Loading...
HomeMy WebLinkAboutContract 57307-PM1PROJECT MANUAL FOR THE CONSTRUCTION OF BIRCHMAN STREET PARKING Paving Improvements to Serve Lot 1R, Block 110, Chamberlain Arlington Heights, First Filing City Project No. 101521 TPW Project K-2610 Mattie Parker David Cooke Mayor City Manager William Johnson Director, Transportation and Public Works Department Prepared for The City of Fort Worth PRIVATELY FUNDED CSC No. 57307-PM1 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project # 101521 Revised March 20, 2020 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 00 42 43 Proposal Form Unit Price 05/22/2019 00 45 12 Prequalification Statement 09/01/2015 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 72 00 General Conditions 11/15/2017 00 73 00 Supplementary Conditions 07/01/2011 00 73 10 Standard City Conditions of the Construction Contract for Developer Awarded Projects 01/10/2013 Division 01 - General Requirements Last Revised 01 11 00 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 01 31 20 Project Meetings 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 55 26 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project # 101521 Revised March 20, 2020 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project’s Contract Documents NONE 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project # 101521 Revised March 20, 2020 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City’s website at: http://fortworthtexas.gov/tpw/contractors/ or https://apps.fortworthtexas.gov/ProjectResources/ Division 02 - Existing Conditions Last Revised 02 41 13 Selective Site Demolition 12/20/2012 02 41 14 Utility Removal/Abandonment 12/20/2012 02 41 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast-In-Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 26 05 10 Demolition for Electrical Systems 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 26 05 50 Communications Multi-Duct Conduit 02/26/2016 Division 31 - Earthwork 31 10 00 Site Clearing 12/20/2012 31 23 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 12/20/2012 31 36 00 Gabions 12/20/2012 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements 32 01 17 Permanent Asphalt Paving Repair 12/20/2012 32 01 18 Temporary Asphalt Paving Repair 12/20/2012 32 01 29 Concrete Paving Repair 12/20/2012 32 11 23 Flexible Base Courses 12/20/2012 32 11 29 Lime Treated Base Courses 12/20/2012 32 11 33 Cement Treated Base Courses 12/20/2012 32 11 37 Liquid Treated Soil Stabilizer 08/21/2015 32 12 16 Asphalt Paving 12/20/2012 32 12 73 Asphalt Paving Crack Sealants 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 13 73 Concrete Paving Joint Sealants 12/20/2012 32 14 16 Brick Unit Paving 12/20/2012 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project # 101521 Revised March 20, 2020 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 32 17 23 Pavement Markings 11/22/2013 32 17 25 Curb Address Painting 11/04/2013 32 31 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates 12/20/2012 32 32 13 Cast-in-Place Concrete Retaining Walls 06/05/2018 32 91 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro-Mulching, Seeding, and Sodding 12/20/2012 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 33 01 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 33 03 10 Bypass Pumping of Existing Sewer Systems 12/20/2012 33 04 10 Joint Bonding and Electrical Isolation 12/20/2012 33 04 11 Corrosion Control Test Stations 12/20/2012 33 04 12 Magnesium Anode Cathodic Protection System 12/20/2012 33 04 30 Temporary Water Services 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 33 05 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 33 05 12 Water Line Lowering 12/20/2012 33 05 13 Frame, Cover and Grade Rings – Cast Iron 01/22/2016 33 05 13.10 Frame, Cover and Grade Rings – Composite 01/22/2016 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 12/20/2012 33 05 16 Concrete Water Vaults 12/20/2012 33 05 17 Concrete Collars 12/20/2012 33 05 20 Auger Boring 12/20/2012 33 05 21 Tunnel Liner Plate 12/20/2012 33 05 22 Steel Casing Pipe 12/20/2012 33 05 23 Hand Tunneling 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 06/19/2013 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 12/20/2012 33 11 14 Buried Steel Pipe and Fittings 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 12 11 Large Water Meters 12/20/2012 33 12 20 Resilient Seated Gate Valve 12/20/2012 33 12 21 AWWA Rubber-Seated Butterfly Valves 12/20/2012 33 12 25 Connection to Existing Water Mains 02/06/2013 33 12 30 Combination Air Valve Assemblies for Potable Water Systems 12/20/2012 33 12 40 Fire Hydrants 01/03/2014 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project # 101521 Revised March 20, 2020 33 12 50 Water Sample Stations 12/20/2012 33 12 60 Standard Blow-off Valve Assembly 06/19/2013 33 31 12 Cured in Place Pipe (CIPP) 12/20/2012 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 12/20/2012 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 12/20/2012 33 31 22 Sanitary Sewer Slip Lining 12/20/2012 33 31 23 Sanitary Sewer Pipe Enlargement 12/20/2012 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 33 31 70 Combination Air Valve for Sanitary Sewer Force Mains 12/20/2012 33 39 10 Cast-in-Place Concrete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 39 30 Fiberglass Manholes 12/20/2012 33 39 40 Wastewater Access Chamber (WAC) 12/20/2012 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 33 41 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 12/20/2012 33 41 12 Reinforced Polyethlene (SRPE) Pipe 11/13/2015 33 46 00 Subdrainage 12/20/2012 33 46 01 Slotted Storm Drains 07/01/2011 33 46 02 Trench Drains 07/01/2011 33 49 10 Cast-in-Place Manholes and Junction Boxes 12/20/2012 33 49 20 Curb and Drop Inlets 12/20/2012 33 49 40 Storm Drainage Headwalls and Wingwalls 07/01/2011 Division 34 - Transportation 34 41 10 Traffic Signals 10/12/2015 34 41 10.01 Attachment A – Controller Cabinet 12/18/2015 34 41 10.02 Attachment B – Controller Specification 02/2012 34 41 10.03 Attachment C – Software Specification 01/2012 34 41 11 Temporary Traffic Signals 11/22/2013 34 41 13 Removing Traffic Signals 12/20/2012 34 41 15 Rectangular Rapid Flashing Beacon 11/22/2013 34 41 16 Pedestrian Hybrid Signal 11/22/2013 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015 34 41 20.02 Freeway LED Roadway Luminaires 06/15/2015 34 41 20.03 Residential LED Roadway Luminaires 06/15/2015 34 41 30 Aluminum Signs 11/12/2013 34 41 50 Single-Mode Fiber Optic Cable 02/26/2016 34 71 13 Traffic Control 11/22/2013 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 6 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project # 101521 Revised March 20, 2020 Appendix GC-4.01 Availability of Lands END OF SECTION City Project Number: 101521Project Type:CFA No City Funding, Re-Development (Private Bid)DescriptionUnit of MeasureSpecification Section NoEstimated QuantityEngineer's EstimateEstimate ExtensionCFA Unit PriceCFA Unit ExtensionContract PriceContract ExtensionDeveloper QuantityDeveloper CostDeveloper PercentageCity QuantityCity Cost City Percentage0170.0100 Mobilization LS 01 70 00 1 $0.00 $0.00 $8,978.90 $8,978.90 1 $8,978.90 100.00000000% $0.00 0.00000000%0171.0101 Construction Staking LS 01 71 23 1 $0.00 $0.00 $3,500.00 $3,500.00 1 $3,500.00 100.00000000% $0.00 0.00000000%0241.0100 Remove Sidewalk SF 02 41 13 450 $0.00 $0.00 $6.50 $2,925.00 450 $2,925.00 100.00000000% $0.00 0.00000000%0241.0401 Remove Concrete Drive SF 02 41 13 300 $0.00 $0.00 $6.50 $1,950.00 300 $1,950.00 100.00000000% $0.00 0.00000000%0241.0900 Remove Misc Conc Structure LS 02 41 13 1 $0.00 $0.00 $1,500.00 $1,500.00 1 $1,500.00 100.00000000% $0.00 0.00000000%0241.1100 Remove Asphalt Pvmt SY 02 41 15 85 $0.00 $0.00 $20.00 $1,700.00 85 $1,700.00 100.00000000% $0.00 0.00000000%3110.0101 Site Clearing LS 31 10 00 1 $0.00 $0.00 $1,767.00 $1,767.00 1 $1,767.00 100.00000000% $0.00 0.00000000%3123.0101 Unclassified Excavation by Plan CY 31 23 16 320 $0.00 $0.00 $47.00 $15,040.00 320 $15,040.00 100.00000000% $0.00 0.00000000%3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential SY 32 01 17 70 $0.00 $0.00 $65.00 $4,550.00 70 $4,550.00 100.00000000% $0.00 0.00000000%3211.0401 Commercial Lime Slurry TN 32 11 29 65 $0.00 $0.00 $170.00 $11,050.00 65 $11,050.00 100.00000000% $0.00 