HomeMy WebLinkAboutContract 51936-A3 CSC No. 51936-A3
AMENDMENT No. 3
TO CITY SECRETARY CONTRACT No. 51936
WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc. ,
(ENGINEER) made and entered into City Secretary Contract No. 51936, (the
CONTRACT) which was authorized by M&C C-28980 on the 15thday of January,
2019 in the amount of $148, 000 . 00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $98, 695 . 00 was administratively authorized on the loth
day of July, 2020, Amendment 2 in the amount of $480, 685 . 00 was
authorized by M&C 21-0061 on the 12th day of January, 2021 .
WHEREAS, the CONTRACT involves engineering services for the
following project:
River Trails Park to River Legacy Park Trail Project, CPN 101767;
and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $57, 500 . 00 . (See Attached Funding
Breakdown Sheet, Page -4-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $784, 880 . 00 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect .
OFFICIAL RECORD
City of Fort worth, Texas River Trails Park to Riv CITY SECRETARY
Prof Services Agreement Amendment Template �/
Revision Date: November 23, 2021 FT. WORTH, TA
Page 1 of 4
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
designated Assistant City Manager.
APPROVED:
City of Fort Worth Halff Associates Inc.
ip�7 `4=a--
Jesica L. McEachern Todd A. Woodson
Assistant City Manager Vice President
DATE: Oct 11) 2022 DATE: September 29, 2022
APPROVAL RECOMMENDED:
)got fop.,
Dave Lewis
Acting Director, Park & Recreation Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
4&LZL 0 ffla
Helen D. Flore
Park Planner
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas River Trails Park to River Legacy Park Trail Project
Prof Services Agreement Amendment Template CPN:101767
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C: n/a
Date : n/a
Jeremy Anato-Mensah
Assistant City Attorney I
ATTEST:
J ette S.Goodall(Oct 11,2022 08 CDT) on �a
/y ` o000000
Jannette Goodall ��o°° 00°0���
City Secretary F11.o °o�4�
..o o YY�{
0, 0 p�r/
��� °o° 00C-1K
o
���nEXAS.oAp
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas River Trails Park to River Legacy Park Trail Project
Prof Services Agreement Amendment Template CPN:101767
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 51936
Amendment No. 3
Department Fund-Account-Center Amount
Park &
Recreation 34018 080450 101767 005030 9999 18020105 $57, 500 . 00
Dept.
Total : $57, 500 . 00
City of Fort Worth, Texas River Trails Park to River Legacy Park Trail Project
Prof Services Agreement Amendment Template CPN:101767
Revision Date: November 23, 2021
Page 4 of 4
mom HALFF"
September 2,2022
Revised September 26,2022
38291.002
Helen Florez
Park&Recreation Department
City of Fort Worth
4200 South Freeway,Suite 2200
Fort Worth,Texas 76115-1499
RE: Trinity Trails East(Phase 2) Supplemental Agreement(Revision 2)
Dear Helen:
The purpose of this letter is to serve as a proposal to provide additional professional services related
to the design of trail facilities for the Trinity Trails East(Phase 2) project.Proposed additional services
include the realignment of trail in River Legacy Park, design of illumination and actuated flashing
beacons at Greenbelt Road mid-block trail crossing, reimbursement for Corridor Development
Certificate (CDC) application fee, and additional scope related to the cultural resources survey and
antiquities permit application.
Task 1:
The proposed Section 5 trail alignment was planned to connect to the existing trail system within River
Legacy Park through the 60%design phase of the project. Following the 60%design phase,Halff was
asked by the City of Fort Worth and the City of Arlington to relocate the proposed Section 5 trail
alignment to connect to a future planned trail within River Legacy Park. The proposed changes to the
trail design impact the horizontal alignment,vertical alignment,grading, and construction quantities.
Task 2:
The original services contract excludes electrical engineering and electronic signage associated with
mid-block trail crossings.The City of Fort Worth directed Halff to incorporate the following elements
into the trail design at the proposed Greenbelt Road mid-block trail crossing:
• Flashing LED signs (4)
• Rectangular rapid flashing beacons (4)
• Illumination poles (2)
This task includes the selection of the flashing LED signs,RRFBs,and illumination at the mid-block
crossing including electrical design,plans, specifications, schedules,and necessary details. This task
also includes construction phase assistance for the mid-block crossing that is limited to review of
submittals and responses to RFIs.
HALFF ASSOCIATES,INC.
1201 NORTH BOWSER ROAD TEL (214)346-6200 WWW.HALFF.COM
RICHARDSON,TX 75081-2275 FAX(214)739-0095
■M0 HAL F F CityHelen Floret
mom
of Fort Worth
■■■ September 2,2022
Page 2
Task 3:
The original services contract states that the City of Fort Worth is responsible to pay any review fees
necessary for the completion of the project. Halff was directed by the City of Fort Worth on May 26,
2022 to pay the CDC application fee to the United States Army Corps of Engineers. This proposal
includes reimbursement for the application fee.
Task 4:
The original services listed an additional project assumption that "the existing bridge over the West
Fork Trinity River, east of Greenbelt Road,will not be removed as part of this project." It was later
determined as design progressed that the existing bridge would be removed, and the proposed
pedestrian bridge would be constructed in the same location to reduce the amount of proposed
earthwork and thus reducing the need for floodplain mitigation. The demolition and removal of the
existing bridge increases the environmental scope of the project related to the cultural resources study
and antiquities permitting.The following subtasks require additional effort:
• Architectural assessment of the historic-age bridge over the West Fork Trinity River
• Backhoe trenching on the West Fork Trinity River banks within the proposed new bridge
footprint
• Additional fieldwork,report writing,addressing agency comments,closing out of antiquities
permit
Task 5:
The proposed Section 5 trail alignment crosses an existing 10"Atmos gas line on the east side of
Greenbelt Road.Atmos has requested depths on the gas line prior to providing approval for the trail
crossing.This task provides Quality Level A subsurface utility engineering analysis of the existing gas
line.
Fees:
The proposed base fee for the services outlined above is $57,500.00. This fee includes all primary
services described in the scope of services outline to be provided by Half£ A schedule of proposed
fees by task is included herein.
Task 1 Trail Realignment $3,000.00
Task 2 Mid-Block Crossing $18,500.00
Task 3 CDC Application Fee $6,000.00
Task 4 Environmental/Cultural Resources $25,000.00
Task 5 Subsurface Utility Engineering $5,000.00
Total $57,500.00
If this agreement is approved by the City,please initiate preparation of a contract amendment at your
convenience. Please let me know if you have any questions.
Sincerely,
mom
■M0 HAL F F Ci Helen Floret
of Fort Worth
■■■ September$2022
Page 3
HALFF ASSOCIATES,INC.
Brandon Tanksley,PE,CFM
Civil Engineer