Loading...
HomeMy WebLinkAboutContract 55269-CO4 CSC No. 55269-CO4 FORT WORTH. City of Fort Worth Change Order Request Project Name 2018 Bond Contract 7 City Sec# 55269 Client Project#(s) 101453 Project Description Water,Sewer and Paving Improvements for 5 Streets in Council District 4 and Haltom City Contractor Stabile and Winn,Inc. Change Order# 4 Date 9/2/2022 City Project Mgr. Greg Robbins City Inspector F OscarAguillon Dept. Unit 1:Water Unit 2:Sewer Unit 3:Paving Unit 4:Haltom City Contract Time Totals CD Original Contract Amount $789,361.00 $557,500.00 $2,010,271.05 $632,855.90 $3,989,987.95 365 Extras to Date 6 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $789,361.00 $557,500.00 $2,010,271.05 $632,855.90 $3,989,987.95 371 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 $0.00 $0.00 90 Revised Contract Amount $789,361.00 $557,500.00 $2,010,271.05 $632,855.90 $3,989,987.95 461 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 0.00% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACTCOST+25%) $4,987,484.94 JUSTIFICATION(REASONS)FOR CHANGE ORDE This change order adds additional time to the project to cover delays caused by several factors. The total number of days requested by the contractor was negotiated and vetted by the project management team. Additional time approval was considered justified for the following factors: 1.)Investigation of a water leak on Ellis Road which stopped construction until it was resolved-6 CD,January 14-19,2022 2.)Grade issues related to drainage and soil series re-evaluation regarding base material and application rate on Ellis Road-18 CD,January 28-February 15,2022 3.)Extended weather(cold freezing)days-7 CD,February 3-5 and 23-26,2022 4.)Concrete and material supplier issues causing limited production and delivery for the concrete from 200 CY/day to 50 CY/day-55 CD,Beginning August 2021 and continuing through project end 5.)Additional work on paving limits on Ellis Road and Seaman Street intersection limits including-4 CD, 4/20,4/27,5/20,5/27 In total,90 CD were approved. It is understood and agreed that the acceptance ofthis Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor Name ract Signature Date Stabile &Winn, Inc. Jerry Henderrson Sep 12,2022 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date o--Af—'V- Sep 14,2022w� � Sep 14,2022 Program Manager Date Senior Capital Project Officer Date Sep 14,2022 93+ Sep 15,2022 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date YP� Sep 15,2022 Sep 15,2022 Assistant City Attorney Date Assistant City Manager Date yss 53 m7 Sep 19,2022 Sep 20.2022 Council Action if required) M&C Number M&C Date Approved ATTEST: o4d4�n Jannette Goodall,City Secretary 9.b.o°hi3 O� OFFICIAL RECOR❑ p�° 00. a 0_ CITY SECRETARY g0 0 0 *Ad FT. WORTH, TX a0000000 a4 nEXpSoAp FORT WORTH City of Fort Worth IF-- Change Order Additions Project Name 2018 Bond Contract 7 City Sec# 55269 Client Project# 101453 Contractor Stabile and Winn,Inc. PM Greg Robbins Inspector Oscar Aguillon Change Order Submittal# ® Date 9/2/2022 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Unit 1:Water $0.00 Unit 2:Sewer $0.00 Unit 3:Paving $0.00 Unit 4:Haltom City $0.00 Sub Total Additions $0.00 Change Order Additions Page 2 of 4 FoK�RIH City of Fort Worth Change Order Deletions Project Name 2018 Bond Contract 7 City Sec# 55269 Client Project# 101453 Contractor Stabile and Winn,Inc. PM Greg Robbins Inspector OscarAguillon Change Order Submittal# ® Date 9/2/2022 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Unit 1:Water $0.00 Unit 2:Sewer $0.00 Unit 3:Paving $0.00 Unit 4:Haltom City $0.00 Sub Total Deletions $0.00 Change Order Deletions Page 3 of 4 MISBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00