HomeMy WebLinkAboutContract 55432-CO1 FORT WoP, FFi City of Fort Worth City SecretaryCopy55432-COI Change Order Request ProjectNamel Little Fossil Creek Interceptor(M-292)Improvements-Part 2A-Location 2 Cily Sec No. 55432 Project No.(s) 56019 0700430 5740010 C01960 C017t10 DOE No. NIA City Proj.No. 1960 P(o)-cl Description: Replacement Main-292,in Haltom City, beginning from a point 310 feet west and 730 feet north of the Fossil Creek/Field Street Intersection,then southerly 730 feet to Fossil Drive and then easterly 1,500 feet to Kerry Lane, Contractor; Mountain Cascade of Texas,LLC Change Order: L� Date: 1 11/912022 City Project Mgr.1 Walter Norwood City Inspeclor; I Shane Be Phone Number:F8 Phone Number: (817)392-2190 Dept, Sewer Totals Contract Time (Calender(lays) Original Contract Amount $1,559,450.00 $1,559,450.00 320 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Dale $1,559,450.00 $1,659,450,00 320 Amount of Proposed Change Order $48,794.82 $48,794.82 120 Revised Contract Amount $1,608,244.82 $1,608,244.82 440 Original Funds Available for Change Orders $77,973.00 $77,973.00 Remaining Funds Available for this CO $77,973A0 $77,973.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.13% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591o) $1,949,312.50 JUSTIFICATION,(REASONS)�FOR.CHANOE ORDER Change Order,No. 1 provides for the following; The replacement of epoxy lined concrete manholes with polymer concrete manholes. The replacement of an 8 foot gate with a 12 foot gate to provide maintenance access for the Field Operations crew. The replacement of an existing sanitary sewer line on Fossil Drive that was undermined during installation of the project sewer main. The installation of an ordor control vent at a project manhole. staff recommends the approval of an additional 120 calendar days to complete work. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full(both time and money)for all costs arising out of,or Incidental to,the above Change Order. Contraotor's Dom an 'Name I �.Contraotor!Name ,Oont aotor BSI nature 'Date Mountain Cascade of Texas,LLC Jason Williford /t�j►/�ZL I :1 nsgeolor Dale, ProjqctManager i Dale rector'W er Dept) Date Construolion.Su ervisor Water De t Date :m,he.ader Nw16,1@113:1]C6 �` Nov 16,2022 Senior City Attorney Date Assistant City Manager Date Nov 17,2022 ana6ughdoff(Nw17, 16M aTrNov 17,2022 Council Action If Required) M&C Number NIA M&C Date Appl N/A FcoP,-r Woo, rH City of Fort Worth Change Order Additions Project Name Little Fossil Creek Interceptor(M-292)Improvements-Part 2A-Localion 2 City Sec No. 55432 Project No,(s) 56019 0700430 5740010 C01960 C01780 DOE No, NIA City Proj,No. 1960 Project Replacement Main-292,in Haltom City, beginning from a point 310 feet west and 730 feet north of the Fossil CreeklFleld Description Street intersection,then southerly 730 feel to Fossil Drive and then easterly 1,500 feet to Kerry Lane. Contractor Mountain Cascade of Texas,LLC Change Order: F--F] Dale: 11/9/2022 City Project Mgr, I Walter Norwood City Inspector Shane Behn ADDITIONS DEPT Qty Unit Unit Cost Total 3 4'Manhole Sewer 1.00 EA $9,000.00 $9,000.00 4 4'Extra Depth Manhole Sewer 10.00 VF $180.00 $1,800.00 48 4'Polymer Manhole Sewer 1.00 EA $10,740.00 $10,740.00 49 4'Extra Depth Polymer Manhole Sewer 4.00 VF $470.00 $1,880.00 50 5'Polymer Manhole Sewer 8.00 EA $12,800.00 $102,400.00 51 5'Drop Polymer Manhole Sewer 1.00 EA $18,000.00 $18,000.00 52 5'Extra Depth Polymer Manhole Sewer 55,00 VF $530.00 $29,150.00 53 7"HES Concrete Pavement Sewer 475.00 SY $124.20 $58,995.60 54 Remove 8'gate Install 12'gate Sewer 2.00 EA $2,500.00 $5,000.00 55 8"Sewer(Haltom City) Sewer 350,00 LF $257.00 $89,950.00 56 Odor Control Vent Sewer 1.00 EA $15,969.82 $15,969.82 Sewer $342,884.82 Page 2 of 4 Additions Sub Total $342,884.82 ]FtoRT WOPT14 City of Fort Worth Change Order Deletions Project Name Little Fossil Creek Interceptor(M-292)Improvements-Part 2A-Location 2 City Sec No. 55432 Project No.(s) 56019 0700430 5740010 C01960 C01780 DOE No. NIA City Proj.No, 1 1960 Project Description Replacement Main-292,in Haltom City, beginning from a point 310 feet west and 730 feet north of the Fossil Creek/Field Street intersection,then southerly 730 feet to Fossil Drive and then easterly 1,500 feet to Kerry Lane. Contractor Mountain Cascade of Texas,LLC Change Order; 0 Date 11/9/2022 City Project Mgr, Walter Norwood City Inspector FShane Bohn DELETIONS ITEM DESCRIPTION DEPT Qty " Unit Unit Cost Total 5 5'Manhole Sewer 8,00 EA $11,000.00 $88,000.00 6 5'Drop Manhole Sewer 1.00 EA $18,000.00 $18,000.00 7 5'Extra Depth Manhole Sewer 56.00 VF $230.00 $12,650.00 25 7"Concrete Pavement Sewer 380,00 SY $103.00 $39,140.00 40 Epoxy MH Liner(4'Manhole) Sewer 10.00 VF $290.00 $2,900,00 41 Epoxy MH Liner(5'Manhole) Sewer 103.00 VF $300.00 $30,900.00 42 Remote Vertical Vent Station Sewer 1.00 LS $2,500.00 $2,500.00 47 Construction Allowance Sewer 1.00 LS $100,000.00 $100,000.00 Sewer $294,090.00 Page 3 of 4 Deletions Sub Total 1$294,090.00 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Page 4 of 4 11/9/2022 CPN 1960 Little Fossil Creek Interceptor (M-292) Improvements - Part 2A-Location 2 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable, .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Walter Norwood Name of Employee Project Manager Title 'ab 1:0RT ��00000000p00 o �-o o•1G ATTEST: �vo o=� *o o*� o 0 o° o 0 0 J�neGoodall(N�i��CST) Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX