HomeMy WebLinkAboutContract 42248-A2 CITY SECRUJA am.- CONTRACT NOS Z*1 AMENDMENT No., 2 To DESIGN PROCUREMENT AGREEMENT THE STATE of TEXAS § City Secretary COUNTY of TARRANT § Contrail: loo WHEREAS, Event Facilities Fort 'worth, Inc., ("Developer") and the City of Fort Worth, ("City'% entered into a 'Design Procurement Agreement CS No. 42248) (M&C C- 25071' July 26, 2011) for certain improvements to Farley Avenue including the realignment of Harley Avenue from Rip Johnson to Montgomery Street and related drainage improvements (the 1%Project"), a,nd WHEREAS, as the Project progressed, additional facilities and infrastructure improvements, were identified to expand the parking system, and provide additional water, sewer and streetsea e improvements related to the realignment of Harley Avenue ("Amendment 1' M& C-25664, JLi1ne 6, 2012); and WHEREAS, as a result of the Project, additional offsite drainage improvements were identified including facilities within the Botanic Gardens enhancing the proposed location for the future Children's Garden as well as traffic signal and pedestrian improvements at Farley Avenue and University Drive were identified' and which are to he constructed under a separate Infrastructure Construction Agreement; and WHEREAS, 'Developer will continue to engage the services of Freese & Nichols, Inc. "Engineer' to pirovide the design work called for by this Amendment; and WHEREAS, Developer and City have agreed to the costs of the additional design work pursuant to this Amendment (M&C C-26217, April 23, 2013), and WHEREAS, Staff has reviewed the scope, fee, costs and schedule for the design of the Amendment and find them to be fair and reasonable; and WHEREAS, City and Developer intend to enter into an Infrastructure Construction Agreement for Harley Phase ("Harley Phase 3 CA") (M&C G ,791 6, June 4, 2013) governing the Developer-awarded construction and reimbursement from the City for the construction costs related to the design work under this Amendment No. 2. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS., For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Regui . OFFICIAL RIECOR JUL ,w 1201,3 CITy slICRIERTA4 , CF's-FFFW, Inc. Amendment 2 to Design Procurement Ag e Page A. The Amendment will generally consist of offsite drainage improvements within the Botanic Gardens enhancing the proposed location for the future Children's Garden as well as traffic signal and pedestrian improvements at Harley Avenue and University Drive as further described by the 9 pages attached as Attachment A hereto (said pages being the same as the exhibits for Harley Phase 3 ICA). B. Developer will amend, its Engineering Contract with Freese and Nichols, Inc. C. City agrees to reimburse Developer, upon approval, of finial plans, for all additional engineering drawings, studies, renderings, contract specifications, estimates, and other documents,, and Harley Avenue Phase; 3 construction oversight, (collectively the "Second Amendment 'Work Product`� necessary, to construct the offsite drainage improvements as well as traffic s,ignal and pedestrian