HomeMy WebLinkAboutContract 56059-A1 CSC No. 56059-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 56059
WHEREAS, the City of Fort Worth (CITY) and Carollo
Engineers, Inc. , (ENGINEER) made and entered into City Secretary
Contract No. 56059, (the CONTRACT) which was authorized by M&C 21-
0374 on the 8"h day of June, 2021 in the amount of $155,200 .00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Rolling Hills (RH) Water Treatment Plant Chlorine Scrubber
Systems;
WHEREAS , it has become necessary to execute Amendment No. 1
to the CONTRACT to include an increased scope of work and revised
fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in proposal attached
hereto and incorporated herein. The cost to City for the
additional design services to be performed by Engineer totals
$450, 000. 00.
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be an
amount of $605,.200, 00.
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
Prof Services Agreement Amendment Template CITY SECRETARY
RevesiQn Date: Navemher 23, 2021 [RH Water Treatment Plank FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
designated Assistant City Manager.
APPROVED: ENGINEER
City of Fort Worth Carollo Engineers, Inc.
Dana Burghdoff(Oct 18,20 18:20 CDT ' L "~
Dana Burghdoff Hutch Musallam, P.E.
Assistant City Manager Vice President
DATE: Oct 18, 2022 DATE: 10/5/2022
APPROVAL RECOMMENDED:
C&cYG A&r Troy L14man, P.E.
Christopher arder(Oct 7,202211:5, Associate Vice President
Chris Harder, P.E.
Director, Water Department DATE: 10/5/2022
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for
the monitoring and administration of this contract, including
ensuring all performance and reporting requirements .
Fa�id4-P aOderya- 1016122
Farida Goderya, P.E.
Senior Project Manager
APPROVED AS TO FORM AND LEGALITY: M&C: 22-0741
WI Date: 9/27/2022
D lack(Oct 18,2022 18:05 CDT)
Douglas W. Black Form 12 95 : 2022-919085
Senior Assistant City Attorney
a �
�pF FORr 4a
ATTEST: )=I�o°° °° O
°2
°
Jannette S.Goodall(OEtt 19,2022 08:22 CDT) __ 6 o o iJ
Jannette S. Goodall �d ° °°°0000
°
City Secretary aaZt nEXAso OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [RH Water Treatment Plant Chlorine Scrubber]
Page 2 of 2 ICPN 1031271
Engineers—Working Wonders With WNW' 100 Ease 15th Street,Suite 540,fort Wor th, fexas 7G102
1'.811.882,05213 F.817.881..9975
September 30, 2022
Farida Goderya, PE-Sr.Project Manager
Fort Worth Water Department
200 Texas Street
Fort Worth,TX 76102
Subject: Rolling Hills Water Treatment Plant Scrubber Replacement Project
City Project Number103127
Amendment No.1: Design and Bidding Assistance
Dear Ms.Goderya:
The Contract Amendment No.1 is provided for design and bid phase assistance for the Rolling Hills Water
Treatment Plant Scrubber Replacement Project.The detailed scope of work for contract amendment No.1
is attached to this letter.The original contract(CSC#56059)was for study and evaluation of the scrubber
condition and replacement alternatives.
The following table identifies the original contract and the proposed current amendment.
Council .. .
Original Contract $155,200 $155,200
Amendment No.1 $450,000 $450,000
If you have any questions concerning this amendment, please let me know.
Sincerely,
CARD LO ENGINEERS, INC.
His iam(Hutch)Musallam,PE
Project Manager
HM:kb
Enclosures: Attachment A-Scope of Services
Attachment B-Fee Justification
CC: File
300.42I GoderyaF 2022-0930,docx WAT E R
t OUR FOCUS
OUR BUSINESS
OUR PASSION
ATTACHM ENT A
DESIGN SERVICES FOR
ROLLING HILLS WATER TREAVENT PLANT SCRUBBER REPLACEMENT-DESIGN
CITY PRDJMT NO.:103127
ATTACHMENT A
Scope for Engineering design Related Services for Water and/or Sanitary Sewer Improvements
DESIGN SERVICES FOR
ROLLING HILLS WATER TREATMENT PLANT SCRUBBER REPLACEMENT
CITY PROJECT NO.: 103127
The scope set forth herein defines the work to be performed by the ENGINEER in completing the
project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed
and address the needs of the Project.
