HomeMy WebLinkAboutContract 54021-CO3 ATTEST:
7a�tiPffa-S. �rn+ LG
J� ,fte ,S �9,z�«��5,CDT) FORT WORTH
Sep 19, 2022
.004�nn
baa FORr��a� CSC No. 54021-0O3
0F00�ooa000000�as
1,vg s=� City Of Fort Worth
p�,� 00*�d Change Order Request
0000000�00 a
�4 rEXp►`�o� Facility and
�Anao44 Project Northside Community Center Renovation City Sec No. 54021
1
Description:
Funding(FID)34018 0800450 5740010 101654 004580 9999 18020109 City Proj.No. 101654
No.(s)
Contractor: HM&MF d/b/a Muckleroy&Falls I Change Order#= Date: 9/14/2022
City Project Mgr.lRonme Clements I City Inspector: Mitch Kiowski
Phone Number: (817)392-8014 1 Phone Number: (817)392-2297
Contract Time
(CD)
Original Contract Amount $4,390,000.00 469
Extras to Date $99,315.00 0
Credits to Date $0.00 0
$0.00 0
Contract Cost to Date $4,489,315.00 469
Amount of Proposed Change Order $17,050.00 0
Revised Contract Amount $4,506,365.00 469
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $0.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.65 Y
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,487,500.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
The purpose of this change order#3 is for additional work on the existing roof.It was in the best interest of the city to have the same
contractor replacing the roof for the city to complete the work that was part of the construction contract with Muckleroy&Falls.This keeps the
warranty of the roof under one contractor.This results in an addition in the contract by$17,050.00.Change order#1,2,&3 results in an final
contract amount of$4,489,315.00 a 2.65%increase from the original contract price of$4,390,000.00.
It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents
payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order.
HM&MF d/b/a Muckleroy&Falls Joshua Rohrer Sep14,2022
Contractor's Company Name Contractor Name Contractor Signature Date
& Sep 14,2022 C, n" Sep 14,2022
PMD Inspector Date Architecural Services Manager Date
a Sep 14,2022 s � Sep 19,2022
PMD Superintendent Date Assistant City Attorney Date
,B7rc t6. Sep 14,2022 Sep 14,2022
o Gz(sep iq zr sco1�
PMD Project Manager Date Director/Property Management Department Date
Sep 14,2022 'ZA2 or%sepie.zu usacor Sep 19,2022
Project Architect Date Assistant City Manager Date OFFICIAL RECORD
CITY SECRETARY
M&C Number 22-0696 M&C Date Approved 1 9/13/2022 FT.WORTH, TX
Contract Compliance Manager: , n �!�✓
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including Brian R.Glass,AM
ensuring all performance and reporting requirements. Assistant Director,Property Managemei
Department June 2018 Rev 1
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 09/13/22 M&C FILE NUMBER: M&C 22-0696
LOG NAME: 21 NORTHSIDE COMMUNITY CENTER CHANGE ORDER NO.3
SUBJECT
(CD 2)Authorize Execution of Change Order No.3, in the Amount of$17,050.00,to City Secretary Contract No.54021 with HM&MF, Ltd.d/b/a
Muckleroy&Falls,for a Revised Total Contract Amount of$4,506,365.00,for the Northside Community Center Renovation(2018 Bond Program)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No.3, in the amount of$17,050.00,to City Secretary Contract
No. 54021 with HM &MF, Ltd.d/b/a Muckleroy&Falls,for a revised total contract amount of$4,506,365.00,for the Northside Communtiy Center
Renovation project(city Project No 101654)(2018 Bond Program)
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to authorize execution of Change Order No. 3, in the amount of$17,050.00. On
April 7, 2020, City Council authorized execution of a Design-Build Contract with HM &MF Ltd.d/b/a Muckleroy&Falls, in the not-to-exceed
amount of$4,390,000.00, including Owner's Construction Contingency Allowance,to design and renovate the Northside Community Center(M&C
20-0240). Change Order No. 1 and Change Order No.2, in the combined amount of$99,315.00,were administratively executed by staff,for a
revised contract amount of$4,489,315.00.The purpose of Change Order No. 3 is for additional unforseen roofing repairs. Change Order No.1, 2
and 3 increases the original contract by$116,365.00 for a revised contract amount of$4,506,365.00. This is a 2.65% increase to the original
contract price.