improvements at Harley Avenue and University Drive required by this Agreement an amount not to exceed $,112,9150.00!. Upon payment to Developer, all designs, drawings, specifications., documents, and other Amendment Work Product,, whether in hard copy or in electronic form, shall become the property of the City. - D. All other terms of the original Design, Procurement Agreement not specifically amended or altered herein remain in full force and effect. The rest of this page intentionally left blank CFW-EFFW, Inc. Amendment 2 to Design Procurement Ag,reement Page 2 of 4 IN TESTIMONY WHERE F, the City and Developer have each executed this instrument through their duly authorized representatives in mulltl'ple or'lgl'nals to be effective as of the last date signed by a Party hereto. CITY OF FORT WORTH — DEVELOPER: Event aril" 'ies W rt rt , Inc. A; � V Fernanido, Costa Kike G6omer Assistant City Manager, President and CEO Date: Date: 067,g6-4 Recommended by;r Program Management Office Transportation & Public Works De m,ent U Brea B rck, P.,E. Douglasj. Wiers,ig, P.E. c�ial Seni r apital Projects Officer Director Approved as to Form & Legality.* M&C: Lj - POP, Date: ?1 4 Douglas W. Black Assistant City Attorney V00000 ATTEST: C:);p JC Vr� Ir Mary J. Kay, 0 00 City Secret, O0000 06 14- Pj OFFICIAL RECORD CITY SECRET FT. WORTH,TX CFW-EFFW, Inc. Amendment 2 to Design Procurement Agreement Page 3 of 4 List of Attachments to t,h,is Agreement, Attachment A- hurley Phase 3 Exhibits [follows] CFW-EFFW, Inc. Amendment 2 to Design:, Procuremien:t Agreement Page 4 of 4 ATTACHMENT cri "'Vill Bljh� 31 1-0 "OV filb St Tfll ill-5t, IN 701 "R W 71h y W 7th St 'W 7rb St 10attosocn,A've nrrW 3 er 4. l."Milr1q, XI Owrnell'S CL K AA,11,11 C.1flarke Ave (# A� A ul Lanc-asit"A ve < W Larw,:,,a*.et Avv,,,,� < all, 77 4-31 S 5 40 C 4 P iadl- ML x I? PROJE T .......... Rd LOCATION y" 77 4. A E,Waih/tpurii Aq,#, IE MAN 'M ,."S IS, 3, MO rr Ha 1 vs, M IS /P I z "k, �N(irt)6r)"00 LaNyettfe A,,te a lC LjI o t A!wel Ayp P ,> "T w Bryce.A r���� � m yyA rviS�ria� OM "ve AN" 84yoc-:1,Ave r z &dc-fi T U,,y > u Q Llldert 04,,�,ra, Undon Afve 10/ IV) A= ai,-!i awaicod A-wp W 44 p (of sixogical tAl C Hos p tal at I to ldk FoiqWooh, /g// pg/ 'slm/,�nq A'vf PatShing Ave cn, 05- eiichma/rt Ave oadalle,St wof it, IR z > D > U Ile lAJ 0) C3 x Ld 0 M > 0 C)l 'o lult L Ul CM .111, 1-t— Fr-eese and Nic holls, Inc. Texos Registered Engineering Firm F-2144 -U! C LJ F&N, J08 NO, U ul > CITY FORT WORTH 40 W, EFF 1 12,21 E OF 0 DATE 01 nj'e, FREESE APPL11- 2013 SCAL %04 WKNOLS, 1-1 AF-R`L F Y AV L N U E 'TAOT TO SCALE LaU ......... ............................. ...... DESIGNED Pfara,Sude 200 C6 1. wi 1-ort W�orlh,lexas 7t;109-4895 CIVIL JT0 LJ IN ci PIII ,, (817),735 7300 l F r E �z �817) 735- r;,A- 7491 E a fu ru W FIGUR .1 S.,L V1 C IN H Y MAP I CV-PL-GN-IEXHBT.dwG u ow Al w ,j<re Dote: Apr 02. 2013 - 9:12arn user. Cj nip: N.,\if\I)ro*ings\PHASE 3\CV--PL-GN-,EX)Ai rl.dwq j r a I I i Co u Li UJ Co Le CL Lj: LZ X 0 V 4 r _. Li L,j M 411L 0 Co ) I �w > 3 It 7, �. Li �.LJ ,"I Ck�z Q,L,.. JE C,.