HomeMy WebLinkAboutContract 54750-CO2 Fci P,-r WO RT H City of Fort Worth CSC No. 54750-0O2
Change Order Request
Project Name: Village Creek Water Reclamation Facility(VCWRF) Phase II Electrical City Sec No.: 54750
Project No,(s):1 56017/0700430/1780 DOE No, N/A City Proj.No.: CO2648-2
Project Descdption; This VCWRF Phase II Improvements includ8 replacement or upgrade of electrical infrastructure within the following areas;Return Sludge
Pump Stations 1,2,&7;Service Water Pump Station 2;Storm Drain Pump Station 2;and Chlorine Area.
Contractor: Winston Electric Inc., dba ACME Electric Change Order# t_=J Date: 11/14/2022
City Project Mgr. Farida Goderya, PE City Inspector: I Nathan Gray
Phone Number: 817-392-8214 Phone Number. 817-991-0629
Dept. Water Sewer Totals Contract Time
Calender days)
Original Contract Amount $8,647 846.00 $8,647,846.00 655
Extras to Date $0.00 084
Credits to Dale
Pending Change Orders(in M&C Process)
Contract Cost to Date $8,647 846.00 $8 647,846.00 739
Amount of Proposed Change Order $85,755,00 $85,755.00 168
Revised Contract Amount $8,733,601.00 $8,733,601.00 907
Original Funds Available for Change Orders $332,463.00 $332,463.00
Remaining Funds Available for this CO $332,463,00 $332,463.00
Additional Funding(if necessary) I il
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.99%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $10,809,807,50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 2 provides for the installation of newstarters for Return Sludge Pumps 71, 72,73 and Waste Sludge 1
Pumps 71 and 72.
I
i
Staff recommends the approval of an additional 168 calendar days for the delivery and installation of the starters.
OFFICIAL RECORD !I
CITY SECRETARY
FT.WORTH,TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Conirictor Signature Date
Winston Electric Inc.,dba ACME Electric Todd Bozeman / o S p.�0;a
OF
Inspector Date Project Manager Date
11/15/2022 Lela, 0-0 ci, 1 1/15/22
Director Water DWpQ Date Con truction Supervisor Date
Nov 16,2022
Assistant City Attorney Date I Assistant City Manager Date
g 310i39� Nov 17,2022 ,ana BurandoFF Nov 17�2022
as 6u neon 17,WM 16M CST)
Council Action if Required)
M&C Number NIA M&C Date Approved N�
F0 RT WO RT H City of Fort Worth
Change Order Additions
Project Name Village Creek Water Reclamation Facility VCWRF Phase II Electrical Improvements City Sec No.: 54750
Project No,(s): 56017/0700430/1780 DOE No. N/A City Proj,No.: CO2648-2
llo
Project areas:Return Sludge Pump Stations 1,2,&7;Service Water Pump Station 2;Storm Drain Pump Station 2;and
Description
Contractor Winston Electric Inc,,dba ACME Electric Change Order:= Date:1 11/14/2022
City Project Mgr. Farida Goderya,PE City Inspector F Nathan Gray
ADDITIONS
ITEM DESCRIPTION DEPT Qt Unit Unit Cost Total
1 CMR 01 -Modifications to RS7 PS(RS-71,72,73,WS-71 &72) Sewer 1.00 LS $85,755.00 $85,755.00
Water
Sewer $85,755.00
Page 2 of 4 Additions Sub Total $85,755,00
Fo RT WO RT H City of Fort Worth
Change Order Deletions
Project Name Village Creek Water Reclamation Facility(VCWRF)Phase II Electrical Improvements I City Sec No.: 54750
Project No.(s): 56017/0700430/1780 DOE No, N/A City Proj.No,: CO2648 2
Project Description This VCWRF Phase II Improvements include replacement or upgrade of electrical infrastructure within the
following areas:Return Sludge Pump Stations 1,2,&7;Service Water Pump Station 2;Storm Drain Pump Station
Contractor Winston Electric Inc.,dba ACME Electric Change Order: [ Date 11/14/2022
City Project Mgr, Farida Gotlerya,PE City Inspector: Nathan Gray
DELETIONS
ITEM DESCRIPTION DEPT City Unit Unit Cost Total
I
—II
Water
Sewer
Page 3 of 4' IDeletions Sub Total �l
MWWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Same as original Contract Miscellaneous changes to RS7 $85,755.00
Total $85,755.00
Previous Change Orders
co# DATE AMOUNT
1 911/2022 $0.00
Total $0.00
Page 4 of 4
CMR-01 RSP-7 RS & WS pump Starters R3
PENDING CHANGE REQUEST COST ANALYSIS
To be completed by General Contractor or Subcontractor
as outlined in the Uniform General Conditions Section 6.6.1
PROJECT: Village Creek Electrical Improvements Phase H
Work performed by:
JOB NO. 2675
( ) General Contractor ( X ) Subcontractor CONTRACTOR: Acme Electric
If subcontractor,give Co.name:ACME ELECTRIC COMPANY PCM#:
CPR#:
Time Extension(if any): 24 weeks RFI#:
ASI#:
Description of Change: Provide and install new starters for RS-71,72,73&WS-71&72
ADDITIONS AND/OR[CREDITS] EXTENSION
A B C D E
Description Quantity Unit Cost/Unit Material Labor E quip. Trans. Stora e
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Subtotals $0.00 $0.00 $0.00 $0.00 $0.00
Line I: Enter total of Columns A+B+C+D+E $0.00
Reynolds Proposal $74,569.57
Line II: If Line I indicates an ADD,Enter 15%of Line I.