0.00000000%3211.0501 6" Lime Treatment SY 32 11 29 1060 $0.00 $0.00 $7.50 $7,950.00 1060 $7,950.00 100.00000000% $0.00 0.00000000%3213.0103 8" Conc Pvmt SY 32 13 13 945 $0.00 $0.00 $75.78 $71,612.10 945 $71,612.10 100.00000000% $0.00 0.00000000%3213.0311 4" Conc Sidewalk, Adjacent to Curb SF 32 13 20 2917 $0.00 $0.00 $7.50 $21,877.50 2917 $21,877.50 100.00000000% $0.00 0.00000000%3213.0501 Barrier Free Ramp, Type R-1 EA 32 13 20 1 $0.00 $0.00 $2,500.00 $2,500.00 1 $2,500.00 100.00000000% $0.00 0.00000000%3213.0506 Barrier Free Ramp, Type P-1 EA 32 13 20 1 $0.00 $0.00 $2,500.00 $2,500.00 1 $2,500.00 100.00000000% $0.00 0.00000000%3213.0700 Joint Sealant LF 32 13 73 1030 $0.00 $0.00 $4.05 $4,171.50 1030 $4,171.50 100.00000000% $0.00 0.00000000%3216.0101 6" Conc Curb and Gutter LF 32 16 13 70 $0.00 $0.00 $35.00 $2,450.00 70 $2,450.00 100.00000000% $0.00 0.00000000%3217.0001 4" SLD Pvmt Marking HAS (W) LF 32 17 23 880 $0.00 $0.00 $6.00 $5,280.00 880 $5,280.00 100.00000000% $0.00 0.00000000%3217.1008 Parking Lot Legend HC EA 32 17 23 2 $0.00 $0.00 $1,295.50 $2,591.00 2 $2,591.00 100.00000000% $0.00 0.00000000%3441.3201 LED Lighting Fixture EA 34 41 20 2 $0.00 $0.00 $1,960.50 $3,921.00 2 $3,921.00 100.00000000% $0.00 0.00000000%3441.3323 Furnish/Install 8' Wood Light Pole Arm EA 34 41 20 2 $0.00 $0.00 $1,460.50 $2,921.00 2 $2,921.00 100.00000000% $0.00 0.00000000%BondsLS 00 00 001 $0.00 $0.00 $4,518.00 $4,518.00 1 $4,518.00 100.00000000% $0.00 0.00000000%Totals:1$0.00 $0.00 $185,253.00 $185,253.00 100.00000000% $0.00 0.00000000%Developer Participation City ParticipationCFW Developer Project Proposal ToolProject Name: Birchman Street ParkingFilter Description by Key Word(s)Filter by SpecificationCity of Fort Worth, TexasDeveloper Project Proposal ToolTPW/PMO Released 20151218Page 1 of 1 nn a� z� - � COMRAC�f�it COVIPL1�11�CL F�']�l�l ] �i�ORKL-R'S CC)VIPI:�Sr1�C[ON LAL3' Pase l oC 1 1 SECTLON 00 45 2G 2 CONTRACTOR COMPL[ANCE Wi7'1-[ WORKER'S COMPENSAT[ON LAW � Pw-suant ta Texas L��bar Code Section 406.09b(a), as acnended, Contractor certifies that it 5 provides worker's com��Lnsation ins�u�ance coverlge Ior all oFits employees ee��p[oy�ed on City G Project No. I01�?1. Conir�ctor ta�rtfter certifiies that. ��ursuant to Texas Labor Code. Section 7 =1Q6.096(b}, ��s an�endcd, it ���ill pro��ide to City its subcontractor's ceE-lificates of�compliance ��ith 8 ����rE:eE-'s compensation cuvera��e. 9 l4 C0�ITRACTQR: � � �� L�a `'2�. �- ��c�����Y: �! u� ��-��� i l; Cofnpany � {Ple P � tt l� � � f ��1 t, �n �j,� �I /� , ls ;y)�l:l�_� ,�' l�l��� , } � I,��f �.�� Si`�natw�e: - l6 Address � l7 � �� �g �� G� ������ � �C� �� T�t��: �"�S�C�� l9 City/State/Zip {Please Print) ?0 2l 2? THC STAT� OF TLXAS �; ?4 COUNTY OF TARi�nN-[� �; 26 f3El= RE M� 1, u� ersi<�n uthorit}�. on chis c[ay p�rsonall}' �ppeareci 27 ��� n � ,#;� , ��'���� �L_. , known to me to be the person ���fiosc nait�e is 28 st3bscribed to the for oin 7 ins •ument ar�d ackno �' <7e q» tk lae/she e�ecuteci the same as 29 the aet and deed af �� �C �`� ;;�l�� �' [,����fic��.�j�-poses anc[ 30 consid�ration therein e�pressed and in t13e ca acity tl�erein st�ted. ; � 1��� 32 GIV �N(� En�'�Y I l/1ND �1ND,SEAI, OF OI�1=iCL this �1 day ol� 33 lV L �� 1��� ���� 34 ;5 � ,, �� `�C�, �1�3'�-� �� >°� `� ANpREA LEE P6LST4N E( ;7 =���Y� Nocary io tt�za�3aoo� Notary Public in ailef for the Sta of Te�as '� My Commission Expires �$ 'f„t Oetober 31, 2023 �9 END OF SECTION �l0 C[Tl' O�' FORT ��'OR'I'F[ l3IH('If,11:1:1"ST72F_FTP:IRI,"7,1"G STANDARd CONS'I'Rl7C'fiUN 5Fk{C[I ICn"1'ION DOCUytEN'1�5 C'rri� Pr-ojecr # IOI�?! ftcviscd April 2. ?Ol� OO i2 43 - I I)cvcloper Awarded Prqject Agreement Page I of 4 � , � SECTION 00 52 43 AGREEMENT 4 THIS AGREEMENT, authorized on October 18, 2021 is made by and between the Developer, 5 5707 Horne, LLC, Tom Purvis, Managing Member, authorized to do business in Texas 6 ("Developer"), and Cates, Courtnev & Roebuck, Inc., authorized to do business in Texas, acting 7 by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK Il 12 13 14 IS 16 17 18 19 20 ?� Contractor shal) complete all Work as specifie�l or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: BIRCHMAN STREET PARKING Citv Project # 101521 Article 3. CONTRACT TIME 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 22 3.2 Fi��al Acceptance. c 23 The Work will be complete for Final Acceptance within � working days after the 24 date when the Contract Time commences to run as provided in Paragraph 12.04 of the 25 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 26 33 Liquidated damages �� 28 29 30 31 32 33 34 35 36 37 Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer financial loss if the Work is not completed within the times specified in Paragraph 32 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the Constr�ictioi� Contract for Developer Awarded Projects. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer One lzurrdred Dollars ($100.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. GTY OF FOR�i� WORTH BIRC'HA�fAN S7RF,b'7' PARkING STANDARD CONSTRUC"CION SPECIFICAT'ION DOCUMGN'I'S— DEVELOPI:R AWnRD1?D PROJGC'IS C'ih� Project h 101521 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 4 38 Article 4. CONTRACT PRICE 39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 40 Documents an amount in current funds of One Hundred Eighty-Five Thousand Two Hundred 41 Fifty-Three Dollars ($185,253.00). 42 Article 5. CONTRACT DOCUMENTS 43 5.1 CONTENTS: 44 A. The Contract Documents which comprise the entire agreement between Developer and 45 Contractor concerning the Work consist of the following: 46 1. This Agreement. 47 48 49 50 51 52 53 54 55 56 57 58 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement 3) State and Federal documents (project specific) b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit h. MBE and/or SBE Commitment Form (If required) 59 3. Standard City General Conditions of the Construction Contract for Developer 60 Awarded Projects. 61 4. Supplementary Conditions. 62 5. Specifications specifically made a part of the Contract Documents by attachment 63 or, if not attached, as incorporated by reference and described in the Table of 64 Contents of the Project's Contract Documents. 65 66 67 68 69 70 71 72 73 74 75 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CI►'Y OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROIECTS Cily Projecl # l0I52/ Revised June 16, 2016 OOS243-3 Developer Awarded Project Agreement Page 3 of 4 76 Article 6. INDEMNIFICATION 77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 78 expense, the city, its officers, servants and employees, from and against any and all 79 claims arising out of, or alleged to arise out of, the work and services to be performed 80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 81 under this contract. This indemnification arovision is saecificallv intended to oaerate 82 and be effective even if it is alleged or proven that all or some of the damaees being 83 sou�ht were caused. in whole or in aart. bv anv act. omission or ne�li�ence of the citv. 84 This indemnity provision is intended to include, without limitation, indemnity for 85 costs, expenses and legal fees incurred by the city in defending against such claims and 86 causes of actions. 87 88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 89 the city, its ofticers, servants and employees, from and against any and all loss, damage 90 or destruction of property of the city, arising out of, or alleged to arise out of, the work 91 and services to be performed by the contractor, its ofticers, agents, employees, 92 subcontractors, licensees or invitees under this contract. This indemnification 93 nrovision is saecificallv intended to operate and be effective even if it is alle�ed or 94 proven that all or some of the dama�es bein� sou�ht were caused, in whole or in nart, 95 bv anv act, omission or ne�li�ence of the citv. 96 97 Article 7. MISCELLANEOUS 98 7.1 Terms. 99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 100 the Construction Contract for Developer Awarded Projects. IOl 102 103 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the Developer. 104 7.3 Successors and Assigns. 105 Developer and Contractor each binds itself, its partners, successors, assigns and legal 106 representatives to the other party hereto, in respect to all covenants, agreements and 107 obligations contained in the Contract Documents. 