise approved by the City of Fort Worth,and such shall be acceptable to the City of Fort Worth insofar
as their financial strength and solvency are concerned. Any company through which the insurance is placed must have a
rating of at least A:VII, as stated in current edition of A. M. Best's Key Rating Guide. At the City's sole discretion, a less
favorable rate may be accepted by the City.
4) Deductible limits on insurance policies and/or self-insured retentions exceeding $10,000 require approval of the City of Fort
Worth as respects this Contract.
5) The City of Fort Worth shall be notified in writing a minimum of thirty days prior to an insurer's action in the event of
cancellation or non-renewal in coverage regarding any policy providing insurance coverage required in this Contract.
6) Full limits of insurance shall be available for claims arising out of this Contract with the City of Fort Worth.
7) The Contractor shall provide certificates of insurance to the City prior to commencement of operations pursuant to this
Contract. Any failure on part of the City of Fort Worth to request such documentation shall not be construed as a waiver of
insurance requirements specified herein.
8) The City of Fort Worth shall be entitled, upon request and without incurring expense,to review the insurance policies including
endorsements thereto and,at their discretion,to require proof of payment for policy premiums.
9) The City of Fort Worth shall not be responsible for paying the cost of insurance coverages required herein.
10) Notice of any actual or potential claim and/or litigation that would affect insurance coverages required herein shall be provided
to the City in a timely manner.
11) "Other insurance" as referenced in any policy of insurance providing coverages required herein shall not apply to any
insurance policy or program maintained by the City of Fort Worth.
12) Contractor shall agree to either require their subcontractors to maintain the same insurance coverages and limits thereof as
specified herein or the Contractor shall provide such coverage on the Contractor's subcontractors.
SECTION L
CHANGES IN THE WORK
L-1 CHANGE ORDER: The Owner, without invalidating the Contract, may order Changes in the Work within the general
scope of the Contract consisting of additions, deletions or other revisions,the Contract Sum and the Contract Time being adjusted
accordingly. All Such Changes in the Work shall be authorized by Change Order, and shall be executed under the applicable
conditions of the Contract Documents.
A Change Order is a written order to the Contractor signed by the Contractor, Owner and the Architect, issued after the execution of
the Contract, authorizing a Change in the Work or adjustment in the Contract Sum or the Contract Time. The Contract Sum and
the Contract Time may be changed only by Change Order.
Any changes in work required due to changed or unforeseen conditions, or by request of either the Contractor or the City, shall be
coordinated with the Director, Property Management Department. A change order must be written and duly negotiated and
executed prior to performing changed work.
The cost or credit to the Owner resulting from a Change in the work shall be determined in one or more of the following ways:
1) by mutual acceptance of a lump sum property itemized, including the allowance to Contractor for overhead and profit
stipulated in the original contract proposal;
2) by unit prices stated in the Contract Documents or subsequently agreed upon;or
3) by cost and a mutually acceptable fixed or percentage fee.
If none of the methods set forth herein above is agreed upon,the Contractor, provided they receive a Change Order, shall promptly
proceed with the Work involved. The cost of such work shall then be determined on the basis of the Contractor's reasonable
expenditures and savings, including a reasonable allowance for overhead and profit as indicted in the original contract proposal. In
such cases, the Contractor shall keep and present, in such form as the Architect shall prescribe, an itemized accounting together
with appropriate supporting data. Pending final determination of cost to the Owner, payments on account shall be made on the
Architect's Certificate of Payment as approved by the Owner.
If after the Contract has been executed, the Architect, requests a price proposal from the Contractor for a proposed change in
scope of the work, Contractor shall process such proposal within seven days of receipt and return the price quote to the Architect in
writing. The Architect shall review the price quotation and if approval is recommended, forward the proposed change order request
and price proposal to the Owner for approval. If approval is not recommended, the Architect will attempt to negotiate with
Contractor to revise the proposal to a figure which is fair and reasonable and forward it on to the Owner for approval. If the
negotiations do not result in an equitable solution, the Architect shall prepare a cost-plus type Change Order with a price-not-to-
exceed figure for approval by the City and require specific documentation to be provided by Contractor in accordance with the
paragraph above.
Contractor is advised that according to City of Fort Worth Charter,that,the City Council must approve all Change Orders and Work
Orders which results in an increase in cost of the contract amount by over$100,000. Normal processing time for the City Staff to
obtain City Council approval, once the recommended change order has been received at the City, is approximately thirty days.
Owner and Contractor shall endeavor to identify Change Order items as early in the Construction process as possible to minimize
their impact on the construction schedule.