This project is included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt
is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement
expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No.23209-05-2018)
and subsequent actions taken by the Mayor and Council.
Business Equity-HM&MF Ltd.d/b/a Muckleroy&Falls is in compliance with the City's BDE Ordinance by committing to 88% SBE participation
on the design phase and 15% MBE participation on the construction phase of this design-build project.The City's SBE goal on the design phase
is 10%and on the construction phase is 15%.
Funding is budgeted in the PACS Culture/Recreation Department's 2018 Bond Program Fund for the purpose of funding the Northside Community
Center project,as appropriated.
This project is located in COUNCIL DISTRICT 2.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the 2018 Bond Program Fund
for the Northside Community Center project to support the approval of the above recommendation and execution of the change order. Prior to any
expenditure being incurred,the Park&Recreation Department has the responsibility to validate the availability of funds.
Submitted for City Manager's Office by: Dana Burghdoff 8018
Originating Business Unit Head: Steve Cooke 5134
Additional Information Contact:
Change Order Request
Detailed(with Breakdown of PCOs), Grouped by Each
MUCKLEROY & ]FALLS Number
Northside Community Center Project# 20643 HM&MF Ltd.,d/b/a MUCKLEROY&FALLS
1100 Northwest 18th St Tel: Fax:
Fort Worth,TX 76164
Change Order Request: COR 063 Date: 7/22/2022
To: James Diestel From: Joshua Rohrer
City of Fort Worth HM&MF Ltd.,d/b/a MUCKLEROY&FALLS
401 W 13th St 3200 Riverfront Dr
Fort Worth,TX 76102 Suite 200
Fort Worth,TX 76107
Description Category Status
Additional Roofing Scope
Reference Required By Days Req Amt Req
Attached 7/29/2022 0 17,050
Notes
PCO No Date Reference Amt Prop Days Req Category Reason
Description Notes
PCO 063 7/22/2022 17,050 0
Additional Roofing Scope This PCO includes costs to complete additional roofing scope. Scope
includes costs for additional demo,flashing,and blocking to existing
roofing that was outside of original scope. Please see attached for
breakdown of costs.
This PCO is issued to incorporate the scope of work items as
specifically detailed on the attached cost summary and supporting
documents.This Proposed Change does not include any additional
scope provisions not specifically included herein.If additional costs
become apparent at a later date,or additional information regarding this
scope of work becomes available,we reserve the right to price any
additional cost and/or schedule impacts as they become known.
Item No Item Description Amt Prop Reference
001 Roofing-Bazan Roofing-Additional Roofing Scope 17,050
Approved By:
Signature
Name Date
Prolog Converge Printed on: 7/22/2022 MuckleroyFallsProlog Page 1
B A Z A N 2824 N Beach St Invoice
�- ROOFING Fort Worth, TX 761 1 1
Phone: 817-831-4253
Invoice # 7438R
Date: 4/18/2022
Bill To: Due Date: 5/18/2022
Muckleroy & Falls
P.O. Number:
3200 Riverfront Dr.Ste.200
Fort Worth,TX 76107
Description Serviced Amount
Cut roof back for new structure. 2,160.00
Furnish &install wood blocking around 3 sides of high new structure. 11,000.00
Install roof insulation (provided by customer).
Furnish &install receiver under windows and EFIS.
Furnish &install base flashing around 3 sides of high new structure. (Modified roofing)
Furnish &install counterflashing flashing around 3 sides of high new structure.
Cut opening, install wood blocking and flash roof hatch. 1,300.00
Overhead &profit. + 2,590.00
$17,050.00
Ship To: Total
Northside Community Center
1 100 NW 18th Street Payments/Credits $0.00
Fort Worth,TX 76164