108 7.4 Severability. Id9 Any provision or part of the Contract Documents held to be I10 unenforceable by a court of competent jurisdiction shall be IIl remaining provisions shall continue to be valid and binding 112 CONTRACTOR. unconstitutional, void or deemed stricken, and all upon DEVELOPER and 113 7.5 Governing Law and Venue. 114 This Agreement, inctuding all of the Contract Documents is performable in the State of 115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 116 Northern District of Texas, Fort Worth Division. C1TY OF FORT WORTH BlRCHMAN STREET PARK/NG STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Ciry Projecl # l0152! Revised June 16, 2016 00�24i-�} llcvcloper A�cardcd Project Agreemeift ���2C a 01 � ��7 E�s 7.6 Au[]�o��f�y co s[gn. [l9 l20 l21 �» l23 I 2=} l2� l�6 1�7 Contracto�• shall attach eviclence of authority to sig�� A�reemeizt, iF other tha« d«ly authorized signatory oF tEie Contraetor. � 1N 1VITNESS 1�V1-ICREOF, De�elc�per a��d Contractor havic eyecuted this Aareement i�3 m��ltiple counterparts. This A�,reeme»t is et��ectivc as of the last date signed by ihe Pae-ties ("Effective Date"). COIIII'3CtOC:. Cates. Co�u�tney. & Rocbuck, [nc. �� ay�� - � (signature) � ��'`� � �����.� C l2 Devela��er: �707 Hoei�e. LLC, To��� Puivis, Mana�in� Member Si�ned: o�t�: �� �. z T�tle: � , � Addeess: �L� �'U�I,�Vi ��i.i..C1t.C. City/StatelZi�: V � � i i,_- �Ly � � (Printec� Na�7�e) r. Address: 222 L�,E�sT �� c-lt�.+.ie.�e£- � Uate: ����'G' �1���`�` ���� Z L2 � - �}��i City/StatelZi�: ��RT t,�oQ."t�F I � iG1t� �' 1 crrY or= E�o�t�r woR ri 3 e��crr,tir,�n srar;rr r: tR,���,�'c. S"I"nNDARD CONS"fRl1C"I�]ON SE'L'GI�[CA'l'[O�I DOCUMIiN1�5 -- DfiVI:LOPER A4�'ARDED PROJLC��S Cif�� Prnjec! �+ IlJl.i2! Rcviscd Jun� 16, 201G p a 0061 13-1 PERFORMANCE BOND Pa�e 1 of2 Bond No. 4437759 1 2 3 4 5 6 7 8 9 THE STATE OF TEXAS COUNTY OF TARRANT SECTION 00 62 13 PERFORMANCE BOND § § KNOW ALL BY THESE PRESENTS: § That we, Cates, Courtney & Roebuck, lnc. , known as "Principal" herein and SureTec Insurance Compan,y , a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), ]0 are held and firmly bound unto the Developer, 5707 Horne, LLC. Tom Purvis, Managing Member, 11 authorized to do business in Teaas ("Developer") and tl�e City of Fort Worth, a Texas municipal 12 corporation ("City"), in the penal sum of, One Hundred Ei�tv-Five Thousand. Two Hundred 13 Fifty-Three Dollars & Zero Cents ($185,253.00) lawful money of the United States, to be paid in 14 Fort Worth, Tarrant County, Texas for the payment of wliicli sum well and truly to be made, jointly 15 unto the Developer and the City as dual obliges, we bind ourselves, our heirs, executors, 16 administrators, successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, Developer and City have eiitered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 19 CFA Number 2018-076 ; and 20 WHEREAS, the Principal lias entered into a certain written contract with the Developer 21 awarded the 18`�' day of October , 20 21 , which Contract is hereby referred to and 22 made a part hereof for all purposes as if fiilly set forth lierein, to furnish all materials, equipment 23 labor and other accessories defined by law, in tlie prosecution of the Work, including any Change 24 25 26 27 Orders, as provided for in said Contract designated as Birchman Street Parkin�tv Project No. 101521. NOW, THEREFORE, tlie condition of this obligation is such that if the said Principal shall faithfiilly perform it obligations under the Contract and sliall in all respects duly and faithfully 28 perform the Work, including Change Orders, under the Contract, according to the plans, 29 specifications, and contract documents therein referred to, and as well during any period of 30 extension of the Contract that may be granted on the part of tlie Developer and/or City, then this 31 obligation shall be and become null and void, otherwise to remain in full force and effect. CITY Of FOR'P WORTH STANDARD CITY CONDITIONS — DEV[LOPGR AWARDED PROJECTS Revised January 31, 2012 Birchman Streel Parking Ciry Project No. 101521 (IUGI li-? f'Lltf OK�7r1NCk: 13ONI] I':ie� ? nl 2 f3ond No. �=�3775C} PROVIDEll I� UK`I'�-��?lt, that if�an� ]c��al ��ctioe� l�c lilec3 �m tftis Boncl. vcnue shall lie i�� ? �l�arrant Couclt�. "Ilcx�s or the United States District Cclurt fur t17r Nnrthern District oi"[�erzas. f=ort 3 l��i�rth Di��ision. �4 ; G 7 ti c� l0 ll l2 l _� l �4 l� lG l7 l3 l9 2(l �, �� �, 2 �4 '7 j 26 �7 2S 29 �0 �I 3? „ » 3 �I >> 3G 37 35 39 aa �i 1 �Z �3 Tltis bond is m��cic and esecutecl in coinpli�incc ��-itEt the ��ro�-isions aCCltapter ��� i o��tlte �I�'czas Go4�ernment Code, �Es an�endcd. and all liabilitics on ti3is ho��d shall f�e cleterminecl in accoi�dance �� ith the provisic7ns ot�said statue. IN �VITN�SS `ViII:R[:OF, the Principal ancl Ihe Surciy h�n e S[GNLD and SI:f1LED this insh�ument €�y duly authc�riiecl ����e��ts and officers on this thc ? 1'' day o� Octoher. 20 ? 1 . Pltli�lC'[P�1L: C�`] I;S, COUf?'INLY d. [ZOI:E3UC1<, C. 13Y: Si��nature ATTT T: r� tit�ven 1_. Rncbiick. Presi�le�tt (Princi����i} Secretary T�lame anci l itle ���.� �� Witness as to Pi' cip�] . Wiu�cs_ as to Suretv �lizai�ctl� (�rav ncEcir�ss: 3?2S 5otiti� Free�vav l�oet Wns�t17. `I'exas 76l f 0 SURI��I�Y: Sl1Rf:"I�EC INSURANCE COMPANY E3Y: � � ���'vY Si��na€ure Mi�ha�l A. S���eei�ev_ t�ttornev-in-i=act 1�ai�ie a�id Title 11ciclress; 5905 Le�acv Drivc, Suite �10{) Plana "['exas 7�02�4 [��I�E�1�one ivui��ber: =�69-3d1-1d48 ~�Note: If�si��ned l�� an of-iic:er ol�[f�e Suret�� Cornpai��-. Il�crc n�ust be on tile a ccrtilied e�tract fi-om tf�e by-Itn�s shc��vin�� that this persc��t h�►s authority to sign sucE� obli��ttliott. li� 5urety�s pl�ysical atlelr�ss is ciil7�ereni from ils mailin�w ac[cJress, 3�oth must be �3�'ovicled. Tlte d�ite ol� tE�c bnnci shall not be E�rior to thc clatc thc Cc�s�ir�ct is a�vt���clr:.f. . _ ,_ �� CI"fl' Of FOft"I' IC`OK Cl I E3ischmaco 5tr�ct Parkins S'f.-1�D;IRF) CI fY' C(�N[.�I I-!(lNti —1)I�VE:LOPEiR A14'<1RUED YKi).f1iC l-S C�ft� Prnj�et Nai. 10! i? l Rr� iscd Ia:suar� 3 i. �012 . . 00 61 14 - I PAYMENT BOND Page I of2 Bond No. 4437759 I ? , � 4 5 6 7 8 9 10 1] THE STATE OF TEXAS COUNTY OF TARRANT SECTION 00 62 l�t PAYMENT BOND § § KN�W ALL BY THESE PRESENTS: § That we, Cates. Courtnev & Roebuck. Inc. , known as "Principal" herein, and_ SureTec Insurance Com�anv , a corporate surety (or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" lierein (wliether one or more), are held and firmly bound unto the Developer 5707 Horne, LLC, Tom Purvis, Mana�� Member, authorized to do business in Texas ("Developer"), and the City of Fort 12 Worth, a Texas municipal corporation ("City"), in the penal siun of One Hundred Eightv-Five 13 Thousand, Two Hutldred Fiftv-Three Dollars & Zero Cents ($185,253.00) lawfiil money of the 14 United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum 15 1G 17 18 19 20 21 well and truly be made jointly unto the Developer and City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, CFA Number 2018-076 ; and WHEREAS, Principal has entered into a certain written Contract with Developer, 22 awarded the 18`�' day of October , 20 21, wliicli Contract is liereby referred to and 23 made a part hereof for all purposes as if fully set fortli herein, to furnisli all materials, equipment, 24 labor and other accessories as defined by law, in tlie prosecution of tlie Work as provided for in 25 26 27 28 29 30 said Contract and designated as Birchman Street Parking, Cityy Project No. 101521. NOW, THEREFORE, THE CONDITION OF THIS OBL[GATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of tl�e Texas Government Code, as amended) in the prosecution of the Work under tl�e Contract, then this obligation shall be and become null and void; otlierwise to remain in full force and effect. CITY OF �ORT WORTI I Birchman Street Parkinp STANDARD CITY CONDITIONS — DEV[LOPER AWARD[D PROJECTS Ciry Project No. 101521 Revised January 31, 2012 001,1 I�S -? P.-11'Nil:�1T 13O1+f1) Pa��� 3 nl' � ��OI10E �IO. =���77J� I�his honc� is made nnil esee:uted in c��ni��lianc� ���itf� thc ��ro� isions ol Chapter ??53 t�f the � � � � G 7 ti � 9 10 ]l 12 ]� f�cs;is G���crnmcnt Coc3e, as amcndcd. ancl �il] liahilitics ���� this bond shall bc dctcrmincd in ae;ccirel��nee �� ith tlte pro�-isions a[�sa�cl statute. 