HomeMy WebLinkAboutContract 56582-CO4 CSC No. 56582-CO4
FORT WORTH City of Fort Worth
Change Order Request
Project Name: Water and Sanitary Sewer replacement Contract 2011 WSM-D Part 2 City Sec No.: 1 56582
Project No.(s): 1929-2 DOE No. N/A CityProj.No.:l 1929
Project Description: Replacing water line,Sanitary Sewer lines,Flat works and Paving on various streets.
Contractor: Woody Contractors INC. Change Order# ® Date: 1 10/14/2022
City Project Mgr.1 Preeti KC City Inspector: I Tamara Vaughn
Phone Number: (817)392-5467 Phone Number: (682)225-9106
Dept. Water Sewer TPW Totals Contract Time
(Calender days)
Original Contract Amount $2,031,329.25 $914,697.25 $0.00 $2,946,026.50 365
Extras to Date $0.00 $0.00 $236,072.00 $236,072.00 120
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $2,031,329.25 $914,697.25 $236,072.00 $3,182,098.50 485
Amount of Proposed Change Order $16,172.70 $45,685.00 $0.00 $61,857.70 30
Revised Contract Amount $2,047,501.95 $960,382.25 $236,072.00 $3,243,956.20 515
Original Funds Available for Change Orders $101,566.75 $45,733.75 $0.00 $147,300.50
Remaining Funds Available for this CO $101,566.75 $45,733.75 $0.00 $147,300.50
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 10.11%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+2591o) $3,682,533.13
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order No.4 will provide for the following items that are necessary on the project:
■ Additional 170 LF of 8-inch sewer pipe installation.
■ 5 additional sanitary sewer services.
■ 2 additional 4 feet diameter manholes.
■ Street pavement markings at the crosswalk on Roosevelt Avenue/25th/26th/27th/28th Street intersections as
required by Transportation and Public Works Department.
Staff concurs with the contractor's request for 30 additional calendar days on the project.
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name=:= Contractor Signature Date
Woody Contractors INC. Troy Woody I Troy Woody 1 0-19-2022
Inspector Date Project Manager Date
ct 25, 2022 10/26/2022
Director Water Dept) Date Construction Su ervisor(TPW) Date
�hns,taoher Marder
•S. Oct 26,2022 10/26/22
h rmW ph,r A,r&r(Oct 24"=16:G0 Col)
Senior Assistant City Attorney Date Assistant City Manager Date
Oct 27,2022 �2f11!819 Nov 2,2022
Council Action If Required
M&C Number N/A M&C Date Approved NTA
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer replacement Contract 2011 WSM-D Part 2 City Sec No.: 56582
Project No.(s): 1929-2 = DOE No. N/A City Proj.No.: 1 1929
Project Replacing water line, Sanitary Sewer lines,Flat works and Paving on various streets.
Description
Contractor Woody Contractors INC. Change Order:® Date: 10/14/2022
City Project Mgr. Preeti KC City Inspector Tamara Vaughn
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
2 8"PVC Sewer Pipe Sewer 170.00 LF $123.00 $20,910.00
5 Remove 4'Sewer Manhole Sewer 1.00 EA $500.00 $500.00
6 Temp Asphalt Pvmt Repair(2"HMAC on 6"Flex Base) Sewer 185.00 LF $23.00 $4,255.00
11 Post-CCTV Inspection Sewer 170.00 LF $10.00 $1,700.00
12 Manhole Vacuum Testing Sewer 2.00 EA $150.00 $300.00
13 Exploratory Excavation of Existing Utilities Sewer 1.00 EA $1,100.00 $1,100.00
14 Trench Safety Sewer 170.00 LF $1.00 $170.00
15 Concrete Collar Sewer 2.00 EA $750.00 $1,500.00
18 4"Sewer Service Sewer 5.00 EA $2,000.00 $10,000.00
19 4'Manhole Sewer 2.00 EA $5,900.00 $11,800.00
22 Epoxy Manhole Liner Sewer 5.00 VF $350.00 $1,750.00
55 Mobilization Sewer 1.00 LS $2,400.00 $2,400.00
45 REEL Raised Markers,Type II-A-A 4"(typ) Water 5.00 EA $4.35 $21.75
46 Pavement Markings,Stop Bar Water 756.00 LF $14.25 $10,773.00
62 6"Solid Stripe(W) Water 150.00 LF $1.95 $292.50
63 6"Solid Double Stripe(Y) Water 1,260.00 LF $3.90 $4,914.00
64 6"Dashed Stripe(Y) Water 50.00 LF $1.95 $97.50
65 Reflection Markers,Type II C-R Water 17.00 EA $4.35 $73.95
Water $16,172.70
Sewer $56,385.00
TPW
Page 1 of 1 Additions Sub Total
FO RT VVo RT H City of Fort Worth
Change Order Deletions
Project Name Water and Sanitary Sewer replacement Contract 2011 WSM-D Part 2 City Sec No.: 1 56582
Project No.(s): 1929-2 DOE No. N/A City Proj. No.: 1929
Project Description Replacing water line, Sanitary Sewer lines, Flat works and Paving on various streets.
Contractor Woody Contractors INC. Change Order: 1E Date 10/14/2022
City Project Mgr. Preeti KC City Inspector: Tamara Vaughn
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
44 Sanitary Sewer Construction Allowance Sewer 1.00 LS $10,700.00 $10,700.00
Water
Sewer $10,700.00
TPW
Page 1 of 1 IDeletions Sub Total 1$10,700.00
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 1 of 1
10/14/2022
Water and Sanitary Sewer replacement Contract 2011 WSM-D, Part 2
CPN 1929
Change Order 4 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Preeti KC
Name of Employee
Sr. Professional Engineer
Title 0o44nn
p9�10F. . �a
d
°0 d
ATTEST: 0,vo g=�
�� 6 00 'G
TgnnP�`1'e S. Goodall �aaa� 00
E00
00
A5a4a
lannette S.Goodall(Nov 2,202211:35 CDT)
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX