Loading...
HomeMy WebLinkAboutContract 57011-AR4 CSC No. 57011-AR4 FORT WORTH® City of Fort Worth �— Construction Allowance Request Project Namel Trinity Boulevard Phase 1-IH 820 to Salado Trail City Sec# 1 57011 Client Project#(s)l 102101 Project Trinity Boulevard Phase 1-Roadway,Drainage,Illumination,Landscape and Traffic Improvements Description Contractorl SJ Louis Construction of Texas LTD. CA#J 4 Date I 10/14/2022 City Project Mgr. Mitch Aiton City Inspectorl Steve Johnson UNIT or DEPT Unit I,IV&V Unit II Unit III Totals Original Contract Amount $16,356,917.65 $3,806,981.00 $147,114.00 $20,311,012.65 Extras to Date Credits to Date Current Contract Amount $16 356 917.65 $3 806 981.00 $ 47 114.0D $20 311 012.65 Amount of Proposed Allocation $12 600.00 $0.00 $0.00 $0.00 $12 600.00 Oriqinal Allowance Available to Allocation $500,000.00 $100,000.00 $20,000.00 $620,000.00 Allowance Funds Previously Allocated $118,541.41 $118,541.41 Revised Allowance Balance $368 858.59 $100 000.00 $20 000.00 $0.00 $488 858.59 JUSTIFICATI EASONS)FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments): This construction allowance is to add item 73A-Portable Radar Detection Speed Trailer(2 EA). Due to the existing constraints of 4'lane,40 mph and wide ROW,drivers have been conditioned they can drive 45-50 mph and feel safe. During construction,we've had trouble getting drivers to respect the traffic control and drive below 40 mph in the construction creating unsafe conditions for the drivers as well as the contractor. We've coordinated with PD but they can only spend so much time and resources on this location. Please see attached Contractor proposed cost of$700/MO. For comparison,please see attached TxDOT average bid price of$838.28/MO. Proposed price is fair and justified. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. ontractor's pany NanfPr Contractor(Name) ontractor Signature Date SJ Louis Construction of Texas LTD. Adam Lunsford ��` oct 17,zo22 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date Oct 18,20 Oct 17,2022 Program Manager Date p oital Project Officer Date Oct 20,2022 Oct 20,2022 Assistant Director(Dept) Date 1111F7LContracting Department(Dept) Date •- oc Oct 24,2022 Assistant City Attorney Date Manager Date Oct 26,2022 Oct 26,2022 ATTEST: �* Al �°°°0000Oo�Y��Y Jannette Goodall,City Secretary ��o° °o 0 0 ~$ o4d ��° °=d 0 *o° °°o*�d °O000000 d nEXASoAp OFFICIAL RECORD CITY SECRETARY Construction Allowance SUMMARY FT. WORTH, TX Page 1 of 4 FORT WORTH City of Fort Worth ` — Construction Allowance Additions Project Name I Trinity Boulevard Phase 1 -IH 820 to Salado Trail Jity Sec# Client Project# 1 102101 Contractor SJ Louis Construction of Texas LTD. PM Mitch Aiton Inspectorl Steve Johnson Construction Allowance Submittal# ate ADDITIONS ITEM DESCRIPTION DEPT Oty Unit Unit Cost Total 73A Portable Radar Detection Speed Trailer(2 EA) Unit I,IV&V 18.0000 MO $700.00 $12,600.00 Unit I,IV&V $12,600.00 Unit II $0.00 Unit III $0.00 $0.00 Total Additions $12,600.00 Construction Allowance Additions Page 2 of 4 FORT WORTH. City of Fort Worth Construction Allowance Value