HomeMy WebLinkAboutContract 54169-AR5 CSC No. 54169-AR5
FORT WORTH City of Fort Worth
_ter CMAR Construction Allowance Request
Project Name Harmon Rd.Improvements(US 287 to Golden Triangle Blvd./Bonds Ranch Rd.) City Sec# 54169
Project#(s) 100459 Date 7/27/2022
Harmon Rd.widening from 2 lanes to 4 lanes divided roadway between US 287 to
Description Golden Triangle Blvd./Bonds Ranch Rd.) AR# 5
Contractor McCarthy Building Companies,Inc.
city
ty
Project Mgr. Alejandra Ayala ciispector Dennis Rodgers
NO. ITEM DESCRIPTION UNIT City UNIT PRICE Original GMP Previous GMP Total PCO 16 Wall PCO 17 HIGH Revised GMP Total
Cast Adjustments EARLY CONC
Div.01-General
00 Survey/layout LS 1 $390,373A0 $390,373.00 $390,373.00 $ 390,373.00
05 Erasion Control LS 1 $242,211A0 $242,211.06 $242,211.00 $ 242,211.00
WCI:Earthwork&Walls
10 McCarthy Building Companies LS 1 $5,921,439.00 $5,921,439.00 $6,098,343.00 $ 1098,343.00
WC2:Underground Drainage
20 North Texas Contracting LS 1 $3,020,778A0 $3,020,778.00 $3,047,022.00 $ 14,165.00 $ 3,061,187.00
WC3:Water/Sanitary Sewer
30 North Texas Contracting LS 1 $1,938,301.00 $1,938,301.00 $2,083,750.00 $ 2,083,750.00
WCA:Electrical
40 Bean Electrical LS 1 $1,351,416.00 $1,351,416.00 $1,334,709.00 $ 1,334,709.00
45 Contingency-Locklaw Ground Boxes LS 1 $37,283.00 $37,283.00 $0.00 $
WC5:Paving
50 iMcMahan Contracting LS 1 $4,469,237.00 $4,469,237.00 $4,476,922.00 $ 12,329.00 $ 4,489,251.00
WC&Landscaping
60 Contingency-Rebid Ls 1 $450,000.00 $450,000.00 $267,402.00 $ z67,4az.0o
WC7:Integral Colored Concrete
70 Fart Worth Civil Construction LS I 1 1 $868,109.00 $868,109.00 $893,675.00 $ 893,675.00
WCB:Traffic Control
60 McCarthy Building Companies LS 1 $717,549.00 $717,549.00 $717,549.00 $ 717,549.00
90 General Conditions 1 $2,241,535.00 $2,241,535.00 $2,241,535.00 $ 2,241,535.00
100 Insurance LS 1 $180,432.00 $180,432.00 $181,794.00 $ 132.00 $ 115.00 1$ 182,0311
110 Fee LS 1 $1,418,86300 $1,418,863.00 $1,428,503.00 $ 929.00 $ 809.00 $ 1143'22
120 McCarthy Performance&Payment Ban LS 1 $168,080A0 $168,080A0 $182,298.00 $ 182,298.00
130 Construction Contingency LS 1 $1,170,780.00 $1,170,780.00 $744,864.00 $ (15,226A0)$ (13,253A0) $ 716,385.00
131 McCarthy Subcontr.Shared Savings LS 1 $98,08200 1 $98,082.00 $ 98,062.00
Owner Allowances:
140 Utility Delay Allowance Ls 1 $200,000.o0 $200,000.00 $175,973.00 $ 175,973.00
141 Construction Ls 1 $200,000.00 $200,000.00 $132,068.00 $ 132,068.00
142 Utility is 1 $100,000.00 $100,000.00 $100,000.00 $ 100,000.00
143 Landscape Restoration is 1 $50,000.00 $50,000.00 $50,000.00 $ 50,000.00
144 lirrigation LS 1 $50,000.00 $50,000.00 $50,000.00 $ 50,000.00
145 Gates LS 1 $30,000.00 $30,000.00 $30,000.02 $ 30,000.00
146 Owner 1%Return&Shared Savings LS 1 $249,323.00 $ 249,323.00
Total Owner Allowance $630,000.00 $787,364.00
Grant Total $25,216,386.00 $ 25,216,386.00 $ - $ - $ - $ $ $ - $ $ 25,216,386.00
730
Addeianal Days Requested a
Revised Contract Time 730
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments):
The justification for this Allowance Request can be found in the attached documentation provided by McCarthy.The justifications have been reviewed and the City concurs with these allowance requests.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. The ProjeGUProgram Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor's Name lContractorSignature Date