If unit prices are stated in the Contract Documents or subsequently agreed upon, and if the quantities originally contemplated are
so changed in a proposed Change Order that application of the agreed unit prices to the quantities of Work proposed will create a
hardship on the Owner or the Contractor,the applicable unit prices shall be equitably adjusted to prevent such hardship.
If the Contractor claims that additional cost or time is involved because of(1)any written interpretation issued pursuant to Section
A, (2)any order by the Architect or Owner to stop the Work pursuant to Section B, where the Contract was not at fault, or(3)any
written order for a minor change in the Work,the Contractor shall make such claim.
L-2 CLAIMS FOR ADDITIONAL COST OR TIME: If the Contractor wishes to make a claim for an increase in the Contract
Sum or an extension in the Contract Time, they shall give the Architect written notice thereof within a reasonable time after the
occurrence of the event that gave rise to such claim. This notice shall be given by the Contractor before proceeding to execute the
Work, except in an emergency endangering life or property in which case the Contractor shall proceed in accordance with Section
J. No such claim shall be valid unless so made. Any change in the Contract Sum or Contract Time resulting from such claim, if
approved by the Owner,shall be authorized by Change Order.
L-3 OVERHEAD ALLOWANCES FOR CHANGES: Should any change in the work or extra work be ordered, the following
applicable percentage shall be added to Material and Labor costs to cover overhead and profit:
1. Allowance to the Contractor for overhead and profit for extra work performed by the Contractor's own forces shall not exceed
fifteen percent 1( a2 .
2. Allowance to the Contractor for overhead and profit for extra work performed by a Subcontractor and supervised by the
Contractor shall not exceed ten percent 1( 0°kl.
L-4 MINOR CHANGES IN THE WORK: The Architect shall have authority to order minor changes in the Work not involving
an adjustment in the Contract Sum or an extension of the Contract Time and not inconsistent with the intent of the Contract
Documents. Such changes may be effected by Field Order or by other written order. Such changes shall be confirmed in writing
by the Architect and shall be binding on the Owner and the Contractor.
L-5 FIELD ORDERS: The Architect may issue written Field Orders which interpret the Contract Documents, or which order
minor changes in the Work without change in Contract Sum or Contract Time. The Contractor shall carry out such Field Orders
promptly.
SECTION M
UNCOVERING AND CORRECTION OF WORK
M-1 UNCOVERING OF WORK: If any Work should be covered contrary to the request of the Owner, it must be uncovered
for observation and replaced, at the Contractor's expense.
If any other work has been covered which the Owner has not specifically requested to observe prior to being covered,the Architect
or the Owner may request to see such work and it shall be uncovered by the Contractor. If such Work be found in accordance with
the Plans and Specifications, the cost of uncovering and replacement shall, by appropriate Change Order, be charged to the
Owner. If such work be found not in accordance with the Plans and Specifications, the Contractor shall pay such costs unless it is
found that this condition was caused by a separate contractor employed by the Owner.
M-2 CORRECTION OF WORK: The Contractor shall promptly correct all work rejected by the Architect or Owner as
defective or as failing to conform to the Plans and Specifications whether observed before or after Substantial Completion and
whether or not fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including the
cost of the Architect's additional service thereby made necessary.
If, within one year after the Date of Substantial Completion or within such longer period of time as may be prescribed by law or by
the terms of any applicable special guarantee required by the Contract Documents, any of the work is found to be defective or not
in accordance with the Contract Documents,the Contractor shall correct it promptly after receipt of a written notice from the Owner
to do so, unless the Owner has previously given the Contractor a written acceptance of such condition,describing same specifically
and not generally.The Owner shall give such notice promptly after discovery of the condition.
All such defective or non-conforming work under the preceding paragraphs shall be removed from the site where necessary and the
work shall be corrected to comply with the Contract Documents without cost to the Owner.
Defective or non-conforming work shall be completed in a timely manner. The Contractor shall respond and/or repair any work that
is deemed an emergency by the City within 24 hours. The Contractor shall respond and/or repair any other defective or non-
conforming work within three working days.
The Contractor shall bear the cost of making good all work of separate contractors destroyed or damaged by such removal or
correction.
If the Contractor does not remove such defective or non-conforming work within a reasonable time fixed by written notice from the
Owner,the Owner may remove it and may store the materials or equipment at the expense of the Contractor. If the Contractor does
not pay the cost of such removal and storage within ten days thereafter,the Owner may upon ten additional days'written notice sell
such work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have
been borne by the Contractor including compensation for additional architectural services. If such proceeds of sale do not cover all
costs that the Contractor should have borne, the difference shall be charged to the Contractor and an appropriate Change Order
shall be issued. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall
pay the difference to the Owner.
