Project Name Trail Gap Connections City Sec# 57154
Client Project#(s)l 101632
Project Construction of accessible trails connecting to the existing trail system at two separate locations throughout the city:Arcadia Trail Park to Beach Street
Description (4859-4899 Seneca Dr,Fort Worth,TX 76137)and Buck Sansom Park to HWY 820(3600 Sansom Park Dr,Fort Worth,TX 76106)
Contractor 2L Construction,LLC Change Order# 3 Date 1 111212022
City Project Mgr. Robert Kevin Rodriguez City Inspector Jason Bradley
Contract Time
Dept. PARD Totals CD
Original Contract Amount $1,386,580.00 $1,386,580.00 180
Extras to Date $33,260.00 $33,260.00 20
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,419,840.00 $1,419,840.00 200
Amount of Proposed Change Order $21,415.00 $21,415.00 60
Revised Contract Amount $1,441,255.00 $1,441,255.00 260
Original Funds Available for Change Orders $138,658.00 $138,658.00
Remaining Funds Available for this CO $105,398.00 $105,398.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.94%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,733,225.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
►During construction,regarding the trail portion from Arcadia Trail Park to Beach Street,it was determined that a change order#3 would be needed due to the following:
• Additional quantities of import dirt have been necessary beyond what was originally anticipated in order to satisfy the reality of grading requirements at the site.
• Likewise,it was determined more cost effective to switch an area from the seeding and soil retention blankets originally called for in the plans to sod(including its
subsequent maintenance and establishment).
• Similarly,an alternative traffic signal foundation was also deemed necessary.
• As well,a proposed segment of trail(located off-site)requested by the community was determined to be no longer feasible.
• Lastly,the substitution of Fencecrete railing was also called for at an even rate of exchange.
►The additional scope of work will increase the contract time from 200 calendar days to 260 calendar days.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor Name Contract Signature Date
2L Construction,LLC Chip Fisher Nov 2,2022
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
Nov 2,2022 9Cau Ji d%kjue-- Nov 2,2022
Program Manager Date Senior Capital Project Officer Date
Z-� ', - Nov 7,2022
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
' '`� _ Nov 8,2022 Nov 9,2022
Assistant City Attorney Date I Assistant City Manager Date
Nov 10,2022 Nov 14,2022
Council Action if required)
M&C Number M&C Date Approved
ATTEST:
Tgnnette S.Goo4all
Jannette Goodall,City Secretary �
O� FOR OFFICIAL RECORD
a*0 -000°Ooo
A D � CITY SECRETARY
� oo.A� FT.WORTH,TX
1J/�oo oo=o °
°°
T oIcy
°000000 Z/
FORT WORTH City of Fort worth
*'--- Change Order Additions
Project Name Trail Gap Connections City Sec# 57154
Client Project# 101632
Contractor 2L Construction,LLC PM Robert Kevin Rodriguez InspectoF Jason Bradley
Change Order Submittal# F--37 Date 111212022
ADDI I IDN5
Unit UnitCost Total
Mr Cy
(bpeaa Footer Foundation
ILING
PARD 42,540.00
Sub TotalAdditions
Change Order Additions Page 2 of 4
Fox RAH City of Fort Worth
Change Order Deletions
Project Name Trail Gap Connections City Sec# 57154
Client Project# 101632
ContractDrF 2L Construction,LLC PM Robert Kevin Roddguez InspectorF Jason Bradley
Change Order Submittal# Date 11I2I2022
DELETIONS
ITEM �IPTIUN DEPT wry Unit ni o a
TRNTC SIGNAL(Foundation)
PARD 5.
two otal Ueeions
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Maintaining commitment on original agreement of 17%
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
1 7/27/2022 $17,660.00
2 8/24/2022 $15,600.00
Total $33,260.00