FORT WORTH City of Fort Worth
Change Order Request
Project Name Riverside Community Park Phase I Improvements Project City Sec# 54041
Client Project#(s) C01196
Project Description Riverside Community Park Phase I Improvements
Contractor Northstar,Construction LLC Change Order# 4 Date 10/10/2022
City Project Mgr. Tonda Rice City Inspector Ozzie Ouimette
Dept. PARD 240 Calendar Days Contract Time
Totals (CD)
Original Contract Amount $1,867,855.00 $1,867,855.00 180
Extras to Date $45,677.20 $45,677.20 190
Credits to Date $24,090.00 $24,090.00
Pending Change Orders(in M&C Process) $0.00
Contract Cost to Date $1,889,442.20 $1,889,442.20 370
Amount of Proposed Change Order $47,880.00 $0.00 $47,880.00 50
Revised Contract Amount $1,937,322.20 $1,937,322.20 420
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $47,880.00 $47,880.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.72%
MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACTCOST+25%) $2,334,818.75
JUSTIFICATION(REASONS)FOR CHANGE ORDER
During construction it was determined that a change order#4 would be needed due to an excess water runoff down Belknap Street creating erosion into the park.
This Change Order is a request to install 6"Enviroflex Blocks as per revised plan sheets provided by Kimley-Hom.
Scope of Work includes:Excavate and haul-off excess dirt,grading of eroded area,install filter fabric,3/4"rock subgrade,approximately 1000 SF of Envroflex blocks with
reinforced concrete perimeter beam and one interior grade change beam,backfill,fine grading,and place up to 150 SY of Bermuda sod.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor(Name) Contract Signature I Date
Northstar Consturction,LLC Michael Heimlich M , CDT,, Nov 2,2022
Inspector/Inspection Supe(visorAaron vbarra=*Z'macro N°,,,,,zoz Date Project and Contract Compliance Manager Date
-'0'kJ N.16,20M Nov4,2022 Oct 21,2022
Iph01i—(N-4,20221__. wmo.(
Program Manager Date Senior Capital Project Officer Date
Nov 18,2022
Director(Dept) Date Acting Director,Contracting Department(Dept) Date
Nov 18,2022 Nov 23,2022
ttomey Date Assistant City Manager Date
Nov 23,2022 Nov 29,2022
Council Action(if required)
M&C Number M&C Date Approved
ATTEST:7amnette S Goosfa go4nnnnb
oa�n p- -OR0.r as
Jannette S.Goodall,City Secretary gA.0 °o0 OFFICIAL RECORD
01.
-o 0A0 CITY SECRETARY
0v0 °=d
p o o d FT.WORTH,TX
�a °° 00 Xy
as °00000000 47,
a�bnFXA�Oqa
h)PT WORTII City of Fort Worth
I-- Change Order Additions
Project Name Riverside Community Park Phase I Improvements Project City Sec# 54041
Client Project# C01196
Contractor] Northstar,Construction LLC PM Tonda Rice Inspector Ozzie Ouimette
Change Order Submittal# ® Date 1011012022
ADDITION5
Unit Unit Cost Total
4.1 Mobilization
4.2 Dirt Work 1.00000000 L 4,515.00
4.3 Install Enviroflex Blocks 1.00000000 L 31,365.00
4.4 ncrete Paving 1.00000000 L 4,675.00
4.5 Bermuda Sod(grass establishment) 1.00000000 LS 2,820.00
PARD $47,880.00
240 Calendar Days $0.00
Sub Total Additions 47,880.00
Change Order Additions Page 2 of 5
FOR_ r WORTH City of Fort worth
Change Order Deletions
Project Name Riverside Community Park Phase I Improvements Project City Sec# 54041
Client Project# CO1196
Contractor Northstar,Construction LLC PM Tonda Rice Inspecto Ozzie Ouimette
Change Order Submittal# ® Date 10110I2022
DELETIONS
Unit ni as 0
PARD 0.00
240 Calendar Days
Sub TotalDeletions
Change Order Deletions Page 3 of 5
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Signature:
Email: