HomeMy WebLinkAboutContract 56515-CO2 CSC No.56515-CO2
FORT WORTH. City of Fort Worth
v(` Change Order Request
Project Namel Lake Como Park and Oakland Lake Park Dam and Erosion Control Improvements City Sec# I CSC 66616
Clem Project#(s) 101592 8,101875
Projectf Restoration of two dams:Lake Como and Oakland Lake Park i
Descriplionl
Contractor The Fain Group,Inc. Change Order# 2 1 Dale
City Project Mgr. Tonda Rice I City Inspector[ Byron Md)onald
—J
Dept. PARD TPW Water Contract Time
Totals (CD)
Original Contract Amount 1,688,264.00 $1.588,264.00 240
Extras to Dale $607,982.60 $607,982.60 110
Credits to Dale $238,000.00 $238,000.00
Pending Change Orders(n MAC Process)
Contract Cost to Dale $1,968,246.60 $1,968,246.60 360
Amount of Proposed Change Order $22,624.00 $0.00 $0.00 $22,624.00 0
RevisedContractAmounl 1,980,870.50 1,980,870.50 350
Original Funds Available for Change Orders 369,982.60 $369.982.60
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $22,624.00 $22,624.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 24,72%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,985,330.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
During construction it was determined that a change order#2 would be needed due to the following:
1.Item 32 9999.2003 Structural Piers+92VF overrun aQ$385NF=$35,420.00.Per the specifications in the plans on pg.S01.02 Detail 1(Typical Case Drilled Pier
Detail),it calls for a depth of 16-0'each in the pierschedule,with 18 total piers,that makes a total of 270VF but 178VF is listed in the bid quantities.
2.During excavating on the west retaining wall,a non-located sewer line was cut.The cost to repair the sewer is$3,800.In order to avoid the maximum
limit on the cost overrun,'Item 46 9999.2010 Repair of Concrete Structure LS BQ:1 Total:$26,000.00 was removed.
3.Due to the delays in availability of the steel plates which cover the flume crossing of the sidewalk,it was determined that the construction of a concrete flume crossings in
lieu of the steel plates would be needed.Item#44 9999.60016/8'Steel Plate Cover was deleted at$6,700 additional 966 SF.
4.Additional quantities of the flexamalwas needed to cover the drainage area at$8,604.00.
•Funding available in project to cover this C.O.#2.
If you have questions please contact the Project Manager,Tonda Rice Phone Number 817.392.6769 or email Tonda.Rice@fortworthtexas.gov.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible forthe monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
ConlracWa Camr ery Name I Conlraclerf Namd Contract Sh nature Dale
The Fain Group Larry Frazier ; , u` Sep 30,2022
nspaclorilmifflaellon Su alulsor Data I Project and Contract Compliance Mansaar Dale
PNov9,2022
^'� Sep 29.2022
ProaramManager anlorC IalPreectOIRCer Dale
sty
IAsslslantDfreclorlDeptl ctingWtaclor,Contractin Department De It Dale
h+7.rfc= Nov9,2022
AeslslanlCllyAllarney_ sslslanl CityManager Dale
`",)IAA-7iw4, Nov 16,2022 Novzl,zozz
as F CouncllAcIloaffiragulradl I
MAC Number I MAC Dale Approved
ATTEST:,7ahhette S Goodall
Jannette S.Goodall(Nov 21,202215:27 CST)
Jannette S.Goodall �gaFoer�Ila
p�o°°°°°°°°'-o9 OFFICIAL RECORD
pc~ios=d CITY SECRETARY
FT.WORTH,TX
Qpaa rE XA54ba
zi�Qb6664
11 ORTWORTf1 City of Fort Worth
—� -- Change Order Additions
Project Name I Lake Como Park and Oakland Lake Park Dam and Eroslan Control Improvements Clly Sec 11 CSC 5651b
Cllenl Project i{ F 101592&101075
Conlractofl The Fain Group,Inc. PM Tonda Rice Inspector Byron McDonald
ChanpOtclarSubrnlllalll �� Dale 911612022
ADDITIONS
ITEM DESCRIPTION DEPT y Unit Unit CostTotal
Flexamal Plus or Appoved Equal
Nlrudu(al Piers
62 Pew Ilern Sevier Line Repa r P R
3 Now Concrete Flume Crossing PARD TM7
PARD $53,324.00
TPW $0.00
Water $0.00
Sub Ta a d it ens 3,32.0
Change Order Additions Page 1 of 1
roar_ AVORTH. City of Fort Worth
"� Change Order Deletions
Project Namo I Lake Como Park and Oakland Lake Park Dam and Erosion Control Im rovemenis City Sec It CSC 56515
Clienl Pfolecl tt I 101592&101075
Comilactorl Tho Fain Group,Inc. PM Tonda Rico Inspector Byron McDonald
Change 0rdarSubrnillal it 0 Dale 9/1612022
DELETIONS
ITEM DESCRIPTION DEP I ly Unit Units ota
6 99�9 .' U Repair of Concrete Structure PART) UU LS 25,0UD.
9999.5001 6/8'6(eel Plate Flume Cover PARD 2.0u 278 0.
PART) $30,700.00
TPW $0.00
Water $0.00
u etal Deletions 43u,tuo.vo
Change Order Deletions Page 1 of 1
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co IE DATE AMOUNT
CO#1 5/25/2022 $13,000.00
Total $13,000.00