1N WdTNCSS `�'I-IEREOF, ihc Pri�tic:i�ril flll(j �Llfl'l\' IIilVC cach SIGNI:D ancl SEAI.I�,D tE�is iE�sirui��ent by duly authorized a�,enEs ancl oi�iiccrs c�n this t[le ? I'' day of Octal�cr ,�0 ?]. �TTE:S"[�: .S {Princi;�al) Sccrctc�ry W itness as to i•i cipal �'I"I'E:S`I�: G}��/%� ;�'�� � � (Stn-ety) Secretan� NI. Brent �eat�� � �� �. , 1Vitness as to 5uretv Efizabetil Grav PK1NC[P�1L: C'n"I'l:S. COUIZ"l'NEY & RQ =I3UCE<, 1NC. E3Y: � Si�.�i�ature �tcv�E� L. Roei�ur.�;_ Presic[ent Nanl� anc[ "l�itle Aciclress: 3`_'?8 Sot�tk� 1=�'ccna� I�ort WoE�th. �I-c�as 761 10 5L1R1-;'1'Y: SIJIZF�"1'liC lv5U�ZANCC; C'OMPANY E3Y: /��Lf,� � G�/� Si�znatt�re ' �-lich�iel A. Sn�eerie�. Attorni:v-in-l=ti�t �£i111C �lllC� � II�C Aciclress: �9Q� Le+�ac� Drive. Suite =�00 Plano. �E�e�as 7�42�€ 'I'elcphnnc Na�ml��r: 469-?�} I - I =18Fi Note: [f� si�i�ec� by t�n afificer of� thc Stn•cty. ihe��e must be o« fife a certilied exlract 1�rom ihe hyla��vs shc��vin�,� that this peeson has atithorit,� ic� si�n such ob�i�,ation. If Sure[y's pllysic��l aciclress is c�il�ferent li�um its mailin�� address, bc7t11 must be provided. -I�hc date of tkte 1�ond sh�ll nat be p��iar to th� d�nc the C.'��ntract is a�varded. E�Iu OI� 5ECTIOy �'I'['Y OF 1=OR'C 11'OIt l l[ 5 E'�\Nl)ARI) L.'I'fl' C'ON[)f [l(�tiS — DL=V1iLC)PI=R :1�1',1K[)f I) NltO.11iC'[ S itcviscd laniiary ; I . ?(11'_ �3irchman Strcrl I'tir[�fn�y Cih' Projecl Na. l0] 5? l OOG219-I MAINTENANCE BOND Page I of3 Bond No. 4437759 I 2 3 4 5 6 7 SECTION 00 62 19 MAINTENANCE BOND THE STATE OF TEXAS COUNTY OF TARRANT § § KNOW ALL IiY THESE PRESENTS: § 8 That we Cates� Courtnev & Roebuck. Inc. , known as "Principal" herein and 9 SureTec Insurance Company , a corporate surety (sureties, if more than one) duly 10 authorized to do business in tlie State of Texas, known as "Surety" herein (whetlier one or more), 1 I are held and firmly bound unto the Developer, 57Q7 Horne, LLC. Tom Purvis, Mana� 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Member, authorized to do business in Texas ("Developer") and tlie City of Fort Worth, a Texas municipal corporation ("City"), in the sum of One Hundred Eiglitv-Five Thousand, Two Hundred Fiftv-Tl�ree Dollars & Zero Cents ($185,253.00) lawful money of tl�e United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum �vell and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and tlirougli a Community Facilities Agreement, CFA Number 2018-076 • and WHEREAS, the Prii�cipal has entered into a certain written contract with the Developer awarded the 18'�' day of October , 20 21 , which Contract is hereby referred to and a made part liereof for all purposes as if fully set forth herein, to furnisli all materials, equipment labor and other accessories as defined by law, in tlie prosecution of tl�e Work, including any Work resulting from a duly authorized Change Order (collectively herein, tlie "Work") as provided for in said Contract and designated as Birchman Street Parkin�ty Project No. 101521 ; and WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during tlie period of hvo (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY Of �ORT WORT}I STANDARD CI"I'Y CONDIl'IONS — DEVELOPER AWARDED PROJECTS Revised lanuary 31, 2012 Birchman Street Parking City Project No. ]01521 0062 19-2 MAINTBNANCE [iOND Page 2 of'3 Bond No. 4437759 � 2 3 4 5 6 7 8 9 10 II 12 13 14 IS 16 17 18 19 20 21 22 23 24 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or Ciry, to a completion satisfactory to tl�e City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal sliall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under tliis Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on tliis Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH STANDARD C1TY CONDITIONS — DEVELOPER AWARDBD PROJGCTS Revised January 31, 2012 Birchman Street Parking City Project No. 101521 I}I11,31�)-3 �\[�11N"fl'_Nr1��'E= l;O\D I';S�_c .i nl :� Bot1c� l��o. =}=�377>9 =4 � G 7 S � 9 l0 ll l2 la l4 l� l6 l7 l� l9 �p ?I �� �; �� �� ?G �� �s �0 31 3? 33 3d �� 3G 37 3� 39 �0 =4 I IN W[TN�SS WE[�lt�;QF�, 1he 1'rincipal 3�tcl the Surct�� have each S�G\LD and SI�AI.l:f7 Ihis instrument I�y duly ��uihc�rizccl a��ents and of�ficc3�s on 11iis thc ? 1'' clay of' Octnbcr'i) ? 1 i�']-. •1�S ': i - --- (E rii�cipal) Sea�etarY Witi�ess as to Pri ipal � PIZI�1CIf'AL: CA"[�I.S_ COUR�f-T:EY & ROEI3UCK_ fNC. 13Y�T-- � ___ . i��nature 5teven L. 1Zaebuc�_ Preside��t Na�ne and "ritic Aciclress: 32?S South Prce�vav I=ort Wortli_ Te�as 761 10 SURI:TY: SliRI;T�C [NSURANCT COMPANY 13Y: / �iiu��e..e�f" !ll.� Si�n�turc Michacl A. Sweei�ev. Attorncv-i�l-l���ct AT"f �ST: Na�l�e and Title �"��/�'��` '� Adclress: �9D� Le�ac� Drivc. 5uil� =400 (Surety) �ecretary M. Brent Beaty Plana. Texas 7�(}?4 `-��-� i /, Witness � to Surcty Tlizabelh Gray �I'ilephonc Nwn�7er: dG9-?�l-1-185 �Noto: if sigited by un ol�ficer ol�ihe Su��ety Cottl��any, lhcE�e n�ust 6e o❑ Iile a ccrtiliocl extract from thc Liy-I���vs sho�vin� ihat this Ue�son l�as authurtty to sign such ��bli��ation. II' SE�reh-'s pllysic��l adc3ress is different li�or» its m�iilin�� address, both must be Earc��ric3ecl. Tlte date of the bonc3 shall not be prior to tlic datc the Conteact is a������c3tcl. �'I7�1' (.)P FORT G��OR"f�H .ti fANI]��RD C1TY CQN131�I I(l\ti — llI:VE�:I_UPLR ����:IRUf:i.) �'EZCI IECTti Rcvised Januan' .i E. 30] � 13irchman Stre�t I'arkine Cil� I'rujLctl�o.l0€�2l SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Statutory Complaint Notice/Filing of Claims To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at: SureTec Insurance Company 9737 Great Hills Trail, Suite 320 Austin, Tx 78759 You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252- 3439. You may write the Texas Department of Insurance at: PO Box 149104 Austin, TX 78714-9104 Fax#: 512-490-1007 Web: http://vwuw.tdi.state.tx.us Email: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance. Texas Rider 06042015 Ppa #: 4221267 �u�eTec Insurance Company LIMITED P�WER OF ATTORNEY K�roiv Al! Me�r by T/rese Prese�rls, That SURE7'EC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Hanis County, Texas, does by these presents make, constitute and appoint Elizabeth Gray, Charles D. Sweeney, Kyle W. Sweeney, Michael A. Sweeney its true and lawful Attorney-in-fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakin�s or otlier instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for, providing the bond penalty does not exceed Five Million and 00/100 Dollars ($5,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifyin� and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be r1 Resolved, that the Presiden� an}• Vice-I'resident, any Assisiant Vicc-President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any onc or more suitable persons as Attorne��(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fac� may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and deli��er, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liabilit}� thereunder, and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and ef%cted by the Corporate Secretary. Be it Resolved, that the signature of any authorized otlicer and seal of tlie Company herctofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any po+vcr of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon tlie Company witli respect to any bond or undertaking to �vhich it is attached. (Adopted at a meeting held on ZQ'" of April, 1999.) In Witness Wlrereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal to be hereto affixed this Z�cn day of A�,St A.D. 2ozo . State of Texas ss: County of Harris . �yWiNw4l�4 yvF�a.NcF`� r�:? X c� r q • -o ; 6{W Gj fZ� 7�'•. j ; `c� �,. a�w''� SURETEC INSURANCE COMPANY By: ''.�%d��� Michael C. Keimig, President On this Z��h day of A��s� A.D. 202o before me personally came Michael C. Keimig, to me known, tivho, being by me duly sworn, did depose and say, that he resides in I-Iouston, Tcxas, that he is President of SURET�C Ii�ISURANCE COMPANY, the company described in and which executed the above instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said Company; and that he signcd his name thereto by like order. � y1N11tM� �''.►�..