HomeMy WebLinkAboutContract 57011-AR4 CSC No. 57011-AR4
FORT WORTH® City of Fort Worth
�— Construction Allowance Request
Project Namel Trinity Boulevard Phase 1-IH 820 to Salado Trail City Sec# 1 57011
Client Project#(s)l 102101
Project Trinity Boulevard Phase 1-Roadway,Drainage,Illumination,Landscape and Traffic Improvements
Description
Contractorl SJ Louis Construction of Texas LTD. CA#J 4 Date I 10/14/2022
City Project Mgr. Mitch Aiton City Inspectorl Steve Johnson
UNIT or DEPT Unit I,IV&V Unit II Unit III Totals
Original Contract Amount $16,356,917.65 $3,806,981.00 $147,114.00 $20,311,012.65
Extras to Date
Credits to Date
Current Contract Amount $16 356 917.65 $3 806 981.00 $ 47 114.0D $20 311 012.65
Amount of Proposed Allocation $12 600.00 $0.00 $0.00 $0.00 $12 600.00
Oriqinal Allowance Available to Allocation $500,000.00 $100,000.00 $20,000.00 $620,000.00
Allowance Funds Previously Allocated $118,541.41 $118,541.41
Revised Allowance Balance $368 858.59 $100 000.00 $20 000.00 $0.00 $488 858.59
JUSTIFICATI EASONS)FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and material as per
attached proposed Construction Allowance Request(with attachments):
This construction allowance is to add item 73A-Portable Radar Detection Speed Trailer(2 EA). Due to the existing constraints of 4'lane,40 mph
and wide ROW,drivers have been conditioned they can drive 45-50 mph and feel safe. During construction,we've had trouble getting drivers to
respect the traffic control and drive below 40 mph in the construction creating unsafe conditions for the drivers as well as the contractor. We've
coordinated with PD but they can only spend so much time and resources on this location.
Please see attached Contractor proposed cost of$700/MO. For comparison,please see attached TxDOT average bid price of$838.28/MO.
Proposed price is fair and justified.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract,including ensuring all performance and reporting requirements.
ontractor's pany NanfPr Contractor(Name) ontractor Signature Date
SJ Louis Construction of Texas LTD. Adam Lunsford ��` oct 17,zo22
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
Oct 18,20 Oct 17,2022
Program Manager Date p oital Project Officer Date
Oct 20,2022 Oct 20,2022
Assistant Director(Dept) Date 1111F7LContracting Department(Dept) Date
•- oc Oct 24,2022
Assistant City Attorney Date Manager Date
Oct 26,2022 Oct 26,2022
ATTEST:
�*
Al �°°°0000Oo�Y��Y
Jannette Goodall,City Secretary ��o° °o
0
0
~$ o4d
��° °=d
0
*o° °°o*�d
°O000000 d
nEXASoAp OFFICIAL RECORD
CITY SECRETARY
Construction Allowance SUMMARY FT. WORTH, TX
Page 1 of 4
FORT WORTH City of Fort Worth
` — Construction Allowance Additions
Project Name I Trinity Boulevard Phase 1 -IH 820 to Salado Trail Jity Sec#
Client Project# 1 102101
Contractor SJ Louis Construction of Texas LTD. PM Mitch Aiton Inspectorl Steve Johnson
Construction Allowance Submittal# ate
ADDITIONS
ITEM DESCRIPTION DEPT Oty Unit Unit Cost Total
73A Portable Radar Detection Speed Trailer(2 EA) Unit I,IV&V 18.0000 MO $700.00 $12,600.00
Unit I,IV&V $12,600.00
Unit II $0.00
Unit III $0.00
$0.00
Total Additions $12,600.00
Construction Allowance Additions
Page 2 of 4
FORT WORTH. City of Fort Worth
Construction Allowance Value
Project Name Trinity Boulevard Phase 1-IH 820 to Salado Trail City Sec#
Client Project# 102101
Contractorl SJ Louis Construction of Texas LTD. PMJ Mitch Aiton Inspector Steve Johnson
Construction Allowance Submittal# Date
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
Unit 1
Item 84 9999.0026 Construction Allowance 0.025200 LS $500,000.00 $12,600.00
Construction Allowance Value
1of1
M/SBE for this Construction Allowance Request
M/SBE Sub Type of Service Amount for this CAR
Total $0.00
Previous Construction Allowance Requests
CAR# DATE AMOUNT
Total
Construction Allowance MSBE Data
Page 4 of 4
REQUEST FOR INFORMATION REPORT (RFI) 0
•
4 —!71
CONTRACT TITLE CONTRACT NO. PRIME CONTRACTOR
Trinity Boulevard Phase 1 -IH 820 to Salado Trail 57011 SJ Louis Construction of Texas LTD.
