HomeMy WebLinkAboutContract 29797-A4 w r AMENDMENT NO. 4 STATE OF TEXAS CITY SECRETARY CONTRACT NO. �~ (M&C Required) COUNTY OF TARWWT 8 the City of Fort Worth (City) and I{ ey-Horn and Associates, Inc. , [Engineer] made and entered into City Secretary Contract No. 29797, (the Contract) which was authorized by the City Council by M&C C-20005 on the 23rd day of February 2004 and subsequently revised by three amendments; and the Contract involves engineering services for the following project: Fort Worth Medical District Water Distribution System Evaluation Study and Improvements, Part 2-. WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised max* fee; NOW THEREFORE City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in M&C C-24752, adopted by the City Council on the 1st day of March 2011 and further amplified in a proposal letter dated December 15F 2010, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $144,000.00. 2 . Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $1,666,750.00. OFFICIAL RECORD; CITY SECRETARY FT. WORTH, TX r 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXE TED on thi s the P 14}k day of N%^-Ar cArx 2011, in Fort Worth,, Tarrant County,, Texas. 0 It 000004 ATTEST•. 0,ZP �o 00 0 -X w.o px o ° Marty Hendr 00 0 City Secretary o Ay 0 Q APP REC ED: ��.�1�q,�` APPROVED: 1 S. Frank Crumb, P.E. Fernando Costa Director, Water Department Assistant City Manager KIMLEY-HORN AND ASSOCIATES,, INC. Engineer By: e L a Name:Glenn Gary, P.E. r.rr- rwwwwwwr....ir�rrwrrwrrrr Principal 801 Cherry Street, Suite 1100 Fort Worth, TX 76102 R AS TO FORM AND LEGALITY: Contract Authar i'z at i olr Date As s i t City Attorney rO!FFICIAL RECORD# CITY SECRETARY FT, WORTH, TX ti e CITYFoRTWORT111 COUNCIL AGENDA COUNCIL ACTION: Approved on 311112011 DATE: 3/1/2011 REFERENCE NO.: **C-24752 LOG NAME: 00MEDICA4-KHA CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 4 in the Amount of$144,000.00 to city Secretary Contract No. 29797 with Kimley-Horn and Associates, Inc., for the Fort Worth Medical District Water Distribution System Evaluation Study and Improvements, Part 2 (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 4 in the amount of$144,000.00 to City Secretary Contract No. 29797, an engineering agreement with Kimley-Horn and Associates, Inc., to provide additional engineering services on the project, thereby increasing the contract amount to $1,050,750.00. DISCUSSION: On March 23, 20047 (M&C C-20005) the City Council authorized the City Manager to execute an engineering agreement with Kimley-Horn and Associates, Inc., in the amount of$049,250.00 for the Fort Worth Medical District Water Distribution System Evaluation Study and Improvements, Part 2. The agreement provided for design of critical water main system upgrade in the vicinity of the JPS Health Network facilities, the Veterans Administration Clinic, Medical Center Surgical Hospital and the replacement of a 30-inch water transmission main from the Holly Water Treatment Plant to the Medical District. The agreement was subsequently revised by three amendments totaling $873,500.00 that are further described as follows: Amendment No. 1 (M&C C-22154, May 29, 2007) in the amount of $571,300.00, provided for additional alignment and routing study, additional design for redesign of the proposed 30 inch water main from the Holly Treatment Plant to the Medical District and substantial coordination with all the different stake holders involved with the construction of 5H 121T. Amendment No. 2 (M&C C-23368, February 24, 2009) in the amount of $309,700.00, provided for additional survey and design for the installation of a 16-inch water line on Morningside Drive, geotechnical investigation, and the separation of the project plans into two separate units in order to expedite construction of the project. Amendment No. 3 administratively approved by the City Manager on January 28, 2010 with a deduct amount of $7,500.00, provided for tunnel extension, jet grouting design, sewer main design and scope reduction on the project. Amendment No. 4 will provide for the following construction assistance services to facilitate timely completion of the project in order to accommodate ongoing improvements within Holly Water Treatment Plant: Shop drawing reviews Construction coordination meetings with City staff and contractor Project management coordination meetings with City staff, Union Pacific and NTTA representatives Material substitution reviews Logname: 50406 1000 I-SJLOUIS Page 1 of 2 w Kimley-Horn and Associates, Inc., proposes to provide the necessary additional work for a lump sum fee of$144,000.00. City staff considers this amount to be fair and reasonable. A waiver of the M11NBE ordinance was granted for this amendment due to the fact that no MIWBE subcontracting opportunities are available on the scope of services to be provided. This project is located in COUNCIL DISTRICT 9. FISCAL INFORMATIONICERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budgets, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. To FundlAccountlCenters FROM Fund/AccountlCenters P265 531.2.00-6091 400247.3 1 $341569.00 P265__...531_2a0___ 60940024732 $691120.00 P265..53.1 200. 609 1 46624733 $111-520.00 P275. 53 .200. .709.1.7002473 1 $31.646..66 P275__ 53.x.200. 709'70024732. $17,2.80.00 P275. 531200. 