McCarthy Building Companies Inc. Riley Seahorn 'S ° Aug 11,2022
ile Seahorn(Au 11,202216:25 CDT
Ins a ection Su erosor Date Pro'ct and Contract Compliance Manager Date
a'L Aug 31,2022 -X4AVIM -*1 45 7/27/2022
nis Radxers(Au ,20120952 CDT)
Pro ram Date Senior Capi I Projedt DRicer Date
Sep 2,2022 1,40Q/ Sep 6,2022
—WAcwedo(sep e,zozzae:za con
Assistant Director(Dept) Date Director,Contracting Department Dept Date
XP4 Sep 6,2022P Sep 6,2022
Assistant City Attorney Date Assistant City Manager Date
ow
19,2022 T`
LW •sev t9zmz 15cz7 cot Sep illia-1, 202Q22 e:ae con Sep 20,2022
ATTEST: �d4vn�n�
Afiette S.Goodall(Sep 20,2o��A�� o00 00 oar OFFICIAL RECORD
Jannette Goodall-City Secretary 'C A. � °o pad
��a °s=d CITY SECRETARY
p
D
a*�
000000000 FT. WORTH, TX
CMAR Construction Allowance Request �)1 nEX p5q�a Page 1 of 1 7/27/2022
PCCO #005
McCarthy Building Companies Inc. Project: 002200.000 - Harmon Road Improvements US 287/81 to
12001 N Central Expressway Suite 400 Golden Triangle Boulevard CPN 100459
Dallas,Texas 75243 Harmon Rd from US 287 to Golden Triangle Blvd,
Phone: (972)991-5500 Fort Worth,Texas 76177
Prime Contract Change Order #005: Customer Allowance/Contingency
Request #005
TO: City of Fort Worth Transportation FROM: McCarthy Building Companies Inc
Department 12851 Manchester Rd
200 Texas Street Saint Louis, Missouri 63131-1802
Fort Worth,Texas 76102
DATE CREATED: 6/29/2022 CREATED BY: Riley Seahorn(McCarthy Building Companies
Inc)
CONTRACT STATUS: Ready for Review REVISION: 0
SCHEDULE IMPACT: 0 days
CONTRACT FOR: 1:Harmon Road Improvements US 287/81 to TOTAL AMOUNT: $0.00
Golden Triangle Boulevard CPN 100459
Prime Contract
DESCRIPTION:
ATTACHMENTS:
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO# Title Schedule Impact Amount
016 CE#016-CE-016-Culvert Wall D Adjustments $0.00
017 CE#017-CE-017-High Early Concrete P2 North $0.00
Total: $0.00
CHANGE ORDER LINE ITEMS:
PCO#016:CE#016-CE-016-Culvert Wall D Adjustments
# Cost Code Description Type Amount
1 33028-33028.0052.00.00-WC 2 STORM CE-016-Culvert Wall D Adjustments Material $14,165.00
DRAIN
2 01800-01800.0810.00.00-Cost of Risk CE-016-Culvert Wall D Adjustments Material $132.00
3 01900-01900.0910.00.00-INITIAL MARKUP CE-016-Culvert Wall D Adjustments Fee $929.00
4 01900-01900.0955.00.00-CONTINGENCY CE-016-Culvert Wall D Adjustments Material ($15,226.00)
Subtotal: $0.00
Grand Total: $0,00
PCO#017:CE#017-CE-017-High Early Concrete P2 North
# Cost Code Description Type Amount
1 32091-32091.0050.00.00-WC 5 PAVING CE-017-High Early Concrete P2 North Material $0,00
2 01800-01800.0810.00.00-Cost of Risk CE-017-High Early Concrete P2 North Material $0.00
3 01900-01900.0910.00.00-INITIAL MARKUP CE-017-High Early Concrete P2 North Fee $0.00
4 01900-01900.0955.00.00-CONTINGENCY I CE-017-High Early Concrete P2 North Material $0.00
Subtotal: $0.00
Grand Total: $0.00
McCarthy Building Companies Inc. page 1 of 2 Printed On:6/29/2022 02:35 PM
E= PCCO #005
The original(Contract Sum) $25,216,386.00
Net change by previously authorized Change Orders $0.00
The contract sum prior to this Change Order was $25,216,386.00
The contract sum would be changed by this Change Order in the amount of $0.00
The new contract sum including this Change Order will be $25,216,386.00
The contract time will not be changed by this Change Order by 0 days.