If the Contractor fails to correct such defective or non-conforming work,the Owner may correct it in accordance with Section G.
The obligation of the Contractor under this Section shall be in addition to and not in limitation of any obligations imposed upon them
by special guarantees required by the Contract Documents or otherwise prescribed by law.
M-3 ACCEPTANCE OF DEFECTIVE OR NON-CONFORMING WORK: If the Owner prefers to accept defective or non-
conforming work, he may do so instead of requiring removal and correction, in which case a Change Order will be issued to reflect
an appropriate reduction in the Contract Sum,or, if the amount is determined after final payment, it shall be paid by the Contractor.
SECTION N
TERMINATION OF THE CONTRACT
N-1 TERMINATION BY THE CONTRACTOR: If the work is stopped for a period of 30 days under an order or any court or
other public authority having jurisdiction,through no act or fault of the Contractor or a Subcontractor or their agents or employees or
any other persons performing any of the work under a contract with the Contractor, or if the work should be stopped for a period of
30 days by the Contractor for the Owner's failure to make payment thereon as provided in Section I, then the Contractor may after
the end of such period of 30 days and upon seven additional days'written notice to the Owner,terminate the Contract.
N-2 TERMINATION BY THE OWNER: If the Contractor is adjudged as bankrupt, or if they make a general assignment for
the benefit of their creditors,or if a receiver is appointed on account of their insolvency,or if the Contractor refuses,except in cases
for which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if they fail to make
prompt payment to Subcontractors or for materials or labor, or fails to comply with all Laws, Statutes, Charter, Ordinances,
Regulations or Orders of any public authority having jurisdiction, or otherwise is guilty of a substantial violation of a provision of the
Contract Documents, then the Owner, on their own initiative that sufficient cause exists to justify such action, may, without
prejudice to any rights or remedy and after giving the Contractor and their surety, if any, seven (7) days'written notice, terminate
the employment of the Contractor and take possession of the site and of all materials, equipment, tools, construction equipment
and machinery thereon owned by the Contractor and may finish the work by whatever method they may deem expedient. In such
case the Contractor shall not be entitled to receive any further payment until the Work is finished.
If the costs of finishing the Work, including compensation for the Architect's additional services exceed the unpaid balance of the
Contract,the Contractor shall pay the difference to the Owner.
The City of Fort Worth may terminate this contract in whole, or from time to time, in part, whenever such termination is in the best
interest of the City. Termination will be effected by delivering to the Contractor a notice of termination specifying to what extent
performance of the work of the contract is being terminated and the effective date of termination. After receipt of termination the
Contractor shall:
a) Stop work under the Contract on the date and to the extent specified on the notice of termination.
b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminated.
c) Terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by the notice of
termination.
After termination as above, the City will pay the Contractor a proportionate part of the contract price based on the work com pleted;
provided, however, that the amount of payment on termination shall not exceed the total contract price as reduced by the portion
thereof allocable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor
shall submit a claim for amounts due after termination as provided in this paragraph within 30 days after receipt of such claim. In
the event of any dispute or controversy as to the propriety or allowability of all or any portion of such claim under this paragraph,
such dispute or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the
City Council of the City of Fort Worth shall be final and binding upon all parties to this contract.
SECTION O
SIGNS
The Contractor shall construct and install the project designation sign as required and in strict accordance with the Specifications
for"Project Designation Signs."This sign shall be a part of this Contract and shall be included in the Contractor's Base Bid for the
Project.
The Contractor may install their company sign and shall allow the Architect to install their company sign. No other signs will be
allowed.
SECTION P
TEMPORARY FACILITIES
P-1 SCOPE: The Contractor shall furnish, erect, and maintain facilities and perform temporary work required in the
performance of this Contract, including those shown and specified.
P-2 USE OF TEMPORARY FACILITIES: All temporary facilities shall be made available for use by all workmen and
subcontractors employed on the project, subject to reasonable directions by the Contractor as to their proper and most efficient
utilization.
P-3 MAINTENANCE AND REMOVAL: The Contractor shall maintain temporary facilities in a proper, safe operating and
sanitary condition for the duration of the Contract. Upon completion of the Contract, all such temporary work and facilities shall be
removed from the premises and disposed of unless otherwise directed or specified hereunder.
P-4 FIELD OFFICES AND SHED: The Contractor is not required to provide a temporary field office or telephone for projects
under$1,000,000. Contractor shall equip the Project Superintendent with a pager and provide 24-hour contacts to the City.
The Contractor shall provide a temporary field office building for themselves, their subcontractors and use by the Architect and
Owner. For construction contracts with a bid price in excess of$1,000,000.00, the Contractor shall provide a separate field office
for the City's field representative (but the separate office may be in the same structure). The buildings shall afford protection
against the weather, and each office shall have a lockable door, at least one window, adequate electrical outlets and lighting,and a
shelf large enough to accommodate perusal of the project drawings. Openings shall have suitable locks. Field offices shall be
maintained for the full time during the operation of the work of the Contract. During cold weather months,the field offices shall be
suitably insulated and equipped with a heating device to maintain 70 degree Fahrenheit temperature during the workday. During
warm weather the offices shall be equipped with an air conditioning device to maintain temperature below 75 degrees F. Upon
completion of the work of the Contract,the Contractor shall remove the building from the premises. I n addition to the drawing shelf,
provide for the City field representatives office: one desk, four chairs, plan rack and a four drawer filing cabinet (with lock). Each
office shall contain not less than 120 square feet of floor space.
The Contractor shall provide and maintain storage sheds and other temporary buildings or trailers on the project site as required for
their use. Location of sheds and trailers shall be as approved by the Owner. Remove sheds when work is completed, or as
directed.
P-5 WIRELESS CONNECTION: The Contractor shall provide and pay for wireless internet connection(WIFI)for the City and
Architect.
P-6 TOILET FACILITIES: The Contractor shall provide proper,sanitary and adequate toilet facilities if required for the use of
all workmen and subcontractors employed on the project.
P-7 UTILITIES: Contractor shall make all necessary arrangements and provide for temporary water and electricity required
during the construction. Contractor shall provide and install temporary utility meters during the contract construction period. These
meters will be read and the Contractor will be billed on this actual use. The Contractor shall provide all labor and materials required
to tap into the utilities. The Contractor shall make the connections and extend the service lines to the construction area for use of
all trades. Upon completion of the work all utility lines shall be removed and repairs made to the existing lines. Only utilities at
existing voltages, pressures,frequencies,etc.will be available to the Contractor.
Water. Provide an ample supply of potable water for all purposes of construction at a point convenient to the project or as shown
on the Drawings. Pipe water from the source of supply to all points where water will be required.
Provide sufficient hose to carry water to every required part of the construction and allow the use of water facilities to
subcontractors engaged on the work. Provide pumps,tanks and compressors as may be required to produce required pressures.
Electric Service. Provide adequate electric service for power and lighting to all points where required. Temporary,electric service
shall be of sufficient capacity and characteristics to supply proper current for various types of construction tools, motors, welding
machines, lights, heating plant, air conditioning system, pumps, and other work required. Provide sufficient number of electric
outlets so that 50 foot long extension cords will reach all work requiring light or power.
Lighting. Supply and maintain temporary lighting so that work of all trades may be properly and safely performed, in such areas
and at such time that day-lighting is inadequate. Provide at least 0.75 watts of incandescent lighting per squgr4e foot and maintain
a socket voltage of at least 110 volts. Use at least 100-watt lamps. In any event,the lighting intensity shall not be less than 5 foot
candles in the vicinity of work and traffic areas.
P-8 HEATING: Heating devices required under this paragraph shall not be electric. The Contractor shall provide heat,
ventilation, fuel and services as required to protect all work and materials and to keep the humidity down to the extent required to
prevent corrosion of any metal and to prevent dampness or mildew which is potentially damaging to materials and finishes. All
such heating, ventilation and services shall be provided and maintained until final acceptance of all work. In addition, the
Contractor shall provide heat ventilation prior and during the following work operations as follows:
a) At all times during the placing, setting and curing of concrete provide sufficient heat to insure the heating of the spaces
involved to not less than 40 F.
b) From the beginning of the application of drywall and during the setting and curing period, provide sufficient heat to produce a
temperature in the spaces involved of not less than 55 F.
c) For a period of seven (7) days previous to the placing of interior finish materials and throughout the placing of finish painting,
decorating and laying of resilient flooring materials, provide sufficient heat to produce a temperature of not less than 60 F.
P-9 TEMPORARY CONSTRUCTION, EQUIPMENT AND PROTECTION: The Contractor shall provide, maintain, and
remove upon completion of the work all temporary rigging, scaffolding, hoisting equipment, rubbish chutes, ladders to roof,
barricades around openings, and all other temporary work as required to complete all work of the Contract. Contractor shall
coordinate the use and furnishing of scaffolds with their sub-contractors.
