HomeMy WebLinkAboutContract 58488 Received Date: Nov 18,2022
Received Time: 8:19 a.m.
Developer and Project Information Cover Sheet:
Developer Company Name: SP White Ft.Worth JV,LLC
Address, State,Zip Code: 8201 Preston Road,Dallas,Texas 75225
Phone&Email: 317-218-1653 1 marcp@scannellproperties.com
Authorized Signatory,Title: Marc Pfleging,Manager
Project Name: 1st Street Industrial
Brief Description: Water, Sewer,Paving, Storm Drain and Street Lights
Project Location: 5301 E. 1st Street,Fort Worth,Texas 76103
Plat Case Number: Plat Name:
Mapsco: 64V Council District: 4
CFA Number: 22-0102 City Project Number: 103882 1 IPRC22-0003
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
City of Fort Worth,Texas Page 1 of 16
Standard Community Facilities Agreement
Rev.9/21
City Contract Number: CSC No.58488
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and SP White Ft. Worth JV, LLC
("Developer"),acting by and through its duly authorized representative. City and Developer are referred to
herein individually as a"party"and collectively as the"parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as 1st Street
Industrial("Project"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project,Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement("Community Facilities"or"Improvements"); and
WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land,pay
fees or construction costs,or meet other obligations that are not a part of this Agreement; and
WHEREAS,the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated
into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exists between the terms and conditions
of this Agreement and the CFA Ordinance,the CFA Ordinance shall control.
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY Page 2 of 16
Standard Community Facilities Agreement FT.WORTH,TX
Rev.9/21
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City (`Engineering
Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
® Exhibit A: Water
® Exhibit Al: Sewer
® Exhibit B: Paving
® Exhibit B 1: Storm Drain
® Exhibit C1: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 —
Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and
Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
City of Fort Worth,Texas Page 3 of 16
Standard Community Facilities Agreement
Rev.9/21
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2)years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement,becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors,or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
City of Fort Worth,Texas Page 4 of 16
Standard Community Facilities Agreement
Rev.9/21
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider,which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight(48)hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed,and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
City of Fort Worth,Texas Page 5 of 16
Standard Community Facilities Agreement
Rev.9/21
11.
Easements and Rights-of-Way
Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS,ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT
OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCLUDINGDEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION, DESIGN,PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PR OPERL Y SA FE G UARD THE WORK, OR ONACCOUNT OF ANY ACT,INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS,SUB CONTRACTORS, OFFICERS,AGENTS OR EMPLOYEES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN BY SAID
CONTRACTORS, THEIR OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER,
DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND
HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES
SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS'
FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS INA
GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE
WITH THE CFA ORDINANCE, AND IN ACCORDANCE WITH ALL PLANS AND
SPECIFICATIONS.
13.
Right to Enforce Contracts
Upon completion of all work associated with the construction of the Improvements,Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors,along with an assignment of all warranties given by the contractors,whether express or implied.
City of Fort Worth,Texas Page 6 of 16
Standard Community Facilities Agreement
Rev.9/21
Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees,and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars($50.00),the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtainproof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
Development Coordination Office SP White Ft. Worth JV, LLC
City of Fort Worth 8201 Preston Road
200 Texas Street Dallas, Texas 75225
Fort Worth, Texas 76102
With a copy to:
With copies to: Scannell Properties #661, LLC
8801 River Crossing Blvd., Suite 300
City Attorney's Office Indianapolis, IN 46240
City of Fort Worth Attn: Jeff Cromer, Counsel
City of Fort Worth,Texas Page 7 of 16
Standard Community Facilities Agreement
Rev.9/21
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of
three(3)years after final payment under the contract,have access to and the right to examine any directly
pertinent books, documents,papers and records of such contractor, involving transactions to the contract,
and further,that City shall have access during normal working hours to all of the contractor's facilities,and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants,officers,contractors,subcontractors,and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
City of Fort Worth,Texas Page 8 of 16
Standard Community Facilities Agreement
Rev.9/21
Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors,and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas,Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose,their attorneys,have had the opportunity to review
and comment on this document;therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
City of Fort Worth,Texas Page 9 of 16
Standard Community Facilities Agreement
Rev.9/21
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and(2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and"company"have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement,by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1)does not boycott Israel; and(2)will not boycott Israel during the term of this Agreement.