►�'� TANYA StdEED ��{�;t�� Nom�y P�kic, stars dT�ma ,�:.ti�,� f� Canrn. E�ires 03,��023 �� „��? t�y tp �2sa�tx3t Tanya Sneed,lVota Public My commission exp es March 30, 2023 I, M. Brent Beaty, Assistant Secretary of SURGTEC INSURANCG COMPANY, do hereby certify that the above and foregoing is a uue and correct copy of a Power of Attomey, executed by said Company, �vhich is still in full force and effecr and furthermore, the resolutions of the Board of Directors, set out in the Power of Attorney are in fi�ll force and effect. Given under my hand and the seal of said Company at Houston, Texas this 21 st day of O ober , •2021 , A.D. - _ _- - M. Brent Beaty, Assistan Se etary Any instrument issued in excess of the penalty sisied above is totally vcid�end without any validity. 4221267 For verification of the authority of this power you rr��y call (713) 812-Q800 gny business day between 8:30 am and 5:00 pm CST. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTIO N CONTRACT CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 – Definition s and Terminology .......................................................................................................... 1 1.01 Define d Terms............................................................................................................................... 1 1.02 Terminology .................................................................................................................................. 6 Article 2 – Preliminar y Matters ......................................................................................................................... 7 2.01 Copie s of Documents .................................................................................................................... 7 2.02 Commencement of Contrac t Time; Notic e to Proceed ................................................................ 7 2.03 Starting the Work .......................................................................................................................... 8 2.04 Before Starting Construction ........................................................................................................ 8 2.05 Preconstruction Conferenc e .......................................................................................................... 8 2.06 Public Meeting .............................................................................................................................. 8 2.07 Initia l Acceptance of Schedules.................................................................................................... 8 Article 3 – Contrac t Documents : Intent, Amending, Reus e ............................................................................ 8 3.01 Intent.............................................................................................................................................. 8 3.02 Reference Standards...................................................................................................................... 9 3.03 Reporting and Resolvin g Discrepancies....................................................................................... 9 3.04 Amending and Supple mentin g Contrac t Documents ................................................................. 10 3.05 Reus e of Documents ................................................................................................................... 10 3.06 Electronic Data ............................................................................................................................ 11 Article 4 – Availabilit y of Lands ; Subsurfac e and Physica l Conditions ; Hazardous Environmental Conditions ; Referenc e Points........................................................................................................... 11 4.01 Availabilit y of Lands .................................................................................................................. 11 4.02 Subsurfac e and Physica l Conditions .......................................................................................... 12 4.03 Differing Subsurfac e or Physica l Conditions ............................................................................. 12 4.04 Underground Facilitie s ............................................................................................................... 13 4.05 Reference Points ......................................................................................................................... 14 4.06 Hazardous Environmenta l Condition at Sit e .............................................................................. 14 Article 5 – Bonds and Insuranc e ..................................................................................................................... 16 5.01 Licensed Suretie s and Insurers ................................................................................................... 16 5.02 Performance, Payment , and Maintenanc e Bonds....................................................................... 16 5.03 Certificates of Insuranc e ............................................................................................................. 16 5.04 Contractor’s Insuranc e ................................................................................................................ 18 5.05 Acceptance of Bonds and Insurance ; Optio n to Replace ........................................................... 19 Article 6 – Contractor’s Responsibilitie s ........................................................................................................ 19 6.01 Supervision and Superintendenc e ............................................................................................... 19 CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 6.02 Labor ; Working Hours ................................................................................................................ 20 6.03 Services, Materials, and Equipment ........................................................................................... 20 6.04 Projec t Schedule.......................................................................................................................... 21 6.05 Substitute s and “Or -Equals ” ....................................................................................................... 21 6.06 Concerning Subcontractors , Suppliers , and Others.................................................................... 24 6.07 Wage Rate s.................................................................................................................................. 25 6.08 Patent Fee s and Royaltie s ........................................................................................................... 26 6.09 Permit s and Utilitie s .................................................................................................................... 27 6.10 Laws and Regulations ................................................................................................................. 27 6.11 Taxe s ........................................................................................................................................... 28 6.12 Use of Sit e and Othe r Area s ....................................................................................................... 28 6.13 Record Documents ...................................................................................................................... 29 6.14 Safety and Protection .................................................................................................................. 29 6.15 Safety Representative.................................................................................................................. 30 6.16 Hazard Communicatio n Progra ms ............................................................................................. 30 6.17 Emergencies and/or Rectification............................................................................................... 30 6.18 Submittals .................................................................................................................................... 31 6.19 Continuing the Wor k................................................................................................................... 32 6.20 Contractor’s General Warranty and Guarante e .......................................................................... 