City of Fort Worth Transportation McCarthy Building Companies Inc
Department
200 Texas Street 12851 Manchester Rd
Fort Worth,Texas 76102 Saint Louis,Missouri 63131-1802
6/29/22
SIGNATURE DATE SIGNATURE DATE SIGNATURtj V DATE
McCarthy Building Companies Inc. page 2 of 2 Printed On:6/29/2022 02:35 PM
!A C m In O M N O A 1N�M M a N Ol �m W m A m O O O O N M
M N M
N m N O N 0 0 0 0 O>f0
Q O N aD M O) r M A ap d. O N O N N a O A M O t0 LLJ M V
w N W t0 N � W O O A N O M M W A PA ------N N
GO) LU bM9 O O O - Q N� r� N N yj O Q V tm E9 EA M EA fA uj
WU MM UT w!f3
N S
# m
m
Q O O N M
a L) e>
c U a
c a—
m `m
m w
.c
m
U w Q c
; O— E N N c
c
3 a 3 v F» e>
o ¢
Q
3 m O O N cfOO O of mNm o
C E V 00 O O O O
c -
Mc�
C7 U
_ a
v
a
] a
] a s a a a a s a a a a
E �
0
O o 0 0 0
Y
pO
W
c U C
O 'y•� .� V d ;A
W N r L F d
�V u �3a � � �o
1
PCO #016
Project:002200.000-Harmon Road Improvements US 287/81 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
Prime Contract Potential Change Order #016: CE #016 - CE-016-Culvert
Wall D Adjustments
TO: City of Fort Worth Transportation Department FROM: McCarthy Building Companies Inc
200 Texas Street 12851 Manchester Rd
Fort Worth Texas,76102 Saint Louis Missouri,63131-1802
PCO NUMBER/REVISION: 016/0 CONTRACT: 1 -Harmon Road Improvements US 287/81 to
Golden Triangle Boulevard CPN 100459 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Riley Seahorn (McCarthy Building
Companies Inc)
STATUS: Pending-In Review CREATED DATE: 6/29/2022
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION:
SCHEDULE IMPACT:
TOTAL AMOUNT: $0.00
POTENTIAL CHANGE ORDER TITLE: CE#016-CE-016-Culvert Wall D Adjustments
CHANGE REASON:Contingency
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#016-CE-016-Culvert Wall D Adjustments
DESCRIPTION OF PROPOSED CHANGE:
CE-016-Culvert Wall D Adjustments
SCOPE:
The Box Culvert D Outflow Headwall had an elevation discrepancy between the top of wall elevations shown on the drawings and proposed final
elevations per plan.The team discovered that if the Headwall,Sidewalk and Curb Lines from STA 64+01.50 to STA 64+75 are built to elevations
provided in drawings,neither the sidewalk nor the area behind curb will meet the 1.5%cross slope specified in the sidewalk standard details along with
the recessed storm drain inlet standard details.The team worked together for the best solution to raise the Culvert D Headwall to ensure there cross
slopes are meet and water sheds to the storm drainage inlet.
REFERENCE:
Please refer to the attached pricing from North Texas Contracting WC 2 subcontractor and plan sheets C5.12,C12.32,and the attached markup.