26.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code,as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for
goods or services that has a value of$100,000 or more that is to be paid wholly or partly from public funds
of the City with a company with 10 or more full-time employees unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott
energy companies during the term of the contract. The terms "boycott energy company" and"company"
have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature
provides written verification to the City that Developer: (1) does not boycott energy companies; and (2)
will not boycott energy companies during the term of this Agreement.
27
Prohibition on Discrimination Against Firearm and Ammunition Industries
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code,as added by Acts 2021,87th Leg.,R.S.,S.B. 19,§ 1,the City is prohibited from entering
into a contract for goods or services that has a value of$100,000 or more that is to be paid wholly or partly
from public funds of the City with a company with 10 or more full-time employees unless the contract
contains a written verification from the company that it: (1) does not have a practice,policy, guidance, or
directive that discriminates against a firearm entity or firearm trade association;and(2)will not discriminate
during the term of the contract against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and"firearm trade association"have the meaning ascribed to those terms
by Chapter 2274 of the Texas Government Code,as added by Acts 2021, 87th Leg.,R.S., S.B. 19, § 1. To
the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not have a practice,policy, guidance, or directive that discriminates against a firearm
entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
28.
Immigration and Nationality Act
City of Fort Worth,Texas Page 10 of 16
Standard Community Facilities Agreement
Rev.9/21
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
29.
Amendment
No amendment,modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
30.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
31.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise,to any other person or entity.
32.
Compliance with Laws,Ordinances,Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that,if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
33.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
City of Fort Worth,Texas Page 11 of 16
Standard Community Facilities Agreement
Rev.9/21
granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
34.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original,but which together will constitute one instrument.
35.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder,and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth,Texas Page 12 of 16
Standard Community Facilities Agreement
Rev.9/21
36.
Cost Summary Sheet
Project Name: 1 st Street Industrial
CFA No.: 22-0102 City Project No.: 103882 IPRC No.: 22-0003
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 2,597,190.80
2.Sewer Construction $ 27,380.00
Water and Sewer Construction Total $ 2,624,570.80
B. TPW Construction
1.Street $ 207,656.00
2.Storm Drain $ 263,698.00
3.Street Lights Installed by Developer $ 71,030.00
4. Signals $ -
TPW Construction Cost Total $ 542,384.00
Total Construction Cost(excluding the fees): $ 3,166,954.80
Estimated Construction Fees:
C. Construction Inspection Service Fee $47,000.00
D. Administrative Material Testing Service Fee $7,350.00
E. Water Testing Lab Fee $840.00
Total Estimated Construction Fees: $ 55,190.00
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 3,166,954.80 X
Completion Agreement= 100%/Holds Plat $ 3,166,954.80
Cash Escrow Water/Sanitary Sewer-- 125% $ 3,280,713.50
Cash Escrow Paving/Storm Drain= 125% $ 677,980.00
Letter of Credit= 125% $ 3,958,693.50
Escrow Pledge A reement=125% $ 3,958,693.50
City of Fort Worth,Texas Page 13 of 16
Standard Community Facilities Agreement
Rev.9/21
IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH DEVELOPER:
le5>k&I.11 Z_Zz .� SP WHITE FT.WORTH JV,LLC,a Delaware
Dana Bu rghdoff(Nov 17,20 16:25 CST limited liability company
Dana Burghdoff
Assistant City Manager By: Scannell Properties#661,LLC,an Indiana
limited liability company,its Manager
Date: Nov 17,2022
Mares uta
Recommended by: By:Marc Pflegin (NO 7,2 210:46 EST)
Marc D.Pfleging,Manager
Dwayne Hollars(Nov 17,2022 09:48 CST)
Dwayne Hollars Date: Nov 17,2022
Contract Compliance Specialist
Development Services
Approved as to Form &Legality:
Richard A.McCracken(Nov 17,202210:33 CST)
Richard A.McCracken
Sr.Assistant City Attorney
M&C No. N/A
Date: Contract Compliance Manager:
Form 1295: N/A By signing, I acknowledge that I am the person
d4vopn
poi*Onr��� responsible for the monitoring and
� 00000�D00000
�soo 00 o administration of this contract,including
ATTEST: °moo o�d
c o o=$ ensuring all performance and reporting
opQ,� p.,� requirements.