CONTRACTOR'S REQUEST FOR INFORMATION
REQUESTING PARTY NAME REQUESTING PARTY TITLE REQUESTING PARTY ORG. PHONE DATE OF REQUEST
Ronald Etter Project Manager SJ Louis 940-399-6757 10/13/22
SECTION(S)REFERENCED
Portable Radar Detection Speed Trailer
POTENTIAL • •
NO CHANGE NO CHANGE
INCREASE IN COST $ 12,600.00 INCREASE IN TIME #of Days=
DECREASE IN COST DECREASE IN TIME #of Days=
INFORMATION REQUESTED
The drivers won't slow down in the construction zone. We've bagged the existing 40 mph speed limit signs,placed temporary 30
mph speed limits,adjusted traffic control to slow drivers and they are still driving 40 mph and higher through the construction zone.
CONTRACTOR RECOMMENDATION
Please allow us to place two radar detection speed trailers on the project.
RESPONDING PARTY NAME RESPONDING PARTY TITLE
Mitch Aiton Sr Professional Engineer 682-715-9424 10/13/22 10/13/22
GOVERNMENT • TO CONTRACTOR
We've coordinated with PD but they don't have enough time to stay out there and can only place their radar trailers out there
for a limited time. Please provide a price.
COST IMPACT JUSTIFICATIONJUSTIFICATION
Please see attached Contractor proposed cost of$700/MO. For
comparison,please see attached TxDOT average bid price of No Schedule Impact
$838.28/MO. Proposed price is fair and justified.
Q. Q. DATE
Mitch Aiton,Sr Professional Engineer �� 10/14/22
Request for Proposal
Project Name C.M.R. -Proposal No. Date
Trinity Blvd., Phase I (I.H. 820 to Salado Trail)
City of Fort Worth, Texas 5 October 13, 2022
Response Required By Transmitted By
Mr. Mitch Aiton, P.E., PMP Ronald Etter
200 Texas Street Project Manager
Fort Worth, Texas 76102 Signature
Via Email R&O--t aL Ette1r
cc: Mr. Trenton Tidwell-Kimley Horn, Via Email
Description of'Work
This CMR request is being submitted as result of ongoing traffic issues along Trinity Blvd.Vehicular traffic passing throught the job site at
high rates of speed daily creating a safety concern to the crews opnt the project.Traffic control measures and signage have been set in
place according to standard practices and traffic control plans provided in the contratc documents.This CMR request is for the addition of
(2) radar detected speed limit signs to help notify the public of the speed limit and how fast they are traveling in hopes to slow them down
through the work zones.
Breakdown of Proposal
Trinity Blvd., Phase I(l.H. 820 to Salado Trail)
Clean Existing 60" RCP Culvert
Item Description Quantity Unit Price Extension
New-1 Portable Radar Detected Traffic Speed Limit Trailers(2EA) 18 MO $700.00 $12,600.00
$0.00
$0.00
$0.00
Net Change: $12,600.00
Additional Calendar Days: 0
If acceptable,please provide an authorization signature below and return one(1)copy to our office.
S.J.Louis Construction Action
xc: S. J. Louis Project No. 22111
S.J. Louis Construction of Texas Ltd.