PROJECT SUMMARY
The Rolling Hills Water Treatment Plant (RHWTP) uses gaseous chlorine for disinfection. The
plant has two 25-tan stationary bulk chlorine storage tanks and two unloading points for 90-ton
bulk chlorine tank rail cars, The plant has an existing emergency chlorine scrubber system
designed to contain and treat the accidental release of chlorine gas from the largest (90-ton) bulk
chlorine storage tank.
ENGINEER completed a condition assessment of the existing chlorine scrubber system at the
Rolling Hills Water Treatment Plant.The condition assessment recommended replacement of the
existing 90-Ton emergency chlorine scrubber system. Several alternatives were evaluated and
presented to the CITY, The CITY chose replacement of the scrubber with a similar configuration:
one scrubber and one tank system capable of handling the accidental release from (90 ton) bulk
chlorine storage tank. The emergency scrubber design criteria are summarized below:
Parameter Value
Type Wet chemical scrubber
Design Counter-current, one-pass through packed media
Chlorine Neutralizing Capacity, tons 90
Chemical reagent NaOH
Reagent concentration 20 %
Reagent volume, gal 150,000
Scrubber airflow, cfm 3,000
Discharge concentration, ppm chlorine c 5
Tank construction Fiberglass, ASME RTP-1 compliant
Reagent recirculation pumps Chemical service, severe duty rated (duty/standby)
Reagent piping CPVC, Schedule 80
Anticipated scrubber downtime 6 months
City of Fort Worth,Taxes
Attachment A—,July 16,2022
PMkO Release Data:081,2014
Page 1 of 7
ATTACHMENT A
DESIGN SERVICES FOR
ROLLING HILLS WATER TREATMENT PLANT SCRUBBER REPLACEMENT•OESIGN
CITY PROJECT NO,:103127
The scope of this project is to replace equipment and components of the existing scrubber system
located outside the chorine storage facility including:
+ Caustic storage tank
• Caustic pumps
• Scrubber unit
• Equipment pads
• Blower fans and duct work
• Caustic overflow tank
• Electrical
• SCADA
• I&C
• Structural (storage area rehabilitation and modification, pads etc.)
+ Miscellaneous site civil
To allow for competition, the design will be based on the scrubber systems from two
manufacturers: De Nora Water Technologies and Evoqua Water Technologies. Since the design
of the two systems is different,the contract documents will include separate designs(plans sheets
and technical specifications) for each of the systems.
Task 1. Design Management
Task 2, Final Design
Task 3. Bid Phase Services
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
• communicate effectively,
• coordinate internally and externally as needed, and
• proactively address issues with the CITY's Project Manager and others as necessary to
make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities.
• Ensure quality control is practiced in performance of the work.
+ Communicate internally among team members.
Chy of Fort Worth,Texas
Attachment A—July 15,2022
PM4 Ratease Dale:08.1.2014
Page 2 of 7
ATTACHMENT
DESIGN SERVICES FOR
ROLLING HILLS WATER TREATMENT PLANT SCRUSBER REPLACEMENT-DESIGN
CITY PROJECT NO.:U3127
• Task and allocate team resources.
1.2. Communications and Reporting
• Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and clarify
scope, understand CITY objectives, and ensure economical and functional designs that
meet CITY requirements.
• Conduct up-to 1,4-person site visit covering the major disciplines to confirm site conditions
and improvements
• Prepare invoices and submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports in the format provided by the Water
Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates with
a schedule narrative monthly, as required in Attachment D to this Standard Agreement
and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M1WBE Report Form and Final Summary Payment Report Form at the
end of the project.
• Personnel and Vehicle Identification: When conducting site visits to the project location,
the ENGINEER or any of its sub-consultants shall carry readily visible information
identifying the name of the company and the company representative,
ASSUMPTIONS
• 10 MWBE reports will be prepared.
• 1 four-person site visit
• 3 meetings with city staff, in addition to design review workshops
• 10 monthly water department progress reports will be prepared.
• 1 0-monthly project schedule updates will be prepared.