�a<uzslEfss-S. Ctoor�aCG oa
JannetteS.Goodall(NOv18,202208:18CST) Qti nEXA5o4p
Jannette S. Goodall Na�l-f Tilly on behalf of
Matt Tilly on behalf of(Nov 17,202210:06 CST)
City Secretary
Janie Scarlett Morales
Development Manager
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
City of Fort Worth,Texas Page 14 of 16
Standard Community Facilities Agreement
Rev.9/21
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
❑ Attachment 2—Phased CFA Provisions
❑ Attachment 3 —Concurrent CFA Provisions
® Location Map
® Exhibit A: Water Improvements
® Exhibit Al: Sewer Improvements
® Exhibit B: Paving Improvements
® Exhibit B 1: Storm Drain Improvements
® Exhibit C1: Street Lights and Signs Improvements
® Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas Page 15 of 16
Standard Community Facilities Agreement
Rev.9/21
ATTACIEMENT"I"
Changes to Standard Community Facilities Agreement
City Project No. 103882
Negotiated changes are contained in the body of the Agreement.
City of Fort Worth,Texas Page 16 of 16
Standard Community Facilities Agreement
Rev.9/21
N
PROJECT LOCATION
O
cr-, RIVER RIDGE
O
n
w u a
��5) LAKE AVE
Z
E 1ST � �U� J
MARBLE FA L
FALL RIVE
FORT White ROCK RI ER
�� Lake EMERALD AK
WORTH
BRIDE 30
TARRANT COUNTY
V1 C INI T Y MA p8m"'�'
MAPSCO NO. #64-U & #64-V
COUNCIL DISTRICT NO. 4
TYLER RIEK:
SCANNELL PROPERTIES
8801 RIVER CROSSING BOULEVARD
INDIANAPOLIS, IN 46240
4060 BRYANT IRVIN ROAD VICINITY MAP EXHIBIT
Pacheco Koch FORT WORTH, TX 76109 817.412.7155
TX REG. ENGINEERING FIRM F-469 CITY PROJECT #103882
TX REG. SURVEYING FIRM LS-10008001 1ST STREET INDUSTRIAL
LOCATED IN THE CITY OF FORT WORTH, TEXAS
DRAWN BY I CHECKED BY SCALE DATE JOB NUMBER TARRANT COUNTY, TEXAS
RDF HPB NTS 05/17/2022 4761-21.280
C��aO o 0� aoQao o �MLa�C�G� 0�]pG�OMC�[MC��I��
0 250 500 1000
PROPOSED PRIVATE GRAPHIC SCALE IN FEET l
10"FIRE SERVICE
PROP.
PUBLIC 12" 0�
WATER LINE
PROPOSED 2" I I
IRRIGATION LINE PROPOSED
AND METER PRIVATE 10"FIRE
SERVICE
PROPOSED PRIVATE
10"FIRE SERVICE
OPOSPROPOSED 2"DOMESTIC
PRMA EE 0"FIRE WATER SERVICE a METER
SERVICE
PROPOSED 2"
IRRIGATION LINE
AND METER
PROP.
PUBLIC 12"
PROP. WATER LINE
PUBLIC 12"
WATER LINE
PROP.
PUBLIC 12"
WATER LINE
EXISTING 16'
WATER LINE
TYLER RIEK:
LEGEND SCANNELL PROPERTIES
16"W EXISTING 16" WATER LINE 8801 RIVER CROSSING BOULEVARD
12"W EXISTING 12" WATER LINE INDIANAPOLIS, IN 46240
PROPOSED WATER LINE
4060 BRYANT IRVIN ROAD WATER MAP EXHIBIT
APacheco Koch FOR WORTH, TX 76109 817.412.7155
TX REG. ENGINEERING FIRM F-469 CITY PROJECT #103882
TX REG. SURVEYING FIRM LS-10008001 1ST STREET INDUSTRIAL
LOCATED IN THE CITY OF FORT WORTH, TEXAS
DRAWN BY I CHECKED BY SCALE DATE JOB NUMBER TARRANT COUNTY, TEXAS
RDF HPB 1"=500' 08/16/2022 4750-21.280
G zz G
G G l�
c�
0 30 60 120 180
c�
PROP.
PUBLIC 4'
SSMH
\ PROP.8"
4"SSFM PUBLIC S.S.
PLM 4"SSFM — — \ — — — —
PROP.
PRIVATE 4" s SS SS —
SSFM
SSMH PROP.
G G PUBLIC 4'
SSMH
EX.PUBLIC
G G 8 ss
EX.GAS
LINES
C9
TYLER RIEK:
LEGEND SCANNELL PROPERTIES
—SSFM— PROPOSED PRIVATE SSFM • PROPOSED PUBLIC 4' SSMH 8801 RIVER CROSSING BOULEVARD
SS EXISTING 8" WATER LINE INDIANAPOLIS, IN 46240
PROPOSED 8" PUBLIC SEWER
4060 BRYANT IRVIN ROAD SEWER MAP EXHIBIT
Pacheco Koch FORT WORTH, TX 76109 817.412.7155
TX REG. ENGINEERING FIRM F-469 CITY PROJECT #103882
- TX REG. SURVEYING FIRM LS-10008001 1ST STREET INDUSTRIAL
LOCATED IN THE CITY OF FORT WORTH, TEXAS
DRAbYM BY I CHECKED B1' SCALE DATE ✓OB NUMBER TARRANT COUNTY, TEXAS
RDF HPB 1"=60' 08/16/2022 4750-21.280
0 125 250 500
GRAPHIC SCALE IN FEET l�
I
I �I
I
I
I
'1-
I
I
I
PROPOSED TOPSOIL PROPOSED CONCRETE
AND SOD(TYP.) DRIVEWAY(TYP.) n
O PROPOSED CONCRETE
PROPOSED BRICK PAVEMENT(TYP.)(TYP.) EA S 1 S T S TREE T
PAVERS
LEGEND
PROPOSED CONCRETE DRIVEWAY
TYLER RISK:
PROPOSED TOPSOIL AND SOD
SCANNELL PROPERTIES
PROPOSED BRICK PAVERS 8801 RIVER CROSSING BOULEVARD
PROPOSED CONCRETE PAVEMENT INDIANAPOLIS, IN 46240
4060 BRYANT IRVIN ROAD PAVING IMPROVEMENTS EXHIBIT
Pacheco Koch FORT WORTH, TX 76109 817.412.7155
TX REG. ENGINEERING FIRM F-469 CITY PROJECT #103882
TX REG. SURVEYING FIRM LS-10008001 1ST STREET INDUSTRIAL
LOCATED IN THE CITY OF FORT WORTH, TEXAS
DRAW/U BY CHECKS® BY SCALE DATE JOB AIUNJBER TARRANT COUNTY, TEXAS
RDF HPB 1"=250' 08/16/2022 4750-21.280
0 125 250 500
GRAPHIC SCALE IN FEET l�
\ \ mminiiiiiiiiij
lip
I
I
I \
I
I
— o
I
I
PROPOSED I PROPOSED 24" PROPOSED 24" I PROPOSED 24"
S'X5'RCB RCP CULVERT RCP CULVERT RCP CULVERT }�}�
PROPOSED PROPOSED - _-
PROPOSED 10'X10' 24"RCP RIPRpP(Typ,) -'
BOX - EAST 1S T S TREE T
LEGEND
PROPOSED RIPRAP TYLER RIEK:
PROPOSED DRAINAGE DITCH CENTERLINE SCANNELL PROPERTIES
8801 RIVER CROSSING BOULEVARD
PROPOSED CULVERT INDIANAPOLIS, IN 46240
o PROPOSED JUNCTION BOX
4060 BRYANT IRVIN ROAD STORM DRAIN IMPROVEMENTS EXHIBIT
Pacheco Koch FORT WORTH, TX 76109 817.412.7155
TX REG. ENGINEERING FIRM F-469 CITY PROJECT #103882
TX REG. SURVEYING FIRM LS-10008001 1ST STREET INDUSTRIAL
LOCATED IN THE CITY OF FORT WORTH, TEXAS
DRAW/U BY CHECKS® BY SCALE DATE JOB AIUNJBER TARRANT COUNTY, TEXAS
RDF HPB 1"=250' 08/16/2022 4750-21.280
0 125 250 500
GRAPHIC SCALE IN FEET l�
NON
L
PROPOSED
ELECTRICAL BOX
PROPOSED �
PROPOSED PROPOSED ELECTRICAL BOX
ELECTRICAL BOX STREET LIGHT
PROPOSED STREET EXISTING
PROPOSED LIGHT STREET LIGHT
STREET LIGHT PROPOSED
ELECTRICAL
EXISTING
STREET LIGHT
EXISTING
CONDUIT(TYP.) EXISTING EAST 1ST S TREE T EXISTING STREET LIGHT
STREET LIGHT
EXISTING
STREET LIGHT PROPOSED
CONDUIT(TYP.)
LEGEND
PROPOSED STREET LIGHT TYLER RIEK:
SCANNELL PROPERTIES
EXISTING STREET LIGHT 8801 RIVER CROSSING BOULEVARD
PROPOSED CONDUIT INDIANAPOLIS, IN 46240
EXISTING CONDUIT
4060 BRYANT IRVIN ROAD LIGHTING MAP EXHIBIT
Pacheco Koch FORT WORTH, TX 76109 817.412.7155
TX REG. ENGINEERING FIRM F-469 CITY PROJECT #103882
TX REG. SURVEYING FIRM LS-10008001 1ST STREET INDUSTRIAL
LOCATED IN THE CITY OF FORT WORTH, TEXAS
DRAW/U BY CHECKS® BY SCALE DATE JOB AIUAfHER TARRANT COUNTY, TEXAS
RDF HPB 1"=250' 09/01/2022 4750-21.280
00 42 43
DAP-BID PROPOSAL
Page l of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Section Unit of Bid
Description Unit Price I Bid Value
No. No. Measure Quantity
UNIT I:WATER IMPROVEMENTS
3311 10,
1 3311.0141 6"Water Pipe 3311 12 LF 8 $167.00 -$1,336.00
3311 10,-
1 3311.0143 6"Water Pipe,Select Backfill 3311 12 LF 95 $167.00 $15,865.00
3311 10,
2 3311.0241 8"Water Pipe 33 11 12 LF 15 $125.00 $1,875.00
3311 10,
3 3311.0243 8"Water Pipe,Select Backfill 3311 12 LF 79 $125.00 $9,875.00
3311 10,
4 3311.0441 12"Water Pipe _33 11 12_ LF 2499 $256.00 $639,744.00
3311 10,
5 3311.0444 12"Water Pipe(Restrained Joints) 3311 12 LF 145 $256.00 -$37,120.00
3311 10,
6 3311.0443 12"Water Pipe,Select Backfill 3311 12 LF 2747 $256.00 $703,232.00
3311.0446 12"Water Pipe,Select Backfill(Restrained 33 11 10,
7
Joints) 33 11 12 LF 571 $256.00 $146176.00
g 3305.2004 12"Water Carrier Pipe 3311 10 LF 752 $151 00 $113 552.00
g 3311 A452 12"DIP Water,CSS Backfill 3311 10 LF 200 $151 00 $30 200.00
-10_- 3305.1104 24 Casing By Other Than Open Cut 33 05 24 LF- 752 - $667 00 $501 584.00
11 3312.2203 2"1Nater Service _`33 12 10 EA 4 -$32000.00=$12 000.00
12- 3-3-1 1 A 6-- 16"Water Pipe,Select Backfill(Restrained 3311 10, �-
Joints) 331112 LF 20 $256.00 $5,120.00
13 3305.0109 Trench Safety 33 05 10- LF- 7131- $4.00 $28,524.00
'14� 3201.0202 Asphalt Pvmt Repair Beyond Defined Width -
Arterial 3301 17 SY 2473 $75.00 $185,475.00
15 3312.3002 6"Gate Valve 33 12 20 �EA- �2 _$2 029 00 $4,058.00
16 3312.3003 8"Gate Valve 33 12 20 EA 6 $2 696 00 $16 176.00
17 3312.3005 12"Gate Valve 33 12 20 EA 15 $5 228 00 $78,420.00
18 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 5.4 -$6 077.00 $32 815.80
1 g 3312.0117 Connection to Existing 4'-12"Water Main 33 12 25 EA 2 $3 000 00 - $6,000.00
2p 3312.0106 Connection to Existing 16'Water Main 33 12 25 EA 1 $12 000.00 $12,000.00
21- 0241,1-216 4"-12 Water Abandon ment Plug 0241 14 EA 1 $2 043.00 $2,043.00
_.._ - ._..._. - 00
22 3312.0001 Fire Hydrant 33 12 40 EA 4 $3 000 00 $12 000.00
23 3312.4004 8"x6' Tapping Sleeve and Valve 33 12 25 EA 1 $2,000.00 $2 000.00
24
25
-2s�
-27-
28
29 _
30
31� - -
32
33
34
35
36
_37
38 --
=3s-
i40�
_41__
42
TOTAL UNIT I:WATER IMPROVEMENTS $2,597,190.80
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Foam Version May 22,2019 004243_Bid Proposal DAP
00 42 43
DAP-BID PROPOSAL