-I Freese and NiOio�s, Inc SC F. IN FEET Ul 1 T 'E N1�,,J .11111111 <r �lrdloiols HA LE", A �a )t WoMhr�Texnrr 7�, 9-4895 ' M ..... V r�...iT W �* e w 7 �' RAF T "„ g a T. 0 ) `/.,55 7491 E B N j Cn ', .mr IV Date Apr 03, 2013 — w 0:14orr 'User; ci ode-, :\'ADr rqS\' L 3\CV—PL—GN—CXHBT2.rjwg ................. CRESTLINE RD p LJ m cr- �N Z a 0 " rn FREY V Uj IWa � a M > < w jm� ct �y U� 2 0, 4 � 0, 120"............ �. � A,L Please ci iclh, 1 �n EF `IT F FORT " "OR..�_� I a � CAS" APRs 01 r HARLEY V E N U E ,CAi ' u, � u m el) X055 iriterro on 1 � $,ort Worth, Texas ?6109-4d95 J�a�u Z, 4��...��t�� � Tai r ce CU r i 6i;. m k UNIVERSITY� __.. 4 % �I ot ( �.�, r�D: 7r�rn V��rr; � file �: .^I Dring% S'k° 3\CV.-.PL-GN--EXHf3I4,dwq m, ROCK PROTECTION F~ w PR TRhVTY PARK µ PROPOSED CRANE[.... TAM PRO FECTUN z z � . ....PROPOSED ILLS > DROP STRUCTURE CL Li 0 4. :m PROPOSED IPRA F— D r Ck IIJ (-) Z CL iw T I �,r°V t✓1 N LL 1 '00' 200 SCALE IN FEET a �a Freese and NlchcI s, Inc. Texas E ist r. Engineering Firm, F­2144 F � JOBl"1 CITE" E FORT WORTH I: .,c � (A L_ 1FREESE 5-(6 tt uI I II �. 0 � OL ,......... ......... 0 L)-�(n 4055 Ink rruuknol Plazo, t�Re 2 _ CIVIL DESIC.uNED J'F0 mi , X51 9.4895 L �'t�r'C Wt'rrmltl� Texas II ,�_ .. CZ na a Q51 2.35...7491 ) (j,�r E. U Lj GL Li 01 < Dote: p( .„...2013 m 0,22e User: cJ File.- N:\Ii("0rcw4)q \PF1E \V— l_... I_EXFfT S.d+wy sir ,w L. ol wy aMt " rv- 4d AF CP tT Lj T * n w e / Mr f l G -, � C 1 q Nrr 1 ">U//7O/�/6�1fi/�///.�'ii�Dl(,/..I,OUV✓%) �/l�G,/.%///%///!///Li/G/A/////i,,,.G.;//& ".�/lo,Y/G. ,l/�,/Qiw%,.i/�3 9',lG,✓ ...... Ci I 01 C G Q="J " j CIO f UJ ru 7 r .p.. �. CL U N1 DE N AVE C r I � f Z 0 Lt C'j ......................... ✓w w a LJ ell L) ...... r SAP a _.W . " Lj ."r,„ "I do L�j u i C. Freese and Nichols,, Inc. w� r EESE F. M INICHO,LS H A L E A V E N E F cart rth, rexos "F 1 V— CIVIL. 4Phoo . ( 1 P) 735,7300 4o ( h 7)r, •-7� t EXHIBIT I G �i�� .... Y rna C I14 dr x a .w _ .w avJ e, Apr 03, 2013 W, rrj User: ci N -, N,\,I, r rrrol 1P ' ` V-PL— N—.XHfj7 w HALEY AVENUE PHASE 3 ST'ORM DRAINAGE AND PEDESTRIAN IMPROVEMENTS EXHIBITE-CONSTRUCTION COSTS Unit 1-Section A-Trinity Park $21918201.00 Unit 1,-Section B - McWane '72" Abandon $77,010.00 TOTAL UNIT 1 $2961830.00 Unit 11 - University Sidewalk $6812917.0O TOTAL EM IT 11 $68,297.00, knit III -Storm Drain Line E Extension $7291121.00 TOTAL UNIT 111 $729,121.00 TOTAL CONSTRUCTION COST $1,094,248.00 / r/ / i 7603 i era" rii... / ,.. ✓ /, /..� :.iii; / ,,... ii rr, r Film, %. r � ,...,. i (i, c r „, ite, /r /rr�/ e„ .�;�r A ► MAE IN OEM 11 New �� ► '► ► I ." .r Mme► r Vk IM � Mot I M, fA III igloo re Noun IBM luring 111MIM-M JAI,= ►•' "� � �� ��►j� N� ���� � Ir uul a '�i� �� .r iw ►► e 40 t ,. M IS Writ: Events e Fort Worth S.J. Louis Const.of TX, Ltd. Project,., �Harlley Ave Phase 3 Paving& Drainage Improvements 620 S. Sixth Ave Bid Date. March 21, 2013 Mansfield,TX 76063 Project a !��i i,,,/ / �� / r ,// / / r r r r r i//r%��/Grrv.,/r/r!�d../i,!/,/��.fa�.rici//�l LIl...� .�///���G:,,,�/G/,�r��.�,/a,�,✓✓/ „r,..,,ow.//i�r,�.