Project Name Trinity Boulevard Phase 1-IH 820 to Salado Trail City Sec# Client Project# 102101 Contractorl SJ Louis Construction of Texas LTD. PMJ Mitch Aiton Inspector Steve Johnson Construction Allowance Submittal# Date CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total Unit 1 Item 84 9999.0026 Construction Allowance 0.025200 LS $500,000.00 $12,600.00 Construction Allowance Value 1of1 M/SBE for this Construction Allowance Request M/SBE Sub Type of Service Amount for this CAR Total $0.00 Previous Construction Allowance Requests CAR# DATE AMOUNT Total Construction Allowance MSBE Data Page 4 of 4 REQUEST FOR INFORMATION REPORT (RFI) 0 • 4 —!71 CONTRACT TITLE CONTRACT NO. PRIME CONTRACTOR Trinity Boulevard Phase 1 -IH 820 to Salado Trail 57011 SJ Louis Construction of Texas LTD. CONTRACTOR'S REQUEST FOR INFORMATION REQUESTING PARTY NAME REQUESTING PARTY TITLE REQUESTING PARTY ORG. PHONE DATE OF REQUEST Ronald Etter Project Manager SJ Louis 940-399-6757 10/13/22 SECTION(S)REFERENCED Portable Radar Detection Speed Trailer POTENTIAL • • NO CHANGE NO CHANGE INCREASE IN COST $ 12,600.00 INCREASE IN TIME #of Days= DECREASE IN COST DECREASE IN TIME #of Days= INFORMATION REQUESTED The drivers won't slow down in the construction zone. We've bagged the existing 40 mph speed limit signs,placed temporary 30 mph speed limits,adjusted traffic control to slow drivers and they are still driving 40 mph and higher through the construction zone. CONTRACTOR RECOMMENDATION Please allow us to place two radar detection speed trailers on the project. RESPONDING PARTY NAME RESPONDING PARTY TITLE Mitch Aiton Sr Professional Engineer 682-715-9424 10/13/22 10/13/22 GOVERNMENT • TO CONTRACTOR We've coordinated with PD but they don't have enough time to stay out there and can only place their radar trailers out there for a limited time. Please provide a price. COST IMPACT JUSTIFICATIONJUSTIFICATION Please see attached Contractor proposed cost of$700/MO. For comparison,please see attached TxDOT average bid price of No Schedule Impact $838.28/MO. Proposed price is fair and justified. Q. Q. DATE Mitch Aiton,Sr Professional Engineer �� 10/14/22 Request for Proposal Project Name C.M.R. -Proposal No. Date Trinity Blvd., Phase I (I.H. 820 to Salado Trail) City of Fort Worth, Texas 5 October 13, 2022 Response Required By Transmitted By Mr. Mitch Aiton, P.E., PMP Ronald Etter 200 Texas Street Project Manager Fort Worth, Texas 76102 Signature Via Email R&O--t aL Ette1r cc: Mr. Trenton Tidwell-Kimley Horn, Via Email Description of'Work This CMR request is being submitted as result of ongoing traffic issues along Trinity Blvd.Vehicular traffic passing throught the job site at high rates of speed daily creating a safety concern to the crews opnt the project.Traffic control measures and signage have been set in place according to standard practices and traffic control plans provided in the contratc documents.This CMR request is for the addition of (2) radar detected speed limit signs to help notify the public of the speed limit and how fast they are traveling in hopes to slow them down through the work