Loading...
HomeMy WebLinkAboutContract 54750-CO2 Fci P,-r WO RT H City of Fort Worth CSC No. 54750-0O2 Change Order Request Project Name: Village Creek Water Reclamation Facility(VCWRF) Phase II Electrical City Sec No.: 54750 Project No,(s):1 56017/0700430/1780 DOE No, N/A City Proj.No.: CO2648-2 Project Descdption; This VCWRF Phase II Improvements includ8 replacement or upgrade of electrical infrastructure within the following areas;Return Sludge Pump Stations 1,2,&7;Service Water Pump Station 2;Storm Drain Pump Station 2;and Chlorine Area. Contractor: Winston Electric Inc., dba ACME Electric Change Order# t_=J Date: 11/14/2022 City Project Mgr. Farida Goderya, PE City Inspector: I Nathan Gray Phone Number: 817-392-8214 Phone Number. 817-991-0629 Dept. Water Sewer Totals Contract Time Calender days) Original Contract Amount $8,647 846.00 $8,647,846.00 655 Extras to Date $0.00 084 Credits to Dale Pending Change Orders(in M&C Process) Contract Cost to Date $8,647 846.00 $8 647,846.00 739 Amount of Proposed Change Order $85,755,00 $85,755.00 168 Revised Contract Amount $8,733,601.00 $8,733,601.00 907 Original Funds Available for Change Orders $332,463.00 $332,463.00 Remaining Funds Available for this CO $332,463,00 $332,463.00 Additional Funding(if necessary) I il CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.99% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $10,809,807,50 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 2 provides for the installation of newstarters for Return Sludge Pumps 71, 72,73 and Waste Sludge 1 Pumps 71 and 72. I i Staff recommends the approval of an additional 168 calendar days for the delivery and installation of the starters. OFFICIAL RECORD !I CITY SECRETARY FT.WORTH,TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor Name Conirictor Signature Date Winston Electric Inc.,dba ACME Electric Todd Bozeman / o S p.�0;a OF Inspector Date Project Manager Date 11/15/2022 Lela, 0-0 ci, 1 1/15/22 Director Water DWpQ Date Con truction Supervisor Date Nov 16,2022 Assistant City Attorney Date I Assistant City Manager Date g 310i39� Nov 17,2022 ,ana BurandoFF Nov 17�2022 as 6u neon 17,WM 16M CST) Council Action if Required) M&C Number NIA M&C Date Approved N� F0 RT WO RT H City of Fort Worth Change Order Additions Project Name Village Creek Water Reclamation Facility VCWRF Phase II Electrical Improvements City Sec No.: 54750 Project No,(s): 56017/0700430/1780 DOE No. N/A City Proj,No.: CO2648-2 llo Project areas:Return Sludge Pump Stations 1,2,&7;Service Water Pump Station 2;Storm Drain Pump Station 2;and Description Contractor Winston Electric Inc,,dba ACME Electric Change Order:= Date:1 11/14/2022 City Project Mgr. Farida Goderya,PE City Inspector F Nathan Gray ADDITIONS ITEM DESCRIPTION DEPT Qt Unit Unit Cost Total 1 CMR 01 -Modifications to RS7 PS(RS-71,72,73,WS-71 &72) Sewer 1.00 LS $85,755.00 $85,755.00 Water Sewer $85,755.00 Page 2 of 4 Additions Sub Total $85,755,00 Fo RT WO RT H City of Fort Worth Change Order Deletions Project Name Village Creek Water Reclamation Facility(VCWRF)Phase II Electrical Improvements I City Sec No.: 54750 Project No.(s): 56017/0700430/1780 DOE No, N/A City Proj.No,: CO2648 2 Project Description This VCWRF Phase II Improvements include replacement or upgrade of electrical infrastructure within the following areas:Return Sludge Pump Stations 1,2,&7;Service Water Pump Station 2;Storm Drain Pump Station Contractor Winston Electric Inc.,dba ACME Electric Change Order: [ Date 11/14/2022 City Project Mgr, Farida Gotlerya,PE City Inspector: Nathan Gray DELETIONS ITEM DESCRIPTION DEPT City Unit Unit Cost Total I —II Water Sewer Page 3 of 4' IDeletions Sub Total �l MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Same as original Contract Miscellaneous changes to RS7 $85,755.00 Total $85,755.00 Previous Change Orders co# DATE AMOUNT 1 911/2022 $0.00 Total $0.00 Page 4 of 4 CMR-01 RSP-7 RS & WS pump Starters R3 PENDING CHANGE REQUEST COST ANALYSIS To be completed by General Contractor or Subcontractor as outlined in the Uniform General Conditions