�ri oi�/�,,,:,,;ir,�,�„r,;� ,,,�,�Gr r�„i„r„�,r� Embankment PF ► Quantity ""i" "� "w"" Bermuda Block Sod Placement $5,0010.00 pe B Barrier Free $4,000.00� r- E Barrier Free Ramp ° � ' ' � ”'h�I iuu.........:-A .................................................�I�tlq pe G Barrier Free Ramp $5,000.00 =�Ty�)e M-3 Barrier Free Ramp ............... -------------------------------------------- Traffic Cont�rol e-Nurn 8i ° r -Bare all Pavement Marking-12 Inch-Crosswalk Line-White- Install . Pavement r! i Bar-White-18 Install ��iii ',® � � � � � : Signal-C1`Signal-Concrete Foundation Ir $11400.00 III VIII II -� uMl tlF N g o •` 40 ����Electrical Ground d �A� �I '. JA �N ���N�ment Marking-Stop Bar- Remove ���7P_a_vement Marking-Crosswalk- Remove $1 44,0.00' ��ffP`_avement Marking-Solid L,ine- Remove___ • _ L •. e . Traffic Signal System Remove Signal-1 0 Ft Pedestal Pole Assembly-item prov,ided by City - Install ����Cable-,Num 14-9 Conductor Stranded- -able- Install Sig nal-I nternatioinal Pedestrian Signal Type Countdown- Install $6,875.010 ................................................ I I 11A Pedestrian Pushbutton & Sign Assembly Type (9 x151 $5$600.00 Siginal-International Pedestrian Signal Type Countdown LED Insert- Install I tolIMM101:0,val I millin k'WJg:+*-iJJM jai= $_681297.9 0 r ,w S.J. Louis Coast.of T 620 S.Sixth Ave Mansfield,, 76063 7x7 Box Culvert€_; ,.. /,,,,,; / i / ,,,�/<,,,/./ //// ,%/ ,,,,,,,/ .:✓ ,/ / ,. / /. ,., / ri ����„ r„.,.. r rill,„ r /iar / ✓. rrr rte/,,rr /i r ,�,,,,, i,,,,,,,/rr „��ri,;r r r o,,.�ir,;... „,rr,,r.i,..//r/o.,r�/rirr �,� / / r .r„ r r ..r r r ,r///..,, ii„„✓.r.. r ,;�” r ,..✓,.. ice,Cr,.,rii/%/��.,Lr/i�/i////�r�/�/,�/l�%�j,�,rae�/�,1,.,�///t l//rrr/r//r// // / r r, / r r ✓ r r.. ' ° " "" 7x7 Box Culvert Salvage and Install --------------- $654.00'-i $168732.010 y�«wu�N IiulpV NMi �� q Box SIN M1 $371 742.06 4' Manhole Riser $5,1000.010 �=" "` P Class d � ! 4' Drop Inlet $3J000.0 Parallel Wing Headwall $910001.00 Trench Safety ��MAsphlalt Trench Repair $24,50b.00l ���IEmbankme" Plan Quantity $1311800.00 Mir ' 1 .,+ Klear and Grub o e a [Remove *''" 1: gill MOM 11 MkV:4kl-ftll*lgjI 1 $7291121.00 FOR UNIT 1, SECTION A (TRINITY PARK)- $219,820.00, TOTAL FOR UNIT 1;, SECTION B (MCWANE 72" Illf III RCP ABANDONY w 0 pl�pl�lll I TOTAL, FOR UNIT 2 (UNIVERSITY S�IDEWALK,)- $681297.00 I�� pII�IIIII�I IIAI �plll TOTAL O I�I�I IIIIINIIM M2 VIII �III���M���II IUD BASE B�ID TOT'AL $1 48',00 ,w w 0 ,. ' M&U ,Keview r d9C .1 1. .a Official site of the City of Fort Worth,Texas o n on i UW C01L AAOU04ENDA CITY C NA R,W11111MMIMS COUNCIL ACTION: Approved on 4/23/2013 -Ordinance No. 207201-04-2013 DATE: 4/23/2013 REFERENCE NO,.: C-26217 LOG NAME: 20HARLEY UP A ICA AM�END—2 CODE I C TYPE: NON- PUBLIC NO CONSENT HEARING,:� SUBJECT.- Authorize Execution of Amendment No. 2 to City Secretary Contract No,. 