DELIVERABLES
A. Meeting summaries with action items.
B. Monthly invoices.
C. Monthly progress reports.
D. Baseline design schedule.
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes.
F. Monthly M1WBE. Report Form and Final Summary Payment Report Form.
City of Fort Worth,Texas
Attachment A July 15,2022
PMO Release Dale:05.1,2014
Page 3 of 7
ATTACHMENT A
DESIGN SERVICES rOR
ROLLING HILLS WATER TREATMENT PLANT SCRUBBER REPLACEMENT-DESIGN
CITY PROJECT NO.:102r
TASK 2. FINAL DESIGN.
Plans and Specifications will be prepared for one bid package for the improvements identified in
the Project Elements. The final design will be submitted to the CITY at the 50% and 90%
completion levels for OWNER review and comments and at 100% for bid advertisement. All
submittals will include electronic version in portable document format(.pcl ). Work will comply with
applicable local, state, and federal regulations in effect at the time Final Design begins:
2.1. Fifty Percent Submittal
ENGINEER will incorporate the FWWD review comments and ENGINEER's internal review
comments and finalize the Preliminary Design Report. In addition, the plans and specifications
will be completed to the 50% level under this task. Four (4) copies of the plans (11x17 format)
and specifications will be submitted for review and comment along with an updated opinion of
probable construction cost.
2.2. Fifty Percent Design Review Workshop
A 50% Design Review Workshop will be conducted two to three weeks after the delivery of the
50% Plans and Specifications. FWWD comments to the plans, specifications, and opinion of
probable construction costs will be received and discussed in a workshop format. ENGINEER will
present a summary of the project status, outstanding issues, changes, decisions required, and
schedule.
2.3. Ninety Percent Submittal
ENGINEER will incorporate the FWWD review comments and ENGINEER's internal review. The
plans and specifications will be completed to the 90% level under this task. Four (4) copies of the
plans (11x17 format) and specifications will be submitted for review and comment along with an
updated opinion of probable construction cost.
2.4. Ninety Percent Design Review Workshop
The 90% Design Review Workshop will be conducted two to three weeks after the delivery of the
90% Plans and Specifications. FWWD comments to the plans, specifications, and opinion of
probable construction costs will be received and discussed in a workshop format. ENGINEER will
present a summary of the project status, outstanding issues, changes, decisions required, and
schedule.
2.5. 1DO% (Bid Ready) Documents
ENGINEER will incorporate FWWD review comments and ENGINEER's internal quality review
comments to produce sealed and signed plans and specifications (Bid Ready Contract
Documents). Five (5) copies of the plans (11x17 format) and specifications will be submitted.
2.6. Cost Estimates
The ENGINEER will prepare an opinion of probable construction cost that will be updated at the
50%, 90%, and 1DO% documents. Cost estimate will be prepared in the ENGINEER'S standard
cost estimating format. In providing opinions of cost and schedules for projects, ENGINEER has
no control over cost or price of labor and material; unknown or latent conditions of existing
equipment or structures that may affect operation and maintenance costs; competitive bidding
procedures and market conditions; time or quality of performance of third parties; quality, type,
management, or direction of operating personnel; and other economic and operational factors
City aP Fort Worth,Texas
Allachment A—July 15,2022
PM{]Release Date,08.1.2014
Poge 4 at 7
ATTACHMENTA
DESIGN SERVIGES FOR
ROLLING HILLS WATER TREATMENT PLANT SCRUBBER REPLACEMENT-DESIGN
CITY PROJECT NO.:103127
that may materially affect the ultimate project cost or schedule, Therefore, ENGINEER makes
no warranty that the CITY's actual project costs, financial aspects, economic feasibility, or
schedules will not vary from ENGINEER's opinions, analyses, projections, or estimates.
2.7. Quality Management
ENGINEER will manage the quality of the deliverables throughout the development of the
project including the 50% submittal, 90% Submittal and Bid Read Document, Specific activities
the ENGNEER will employ include:
1. Internal peer review of concepts by senior staff not directly involved with the Project
during the Preliminary Design Phase.