520 S. 6th Avenue
Mansfield, Texas 76063
(817) 477-0320 Office(817) 477-0552 Fax
0
00
N
00
co
00
GA
CD
r
CD
T
ifl
N
EA
rv�m o Iq m m m I °a'. `''`,
❑y 4 <Nh9�Q(la�]]' Mm• 1Cm.97'AImn.bcLLfl]3 Mr:�C[1]] mU] R Om 6n3 Hm SCC9]] fmp9i mF. mU] WnN -WNi,i�p 6IRn3 m! 6INn3 N �m HIM
LyJ.i63
61
N Il - OgO 0
-I M O I -i ]
I C' Q N,N LL] -4 4:N:[I. m CO-H -
NI!3]
w
_ s $ $ $ S $ $.. '$. $. $ 0 8 C7, $. o $ $ $.o o $. o.o:0 8 0.0 0 8 0
❑ � o� p3 ��r77 ui G� p ii ra M'.H' h c7 [[77 r. m o (d aa d' N:O fr � m eY N GG�� h It '{ { N 0 fp
'ri f0 u5 n fJ rl -h d � N m � •,i In iG � ri N.wl.ri N r{ ri � � •i i rn77
I m n 4 cv m m v -}e{ 15) m rI 'i N i rI cv N .l rI �i N N N
n x I
ti 4 e} N 4 p n M m ? O O rev LO M 00 w 7 n 17 In W 0LU
R] ti 4 iP IS7 ❑'i n n al m fo N N N m n e•I
ei O M n Ih Ih t~ N ei rn m Ih
f9 t9 4g f9 4g t9 N f9 M as e3 ti r *A W W is3 r r
t9 N3 i9 fA t9 fA i9 ei
N N W W O� 4 1ri n rl Ihn N I�.77 n7 rl � iG M1 ti tl' NC n .0 O n
sl rl
- � [[m�� e r i e•i
0
N
+j, ri ri ri Ti'rl n7 Ti V m] ri'rl'rl .7 .i .i 'I .i .i ri'rl
E w
O ❑
O I w
U
Sry�z y Q ¢ Q ¢ Q QQ QQ ¢¢ QQ qq QQ QQ QQ ¢¢ ¢¢ QQ ¢¢ gq QQ QQ ¢ QQ QQ QQ ¢¢ QQ QQ ¢¢ QQ
C W W W W W W L11 W W J W W J W W W W J ❑ � W ❑ ❑ W W W W W W W W W W W L11 ❑ W W ❑
J J
4 N Q S m
W Q m C] W
O
0] � � � � � Cid C-� w w 3w
N
J 7 ❑ J uW,I W 7 a V7 7N N N S
d dS 7 Yx w wp cO w Ipr
w g g SN N
--w> gw ❑�` O [Qe HyZ ¢N JQH pJ 4w ❑ w >p ¢ �jJ J J CL
p Sz}L}V N
Lu
W w w W W ¢ z
N d Q Q Q FF
Z z Y w t ~ ¢ ❑ ❑ S w C] J ❑J W W � W
z w C } uu Y77 u�Y7y uu Y77 ¢ } Y --Y m Y ❑ q
w w ¢ z m J J Z z
LIJ p `G N j ❑ ❑ 4 4 O'4 H .� IL [] y w m w w O O
w ¢ ❑2! ccq� d� q� M dm �4 qm d� ir LL, dm 0.W W Qz zp zp pz y z z a g ❑ _
LY ❑ N } V` I/d� V�7 [] ir�77 NU H�7 L] rd7 �7 UN [] dN �7 H [] H H z z
d a N u7 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ N❑ U❑7 d d d d d d S S p ❑ CL ❑ d d d d
¢ J J J > > > > > > > > > > > > > > y ti ¢z k N W J J J J Z Z Q w a w- W-
p` m qN pO M 6 O O pp M 6 CD -i
i -i d -iO C-d -i -i -iN pp d O 6_
Ill II] Id Id fo Id Id Id fo Id Id Id Uo ❑ = = r- h 61 O1 T O1 ❑ q m T ❑ ❑ N .-i N N d
O O p 0 ❑ ❑ q 0 ❑ ❑ q 0 p ❑ p 0 ❑ O p p O q 6 ❑ ri Ti ri ri EN [U [N
m m m m m m M m m M m m m m M M m m
CL
� _7.tTT�P'r- [o m o [y M -1 4C] [n i- W m o r N M, ,VL] cC'I+'co m o r'N t`-] V 4n [G r- co'm
102101 -CNAR-Trinity Boulevard CA #4
Final Audit Report 2022-10-19
Created: 2022-10-15
By: Andrea Munoz(Andrea.M u noz@fortworthtexas.gov)
Status: Canceled/Declined
Transaction ID: CBJCHBCAABAAAg9sADpK1paYSIk8QA3VcTQ8VaoQj6bb
"102101 -CNAR-Trinity Boulevard CA #4" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2022-10-15-2:07:54 AM GMT-IP address:204.10.91.100
Document emailed to mitchell.aiton@fortworthtexas.gov for signature
2022-10-17-1:13:32 PM GMT
Email viewed by mitchell.aiton@fortworthtexas.gov
2022-10-17-1:14:30 PM GMT-IP address: 107.211.196.70
