HomeMy WebLinkAboutContract 58123-CO1 CSC No. 58123-001
FORT WORTH. City of Fort Worth
Change Order Request
Project Name E.Rosedale Landscaping and Irrigation City Sec# 58123
Client Project#(s) 103259
Project Description Landscaping and irrigation in the median of E.Rosedale Street from Miller Avenue to IH-820
Contracto C.Green Scaping,LP Change Order# 1 Date 10/17/2022
City Project Mgr. Leon Wilson City Inspector Oscar Aguillon
Dept. TPW Contract Time
Totals (CD)
Original Contract Amount $535,580.90 $535,580.90 90
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $535,580.90 $535,580.90 90
Amount of Proposed Change Order $32,958.00 $32,958.00
Revised Contract Amount $568,538.90 $568,538.90 90
Original Funds Available for Change Orders $50,000.00 $50,000.00
Remaining Funds Available for this CO $50,000.00 $50,000.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 6.15%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $669,476.13
JUSTIFICATION(REASONS)FOR CHANGE ORDER
City of Fort Worth has compared the unit prices which are being proposed by the contractor to other similar items and accepts the unit costs.The difference in pricing can be
justified by the current market pricing which is fluctuating on a monthly basis due to price escalation and inflation.The City finds that the prices that are being proposed by the
contractor are fair and reasonable.CPN 102931 which opened bids on September 29,2022 was used as the basis for the acceptance of the Bermuda block sod pricing.The
average unit cost in CPN 1023931 for block sod is$7.75/SY,the unit cost included in this change order is$7.56/SY.Acceptance of the unit cost for the Vx6"concrete mow
strip was determined by evaluating the cost per unit volume of concrete installed.The proposed mow strip unit cost is 17%higher than the original bid item but installs 495%
more concrete by volume.The proposed mow strip unit cost also includes#4 rebar and is installed partially below ground with excavation included in the unit cost.The original
bid item did not include rebar and was designed to be installed above ground.
The construction of the landscape edging requires replacement of the existing adjacent groundcover.A detail in the plans indicate'by others"which is incorrect.It should be
included in the construction contract. The extruded concrete curb in the plans is not reinforced and is approximately 4"xY and triangular shaped.A reinforced 6"xV
rectangular concrete mow strip would be more durable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements.
Contractor's Company Name .ntractor IN Contract Signature
C.Green Scalping,LP Carson Green °e,o«s,z�zoau on Oct 19,2022
Inspector/Inspection Super ate Project and Contract Compliance Manager Date
Oct 20,2022 Oct 20,2022
Program Manager F Date Senior Capital Project Officer Date
Oct 21,2022 Oct 21,2022
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
AW,4- Oct 24,2022 Oct 24,2022
Assistant City Attorney Date lAssistant City Manager Date
ate! «n Oct 26,2022 Oct 26,2022
Council Action(if required)
M&C Number N/A M&C Date Approved N/A
ATTEST:
Tc+nnHte S roodall b
qL
Jannette Goodall,City Secretary AAoo '°oQa��
ho OFFICIAL RECORD
00° °_�° CITY SECRETARY
0 ICY
°O°°°°o°° a FT. WORTH, TX
���n ixAso4'
FORTWORTH City of Fort Worth
I---- Change Order Additions
Project Name E.Rosedale Landscaping and Irrigation City Sec# 58123
Client Project# 103259
Contractor C.Green Scaping,LP PM Leon Wilson Inspector F Oscar Aguillon
Change Order Submittal# O1 Date 10/17/2022
ADDITIONS
ITEM DESCRIPTION DEPT City Unit Unit Cost Total
ew ermu a 7oc o
New 6"x6"Reinforced Concrete(3000psi)Mow Strip TPW 5,382.00000000 LF $34.00
TPW S189,036.00
Sub Total Additions $
Change Order Additions Page 2 of 5
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name E.Rosedale Landscaping and Irrigation City Sec# 58123
Client Project# 103259
Contractor C.Green Scalping,LP PM Leon Wilson Inspector Oscar Aguillon
Change Order Submittal# O Date 10/17/2022
DELETIONS
y Unit Unit Cost Total
oncrete z7ge Strip
TPW $156,078.00
Sub Total Deletions
Change Order Deletions Page 3 of 5
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00