zones. Breakdown of Proposal Trinity Blvd., Phase I(l.H. 820 to Salado Trail) Clean Existing 60" RCP Culvert Item Description Quantity Unit Price Extension New-1 Portable Radar Detected Traffic Speed Limit Trailers(2EA) 18 MO $700.00 $12,600.00 $0.00 $0.00 $0.00 Net Change: $12,600.00 Additional Calendar Days: 0 If acceptable,please provide an authorization signature below and return one(1)copy to our office. S.J.Louis Construction Action xc: S. J. Louis Project No. 22111 S.J. Louis Construction of Texas Ltd. 520 S. 6th Avenue Mansfield, Texas 76063 (817) 477-0320 Office(817) 477-0552 Fax 0 00 N 00 co 00 GA CD r CD T ifl N EA rv�m o Iq m m m I °a'. `''`, ❑y 4 <Nh9�Q(la�]]' Mm• 1Cm.97'AImn.bcLLfl]3 Mr:�C[1]] mU] R Om 6n3 Hm SCC9]] fmp9i mF. mU] WnN -WNi,i�p 6IRn3 m! 6INn3 N �m HIM LyJ.i63 61 N Il - OgO 0 -I M O I -i ] I C' Q N,N LL] -4 4:N:[I. m CO-H - NI!3] w _ s $ $ $ S $ $.. '$. $. $ 0 8 C7, $. o $ $ $.o o $. o.o:0 8 0.0 0 8 0 ❑ � o� p3 ��r77 ui G� p ii ra M'.H' h c7 [[77 r. m o (d aa d' N:O fr � m eY N GG�� h It '{ { N 0 fp 'ri f0 u5 n fJ rl -h d � N m � •,i In iG � ri N.wl.ri N r{ ri � � •i i rn77 I m n 4 cv m m v -}e{ 15) m rI 'i N i rI cv N .l rI �i N N N n x I ti 4 e} N 4 p n M m ? O O rev LO M 00 w 7 n 17 In W 0LU R] ti 4 iP IS7 ❑'i n n al m fo N N N m n e•I ei O M n Ih Ih t~ N ei rn m Ih f9 t9 4g f9 4g t9 N f9 M as e3 ti r *A W W is3 r r t9 N3 i9 fA t9 fA i9 ei N N W W O� 4 1ri n rl Ihn N I�.77 n7 rl � iG M1 ti tl' NC n .0 O n sl rl - � [[m�� e r i e•i 0 N +j, ri ri ri Ti'rl n7 Ti V m] ri'rl'rl .7 .i .i 'I .i .i ri'rl E w O ❑ O I w U Sry�z y Q ¢ Q ¢ Q QQ QQ ¢¢ QQ qq QQ QQ QQ ¢¢ ¢¢ QQ ¢¢ gq QQ QQ ¢ QQ QQ QQ ¢¢ QQ QQ ¢¢ QQ C W W W W W W L11 W W J W W J W W W W J ❑ � W ❑ ❑ W W W W W W W W W W W L11 ❑ W W ❑ J J 4 N Q S m W Q m C] W O 0] � � � � � Cid C-� w w 3w N J 7 ❑ J uW,I W 7 a V7 7N N N S d dS 7 Yx w wp cO w Ipr w g g SN N --w> gw ❑�` O [Qe HyZ ¢N JQH pJ 4w ❑ w >p ¢ �jJ J J CL p Sz}L}V N Lu W w w W W ¢ z N d Q Q Q FF Z z Y w t ~ ¢ ❑ ❑ S w C] J ❑J W W � W z w C } uu Y77 u�Y7y uu Y77 ¢ } Y --Y m Y ❑ q w w ¢ z m J J Z z LIJ p `G N j ❑ ❑ 4 4 O'4 H .� IL [] y w m w w O O w ¢ ❑2! ccq� d� q� M dm �4 qm d� ir LL, dm 0.W W Qz zp zp pz y z z a g ❑ _ LY ❑ N } V` I/d� V�7 [] ir�77 NU H�7 L] rd7 �7 UN [] dN �7 H [] H H z z d a N u7 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ N❑ U❑7 d d d d d d S S p ❑ CL ❑ d d d d ¢ J J J > > > > > > > > > > > > > > y ti ¢z k N W J J J J Z Z Q w a w- W- p` m qN pO M 6 O O pp M 6 CD -i i -i d -iO C-d -i -i -iN pp d O 6_ Ill II] Id Id fo Id Id Id fo Id Id Id Uo ❑ = = r- h 61 O1 T O1 ❑ q m T ❑ ❑ N .-i N N d O O p 0 ❑ ❑ q 0 ❑ ❑ q 0 p ❑ p 0 ❑ O p p O q 6 ❑ ri Ti ri ri EN [U [N m m m m m m M m m M m m m m M M m m CL � _7.tTT�P'r- [o m o [y M -1 4C] [n i- W m o r N M, ,VL] cC'I+'co m o r'N t`-] V 4n [G r- co'm 102101 -CNAR-Trinity Boulevard CA #4 Final Audit Report 2022-10-19 Created: 2022-10-15 By: Andrea Munoz(Andrea.M u noz@fortworthtexas.gov) Status: Canceled/Declined Transaction ID: CBJCHBCAABAAAg9sADpK1paYSIk8QA3VcTQ8VaoQj6bb "102101 -CNAR-Trinity Boulevard CA #4" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2022-10-15-2:07:54 AM GMT-IP address:204.10.91.100 Document emailed to mitchell.aiton@fortworthtexas.gov for signature 2022-10-17-1:13:32 PM GMT Email viewed by mitchell.aiton@fortworthtexas.gov 2022-10-17-1:14:30 PM GMT-IP address: 107.211.196.70 Signer mitchell.aiton@fortworthtexas.gov entered name at signing as Mitch Aiton 2022-10-17-1:22:11 PM GMT-IP address:204.10.91.100 Document e-signed by Mitch Aiton (mitchell.aton@fortworthtexas.gov) Signature Date: 2022-10-17-1:22:13 PM GMT-Time Source:server-IP address:204.10.91.100 Document emailed to mohammad.khan@fortworthtexas.gov for filling 2022-10-17-1:22:15 PM GMT Email viewed by mohammad.khan@fortworthtexas.gov 2022-10-17-3:00:23 PM GMT-IP address:209.194.29.100 Signer mohammad.khan@fortworthtexas.gov entered name at signing as Zeeshan Khan 2022-10-17-3:00:37 PM GMT-IP address:209.194.29.100 Form filled by Zeeshan Khan (moham mad.khan@fortworthtexas.gov) Form filling Date:2022-10-17-3:00:39 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to adaml@sjlouis.com for signature 2022-10-17-3:00:42 PM GMT Email viewed by adaml@sjlouis.com 2022-10-17-3:04:02 PM GMT-IP address:63.145.51.2 FORT W❑RTH., Powered Y Adobe Acrobat Sign Signer adaml@sjlouis.com entered name at signing as Adam Lunsford 2022-10-17-3:05:01 PM GMT-IP address:63.145.51.2 Document e-signed by Adam Lunsford (adaml@sjlouis.com) Signature Date: 2022-10-17-3:05:02 PM GMT-Time Source:server-IP address:63.145.51.2 Document emailed to steve.johnson@fortworthtexas.gov for signature 2022-10-17-3:05:05 PM GMT Email viewed by steve.johnson@fortworthtexas.gov 2022-10-18-6:33:45 PM GMT-IP address:209.194.29.100 Signer steve.johnson@fortworthtexas.gov entered name at signing as Steven Johnson 2022-10-18-6:34:53 PM GMT-IP address:209.194.29.100 Document e-signed by Steven Johnson (steve.johnson@fortworthtexas.gov) Signature Date: 2022-10-18-6:34:55 PM GMT-Time Source:server-IP address:209.194.29.100 Document emailed to Raul.LopezRoura@fortworthtexas.gov for signature 2022-10-18-6:34:58 PM GMT Email viewed by Raul.LopezRoura@fortworthtexas.gov 2022-10-18-7:01:59 PM GMT-IP address:209.194.29.100 Email viewed by Raul.LopezRoura@fortworthtexas.gov 2022-10-19-8:28:57 PM GMT-IP address:209.194.29.100 Document canceled by Andrea Munoz(Andrea.M unoz@fortworthtexas.gov) 2022-10-19-9:52:11 PM GMT-IP address:209.194.29.100 FORT W❑RTH., Powered Y Adobe Acrobat Sign 102101 -CNAR-Trinity Boulevard CA #4 Interim Agreement Report 2022-10-20 Created: 2022-10-19 By: Andrea Munoz(Andrea.Munoz@fortworthtexas.gov) Status: Out for Signature Transaction ID: CBJCHBCAABAA8H2fpjl_yE2f sMaXBwiUegkBgTkAB1W Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature.A final audit report will be generated when the agreement is complete. "102101 -CNAR-Trinity Boulevard CA #4" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2022-10-19-10:00:41 PM GMT-IP address:209.194.29.100 Document emailed to Raul.LopezRoura@fortworthtexas.gov for signature 2022-10-19-10:15:07 PM GMT Email viewed by Raul.LopezRoura@fortworthtexas.gov 2022-10-20-0:23:58 AM GMT-IP address: 172.58.176.137 FORT W❑RTH., P'—"d by Adobe Acrobat Sign