ATTACHMENTS:
# Cost Code Description Type Amount
1 33028-33028.0052.00.00-WC 2 STORM DRAIN CE-016-Culvert Wall D Adjustments Material $14,165.00
2 01800-01800.0810.00.00-Cost of Risk CE-016-Culvert Wall D Adjustments Material $132.00
3 01900-01900.0910.00.00-INITIAL MARKUP CE-016-Culvert Wall D Adjustments Fee $929.00
4 01900-01900.0955.00.00-CONTINGENCY CE-016-Culvert Wall D Adjustments Material $(15,226.00)
McCarthy Building Companies Inc. page 1 of 2 Printed On:6/29/2022 12:26 PM
PCO #016
Project:002200.000-Harmon Road Improvements US 287/81 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
Grand Total:1 $0.00
City of Fort Worth Transportation McCarthy Building Companies Inc
Department
200 Texas Street 12851 Manchester Rd
Fort Worth Texas 76102 Saint Louis Missouri 63131-1802
06/29/22
SIGNATURE DATE SIGNATURE DATE SIGNATUR DATE
McCarthy Building Companies Inc. page 2 of 2 Printed On:6/29/2022 12:26 PM
HARMON RD-CULV D EAST HEADWALL ELEVATION ADJUSTMENT
NORTH TEXAS
•
BID ITEM DESCRIPTION CITY UNIT UNIT PRICE TOTAL
N/A CULV D EAST HEADWALL ADJUSTMENT 1 EA $ 14,164.45 $ 14,164.45
TOTAL(ROUNDED) $ 14,165.00
NOTES PRICING IS TO RAISE PREVIOUSLY CONSTRUCTION CULV 0
EAST HEADWALL NO MORE THAN 8"HIGHER THAN EXISTING
EXCLUDES TRAFFIC CONTROL,BARRICADES,FLAGGING
EXCLUDES PAVING REMOVAL&REPLACEMENT IF REQUIRED
EXCLUDES SWPPP,EROSION CONTROL AND SPRINKLER REPAIR
EXCLUDES SEEDING,SODDING AND LANDSCAPING
EXCLUDES EXPANSION MATERIAL FOR ADJACENT CONCRETE POURS
PREPARED BY: WES LANCASTER
DATE: 3/7/2022
NORTH TEXAS CHANGE ORDER COST
CHANGE DESCRIPTION:CULV D HEADWALL ADJUSTMENT
RAISE TOP OF HEADWALL ELEVATIONS TO MATCH ADJACENT CONCRETE PAVING GRADES
LABOR BREAKDOWNS 10 HOUR DAYS REGULAR REGULAR OT OT TOTAL
QTY DESCRIPTION HOURS RATES HOURS RATES AMOUNT
LABOR SUBTOTAL $
EQUIPMENT UNIT REGULAR REGULAR TOTAL
QTY DESCRIPTION HOURS RATES AMOUNT
EQUIPMENT SUBTOTAL $
MATERIALS/MIS
CELL UNIT QUANTITY UNIT PRICE TOTAL
DESCRIPTION AMOUNT
MATERIAL SUBTOTAL $
SUBCONTRACTORS UNIT QUANTITY UNIT PRICE TOTAL
DESCRIPTION AMOUNT
IMT CULV D HEADWALL ADJUSTMENT EA 1 $ 13,489.95 $ 13,489.95
SUBCONTRACT SUBTOTAL $ 13,489.95
TOTALS&MARK UP SUMMARY QUANTITY UNIT OF MEASURE UNIT PRICE TOTAL
AMOUNT
BARE LABOR COST 1 LS $ $
LABOR BURDENS 45°/u PCT $ _$
LABOR MARKUP 15% PCT $ $
EQUIPMENT SUBTOTAL 1 LS $ $
EQUIPMENT MARKUP 15% PCT $ $
MATERIALS SUBTOTAL 1 LS $ $
MATERIALS MARKUP 15% PCT $ $
SUBCONTRACTOR SUBTOTAL 1 LS_ $ 13,489.95 $ 13,489:95
SUBCONTRACTOR MARKUP 5% PCT $ 13,489.95 $ 674.50
COST TOTAL $ 14,164.45
NOTES
IMT Construction, LLC i M�
WBE/SBE/MBE/DBE '
11130 Petal St- Suite 200
Dallas,TX 75238 CONSTRUCTION LLC.
