Loading...
HomeMy WebLinkAboutContract 56515-CO2 CSC No.56515-CO2 FORT WORTH. City of Fort Worth v(` Change Order Request Project Namel Lake Como Park and Oakland Lake Park Dam and Erosion Control Improvements City Sec# I CSC 66616 Clem Project#(s) 101592 8,101875 Projectf Restoration of two dams:Lake Como and Oakland Lake Park i Descriplionl Contractor The Fain Group,Inc. Change Order# 2 1 Dale City Project Mgr. Tonda Rice I City Inspector[ Byron Md)onald —J Dept. PARD TPW Water Contract Time Totals (CD) Original Contract Amount 1,688,264.00 $1.588,264.00 240 Extras to Dale $607,982.60 $607,982.60 110 Credits to Dale $238,000.00 $238,000.00 Pending Change Orders(n MAC Process) Contract Cost to Dale $1,968,246.60 $1,968,246.60 360 Amount of Proposed Change Order $22,624.00 $0.00 $0.00 $22,624.00 0 RevisedContractAmounl 1,980,870.50 1,980,870.50 350 Original Funds Available for Change Orders 369,982.60 $369.982.60 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $22,624.00 $22,624.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 24,72% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,985,330.00 JUSTIFICATION(REASONS)FOR CHANGE ORDER During construction it was determined that a change order#2 would be needed due to the following: 1.Item 32 9999.2003 Structural Piers+92VF overrun aQ$385NF=$35,420.00.Per the specifications in the plans on pg.S01.02 Detail 1(Typical Case Drilled Pier Detail),it calls for a depth of 16-0'each in the pierschedule,with 18 total piers,that makes a total of 270VF but 178VF is listed in the bid quantities. 2.During excavating on the west retaining wall,a non-located sewer line was cut.The cost to repair the sewer is$3,800.In order to avoid the maximum limit on the cost overrun,'Item 46 9999.2010 Repair of Concrete Structure LS BQ:1 Total:$26,000.00 was removed. 3.Due to the delays in availability of the steel plates which cover the flume crossing of the sidewalk,it was determined that the construction of a concrete flume crossings in lieu of the steel plates would be needed.Item#44 9999.60016/8'Steel Plate Cover was deleted at$6,700 additional 966 SF. 4.Additional quantities of the flexamalwas needed to cover the drainage area at$8,604.00. •Funding available in project to cover this C.O.#2. If you have questions please contact the Project Manager,Tonda Rice Phone Number 817.392.6769 or email Tonda.Rice@fortworthtexas.gov. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible forthe monitoring and administration of this contract,including ensuring all performance and reporting requirements. ConlracWa Camr ery Name I Conlraclerf Namd Contract Sh nature Dale The Fain Group Larry Frazier ; , u` Sep 30,2022 nspaclorilmifflaellon Su alulsor Data I Project and Contract Compliance Mansaar Dale PNov9,2022 ^'� Sep 29.2022 ProaramManager anlorC IalPreectOIRCer Dale sty IAsslslantDfreclorlDeptl ctingWtaclor,Contractin Department De It Dale h+7.rfc= Nov9,2022 AeslslanlCllyAllarney_ sslslanl CityManager Dale `",)IAA-7iw4, Nov 16,2022 Novzl,zozz as F CouncllAcIloaffiragulradl I MAC Number I MAC Dale Approved ATTEST:,7ahhette S Goodall Jannette S.Goodall(Nov 21,202215:27 CST) Jannette S.Goodall �gaFoer�Ila p�o°°°°°°°°'-o9 OFFICIAL RECORD pc~ios=d CITY SECRETARY FT.WORTH,TX Qpaa rE XA54ba zi�Qb6664 11 ORTWORTf1 City of Fort Worth —� -- Change Order Additions Project Name I Lake Como Park and Oakland Lake Park Dam and Eroslan Control Improvements Clly Sec 11 CSC 5651b Cllenl Project i{ F 101592&101075 Conlractofl The Fain Group,Inc. PM Tonda Rice Inspector Byron McDonald ChanpOtclarSubrnlllalll �� Dale 911612022 ADDITIONS ITEM DESCRIPTION DEPT y Unit Unit CostTotal Flexamal Plus or Appoved Equal Nlrudu(al Piers 62 Pew Ilern Sevier Line Repa r P R 3 Now Concrete Flume Crossing PARD TM7 PARD $53,324.00 TPW $0.00 Water $0.00 Sub Ta a d it ens 3,32.0 Change Order Additions Page 1 of 1 roar_ AVORTH. City of Fort Worth "� Change Order Deletions Project Namo I Lake Como Park and Oakland Lake Park Dam and Erosion Control Im rovemenis City Sec It CSC 56515 Clienl Pfolecl tt I 101592&101075 Comilactorl Tho Fain Group,Inc. PM Tonda Rico Inspector Byron McDonald Change 0rdarSubrnillal it 0 Dale 9/1612022 DELETIONS ITEM DESCRIPTION DEP I ly Unit Units ota 6 99�9 .' U Repair of Concrete Structure PART) UU LS 25,0UD. 9999.5001 6/8'6(eel Plate Flume Cover PARD 2.0u 278 0. PART) $30,700.00 TPW $0.00 Water $0.00 u etal Deletions 43u,tuo.vo Change Order Deletions Page 1 of 1 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co IE DATE AMOUNT CO#1 5/25/2022 $13,000.00 Total $13,000.00