Page 2 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Ridlist Item Specification Section Unit of Bid
Description Unit Price Bid Value
No. No. Measure Quantity
UNIT II:SANITARY SEWER IMPROVEMENTS
3311 10,
1 3331 12,
3331.4117 8"Sewer Pipe,Select Backfill 3331 20 LF _16 $108.00 __$1,728.00
, _ ......., __ —
2 3305.0109 Trench Safety 33 05 10 —LF 16—- $4.00 $64.00
3 3339.1001 4'Manhole 33 39 10 EA 2 $9,568.00 $19 136.00
4 3339.0001 Epoxy Manhole Liner 33 39 60 VF 12 $176.00 $2 112.00
5 3305.0112 Concrete Collar 33 05 17 EA 2 —,$1,470.00 $2 940.00
g 3301.0002 Post CCTV Inspection 33 01 31 LF 16_ $25.00 $400.00
7 3301.0101 Manhole Vacuum Testing 3301 30 EA� 2 $500.00 $1 000.00
9
10
11
12
13
14
15
16
17 _
18
19
20
21
22 —
23
24
25
26
27
28
i29'
i.3Q�
i 31
32
—_33�
34'
_35
36
37
38
�39,
40
41
42
43
44
45
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $27,380.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 00 42 43 Bid Proposal DAY
00 42 43
DAP-BID PROPOSAL
Page 3 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Infonnation Bidder's Proposal
Bidlist Item Specification Section Unit of Bid Unit Price Bid Value
Description No. No. Measure Quantity
UNIT III:DRAINAGE IMPROVEMENTS
1 0241.4401 Remove Headwall/SET 0241 14 EA 4 $1,020.00 $4,080.00
2 0241.3017 Remove 30"Storm Line 02 41 14 LF 62 0.00 $2 480.00
3
i 0241.3019 Remove 36"Storm Line 0241 14 LF 52 $40.00 $2 080.00
. - --
-- - —
4 341.0205 24"RCP,Class I- -II 3341 10 LF 268 $109 00 $29 212 00
3341.1502 8x5 Box Culvert 3341 10 LF 33 $628.00 $20,724.00
�6� Safety End Treatment(24 in)(PSET-P)(6:1) TxDOT Item 467 EA— _7 $1,864;00 $13,048.00
7 Safety End Treatment(8'x5')(SETB-PD)(6:1) TxDOT Item 467 EA 1 $18 000 00 $18 000.00
_Si 3349.0006 Storm Junction Structure ,3..49 10, EA 1 $10,000.00 �$10,000.00
9 3137.0104 Medium Stone Riprap,dry 31 3700 SY 2398 _$65.00 i$155 870 00
10 31H-E101 SWPPP a 1 acre_. � 31 25 00 LS 1 i$7,000.00 $7,000.00
11 3305.0109 Trench Safety 33 05 10 LF 301 $4 00 $1 204.00
12
13
14
E
15.�s._.-
17
18
T19--
20
21�— —
22� -
23
24
25
26 _
27
28
29
30
31—
i 32
33 i
i35 _
36—
_37—
38 f
39_
40
_41
42_
43
44
45
TOTAL UNIT III:DRAINAGE IMPROVEMENTS $263,698.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 00 42 43 Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 4 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Biddcr's Proposal
Bidlist Item Specification Section I Unit of Bid
Description Unit Price Bid Value
No. No. Measure Quantity
NIT IV:PAVING IMPROVEMENT
1 0241.0401 Remove Concrete Drive 0241 13 SF 2875 $13.00 —$37,375.00
2 Remove Gravel Driveway TxDOT Item 247 SY 72 $10.00 $720.00
3 3216.0101 6"Conc Curb and Gutter 32 16 13 LF 1543 $25.00 $38,575.00
4 3471.0001 Traffic Control 3471 13 MO 2 $9,500 00 $19,000.00
5 3213.0403 8"Concrete Driveway 32 13 20 SF 4587 $11 00 $50,457.00
6 3291.0100 Topsoil 3291 19 CY 243 $46.00 $11 178.00
7 3292.0100 Block Sod Placement 32 92 13 SY 2918 $5.00 $14 590.00