2. Quality check of deliverables performed by a team of qualified senior staff for each
deliverable including
3. Constructability review of the 90% deliverable
2.8. Coordination with Fort Worth Fire Department(FWFD)
This task includes coordination with the fire department for review and approval of the
improvements. A total of one (1) face to face meeting with the FWWD is assumed for this task,
2.9. TCEQ Coordination
This task includes preparation of summary transmittal letters to TCEQ to comply with TCEQ
Chapter 290 requirements. Sid ready contract documents will be submitted to TCEQ if required
to complete TCEQ review.
Deliverables
1. Meeting and Workshop Agendas and Minutes, 1 copy for each attendee distributed
electronically in Portable Document Format(PDF). Agendas will also be distributed in
hardcopy at the beginning of each meeting and workshop.
2. 50% Final Design Plans, Specifications, and updated Opinion of Probable Construction
Cast, 4 hard copies each half sized (11 x 17) plans and 8.5 x 11 specifications.
3. 50% Final Design Review Comments/Response Log/Decision Log.
4. 90% Final Design Plans, Specifications, and updated Opinion of Probable Construction
Cost, 4 hard copies each half sized (11 x 17) plans and 8.5 x 11 specifications.
5. 90% Final Design Review Comments/Response Log/Decision Log.
6. 100% (Bid ready) plans, specifications, and updated Opinion of Probable Construction
Cost, 5 hard copies each half sized (11x17) plans and specifications.
7. Bid ready contract documents TCEQ Summary Transmittal Letter, 1 hard copy.
TASK 3. BID PHASE SERVICES.
Cily of Fort Worth,Texts
Attachment A—July 15.2022
PM4 Release Data:08.1,2014
Page 5 of 7
ATTACHMLNT A
DESIGN SERVICES FOR
ROLLING HILLS WATER TREATMENT PLANT SCRUBBER REPLACEMENT-DESIGN
CITY PROJECT NO.:103127
ENGINEER will support the bid phase of the project as follows.
3.1. Bid Support
0 The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access
to potential bidders.
o Plan Sets are to be uploaded to BIM360 in .pdf formats, .pdf. The .pdf will consist
of one file of the entire plan set.
• The ENGINEER will develop and implement procedures for receiving and answering
bidders' questions and requests for additional information. The procedures shall include
a log of all significant bidders' questions and requests and the response thereto. The log
shall be housed and maintained in the project's BIM 360 (or other applicable City
provided software) folder titled Request for Information. The ENGINEER will provide
technical interpretation of the contract bid documents and will prepare proposed
responses to all bidder's questions and requests, in the form of addenda. The
ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all
plan holders.
• Attend the pre-bid conference in support of the CITY.
+ Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
* Attend the bid opening in support of the CITY.
Tabulate and review all bids received for the construction project, assist the CITY in
evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation
and the CFW Data Spreadsheet created utilizing CFW Bid tools only are to be uploaded
into the project's Bid Results folder on BIM360.
• Incorporate all addenda into the contract documents and issue conformed sets.
3.2. Conformed Documents
At the completion of the bid period, ENGINEER will prepare conformed drawings and
specifications consisting of the bid documents updated to reflect the administrative and
technical addenda and the executed contract documents.
ASSUMPTIONS
The project will be bid only once and awarded to one contractor.
• 4 sets of size drawings plans and 4 sets specifications (conformed, if applicable)
will be delivered to the CITY.
• PDF, DWF and DWG files will be uploaded to Buzzsaw.
DELIVERABLES
A. Addenda
City of Fort Worth,'texas
Altachment A—July 15.2022
PMC Release Date:08,1.2014
Page 6 of 7
ATTACHMENT
DESIGN SERVICES FOR
ROLLING HILLS WATER TREATMENT PLANT SCRUBBER REPLACEMENT-DESIGN
CITY PROJECT NO.:103127
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E. Construction documents (conformed, if applicable)
Additional Services not included in the existing Scope of Services — CITY and ENGINEER
agree that the fallowing services are beyond the Scope of Services described in the tasks above.
However, ENGINEER can provide these services, if needed, upon the CITY's written request.
Any additional amounts paid to the ENGINEER because of any material change to the Scope of
the Project shall be agreed upon in writing by both parties before the services are performed.
These additional services include but are not limited to the following:
• Design of caustic containment volume in addition to the existing containment area.