If Line I indicates CREDIT,enter-0- $11,185.43
Line III: Enter total Col E(Storage) $0
Line IV: Enter 49%of Col B for Workman's
Comp.Social Security,and like taxes $0.00
Line V: Total Line I thru Line IV
Enter here and on Summary Sheet $85,755.00
SIGNATURE: DATE:
City of port Worth
SIGNATURE: DATE:
Acme Electric Company
Industrial Connections&Solutions LLC
Mebane Equipment Operation
To: THE REYNOLDS COMPANY
Date:5/17/2022
MCC,LIMIT AMP&SWITCHBOARD
AFTERMARKET QUOTATIONS
Prop 0 KGO61722 Rev 3
Est,Ship: 16-20 WKS' X Evolution E9000
[tom City E ul .Description H t. Net Each Lino Total
1 3 CB SZ4 FVNR 75 HP UNITS 30"
INCLUDES:300VA CPT,PHASE MONITOR,
XFMR LED LIGHTS,E-STOP,TIMING RELAY&BASE,
AUX RELAY,2 POS SW,AMB OL,WIRE MARKERS,
SIS WIRE&CABLE,DOOR DIAGRAMS,SS NP SCREWS,
SHUTTER TYGER HYDES,AUX REALY
REF ORDH 151986654 SHH 106
REPLACING UNIT ACJ,ADH,and ADM IN ITEM 40
MCC-RS7
2 2 IC13 SZ FVNR 25 HP UNITS 18"
INCLUDES:100VA CPT,PHASE MONITOR,
XFMR LED LIGHTS,E-STOP,TIMING RELAY&BASE,
AUX RELAY,2 POS SW,AMB OL,WIRE MARKERS,
SIS WIRE&CABLE,DOOR DIAGRAMS,SS NP SCREWS,
SHUTTER,TYGER HYDES,AUX REALY
REF ORDII 151985554 SHH 106
REF ORDH 151985654 SHH 106
REPLACING UNITS ACM&AEE IN ITEM 40 MCC-RS7
3 U date Power System Stud
TOTAL NET USD ,
ARL
01 Solutions G/A00
hEBME. NC IISA
M.NO. 377BTM
_ New 75HP size 4, CONT.ON SM.42A
SPLICE UL U UL 3 UL U- UL 30 inch units OUTLINE-SUHHARY RELIAOEAR LV HCC
DNB.FOR INSTALLATI0N
6PACE FDRCB/30 FDRCB/20 FDRCO/20 FVNR Circuit 106 applies, BUST ITEM NAME, HCC-RS7
MC ADC ACC ADC 330 PP
FVNR FDRCD/3G FDRCB/20 FvPR TOTAL SECTIONS G
10 ADD ACD 59
FDRCO/39 FORCB/39 .� O.E. R011, 1210102029
ME OBE E Am 1 ITEM NO. 35
FV11 FDRCB/30 FVN2 DRC PANEL CATAL00 I,b. 1519D535440
10 ADF 39 AEF
FRONT FDRCB/30 TV CUSTOMER.
d
AGO THE REYNOLDS COMPANY,FORT NORTH
VIER FDRCO/30
ABN A USER.
FDRCB/20 FVNR Fort Nmlh VI I lose Croat MF rfi2 Elm A
MI 3GNew 25HP starters FDRCD/20 IIE7V1 CLASS 11 TYPE L QtCL.10
AB1 AEJ POIIER6UPPLY400VOLTS60ITZ FORCB/20 Fvial HAWCO 3 PHASE 4 HIRE
Amc to 3sD 18 inch Units
FORCO/20 — --- - - CONTROL 120V AC SING HINDINA CPT
SECT.HEIGHT AOL
SD I ICHE9 FORCE/211 Circuit 106 applies, I AMPS HATL PLATING
M11 AM ACM ADM Mill BUS 690 COPPER STD TIII
VERT. BUS COPPER BID Till
AEO AFO 6ND, BUS 300 COPPER STD Till
II-SHIPPING E91)I COZ!
UL SECT 2 3 4 5 O NEAT. BU9 609 COPPER STD Till
LENGTH UUS DRACINO 650G0 SYMMETRICAL
It0. 1
MCC SHORT CMT.RATING 65000 SYN.
EST. REIGHT 3000 LOS. _
HOB. SHEETI D SI ETS
sTANDMD DRAW NOi 377BB223
SECT,IUD FRONT 20,00 FRONT 2040 FRONT 2G,Q0 FRONT 2040 FRONT 20 O FRONT 20,20 SPECIAL BRANIIRh
SPEC.511TS..
k 60 UNIT 1C.ST1.i
PLUG IC.SH.-
VEAT. BUS°. S00 Goo C90 GOO 600 690 EWINEER,CCH CCH
STUD VERT. UUS A.
VERY. BUS S/U LEWTH 5.5 5.5 5.5 5.5 3.3 4.0 ISSUFO 02/09/2021
STUD VERT.BUS 9/U LENGTH REV. It0, 7 REV.C6/0912021
VERT.6TA0 OND 9/U LENOTH
VERT.LMD ONO O/U LEHGTII
CU610MER INC.LINE PER PHASE
2-12/0 AHO-520 HCH BOTTOM SECT.AF 2-e2/0 RHO-590 MCH BOTTOM SECT, AE
Page 51
11/14/2022
CPN CO2648-2
Village Creek Water Reclamation Facility (VCWRF) Phase II Electrical Improvements
Change Order 2 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Farida Goderya,PhD,PE
Name of Employee
Senior Project Manager
Title
odvan4��
°°o
p
0
ATTEST: do ap-+
Pv o=
° °
L Q���rEXAS��p
Jannette S.Goodall(Nov 18,202208:20 CST) bnaaa44
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX