HomeMy WebLinkAboutResolution 5640-10-2022 A Resolution
NO. 5640-2022
A RESOLUTION AUTHORIZING EXECUTION OF AN ADVANCE
FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF
TRANSPORTATION IN THE AMOUNT OF $526,900.00, OF WHICH CITY
PARTICIPATION IS APPROXIMATELY $504,004.00, FOR
PROFESSIONAL SERVICES AND ENGINEERING TO WIDEN LAS
VEGAS TRAIL FROM TWO LANES TO FOUR LANES FROM
INTERSTATE HIGHWAY 820 TO APPROXIMATELY QUEBEC DRIVE
WHEREAS, federal law establishes federally funded programs for transportation improvements
to implement its public purposes, and
WHEREAS, the Texas Transportation Code, Section 201.103 establishes that the State shall
design, construct and operate a system of highways in cooperation with local governments, and Section
222.052 authorizes the Texas Transportation Commission to accept contributions from political
subdivisions for development and construction of public roads and the state highway system within the
political subdivision, and
WHEREAS, federal and state laws require local governments to meet certain contract standards
relating to the management and administration of State and federal funds, and
WHEREAS, the Texas Transportation Commission has codified 43 TAC, Rules 15.50-15.56
that describe federal, state, and local responsibilities for cost participation in highway improvement and
other transportation projects, and
WHEREAS, the Texas Transportation Commission passed Minute Order Number 115814
authorizing the State to undertake and complete a highway improvement or other transportation project
generally described as construct new roadway lanes; and
WHEREAS, the City of Fort Worth identified the need to widen Las Vegas Trail from IH 820 to
approximately Quebec Drive with intersection, traffic signal, pedestrian and stormwater channel
improvements; and
WHEREAS, the City of Fort Worth and Texas Department of Transportation have
negotiated terms of an Advance Funding Agreement in the Amount of $526,900.00, of
which the State Participation Amount is $22,896.00 and Local Participation Amount is
$504,004.00 for Professional Services and Engineering to Widen Las Vegas Trail from
Two-Lanes to Four-Lanes from Interstate Highway 820 to Approximately Quebec Drive,
to Include Intersection, Traffic Signal, Sidewalk, and Stormwater Crossing Improvement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS, THAT:
The City Manager is hereby authorized to execute an Advance Funding Agreement
with the Texas Department of Transportation (CSJ: 0902-90-176) in the Amount of
$526,900.00, of which the Local Participation Amount is $504,004.00, not including cost
overruns, for Professional Services and Engineering to Widen Las Vegas Trail from Two-
Lanes to Four-Lanes from Interstate Highway 820 to Approximately Quebec Drive, to
Include Intersection, Traffic Signal, Sidewalk, and Stormwater Crossing Improvement.
Adopted this 111h day of October 2022.
ATTEST:
sT7 Sb
By: Jannette S.Goodall(Oc 12,2022t 16:09 CDT) �( •. /
Jannette S. Goodall, City Secretary I`�'.• . ;
�� �0_1 :10
RICM-0f-WAY TAY£
CITY OF FORT WORTH I axws£n ae£va uuns
� v-�— rRovoscu s'snewcux uuns
* .. ewovn5en sroRu oR,vu
' , vRavism ra•suucwr s£W£R
/ sRans£o ia'IINrcR
I � nnnr RMJ/r ar wAr
r I
.I
-Y CITY OF FORT WORTH
po
�x
CITY OF WHITE SETTLEMENT
"`✓ \ w y S�F.ITff,REVIE",DnI4F x.
