HomeMy WebLinkAboutContract 56537-A1 CSC No. 56537-Al AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 56537 WHEREAS, the City of Fort Worth (CITY) and Gupta Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 56537, (the CONTRACT) which was authorized by M&C 21- 0768 on the 281:1' day of September, 2021 in the amount of $1,198, 900 . 00 ; and WHEREAS, the CONTRACT involves engineering services for the following project: Village Creek Water Reclamation Facility (VCWRF) Phase III Electrical Improvements; WHEREAS , it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE , CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $40,240. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,239,140. 00. 3 . All other provisions of the Contract, which are not ex ressl amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [VCWRF Phase III Electrical Improvements] Page 1 of 2 [CPN 1033231 EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: ENGINEER City of Fort Worth Gupta Associates, I ,era a Lde Dana Burghdoff(N 2,2022 W.53CDT) Dana Burghdoff PuzAet Gupta, P. E. Assistant City Manager Vice President DATE: Nov 2, 2022 DATE: [a Z Z� 26 2Z APPROVAL RECOMMENDED: Chrisfapher Harder Christopher Harder(Oct 25,202213:06 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . CIO- 10/24/2022 Farida Goderya, P.E. Senior Project Manager APPROVED AS TO FORM AND LEGALITY: MSC: N/A SEW, Date: N/A �'^^4(Oct 27,2022 17:00 CDT) Douglas W. Black Form 1295: N/A Senior Assistant City Attorney �44vn�p�� 0 °��d�0 09a°a ATTEST: .o o o=d a OFFICIAL RECORD Tanne�-te S. Goodall aaa TEXASapb Jannette S.Goodall(Nov 2,2022 11:34 CDT �bbnaa4O' Jannette S. Goodall CITY SECRETARY City Secretary FT. WORTH, T Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [VCWRF Phase III Electrical Improvements] Page 2 of 2 [CPN 1033231 09/26/2022 A' Gupta&Associates, Inc GCONSULTING ENGINEERING 13717 Neutron Road Dallas,TX 75244 Tel:972-490-7661 Ms. Farida Goderya, PhD, PE City of Fort Worth Water Department Subject: Village Creek Water Reclamation Facility Phase III Electrical and Switchgear Improvements Project;CPN-103323;CSC#56537—Amendment No. 1 Dear Ms.Goderya, During site visits and design review meetings there are several items which were identified as additional service to the base contract: 1. Demolition of the existing Maintenance Building,adjacent to Return Sludge Pump Station No.5 (RS5) 2. S02 Area Modifications 3. U-Box,Outfall and Sample Building Detailed design changes are identified in the attachments from JQ and FNI. The table below is a breakdown of the additional design/bid cost associated with the modifications identified above: Scope Item Description Fee Task 1 Project Management FNI:$3,717 GAL$1,186 Task 2 Design Phase FNI:$14,856 JQ:$15,545 GAL$3,520 Task 3 Bid Phase FNI:$1,416 Tota 1 $40,240 The status of the project is as follows: Original Contract Amount $1,198,900 Total Authorized Amendment(s) $07000 Amendment No.1 $40,240 Revised Contract Amount $1,239,140 We appreciate the City of Fort Worth giving us the opportunity to provide additional design services. Sincerely, Puneet Gupta, PE CC:Andrew Reed, PE George Luke, PE V.K.Gupta, PE W O O O (N s > _ n A D o v cn D Z1 W Q N N N y 0 c IMF B _ W W N to> -• N � ID (D 3 T T ,n.. � G z � rJz `° � z D 90 a (D — CD m D m to 3 cn m (n 0 C o Qu o W fD D N c CDCD m n n (D Ccn — n (D R > > N Dm � �CC Lo 3 D3 < CD C C � ymN Z7 (n -7 0 O v n O o < (D CD 7 N T S N (D 2 O o O ° c O O o O !D 2 ;o o cn cn 0 3 m O cn o cn to O CD O O m c � m c� � O m m n � H O G o O O .� N 2 O W W O O Cn c m _ c o• o to e»vi En to t» n 4U N N O W m 3 O O O O O O CD O CD O O i 0 0 O O N fA fA fA ffl E O O O O O EA W ffl ffl CA N w 1fl EA cn ffl fA C 01 � Cn N A is Cn W -> A A 0),CD cn O -> V V N C co N � o d V V O) O V W O O p�j O O) •O 60 69(A ffl cn Efl fo fA(A 6.1 n 0 O A W H r N W W — A N A_ A W 0 O w CD O t0 N CO O N 0 0 0 O 6� W N Co CD -� W O W