42521, an Infrastructure Construction Agreement with Event Facilities Fort Worth, Inc., in the Amount of$281,,153.14 to Allow Reimbursement for Additional Improvements Related to the Harley Avenue Phase 2 Realignment Project for a, Total Contract in the,Amount of $10,704,282.86, Authorize the City Manager to Execute Amendment No. 2,to City Secretary Contract No. 42248, a Design Procurement Agreement with Event Facilities Fort Worth, Inc., in the Amount of$112,950.00 Bri�nginig the Total Contract Amount to $1,1691,924.00,, Authorize a Transfer in the Amount of$77,950.00 from the Park Gas Well Leases Fund to the Stormwater Capital Projects Fund' and Adopt Appropriation Ordinance (COUNCIL DISTRICT 17) RECOMMENDATION-, It is recommended that the City Council.* 1. Authorize the transfer in the amount of$77,9!50.0,0 from the Park Gas Well Leases Fund to the Stormmwater Capital Projects Fund, 2., Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Stormwater Capital Projects Fund in the amount of$77,9:50.00, 3. Authorize execution of Amendment No. 2 to,City Secretary Contract No. 42521, an Infrastructure Construction Agreement with Event Facilities Fort Worth, Inc., in the amount of$1281,153.14 in order to allow reimbursement for additional utility, paving, landscaping, and parking system improvement's associated with the Harley Avenue Phase 2 Realignment Project, thereby increasing the contract amount to $10,704,282.86; and 4. Authorize the execution Amendment No. 2 to, City Secretary Contract No. 42248, a Design Procurement Agreement with Event Facilities Fort Worth Inc., in the amount of$1121,9501.00 bringing the total contract amount to$1,1169,1924.00. 4 DISCUSSION,,, The Harley Avenue Phase 2 Realignment Project provides for a realigned Harley Avenue through the Will Roger Memorial Center (WRIVIC) and additional water,, s,ewer, paving and parking improvements associated with the expansion of RIVIC, Event Facilities Fort Worth, Inc. (EFFW) is managing this improvement th�rough two separate Agreements. Infrastructure Construction Agreement Amendment No. 2 to City Secretary Contract No. 42521 provides for improvements associated with additional waterX sanitary se:wer, paving, landscaping and parking infrastructure in response to changes in the facilities expansion plan, of the WRIVIC. In addition, this Amendment includes the removal of storm drainage improvements in Trinity Park,since it was determined that these improvements could be deferred to a later date. Amendment No. 2 costs total $281,153.14 and are associated with the following functional elements and funding sources. http://ap;ps.cfwnet.org/coun,cil—Packet/me—review.aspi.?IDI=1 8261&councildate-4/23/2013 6/10/2013 m&t-, Keview The table below provides the history of the Infrastructure Construction Agreement Work Ellement, Funding Source Amount Water Improvements Water Ca ital Projects Fund $ 551421.38 Sanitary Sewer Improvements, Sewer Capital Projects Fund $ 1781541.99 Paving and Landscaping ILA wfTarrant County $ 308,750.21 Harlex Trianqle Parkway Lot Municipal Parkin q Fund $293801.56 Subtotal $ 8361515.14 Trinity Park Drains Channel Storm water Capital Fund ($5551362-0 Total—Amendment No. 2, $ 281,153.14 Action Amount DescrimpLion M&C No. ApErovall Date Initial Contract $8,550,644.80 �H�a,rl'e:y Realignment Project C-25261 11-01-�201 1 Rip Johnson to Montgomery a Water, Sewer, Paving, Draina2e