7091.70024733 $21686_.60 Submitted for City_Manager's Office by_ Fernando Costa (6122) D.riginating_De.partment.Head: S. Frank Crumb (8207) Add.itional...Informati.o_n__Contact.:. Liam Conlon (6824) ATTACHMENTS 60MEDICA4-KH MAP.pdf Logname: 604061 OCO 1-SJLOUIS Page 2 of 2 Kimley-Horn and Associates, Inc. December 15,2010 suhs 950 8o1 Gerry sreK Unit I1 Fort Worth,Texas Mr. Liam Conlon 76102 Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth,TX 76 102 Re: City of Fort Worth-Water Distribution Improvements in the Medical District-Pad 2,Additional Services Contract Amendment No-4 KHA No. 46 1418022 City Project No.00247IDOE No.6288 Dear Liam: The City of Fort Worth(City)has requested Kimley--Horn and Associates,Inc. (Kimley-Horn)to perform additional construction phase services for the Medical District Water Distribution System Improvements,Part 4—South Holly Water Treatment Plant to the Medical District project. Kimley-Horn has performed or will perform the work outlined in the following items: Item I(Additional Construction Phase Services) Perform the additional construction phase services which include: • Construction Coordination Meetings—Kimley--Horn will conduct and prepare meeting notes for weekly construction coordination meetings. Kirnley-Horn will conduct project management meetings with City staff twice per month. • Clarifications and Interpretations,Shop Drawings,Substitutes,and Site Visits: In accordance with provisions outlined in Amendment No. 1,Kimley- Horn will provide the following services: 1. Clarifications and Interpretations. Kimley-Horn will respond to reasonable and appropriate Contractor requests for information and issue necessary clarifications and interpretations of the Contract Documents to City as appropriate to the orderly completion of TEL $17 335 6511 FAX 817 335 5070 n Kimley-Horn Mr.Liam Conlon,December I5,20 10,Page 2 1 and Associates, Inc. Contractor's work. Any orders authorizing variations from the Contract Documents will be made by City. 2. Shop drawings. Kimley-Horn will review and recommend appropriate action in request to Shop Drawings for the Contractor is required to submit,but only for conformance with the information given in the Contract Documents and compatibility with the design concept of the completed Project as a functioning whole as indicated in the Contract Documents. Such review and approvals or other action will not extend to means,methods,techniques,equipment choice and usage,sequences,schedules,or procedures of construction or to related safety precautions and programs. 3. Substitutes and"or-equal." Evaluate and determine the acceptability of substitute or"or-equal"materials and equipment proposed by Contractor in accordance with the Contract Documents,but subject to the provisions of applicable standards of state or local government entities. 4. Site Visits. Kimley-Horn will perform site visits in accordance with the Engineering Agreement and Amendments for this project. ■ Change Orders—Consultant may recommend Change Orders to Client, and will review and make recommendations related to Change Orders submitted or proposed by the Contractor. • Project Management—Perform project management services including coordination with City staff,Contractor, Union Pacific Railroad,and NTTA representatives. Scope of Services The scope of services for this amendment is divided into the following tasks: Item 1(Additional Construction Phase Services): $124,200 Kindey-Horn $ 18,000 Tunneling 1,800 10%Sub Fee $144,000 Total (water$115,240 Sever$28,800) • Task 1—Construction Coordination Meetings--Kimley-Horn will conduct and prepare meeting notes for weekly construction coordination meetings. Kimley-Horn will conduct project management meetings with City staff twice per month. $34,900($27,920 water and$6,980 sewer) KII11l 1-H01'n Mr.Liam Conlon,December 15,2010,Page 3 and Associates,Inc. • Task 2--Clarifications and Interpretations, Shop Drawings,Substitutes, and Site Visits. $76,000($60,800 water and$15,200 sewer) • Task 3--Change Orders--Consultant may recommend Change Orders to Client}and will review and make recommendations related to Change Orders submitted or proposed by the Contractor. $22,400($17,920 water and$4,480 sewer) • Task 4--Project Management-Perform project management services including coordination with City staff,Contractor,Union Pacific Railroad,and NTTA representatives. $10,700($8,560 water and $2,140 sewer) We recommend that the City increase the budget by$1 46,040 for these additional services. From the additional services listed above,the recommended breakdown for water and sewer services is as follows: Description water Seger Total Item I -Additional Construction $115,200 $2$,800 $144,000 Phase Services Total $1159200 $289800 $144,000 The following table summarizes the fee per work Phase: Work Phase water Fee Sewer Fee Total Fee 31 $34,560 $8,640 $43,200 32 $69,120 $172280 $86,400 33 $1 1,524 $2,880 $14,400 51 $0 $0 $0 Total $115,200 $28!800 $144,000 MMMOMMMA If the City concurs with our requested additional services,the summary of fees for this project is shown in the table below: Revised Contract ContractlAmendment Water Fee Sewer Fee Survej Fee Total Fee Amount Original Contract $534,000 $0 $115,250 $649,254 $6491,250 Amendment Igo. 1 $484,400 $49.404 $371,500 $571,304 $1,2201,550 Amendment Igo.2 $1291,000 $154s450 $269250 $3039700 $1,530,250 Amendment No. 3 ($37,750)_ $4 ($7,504) $115227750 Amendment No. 4 $115p200 $289800 $Q $144.9000 $1,666,750 TOTAL 51458,850 $228,900 $1791000 $1}666,750 $1,666,750 1 Kim -Horn Mr.Liam Conk),December l5,2014,Page 4 APIP and Associates,Inc. MIWBE participation is not planned for these additional services. With the revised contract amount of$1,666,750,our total contract ND"E participation is proj ected to be$218,045(13.1%). We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KEMLEY HORN AND ASSOCIATES,INC. Glenn A.Gary,P.E. Principal JRT:jrt K:IF711Y UtiliticeMI813022,1P doe