32 6.21 Indemnificatio n ......................................................................................................................... 33 6.22 Delegation of Professiona l Design Services .............................................................................. 34 6.23 Righ t to Audit.............................................................................................................................. 34 6.24 Nondiscriminatio n....................................................................................................................... 35 Article 7 – Othe r Wor k at the Sit e ................................................................................................................... 35 7.01 Related Wor k at Sit e ................................................................................................................... 35 7.02 Coordination................................................................................................................................ 36 Article 8 – City’s Responsibilitie s................................................................................................................... 36 8.01 Communications to Contractor ................................................................................................... 36 8.02 Furnis h Data ................................................................................................................................ 36 8.03 Pay Whe n Due ............................................................................................................................ 36 8.04 Lands and Ease ments ; Report s and Tests................................................................................... 36 8.05 Change Orders............................................................................................................................. 36 8.06 Inspections , Tests , and Approvals .............................................................................................. 36 8.07 Limitation s on Cit y’s Responsibilitie s ....................................................................................... 37 8.08 Undisclose d Hazardous Environmenta l Condition .................................................................... 37 8.09 Complianc e wit h Safety Progra m ............................................................................................... 37 Article 9 – City’s Observation Status Durin g Construction ........................................................................... 37 9.01 City’s Projec t Manager ……...................................................................................................... 37 9.02 Visit s to Sit e ................................................................................................................................ 37 9.03 Authorize d Variation s in Wor k .................................................................................................. 38 9.04 Rejecting Defective Work .......................................................................................................... 38 9.05 Determination s for Work Performed .......................................................................................... 38 9.06 Decision s on Require ments of Contrac t Documents and Acceptability of Work ..................... 38 CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 Article 10 – Change s in the Work; Claims; Extra Wor k ................................................................................ 38 10.01 Authorize d Change s in the Wor k ............................................................................................... 38 10.02 Unauthorize d Change s in the Wor k ........................................................................................... 39 10.03 Execution of Change Order s....................................................................................................... 39 10.04 Extra Work .................................................................................................................................. 39 10.05 Notificatio n to Surety .................................................................................................................. 39 10.06 Contrac t Claims Process ............................................................................................................. 40 Article 11 – Cos t of the Work; Allowances; Unit Pric e Work; Plan s Quantity Measurement...................... 41 11.01 Cos t of the Work ......................................................................................................................... 41 11.02 Allowance s .................................................................................................................................. 43 11.03 Unit Pric e Wor k .......................................................................................................................... 44 11.04 Plan s Quantity Measurement ...................................................................................................... 45 Article 12 – Change of Contrac t P rice ; Change of Contrac t Time ................................................................. 46 12.01 Change of Contrac t Pric e ............................................................................................................ 46 12.02 Change of Contrac t Time............................................................................................................ 47 12.03 Delays .......................................................................................................................................... 47 Article 13 – Tests and Inspections ; Correction, Remova l or Acceptance of Defective Wor k ...................... 48 13.01 Notic e of Defects ........................................................................................................................ 48 13.02 Access to Wor k ........................................................................................................................... 48 13.03 Tests and Inspections .................................................................................................................. 48 13.04 Uncovering Wor k........................................................................................................................ 49 13.05 Cit y Ma y Stop the Wor k ............................................................................................................. 49 13.06 Correction or Remova l of Defective Work ................................................................................ 50 13.07 Correction Perio d ........................................................................................................................ 50 13.08 Acceptance of Defective Work................................................................................................... 51 13.09 Cit y Ma y Correct Defective Wor k ............................................................................................. 51 Article 14 – Payments to Contractor and Completio n .................................................................................... 52 14.01 Schedule of Values...................................................................................................................... 52 14.02 Progres s Payments ...................................................................................................................... 52 14.03 Contractor’s Warranty of Title ................................................................................................... 54 14.04 Partia l Utilizatio n ........................................................................................................................ 55 14.05 Fina l Inspection ........................................................................................................................... 55 14.06 Fina l Acceptance ......................................................................................................................... 55 14.07 Fina l Payment.............................................................................................................................. 