Office-(972)707-0664/(469)456-5604
estimating@imtconstruction.com
For Job: Harmon Rd -Wall D (Adding No More Than 8" Thickness) Bid Date: 03/07/22
Unit of
Item No. Qty. Measure Cost per Unit Amount
Materials
Sika Crete 211 -80 Ibs Bags 100 EA 52.00 5,200.00
Sika Top Dispersant (bonding agent- per gallon) 3 GAL 69.00 207.00
Forms Plywood Cut-4' x 8' 7 EA 69.00 483.00
2' x 4' lumber-75% Reusable (price figured at 25%of$1.80) 450 LF 0.45 202.50
Bar Ties (per Box) 1 EA 109.00 109.00
#6 Rebar-300 LF(weighs 1.5 Ibs per LF) 450 LB 0.81 362.25
#4 Rebar- 148 LF(weighs.671bs per LF) 100 LB 0.81 80.50
Epoxy(per gallon) 3 GAL 75.00 225.00
Total Materials: $6,869.25
Labor
Remove & Reinstall Top Rail - Remove (2 men, 2 hrs) 4 HR
Remove & Reinstall Top Rail - Replace (2 men, 3 hrs) 6 HR
Grind & Rough Top of Wall (2 men,4 hrs) 8 HR
Drill, Epoxy, &Tie Steel (4 men, 6 hrs) 24 HR
Build Forms &Set (4 men, 6 hrs) 24 HR
Mix& Place Sika (4 men, 6 hrs) *Note-Cure Time is7days 24 HR
Strip & Patch (4 men, 4 hrs) 16 HR
Total Labor: $4,340.70
Rentals, Etc
Scaffolding Rental 1 LS 780.00 780.00
*Setup 1 LS 450.00 450.00
*Remove and Return 1 LS 350.00 350.00
Pump Water Rental 1 LS 500.00 500.00
*Labor&Gas 1 LS 200.00 200.00
Total for rentals, etc needed to match McCarthy's Requirements: $2,280.00
Exclusions:Traffic Control,Barricades,Bonds,Permits,Erosion Control,Placing Rock in Structures, Total Materials&
Testing,Testing Fees,Staking,Haul-Off,Removals,Trench Safety,Shoring,Excavation,Dewatering, Labor: $11,209.95
Joint&Seal,Shop Drawings,Railings,Form Liner,Veneer,Coloring,Special Concrete,and Backfill.
Inclusions:Labor,Concrete,Steel,and other materials as needed to complete the job.
All items bid as cast-in-place unless otherwise specified. Total Materials,
Prices are bid per current available information and assume normal scope of work. Labor, & Rentals: $13,489.95
Additional depth,larger-than-normal throats,special rings&covers,or any variant
beyond normal scope may incur an additional cost.
Prices subject to escalation,not to exceed 10%,every 12 months,beginning from start date. Bid Valid for 60 Days from Bid Date
/
ƒ ®Cl) BD
@
/\
e @@_,
o ] £ o,4s ( K
!
I [ co
i�® \k
±/\
)\)
)\/ � � _
±
E
}
_ \
0
}
@ co )
m
/
o /)
7 k
/ ! \I )
/ \ k
k�M 0
� ¥
)\j #2
)\\ zo
� \ �
\ �
_ §
D
/ �
j
: <
§
�
! ' } m
\
\ §co 7 =
7 -
g �§ -
_
co
) u ®®wJe® \/
I§/ n 4s
))) 1I &�N
6
&/
PCO #017
Project:002200.000-Harmon Road Improvements US 287/81 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
Prime Contract Potential Change Order #017: CE #017 - CE-017-High Early
Concrete P2 North
TO: City of Fort Worth Transportation Department FROM: McCarthy Building Companies Inc
200 Texas Street 12851 Manchester Rd
Fort Worth Texas,76102 Saint Louis Missouri,63131-1802
PCO NUMBER/REVISION: 017/0 CONTRACT: 1 -Harmon Road Improvements US 287/81 to
Golden Triangle Boulevard CPN 100459 Prime
Contract
REQUEST RECEIVED FROM: CREATED BY: Riley Seahorn (McCarthy Building
Companies Inc)
STATUS: Draft CREATED DATE: 6/29/2022
REFERENCE: PRIME CONTRACT #005-Customer Allowance/Contingency
CHANGE ORDER: Request#005
FIELD CHANGE: No
LOCATION:
SCHEDULE IMPACT:
TOTAL AMOUNT: $0.00
POTENTIAL CHANGE ORDER TITLE: CE#017-CE-017-High Early Concrete P2 North
CHANGE REASON:Contingency
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE#017-CE-017-High Early Concrete P2 North
DESCRIPTION OF PROPOSED CHANGE:
CE-017-High Early Concrete P2 North
SCOPE:
After conversations with the local business they could not have the driveway out of commission for any length of time due to it being the main point of
entry for their deliveries. McCarthy and the City of Fort Worth agreed the best move to keep the schedule moving and the resident at bay was to place
this one driveway with high early concrete.The placement allowed the scope of work to be down for 4 days in lieu of the typical 10 business days.