• Modification to duct work or piping inside the existing chlorine storage building or outside
of the immediate scrubber area.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
I
• Construction management and inspection services.
• Periodic site visits during construction phase.
• Preparation of a risk management plan
• Design phase public meetings.
• Performance of materials testing or specialty testing services.
• Additional submittals
• Services necessary due to the default of the Contractor,
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement, and inspection after final completion.
► Services related to Subsurface Utility Engineering Levels A, B, C or D.
• Services related to Survey Construction Staking.
• Services related to acquiring real property including but not limited to easements, right-
of-way, and/or temporary right-of-entries.
• Services to support, prepare, document, bring, defend, or assist in litigation undertaken
or defended by the CITY.
• Construction Shop drawing review, samples and other submittals submitted by the
contractor,
City of Fart Worth,Texas
Attaohrrenl A—July 16,2022
PMO Release Date:48 1,2P1A
Page 7 of 7
M N
n� w
u
�Ny x N q tl ff..
u
��� W wwga a r�g,Hmm�,�nq��a�vmanwnnrv`$�an..orps�wm�oPP��
i M
S f� pg pG PPpp
YY
� f w
td_
lq tl t
q m e tl 41 r r p p Y p a•f O ¢
r�
P
2
949 As
m v _
aiu a »
rn v
MRIR;�!9w, g$$n o aw tl x no rv4lY,'�.m tlm tl
kz
.5
n
x
•�y rg" °� ;-'� '�+mi w a a`d 4 P a'e$kS�'''_ •+a �n ry.-tl a r tl a w a,.,. .•, N r�
� � x
L
li N e 8 r
��q$Y ,.�¢nam np4Ptltllem P ..,neoPp rn
a
W
� � d
D
� n p
E N m E
o r.
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, September 27, 2022 REFERENCE NO.: **M&C 22-0741
LOG NAME: 60RHWTP SCRUBBERA1 —CAROLLO
SUBJECT:
(CD 8)Authorize Execution of Amendment No. 1 to an Engineering Agreement with Carollo Engineers,
Inc., in the Amount of$450,000.00 for Additional Services to the Rolling Hills Water Treatment Plant
Chlorine Scrubber System Project, Adopt Resolution Expressing Official Intent to Reimburse Expenditures
with Proceeds of Future Debt, and Adopt Appropriation Ordinance to Effect a Portion of Water's
Contribution to the Fiscal Years 2022- 2026 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1.Authorize execution of Amendment No. 1 to City Secretary No. 56059 an engineering agreement
with Carollo Engineers, Inc. in the Amount of$450,000.00 for additional services to the Rolling Hills
Water Treatment Plant Chlorine Scrubber System project for a revised contract amount of
$605,200.00;
2.Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds
from future debt for the Rolling Hills Water Treatment Plant Chlorine Scrubber Systems project; and
3.Adopt the attached appropriation ordinance adjusting appropriations in the Water&Sewer
Commercial Paper Fund by increasing appropriations in the Rolling Hills Water Treatment Plant
Chlorine Scrubber System Project (City Project No. 103127) in the amount of$530,000.00 and
decreasing appropriations in the W&S Commercial Paper project (City Project No. UCMLPR) by
the same amount, to effect a port of Water's contribution to the Fiscal Years 2022-2026 Capital
Improvement Program.
DISCUSSION:
On June 8, 2021, Mayor and Council Communication (M&C) 21-0374, authorized an engineering
agreement with Carollo Engineers, Inc. (City Secretary Contract No. 56059), in the amount of
$155,200.00, for an evaluation and to determine whether to replace or upgrade the existing chlorine
scrubber system.
The proposed Amendment will provide plans, specifications, and contract documents for the replacement
of existing chlorine scrubber system.
Carollo Engineers, Inc., proposes to perform the additional services not to exceed fee of$450,000.00.
Staff considers the fee to be fair and reasonable for the scope of services proposed. In addition to the
amendment amount, $80,000.00 is required for project management and material testing.
This project will have no impact on the Water Department operating budget when complete.