8 3214.0100 Brick Pvmt 32 14 16 SY— —276= $28 00 $7,728.00
- -- _ ----�— il,-6—-— — ---
9 3212.0302 2"Asphalt Pvmt Type D 32 12 16 SY 657 $9 00 $5,913.00
_._ e— — — m_= . —
1 D 3212.0505 8"Asphalt_Base Type B 32 12 16 SY 657 $33.00 $21 681.00
11 3217.0201 8"SLD Pvmt Marking HAS(W) 32 17 23 LF 139 $1 00 $139.00
12 3217.1004 Lane Legend Only 32 17 23 EA 1 $150.00 $150.00
13 3217.1002 Lane Legend Arrow 32 17 23 EA 1 $150.00 $150.00
14
15T
_ 16
17
18
—20
-21
0
— —
—2 ----
23
—24— — --
25
26-
--27— —
28
29 s
30—
31
32
33
—34
35
36'
—.37—
38
—39—
40_
41
_42_
_43
44—
45— —----
TOTAL UNIT IV:PAVING IMPROVEMENTS1 $207,656.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 00 42 43_Bid Proposal CAP
00 42 43
DAP-BID PROPOSAL
Page 5 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Section Unit of Bid Unit Puce Bid Value
No Description No. Measure Quantity
UNIT V:STREET LIGHTING IMPROVEMENT
1 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 950 $15.00 $14 250.00
2 3441.1405 NO 2 Insulated Elec Condr 3441 10 LF 2510 $5.00 $12,550.00
3 3441.1410 NO 10 Insulated Elec Condr 3441 10 LF 270 $2.00 $540.00
4 3441.1413 NO 6 Bare Elec Condr SLD 3441 10 LF 1255 $3 00 �$3 765.00
5 3441.1502 Furnish/Install Ground Box Type-B,w/Apron 3441 10_..-EA 6 $2,000 00 $12 000:00
6 3441.1507 Remove Ground Box 3441 13 EA 2 $250.00 $500.00
7 3441.3201 LED Lighting Fixture 34 41 20 EA 2 $350.00 $700.00
8 3441.3302 Rdw_y Ilium_Foundation TY 3,5,6,and S 34 41 20 =EA_ _1i �$1,600.00 _$1 600.00
9 3441.3352 Furnish%Install Rdway Ilium TY 18 Pole 34 41 20 EA_ 1 $4,500.00 $4 500.00
2 Fu ___ ._..
10 3441.3501 Salvage Street Light Pole 34 41 20 EA 1 i $1,250.00 $1,250.00
11 3441.3502 Relocate Street Light Pole 34 41 20 EA 2 $2 500.00 -$5 000.00
12 Foundation 99 99 99 LF 16 $250.00 $4 000.00
13 9999.0002 Abandon Existing Conduit in Place 99 99 99 LF 75 $15.00 $1 125.00
-
14 9999.0003 Remove Existing Conduit 99 99 99 LF 925 $10 00 $9,250.00
16
17
- 8
19-
20
`21-
-22-
-23-
_24__
-25
-26-
27
28i
29
30
31
-s32- -
33J
=35
-----36= ---
-37-
�38:
40
41
-42
_43-
44-
45-
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $71,030.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 00 42 43_Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 6 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value
No. No. Measure Quantity
Bid Summary
UNIT I:WATER IMPROVEMENTS $2,597,190.80
UNIT II:SANITARY SEWER IMPROVEMENTS $27,380.00
UNIT III:DRAINAGE IMPROVEMENTS $263,698.00
UNIT IV:PAVING IMPROVEMENTS $207,656.00
UNIT V:STREET LIGHTING IMPROVEMENTS $71,030.00
Total Construction Bid $3, 666,954.80
This Bid is submitted by the entity named below:
BIDDER: BY: ZACH FUSILIER
NORTH TEXAS CONTRACTING,INC _
4999 KELLER-HASLET ROAD
KELLER,TEXAS 76244 TITLE: VICE PRESIDENT
DATE: 10/7/22
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 150 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Forth Version May 22,2019 00 42 43_Bid Proposal_DAP