REFERENCE:
Please refer to the attached pricing from McMahon Contract,WC 5 Subcontractor.
ATTACHMENTS:
# Cost Code Description Type Amount
1 32091-32091.0050.00.00-WC 5 PAVING CE-017-High Early Concrete P2 North Material $0.00
2 01800-01800.0810.00.00-Cost of Risk CE-017-High Early Concrete P2 North Material $0.00
3 01900-01900.0910.00.00-INITIAL MARKUP CE-017-High Early Concrete P2 North Fee $0.00
4 01900-01900.0955.00.00-CONTINGENCY CE-017-High Early Concrete P2 North Material $0.00
Grand Total: $0.00
McCarthy Building Companies Inc. page 1 of 2 Printed On:6/29/2022 03:01 PM
PCO #017
Project:002200.000-Harmon Road Improvements US 287/81 to Golden
Triangle Boulevard CPN 100459
Harmon Rd from US 287 to Golden Triangle Blvd,
Fort Worth,Texas 76177
City of Fort Worth Transportation McCarthy Building Companies Inc
Department
200 Texas Street 12851 Manchester Rd
Fort Worth Texas 76102 Saint Louis Missouri 63131-1802
�Ahou-
SIGNATURE DATE SIGNATURE DATE SIGNATURkJ V DATE
McCarthy Building Companies Inc. page 2 of 2 Printed On:6/29/2022 03:01 PM
M`M41fQN.
Project: Harmon Road COJOVICTIN5 L.P.
County:Tarrant
DETAILED COST BREAKDOWN 8"HES Driveway Paving
Material Price Difference
UNIT EXTENDED
DESCRIPTION QTY UNIT COST COST
5000 PSI STRT 1 Day PT AIR(3000PS1 @ 24hrs) 1.00 CY $ 146.00 $ 146.00
2% Non Chloride Accelerator 1.00 CY $ 9.00 $ 9.00
Waste 10% 1.00 CY $ 14.60 $ 14.60
Concrete Budget Price w/Waste 1.00 CY $ 110.00 $ 110.00
Fuel/Enviromental Surcharge $40/10CY Load) 1.00 CY 1 $ 4.00 1 $ 4.00
MATERIAL COST $ 63.60
15%MATERIAL MARKUP $ 9.54
1%Bond $ 0.64
TOTAL ADDITIONAL MATERIAL COST $ 73.78
NEW ITEMS COST SUMMARY
TOTAL ADDITIONAL HES Concrete COST $ 73.78
Paving Thickness 8 in
0.666666667 ft
0.222222222 yd
1CY Concrete covers?SY 4.5 SY
Cost Increase from Regular Concrete $ 73.78 Per CY
$ 16.39 Per SY
8"Concrete Pavement $ 47.76 Per SY
8"Concrete Pavement(HES) $ 64.15 Per SY
Cost Escalation
UNIT EXTENDED
DESCRIPTION QTY UNIT COST COST
8"Concrete Pavement HES 1.00 SY $ 64.15 $ 64.15
Labor Escalaton for HES Placement inc. 1%Bond 1.00 SY $ 7.06 $ 7.06
TOTAL ITEM COST(Per SY) $ 71.21
COSTSUMMARY
TOTAL COST-8"Concrete Pavement(HES) I is 71.21 JPerSY
Notes:
This is a SY price.Total cost of change depends on total area placed.
Items not included above are upon request and at an extra cost dependent on the terms of SRM Concrete.
Other additives or changes are upon request and at extra cost(if applicable).
Gg _ 0 (^O V
Z12—
`vim x I -boa rw " oT 111 L a� 'S.' q O W d O O
FNsi �iw _ iF, = p�§I: >
.H 3 P
tia aa+
QO
ryalry;�ol..O
- O W N
_ w � _ =Ew
NORTH W U z V x' �'
¢ Q
09+66 V1S NO"HVH 3NI-IHOlVW
—
00+96 V1S NOV4UVH 3NIIHO1VW
IT
Ia
I I
I I
F II II I w �
---�
,0"Ll.GILL � ILL'
T T
I I
I
I i I r II i I I i I I I I ---
I
w T
- I I Z.