The Contractor shall provide, maintain, and remove upon completion of the work, or sooner, if authorized by the Owner,all fences,
barricades, lights, shoring, pedestrian walkways, temporary fire escapes, and other protective structures or devices necessary for
the safety of workmen, City employees,equipment,the public and property.
All temporary construction and equipment shall conform to all regulations, ordinances, laws and other requirements of the
authorities having jurisdiction, including insurance companies,with regards to safety precautions,operation and fire hazard.
The Contractor shall provide and maintain pumping facilities, including power, for keeping the site, all times, whether from
underground seepage, rainfall,drainage of broken lines.
The Contractor shall maintain provision for closing and locking the building at such time as possible to do so. If this is not feasible,
maintain a night
The Contractor shall provide and maintain all barricades or enclosures, required to protect the work in progress from outside
elements, dusts, and other disturbances as a result of work under this Contract. Such protection shall be positive, shall meet the
approval of the Owner and shall be maintained for the duration of the construction period or as required to provide for the protection
as specified.
P-10 PROJECT BULLETIN BOARD: The Contractor shall furnish, install and maintain during the life of the project a weather-
tight bulletin board approximately 3 feet high by 5 feet wide having not less than two hinged or sliding glass doors with provisions
for locking. The bulletin board shall be mounted where and as approved by the Owner, in a prominent place accessible to
employees of the Contractor and sub-contractors, and to applicants for employment. The bulletin board shall remain the property
of the Contractor and shall be removed by them upon completion of the Contract work. The following information which will be
furnished by the City to the Contractor shall be posted on the bulletin board and shall be maintained by the Contractor in easily
readable condition at all times for the duration of the Contract.
a. The Equal Opportunity Poster and Notice Nondiscrimination of Employment(Standard Form 38).
b. Wage Rate Information Poster(Form SOL 155), with the Contract Schedule of minimum wage rates as required by the
Davis-Bacon Act.
C. Safety Posters.
SECTION Q
VENUE
Should any action arise out of the terms and conditions of this contract,venue for said action shall lie in Tarrant County, Texas.
PROPOSAL
JOB ORDER CONTRACT SERVICES
TO: MR. DAVID COOKE
CITY MANAGER
ATTN: PURCHASING OFFICE
200 TEXAS STREET
CITY OF FORT WORTH, TEXAS
FOR: JOB ORDER CONTRACT SERVICES
VARIOUS CITY OF FORT WORTH FACILITIES
FORT WORTH, TEXAS 76107
Project No. PMD 24#= 102Z2 -(:)L-{
Pursuant to the foregoing "Notice to Offerors," the undersigned understands the Request for
Proposal for Job Order Contract services, and hereby proposes to do all the work and furnish all
labor, equipment and materials necessary to fully complete all the work as provided in the Job
Order Form, and subject to the inspection and approval of the Director of Transportation and
Public Works of the City of Fort Worth.
As addressed in the INSTRUCTIONS TO OFFERORS, the Proposal Requirements are as
follows:
• This Proposal Form, with Coefficients expressed as"X.XXX".
• Attachment "A": Contractors Qualifications Statement (AIA Form A305), including client
references.
• Attachment"B": Project Team Members and Contractors Experience
• Attachment"C": Other Subcontractors, Suppliers, and/or design professionals
• Attachment"D": Letter of Insurability
• Conflict of Interest Affidavit(and CIQ,CIS if required)
Coefficient 0.90%
Non-pre-priced Item Coefficient 10.0%
Non-standard Labor Coefficient 10.0%
The undersigned assures that its employees and applicants for employment and those of any
labor organization, subcontractors or employment agency in either furnishing or referring
employee applicants to the undersigned are not discriminated against as prohibited by the terms
of City Ordinance 7278 as amended by City Ordinance 7400 (Fort Worth City Code Section
13A-21 through 13A-29).
Job Order Contract Services RFP(April 2022) Page 12 of 29
Respectfully submitted,
Mart,Inc.
By:
Company
05/26/2022
Signa re Date
Tim Proctor President
Printed Name of Principal Title
Address: 1503 Perry Street
Street
Irving,TX 75060
City Zip
Email: Projects@martgc.com
Phone: 972-721-1522 FAX: 972-721-1660
Receipt is acknowledged of the following Addenda:
Addendum No. 1: _ Addendum No. 2:
Addendum No. 3: Addendum No. 4:
Addendum No. 5: Addendum No. 6:
End of Proposal Form
Job Order Contract Services RFP(April 2022) Page 13 of 29