C-25664 06-1�,2-2012 Amendmentl$11872'1484-92 WRIVIC Parking Expansion and i No. 1 Associated Water, Sewer, and Davin Llmgrovements Amendment $ 21817153-141 ILandscaping and Hardscape Pending Pending No. Elements dditional Water Irn rovements Total $10,7040428-86 Desiqln Procurement Ac ireement Amendment No. 2, to City Secretary Contract No. 42248 prolvides for additional storm drain design in the Botanic Garden that will also support the development of the future Children's Garden. This Amendment also provides for desilgn work,associated with traffic signal and pedestrian, improvements at the intersection of Harley Avenue and University Drive. Amendment No. 2 costs total $112,950.00 and are associated with the following functional elements,and funding sources. Work Element Fundlona Source Amount Storm Drain in Botanic Garden: Park Gas Well Leases Fund $ 771950.00 Harley/University Intersection 2004 CIP $ 35,000-00 Ins erovements, to -Amendment N�o. 2 $112$950.00 The table bellow provides,the history of the Design Procurement Agreement. A ctimon Amount, Description M&,C No. Approval Date Initial Contract $937,600.00 H!,arley Realignmen t Project C-25071 017-26-2011' Desi gn Amendment $1121374-00 WRIVIC Parking Expansion C-25664 06-06-2012 No. 1 and Associated Water,, Sewer, and Pavi�ngIlmerovements Am e d'n e nt $1121950.00 Storm Drain Design: in BG Pending Pending No,. 2 Intersection_1.mp rove mi e�nts ----------- Total $111$1699924.010 M/WBE Office: The developer has agreed to provide for a 15 percent M/WBE commitment in the amendments,to the In�frastr�ucture Construction Agreement., httr):Hat)t)s.cfwnet.or�eounciI packet/mc review.asp?.1D==1826 1&colunci1 date=4/23/2013 6/10/2013 Ulage 3 o,t 3 This project, is, located in COUNCIL, DISTRICT 7 and serves the entire City. FISCAL INFORMATIONXIERTIFICATION: The Financial Management Services, Director certifies that funds are available in the current capital b�ud�gets, as appropriated, of the Street improvements, Fund, the Water Capital Projects Fund, the Sewer Capital Projects fund, the Grant Capital Projects Fund, the Western Heritage Parking Garage Fund, and the Park Gas Well Leases Fund and, upon approval of the above recommendations, funds will be available in the current capital budget, as appropriated, of the Stormwater Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 2)E228 472282 207280014330 $77J 50.00 4)P228 539120 207280014330 $77, 50.00 2) P228_539120 207280014330 $77,950.00 4)C2 539120 20723 14,330 $35, O0.00 88 539140 707130014380 $178 99 ,541. 3)P265 539,140 607,1140014380, $55,421-38 3) F'2491 541200 257060014380 $293J801.56 �1 �8, 50-21 GiR74 541�200 020422472813 $30 0 1)Q282 538070 801929966600 $77JI950-00 Submifted for Ci!y' Manager's Office b3L' Fernando Costa (6 122) 0,[!ginating Department Head: Douglas W. Wilersig (7801) Additional Information Contact: Bryan, Beck (7909) ATTACHMENTS 20HARLEY DPA ICA AMEND 2 A01 3.doic Harlev Ave,nluelProject Overview Map.odf http://apps.cfwnet.o,r,9/c,ouncll_packet/mc—review.asp?ID=1826 1&counc11date=4/23/2013 6/10/201.3 .1 ............--l-11--1"-I