_ - -----x- . ,
+ F �
1 { +
QUEBEC DRIVE
1 I'JO•RIGIR-aF-WAYj � I
I ram•--, - -'-"---} ^'--v.�
LAS VEGAS TRAIL
CONCEPT EXHIBIT
GPAFNI[Y.ILEIR FEtT -
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 10/11/22 M&C FILE NUMBER: M&C 22-0845
LOG NAME: 2022 LAS VEGAS TRAIL AFA&APPROPRIATION
SUBJECT
(CD 7)Adopt a Resolution Authorizing Execution of an Advance Funding Agreement with the Texas Department of Transportation in the Amount of
$526,900.00,of Which the State Participation Amount is$22,896.00 and Local Participation Amount is$504,004.00 for Professional Services
and Engineering to Redesign North Las Vegas Trail from Loop 820 West to Quebec Drive,Adopt Appropriation Ordinance,and Amend the Fiscal
Years 2022-2026 Capital Improvement Program
r��.+v.nm�nuN I IVIY:
It is recommended that the City Council:
1. Adopt the attached Resolution authorizing execution of an Advance Funding Agreement with the Texas Department of Transportation in the
amount of$526,900.00,of which the State participation amount is$22,896.00 and the local participation amount is$504,004.00 for
professional services and engineering to redesign North Las Vegas Trail from Loop 820 West to Quebec Drive(City Project No. 103085);
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the 2007 CritCapProj-CO2013A Funds in
the amount of$600,000.00,from available funds,for the purpose of funding the North Las Vegas Trail project(City Project No. 103085);
3. Authorize payment to the Texas Department of Transportation in the amount of 504,004.00;and
4. Amend the Fiscal Year 2022-2026 Capital Improvement Program.
DISCUSSION:
In 2019,the North Central Texas Council of Governments,Texas Department of Transportation and Cities of Fort Worth and White Settlement met
to discuss potential improvements to redesign North Las Vegas Trail from Loop 820 West to Quebec Drive,to include sidewalks,intersection and
traffic signal improvements.In addition,stormwater crossing improvements to address water overtopping at North Las Vegas Trail between
Heron Drive and Shoreview Drive were identified.
The Texas Department of Transportation(TXDOT)will manage and implement the project,which is within the Cities of Fort Worth and White
Settlement.The portion of the project within the city limits of Fort Worth,will be a City of Fort Worth asset.The Texas Department of Transportation
executed two separate preliminary engineering and environmental services agreements;one with the City of Fort Worth,and one with the City of
White Settlement.The agreement with City of Fort Worth was approved on December 1,2020(M&C 20-0875)in an amount of$315,000.00.
This M&C will provide funding to TXDOT to complete the final design and environmental services for the project. Upon completion of final
engineering,a more accurate costs estimate for right-of-way,utilities,and construction will be identified.An amendment to the funding agreement
between Texas Department of Transportation and the City of Fort Worth will be necessary to include the project phases of right-of-way,utilities,
and construction.
The table below summarizes past appropriations,sources,the additional funding,and the estimated total cost of the project at completion:
North Las Vegas Trail Project(City Project No. 103085)
Fund Existing Funding Additional Funding Project Funding Total
2007 Critical Capital $400,000.00 $400,000.00
Projects-39001
2007 CritCapProj- $600,000.00 $600,000.00
CO2013A-34012
Grand Total $400,000.00 $600,000.00 $1,000,000.00
Funding for this project was not included in the FY2022-2026 Capital Improvement Program(CIP)due to the project originated after the CIP was
adopted. The action in this M&C will amend the FY2022-2026 Capital Improvement Program as approved in connection with Ordinance 25073-
09-2021.
Funding is available for appropriation from available funds within the 2007 CritCapProj-CO2013A Fund for the purpose of funding the North Las
Vegas Trail project.
The North Las Vegas Trail project is located with COUNCIL DISTRICT 7.
A Form 1295 is not required because:This contract will be with a governmental entity,state agency or public institution of higher education:
TXDOT
,FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified-All Funds within the 2007 CritCapProj-CO2013A Fund and
upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the 2007
CritCapProj-CO2013A Fund for the North Las Vegas Trail project to support the approval of the above recommendations and execution of the
advance funding agreement. Prior to an expenditure being incurred,the Transportation&Public Works Department has the responsibility of
verifying the availability of funds.
Submitted for City Manager's Office by: William Johnson 5806
Originating Business Unit Head: Lauren L Prieur 6035
Additional Information Contact: Monty Hall 8662