— Z. ,0'lL ,S ,0'LL 0" ——
_ I I
I
im I a
® I IollI I
I I I I I I
la' I I I I
® �
s3 wz IP---
I pI
I I I I
09+W V1S NOMJVH 3NIIHOlVIN
I '
09+L8 V1S NOMJVH 3NI-IHO1VW
6x.p'lyd6ullulo(\pauigwoo sasoyd\slaays\ppoo\poo�uow—v1 LOZ8LOl90\L qL—�—zzoz ualij
(OS+S6 tl15 O1 did Pl — 6Z�b0:0t SL—to—MZ .pano5 ieodl
,,did'Wolsunq'£S:LOAI SL-40—ZZOZ %18'Pallold
100459-CMAR-Construction Allowance Request
#5 Harmon Road Widening
Final Audit Report 2022-08-31
Created: 2022-08-11
By: Andrea Munoz(Andrea.M unoz@fortworthtexas.gov)
Status: Canceled/Declined
Transaction ID: CBJCHBCAABAABJNdkmTu-KTFZCcx2zwzLHf8 IVdeS9x
"100459-CMAR-Construction Allowance Request #5 Harmon Ro
ad Widening" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2022-08-11 -2:35:58 PM GMT-IP address:204.10.91.100
Document emailed to Riley Seahorn (rseahorn@mccarthy.com) for signature
2022-08-11 -2:38:05 PM GMT
Email viewed by Riley Seahorn (rseahorn@mccarthy.com)
2022-08-11 -9:12:16 PM GMT-IP address: 180.149.5.218
Document e-signed by Riley Seahorn (rseahorn@mccarthy.com)
Signature Date:2022-08-11 -9:25:53 PM GMT-Time Source:server-IP address: 165.225.216.159
Document emailed to Sara.Cox@fortworthtexas.gov for filling
2022-08-11 -9:25:55 PM GMT
Email viewed by Sara.Cox@fortworthtexas.gov
2022-08-12-1:06:19 PM GMT-IP address:209.194.29.100
Signer Sara.Cox@fortworthtexas.gov entered name at signing as Sara Cox
2022-08-12-1:06:34 PM GMT-IP address:209.194.29.100
=' Form filled by Sara Cox (Sara.Cox@fortworthtexas.gov)
Form filling Date:2022-08-12-1:06:36 PM GMT-Time Source:server-IP address:209.194.29.100
Document emailed to Dennis.Rodgers2@fortworthtexas.gov for signature
2022-08-12-1:06:38 PM GMT
Email viewed by Dennis.Rodgers2@fortworthtexas.gov
2022-08-24-6:53:29 PM GMT-IP address: 174.246.146.88
FeoR ► OR l H. I PerW w by
Adobe
Acrobat Sign
Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) added Dennis Rodgers (DARodgers@Transystems.com)
as an alternate for Dennis.Rodgers2@fortworthtexas.gov
2022-08-26-8:40:15 PM GMT-IP address:204.10.91.100
Document emailed to Dennis Rodgers (DARodgers@Transystems.com)for signature
2022-08-26-8:40:16 PM GMT
New document URL requested by Riley Seahorn (rseahorn@mccarthy.com)
2022-08-29-10:32:42 PM GMT-IP address: 165.225.10.181
Email viewed by Dennis Rodgers (DARodgers@Transystems.com)
2022-08-31 -2:51:47 PM GMT-IP address: 174.197.78.4
Document e-signed by Dennis Rodgers (DARodgers@Transystems.com)
Signature Date:2022-08-31 -2:52:49 PM GMT-Time Source:server-IP address: 174.197.78.4
Document emailed to Alejandra.Ayala@fortworthtexas.gov for filling
2022-08-31 -2:52:50 PM GMT
Email viewed by Alejandra.Ayala@fortworthtexas.gov
2022-08-31 -8:05:06 PM GMT-IP address:209.194.29.100
Signer Alejandra.Ayala@fortworthtexas.gov entered name at signing as Alejandra Ayala
2022-08-31 -8:05:28 PM GMT-IP address:209.194.29.100
Form filled by Alejandra Ayala (Alejandra.Ayala@fortworthtexas.gov)
Form filling Date:2022-08-31 -8:05:30 PM GMT-Time Source:server-IP address:209.194.29.100
Document emailed to Raul.LopezRoura@fortworthtexas.gov for signature
2022-08-31 -8:05:32 PM GMT
Document canceled by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2022-08-31 -8:29:46 PM GMT-IP address:209.194.29.100
FORT WORTH.., Powered by
Adobe
Acrobat Sign