Section 6.6.1 PROJECT: Village Creek Electrical Improvements Phase H Work performed by: JOB NO. 2675 ( ) General Contractor ( X ) Subcontractor CONTRACTOR: Acme Electric If subcontractor,give Co.name:ACME ELECTRIC COMPANY PCM#: CPR#: Time Extension(if any): 24 weeks RFI#: ASI#: Description of Change: Provide and install new starters for RS-71,72,73&WS-71&72 ADDITIONS AND/OR[CREDITS] EXTENSION A B C D E Description Quantity Unit Cost/Unit Material Labor E quip. Trans. Stora e $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotals $0.00 $0.00 $0.00 $0.00 $0.00 Line I: Enter total of Columns A+B+C+D+E $0.00 Reynolds Proposal $74,569.57 Line II: If Line I indicates an ADD,Enter 15%of Line I. If Line I indicates CREDIT,enter-0- $11,185.43 Line III: Enter total Col E(Storage) $0 Line IV: Enter 49%of Col B for Workman's Comp.Social Security,and like taxes $0.00 Line V: Total Line I thru Line IV Enter here and on Summary Sheet $85,755.00 SIGNATURE: DATE: City of port Worth SIGNATURE: DATE: Acme Electric Company Industrial Connections&Solutions LLC Mebane Equipment Operation To: THE REYNOLDS COMPANY Date:5/17/2022 MCC,LIMIT AMP&SWITCHBOARD AFTERMARKET QUOTATIONS Prop 0 KGO61722 Rev 3 Est,Ship: 16-20 WKS' X Evolution E9000 [tom City E ul .Description H t. Net Each Lino Total 1 3 CB SZ4 FVNR 75 HP UNITS 30" INCLUDES:300VA CPT,PHASE MONITOR, XFMR LED LIGHTS,E-STOP,TIMING RELAY&BASE, AUX RELAY,2 POS SW,AMB OL,WIRE MARKERS, SIS WIRE&CABLE,DOOR DIAGRAMS,SS NP SCREWS, SHUTTER TYGER HYDES,AUX REALY REF ORDH 151986654 SHH 106 REPLACING UNIT ACJ,ADH,and ADM IN ITEM 40 MCC-RS7 2 2 IC13 SZ FVNR 25 HP UNITS 18" INCLUDES:100VA CPT,PHASE MONITOR, XFMR LED LIGHTS,E-STOP,TIMING RELAY&BASE, AUX RELAY,2 POS SW,AMB OL,WIRE MARKERS, SIS WIRE&CABLE,DOOR DIAGRAMS,SS NP SCREWS, SHUTTER,TYGER HYDES,AUX REALY REF ORDII 151985554 SHH 106 REF ORDH 151985654 SHH 106 REPLACING UNITS ACM&AEE IN ITEM 40 MCC-RS7 3 U date Power System Stud TOTAL NET USD , ARL 01 Solutions G/A00 hEBME. NC IISA M.NO. 377BTM _ New 75HP size 4, CONT.ON SM.42A SPLICE UL U UL 3 UL U- UL 30 inch units OUTLINE-SUHHARY RELIAOEAR LV HCC DNB.FOR INSTALLATI0N 6PACE FDRCB/30 FDRCB/20 FDRCO/20 FVNR Circuit 106 applies, BUST ITEM NAME, HCC-RS7 MC ADC ACC ADC 330 PP FVNR FDRCD/3G FDRCB/20 FvPR TOTAL SECTIONS G 10 ADD ACD 59 FDRCO/39 FORCB/39 .� O.E. R011, 1210102029 ME OBE E Am 1 ITEM NO. 35 FV11 FDRCB/30 FVN2 DRC PANEL CATAL00 I,b. 1519D535440 10 ADF 39 AEF FRONT FDRCB/30 TV CUSTOMER. d AGO THE REYNOLDS COMPANY,FORT NORTH VIER FDRCO/30 ABN A USER. FDRCB/20 FVNR Fort Nmlh VI I lose Croat MF rfi2 Elm A MI 3GNew 25HP starters FDRCD/20 IIE7V1 CLASS 11 TYPE L QtCL.10 AB1 AEJ POIIER6UPPLY400VOLTS60ITZ FORCB/20 Fvial HAWCO 3 PHASE 4 HIRE Amc to 3sD 18 inch Units FORCO/20 — --- - - CONTROL 120V AC SING HINDINA CPT SECT.HEIGHT AOL SD I ICHE9 FORCE/211 Circuit 106 applies, I AMPS HATL PLATING M11 AM ACM ADM Mill BUS 690 COPPER STD TIII VERT. BUS COPPER BID Till AEO AFO 6ND, BUS 300 COPPER STD Till II-SHIPPING E91)I COZ! UL SECT 2 3 4 5 O NEAT. BU9 609 COPPER STD Till LENGTH UUS DRACINO 650G0 SYMMETRICAL It0. 1 MCC SHORT CMT.RATING 65000 SYN. EST. REIGHT 3000 LOS. _ HOB. SHEETI D SI ETS sTANDMD DRAW NOi 377BB223 SECT,IUD FRONT 20,00 FRONT 2040 FRONT 2G,Q0 FRONT 2040 FRONT 20 O FRONT 20,20 SPECIAL BRANIIRh SPEC.511TS.. k 60 UNIT 1C.ST1.i PLUG IC.SH.- VEAT. BUS°. S00 Goo C90 GOO 600 690 EWINEER,CCH CCH STUD VERT. UUS A. VERY. BUS S/U LEWTH 5.5 5.5 5.5 5.5 3.3 4.0 ISSUFO 02/09/2021 STUD VERT.BUS 9/U LENGTH REV. It0, 7 REV.C6/0912021 VERT.6TA0 OND 9/U LENOTH VERT.LMD ONO O/U LEHGTII CU610MER INC.LINE PER PHASE 2-12/0 AHO-520 HCH BOTTOM SECT.AF 2-e2/0 RHO-590 MCH BOTTOM SECT, AE Page 51 11/14/2022 CPN CO2648-2 Village Creek Water Reclamation Facility (VCWRF) Phase II Electrical Improvements Change Order 2 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature Farida Goderya,PhD,PE Name of Employee Senior Project Manager Title odvan4�� °°o p 0 ATTEST: do ap-+ Pv o= ° ° L Q���rEXAS��p Jannette S.Goodall(Nov 18,202208:20 CST) bnaaa44 Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX