Loading...
HomeMy WebLinkAboutContract 52793-CO1 Attest- �J�iiette S.Goodall(Oct 4,2022 20:0 DT) FORT WDRTH . °FORr�aa� CSC No. 52793-COl �vo o=� City Of Fort Worth ° °°o*�d Change Order Request O°0°000° !y rEX p5oap Facility and Project Existing Drop-Off Stations-Building Modifications&Site Modifications:Old City Sec No. 52793 t Hemphill Road Description: Funding(FID)54002-0239901-5740010-100192-000880-9999 City Proj.No. 100192 No.(s) Contractor: Basecom,Inc. Change Order#F_ Date: 9I26I2022 City Project Mgr.Alfonso Meza City Inspector: I Don Isaacs Phone Number:(817)392-8274 Phone Number: (817)392-8078 Contract Time (CD) Original Contract Amount $1,194,241.00 190 Extras to Date $0.00 0 Credits to Date $0.00 0 Pending Change Orders(in M&C Process) $0.00 0 Contract Cost to Date $1,194,241.00 0 Amount of Proposed Change Order $64,955.00 30 Revised Contract Amount $1,259,196.00 220 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $0.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.44 % MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $1,492,801.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER The purpose of Change Order#1 is to install 6 light poles around the perimeter of the site.Change Order No.1 increases the original contract ($1,194241.00)by$64,955 for a revised contract amount of$1.259,196.00.A 5.44 percent increase to the original contract price.Additionally, there are 30 days added to the contract for this work. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order. AkjBasecom,Inc. 0__(s,p27, 7:09CDT) Sep 27,2022 a� Contractor's Company Name Contractor Name Contractor Signature Date 6/G Sep 27,2022 Oct 3,2022 on iaaa6(SIP 2 a0 CDT PMD Inspector Date Architecural Services Manager Date awe Sep 28,2022 Oct 3,2022 PMD Superintendent Date Director Property Management Department Date Oct 3,2022 C�a s � Oct 4,2022 PMD Project Manager Date Assistant City Attorney Date Oct 3,2022 75ar i &, a�da Oct 4,2022 Dana BurDana Dur h- 0:321 6 CDT Project Architect Date Assistant City Manager Date OFFICIAL RECORD M&C Number N/A M&C Date Approved N/A CITY SECRETARY FT.WORTH, TX Contrail Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including Brian R.Glass,AIA ensuring all performance and reporting requirements. Architectural Services Manager June 2018 Rev 1 ' BASECOM CONSTRUCTION SERO E 722 Missouri Ave., Fort Worth,Texas 76104 (817) 589-0050 Fax: (817)483-2609 January 21,2021 The City of Fort Worth Attn: Scott Fisher Re: City of Fort Worth—Old Hemphill Drop Off Station Revision 1 Request for Change #8 Mr. Fisher, Basecom, Inc. is pleased to submit Revision 1 for RFC 98 for the City of Fort Worth— Drop Off Station—Old Hemphill project. This RFC reflects the changes issued in Revisions 10 & 11. Please see below for pricing and breakout. Item 2 -Additional Pole Lights (6) - Basecom Electrical to Install 6—30' Poles & Lighting $ 38,548.00 - Convenience Outlets at Poles (2) $ 1,350.00 - BASECOM ADDITIONAL GENERAL CONDITIONS $ 15,172.00 OVERHEAD& FEE FOR BASECOM WORK (15%) $ 8,260.00 BONDS $ 1,625.00 TOTAL $64,955.00