It is the practice of the Water Department to appropriate its Capital Improvement Program (CIP) plan
throughout the fiscal year, instead of within the annual budget ordinance, as projects commence,
additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will
appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2022-2026
Capital Improvement Program, as follows:
60RHWTP SCRUBBERA1 —CAROLLO
Budget Revised
Capital Fund Project FY2022 CIP Change
Name Name Appropriations Authority Increase/ Budget
Decrease) Budget
56021 —W&S 103127 — RH $0.00 This M&C $530,000.00 $530,000.00
Commercial Chlorine
Paper Fund Scrubber
Lyroje ct I J
Funding for the RHWTP Chlorine Scrubber System Evaluation is depicted below:
Fund Existing [Additional Appropriations Project Total*
Appropriations
W&S Rev
Bonds
Series 2022 $190,000.00 $0.00 $190,000.00
— Fund
56020 J
W&S
Commercial $0.00 $530,000.00 $530,000.00
Paper—
Fund 56021
Project $190,000.00 $530,000.00 $720,000.00
Total
*Numbers rounded for presentation purposes.
This project is anticipated to be included in a future revenue bond issue for the Water& Sewer Fund.
Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation
authority authorized under the Callable Commercial Paper Program (CP)will be used to provide interim
financing for this project until debt is issued. Once debt associated with this project is sold, bond
proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance
with the attached Reimbursement Resolution. Under federal law, debt must be issued within
approximately three years in order for these expenses to be reimbursable. Adoption of the attached
resolution does not obligate the City to sell bonds, but preserves the ability to reimburse itself from tax-
exempt bond proceeds.
Business Equity: Carollo Engineers, Inc. agrees to maintain its initial M/WBE commitment of seven
percent that it made on the original agreement and extend and maintain that same M/WBE commitment
of seven percent to this first amendment. Therefore Carollo Engineers, Inc. remains in compliance with
the City's Business Equity Ordinance and attests to its commitment by its signature on the Acceptance of
Previous M/WBE Commitment form executed by an authorized representative of its company.
This project is located in COUNCIL DISTRICT 8 and serves all COUNCIL DISTRICTS.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that funds are currently available in the UCMLPR W&S Commercial
Paper project within the W&S Commercial Paper Fund and upon approval of the above recommendations
and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial
Paper Fund for the RH Chlorine Scrubber System project to support the approval of the above
recommendations and execution of the contract. Prior to any expenditure being incurred, the Water
Department has the responsibility to validate the availability of funds.
FUND IDENTIFIERS (FIDs),:
TO
Fund Department ccoun Project JProgram ctivity Budget Reference # mount
ID ID Year (Chartfield 2)
FROM
Fund Department Accoun Project Program ctivity Budget T- Reference # mount
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by_ Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Farida Goderya (8214)
ATTACHMENTS
1. 60RHWTP Scrubbbera1-Carollo.docx (CFW Internal)
2. 60RHWTP SCRUBBERA1 —CAROLLO 1295.pdf (CFW Internal)
3. 60RHWTP SCRUBBERA1 —CAROLLO APCF.pdf (CFW Internal)
4. 60RHWTP SCRUBBERA1 —CAROLLO FID Table WCF 08.25.22.xlsx (CFW Internal)
5. 60RHWTP SCRUBBERA1 —CAROLLO MAP.pdf (Public)
6. 60RHWTP SCRUBBERA1 —CAROLLO SAM.pdf (CFW Internal)
7. ORD.APP60RHWTP SCRUBBERA1 — CAROLLO 56021 A022(r3).docx (Public)
8. PBS CPN 103127.pdf (CFW Internal)
9. Res.60RHWTP SCRUBBERA1 —CAROLLO.docx (Public)
L L L
W W �
X X X
al al aJ
Vl Vl Vl
O O O
a a a
L L L
a a a
'a
G7
.a
G7
G7
c c Z c
o O ul o
E E E
c
W
J
U)
L.
E m O m
to
.O a` = a` O a`
mU u W V 1111111111
0 C U)
FBI L~L W
LL 0 w a w
3 bA
f = w to
W 3 y
a)i
m m } L. m
O
W
Lu
Q Q W
w wIA ,v
'oc 'oo
a _ a _ LL a _
c c c
O O o - -
- U U U
a a a
it U
a - - a a - - -
aJ w a,
o C o
c C
� 3
LL LL LL
U U U
al al w
OC OC a'