Signer mitchell.aiton@fortworthtexas.gov entered name at signing as Mitch Aiton
2022-10-17-1:22:11 PM GMT-IP address:204.10.91.100
Document e-signed by Mitch Aiton (mitchell.aton@fortworthtexas.gov)
Signature Date: 2022-10-17-1:22:13 PM GMT-Time Source:server-IP address:204.10.91.100
Document emailed to mohammad.khan@fortworthtexas.gov for filling
2022-10-17-1:22:15 PM GMT
Email viewed by mohammad.khan@fortworthtexas.gov
2022-10-17-3:00:23 PM GMT-IP address:209.194.29.100
Signer mohammad.khan@fortworthtexas.gov entered name at signing as Zeeshan Khan
2022-10-17-3:00:37 PM GMT-IP address:209.194.29.100
Form filled by Zeeshan Khan (moham mad.khan@fortworthtexas.gov)
Form filling Date:2022-10-17-3:00:39 PM GMT-Time Source:server-IP address:209.194.29.100
Document emailed to adaml@sjlouis.com for signature
2022-10-17-3:00:42 PM GMT
Email viewed by adaml@sjlouis.com
2022-10-17-3:04:02 PM GMT-IP address:63.145.51.2
FORT W❑RTH., Powered Y
Adobe
Acrobat Sign
Signer adaml@sjlouis.com entered name at signing as Adam Lunsford
2022-10-17-3:05:01 PM GMT-IP address:63.145.51.2
Document e-signed by Adam Lunsford (adaml@sjlouis.com)
Signature Date: 2022-10-17-3:05:02 PM GMT-Time Source:server-IP address:63.145.51.2
Document emailed to steve.johnson@fortworthtexas.gov for signature
2022-10-17-3:05:05 PM GMT
Email viewed by steve.johnson@fortworthtexas.gov
2022-10-18-6:33:45 PM GMT-IP address:209.194.29.100
Signer steve.johnson@fortworthtexas.gov entered name at signing as Steven Johnson
2022-10-18-6:34:53 PM GMT-IP address:209.194.29.100
Document e-signed by Steven Johnson (steve.johnson@fortworthtexas.gov)
Signature Date: 2022-10-18-6:34:55 PM GMT-Time Source:server-IP address:209.194.29.100
Document emailed to Raul.LopezRoura@fortworthtexas.gov for signature
2022-10-18-6:34:58 PM GMT
Email viewed by Raul.LopezRoura@fortworthtexas.gov
2022-10-18-7:01:59 PM GMT-IP address:209.194.29.100
Email viewed by Raul.LopezRoura@fortworthtexas.gov
2022-10-19-8:28:57 PM GMT-IP address:209.194.29.100
Document canceled by Andrea Munoz(Andrea.M unoz@fortworthtexas.gov)
2022-10-19-9:52:11 PM GMT-IP address:209.194.29.100
FORT W❑RTH., Powered Y
Adobe
Acrobat Sign
102101 -CNAR-Trinity Boulevard CA #4
Interim Agreement Report 2022-10-20
Created: 2022-10-19
By: Andrea Munoz(Andrea.Munoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAA8H2fpjl_yE2f sMaXBwiUegkBgTkAB1W
Agreement History
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature.A final audit report will
be generated when the agreement is complete.
"102101 -CNAR-Trinity Boulevard CA #4" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2022-10-19-10:00:41 PM GMT-IP address:209.194.29.100
Document emailed to Raul.LopezRoura@fortworthtexas.gov for signature
2022-10-19-10:15:07 PM GMT
Email viewed by Raul.LopezRoura@fortworthtexas.gov
2022-10-20-0:23:58 AM GMT-IP address: 172.58.176.137
FORT W❑RTH., P'—"d by
Adobe
Acrobat Sign