56 14.08 Fina l Completio n Delayed and Partia l Retainage Release ........................................................ 56 14.09 Waive r of Claims ........................................................................................................................ 57 Article 15 – Suspension of Wor k and Terminatio n ........................................................................................ 57 15.01 Cit y Ma y Suspend Work............................................................................................................. 57 15.02 Cit y Ma y Terminat e for Caus e ................................................................................................... 58 15.03 Cit y Ma y Terminat e For Convenienc e ....................................................................................... 60 Article 16 – Dispute Resolutio n ...................................................................................................................... 61 16.01 Methods and Procedure s ............................................................................................................. 61 CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 Article 17 – Miscellaneous .............................................................................................................................. 62 17.01 Givin g Notic e .............................................................................................................................. 62 17.02 Computation of Times ................................................................................................................ 62 17.03 Cumulativ e Remedie s ................................................................................................................. 62 17.04 Surviva l of Obligation s ............................................................................................................... 63 17.05 Headings ...................................................................................................................................... 63 CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 1 of 63 ARTICLE 1 – DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Whereve r use d in thes e General Conditions or in othe r Contrac t Documents , the terms listed belo w have the meanings indicate d whic h are applicable to both the singula r and plura l thereof, and words denoting gende r shall includ e the masculine , feminin e and neuter . Said terms are generally capitalize d or writte n in italics , but not always. Whe n use d in a context consistent with the definitio n of a listed -define d term, the term shall have a meaning as define d belo w whether capitalize d or italicize d or otherwise . In additio n to terms specifically de fined , terms wit h initial capital letters in the Contrac t Documents includ e references to identifie d article s and paragraphs, and the title s of othe r documents or forms. 1. Addenda—Written or graphic instru ments issued prior to the opening of Bid s whic h clarify, correct, or change the Biddin g Require ments or the propose d Contrac t Documents. 2. Agreement—The written instru ment whic h is evidenc e of the agreement between Cit y and Contractor covering the Work. 3. Applicatio n for Payment—The for m acceptable to Cit y whic h is to be use d by Contractor during the cours e of the Wor k in requesting progres s or fina l payments and whic h is to be accompanie d by suc h supporting documentation as is require d by the Contrac t Documents. 4. Asbestos—Any material tha t contains mor e tha n one percent asbestos and is friable or is releasing asbestos fiber s int o the air above current action levels establishe d by the United States Occupationa l Safety and Health Administration. 5. Award – Authorization by the Cit y Council for the Cit y to ente r int o an Agree ment. 6. Bid —The offer or proposa l of a Bidde r submitte d on the prescribe d form setting forth the price s for the Work to be performed. 7. Bidder —The individua l or entit y who submit s a Bid directly to City. 8. Biddin g Documents—The Biddin g Require ments and the propose d Contrac t Documents (includin g all Addenda). 9. Biddin g Requirements—The advertise ment or Invitatio n to Bid , Instructions to Bidders , Bid security of acceptable for m, if any, and the Bid For m wit h any supple ments. 10. Business Day – A busines s da y is define d as a da y tha t the Cit y conducts nor mal business, generally Monda y through Friday , except for federal or state holidays observe d by the City. 11. Calendar Day – A da y consistin g of 24 hour s measured from midnight to the next midnight. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 2 of 63 12. Change Order—A document, whic h is prepare d and approve d by the City , whic h is signed by Contractor and Cit y and authorize s an addition, deletion , or revisio n in the Wor k or an adjustment in the Contrac t Pric e or the Contract Time, issued on or afte r the Effective Date of the Agree ment. 13. City— The Cit y of For t Worth, Texas, a home -rule municipa l corporation, authorize d and chartered unde r the Texa s State Statutes, acting by it s governing body through it s City Manager, his designee , or agents authorize d unde r his behalf , each of whic h is require d by Charter to perfor m specific dutie s wit h responsibilit y for fina l enforce ment of the contracts involvin g the Cit y of For t Worth is by Charter veste d in the Cit y Manage r and is the entity wit h whom Contractor ha s entered int o the Agree ment and for whom the Wor k is to be performed. 14. City Attorne y – The officially appointe d Cit y Attorne y of the Cit y of For t Worth, Texas, or his duly authorize d representative. 15. City Council - The duly elected and qualifie d gover nin g body of the Cit y of For t Worth, Texas. 16. City Manager – The officially appointe d and authorized Cit y Manage r of the Cit y of Fort Worth, Texas, or his duly authorize d representative. 17. Contract Claim—A de mand or assertion by Cit y or Contractor seeking an adjustment of Contrac t Pric e or Contrac t Time, or both, or othe r relie f wit h respect to the terms of the Contract. A de mand for mone y or services by a thir d party is not a Contrac t Claim. 18. Contract—The entir e and integrate d written docume nt between the Cit y and Contractor concerning the Work. The Contrac t contains the Agree ment and all Contrac t Documents and supersede s prio r negotiations , representations , or agreements , whethe r writte n or oral. 19. Contract Documents—Thos e ite ms so designate d in the Agree ment. All ite ms liste d in the Agree ment are Contrac t Documents . Approve d Submittals , othe r Contractor submittals , and the reports and drawings of subsurfac e and physica l conditions are not Contrac t Documents. 20. Contract Price —The moneys payable by Cit y to Contractor for completio n of the Wor k in accordance wit h the Contrac t Documents as state d in the Agree ment (subjec t to the provisions of Paragraph 11.03 in the case of Unit Pric e Work). 21. Contract Time —The numbe r of days or the date s state d in the Agree ment to: (i) achieve Milestones , if any and (ii) complet e the Wor k so tha t it is ready for Fina l Acceptance. 22. Contractor—The individua l or entit y wit h whom Cit y ha s entered int o the Agree ment. 23. Cost o f th e Work —Se e Paragraph 11.01 of thes e General Conditions for definition. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 3 of 63 24. Damage Claims – A de mand for mone y or services arisin g from the Projec t or Sit e from a thir d party, Cit y or Contractor exclusiv e of a Contrac t Claim. 25. Day or da y – A day, unles s otherwis e defined, shall mean a Calenda r Day. 26. Directo r o f Aviatio n – The officially appointe d Director of the Aviatio n Department of the Cit y of For t Worth, Texas, or his duly appointe d representative, assistant, or agents. 27. Directo r of Park s and Community Services – The officially appointe d Director of the Parks and Community Services Department of the Cit y of For t Worth, Texas, or his duly appointed representative, assistant, or agents . 28. Directo r of Planning and Development – The officially appointe d Director of the Planning and Development Department of the Cit y of For t Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Directo r o f Transportation Public Work s – The officially appointe d Director of the Transportation Public Works Department of the Cit y of For t Worth, Texas, or his duly appointe d representative, assistant, or agents. 30. Directo r o f Wate r Departmen t – The officially appointe d Director of the Water Department of the Cit y of Fort Worth, Texas, or his duly appointe d representative, assistant, or agents. 31. Drawings—Tha t par t of the Contrac t Documents prepare d or approve d by Enginee r which graphically show s the scope , extent, and character of the Wor k to be performed by Contractor . Submittals are not Drawings as so de fined. 32. Effectiv e Date of th e Agreement—The date indicate d in the Agree ment on whic h it becomes effective, but if no suc h date is indicated, it means the date on whic h the Agree ment is signed and delivere d by the las t of the two partie s to sig n and deliver. 33. Engineer—The license d professiona l enginee r or engineerin g fir m registered in the State of Texa s perfor min g professiona l services for the City. 34. Extra Wor k – Additiona l wor k made necessary by change s or alterations of the Contract Documents or of quantitie s or for othe r reasons for whic h no price s are provide d in the Contrac t Documents . Extra work shall be par t of the Work. 35. Field Order — A writte n orde r issued by Cit y whic h require s change s in the Wor k but which doe s not involve a change in the Contrac t Price , Contrac t Time, or the inten t of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 36. Fina l Acceptance – The writte n notic e give n by the Cit y to the Contractor tha t the Work specifie d in the Contrac t Documents ha s bee n complete d to the satisfaction of the City. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 4 of 63 37. Fina l Inspectio n – Inspection carrie d out by the Cit y to verif y tha t the Contractor has complete d the Work, and each and every part or appurtenanc e thereof, fully , entirely , and in conformanc e wit h the Contrac t Documents. 38. General Requirements—Sections of Divisio n 1 of the Contrac t Documents. 39. Hazardou s Environmental Condition—The presenc e at the Sit e of Asbestos, PCBs, Petroleum, Hazardous Waste , Radioactive Material, or othe r materials in suc h quantitie s or circumstances tha t may present a substantia l dange r to persons or property expose d thereto. 40. Hazardous Waste —Hazardous waste is define d as any solid waste liste d as hazardous or possesses one or more hazardous characteristics as define d in the federa l waste regulations, as amende d from time to time. 41. Laws and Regulations—Any and all applicable laws , rules , regulations , ordinances , codes, and order s of any and all governmenta l bodie s, agencies, authorities , and courts having jurisdiction. 42. Liens —Charges , security interests, or encumbrances upon Projec t funds , rea l property, or persona l property. 43. Major Item – An Ite m of wor k include d in the Contract Documents tha t ha s a total cos t equal to or greater tha n 5% of the origina l Contrac t Pric e or $25,000 whicheve r is less. 44. Milestone—A principa l event specifie d in the Contrac t Documents relatin g to an inter mediate Contrac t Time prio r to Fina l Acceptance of the Work. 45. Notice o f Award —The writte n notic e by Cit y to the Successful Bidde r stating tha t upon timely complianc e by the Successful Bidde r wit h the conditions precedent liste d therein, City will sig n and delive r the Agree ment. 46. Notic e to Proceed—A writte n notic e give n by Cit y to Contractor fixin g the date on whic h the Contrac t Time will commenc e to run and on whic h Contractor shall start to per form the Wor k specifie d in Contrac t Documents. 47. PCBs—Polychlorinate d biphenyls. 48. Petroleum—Petroleum, includin g crude oil or any frac tio n thereof whic h is liquid a t standard conditions of temperatur e and pressure (60 degree s Fahrenheit and 14.7 pounds pe r square inc h absolute), suc h as oil, petroleum, fue l oil, oil sludge , oil refuse , gasoline , kerosene , and oil mixe d wit h othe r non-Hazardous Waste and crude oils. 49. Plan s – Se e definitio n of Drawings. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 5 of 63 50. Projec t Schedule—A schedule , prepare d and maintaine d by Contractor , in accordance with the General Require ments , describin g the sequenc e and duration of the activitie s comprising the Contractor’s pla n to accomplis h the Wor k within the Contrac t Time. 51. Project—The Wor k to be perfor med unde r the Contrac t Documents. 52. Project Manager—The authorize d representative of the Cit y who will be assigne d to the Site. 53. Public Meetin g – An announce d meeting conducte d by the Cit y to facilitat e public participatio n and to assist the public in gainin g an infor med vie w of the Project. 54. Radioactive Material—Source , special nuclear, or byproduc t material as define d by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amende d from time to time. 55. Regula r Working Hour s – Hours beginning at 7:0 0 a.m. and ending at 6:0 0 p.m., Monday thr u Frida y (excluding lega l holidays). 56. Samples—Physica l exa mple s of materials, equipment, or workmanship tha t are representative of some portion of the Work and whic h establis h the standards by whic h such portion of the Work will be judged. 57. Schedule o f Submittals—A schedule , prepare d and maintaine d by Contractor, of required submittals and the time require ments to support schedule d perfor manc e of related construction activities. 58. Schedule o f Values—A schedule , prepare d and maintaine d by Contractor , allocatin g portions of the Contrac t Pric e to various portions of the Wor k and use d as the basis for reviewing Contractor’s Application s for Payment. 59. Site —Lands or areas indicate d in the Contrac t Documents as bein g furnishe d by Cit y upon whic h the Work is to be perfor med, includin g rights -of-way, permits , and easements for access thereto, and suc h othe r land s furnishe d by Cit y whic h are designate d for the us e of Contractor. 60. Specifications—Tha t par t of the Contrac t Documents consistin g of writte n require ments for materials, equipment, systems, standards a nd workmanship a s applie d to the Work, and certain administrativ e require ments and procedura l matters applicable thereto. Specifications may be specifically made a part of the Contrac t Documents by attachment or , if not attached, may be incorporate d by reference as indicate d in the Table of Contents (Divisio n 00 00 00) of each Project. 61. Subcontractor—An individua l or entit y having a direc t contrac t wit h Contractor or wit h any othe r Subcontractor for the perfor manc e of a part of the Work at the Site. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 6 of 63 62. Submittals—All drawings , diagra ms, illustrations , schedules , and othe r dat a or in for mation whic h are specifically prepare d or assemble d by or for Contractor and submitte d by Contractor to illustrat e some portion of the Work. 63. Substantial Completion – The stage in the progress of the Project when the Work is sufficiently complete in accordance with the Contract Documents for Final Inspection. 64. Successful Bidder—The Bidde r submittin g the lowes t and mos t responsive Bid to whom City make s an Award. 65. Superintendent – The representative of the Contractor who is available at all times and able to receive instructions from the Cit y and to act for the Contractor. 66. Supplementary Conditions—Tha t part of the Contrac t Documents whic h amends or supple ments thes e General Conditions. 67. Supplier—A manufacturer, fabricator, supplier , dis tributor , materialman, or vendor having a direc t contrac t wit h Contractor or wit h any Subcontractor to furnis h materials or equipment to be incorporate d in the Wor k by Contractor or Subcontractor. 68. Underground Facilities—All underground pipelines , conduits , ducts , cables, wires, manholes , vaults , tanks , tunnels , or othe r suc h facilitie s or attachments , and any encasements containing suc h facilities , includin g but not limit ed to, thos e tha t conve y electricity, gases, steam, liquid petroleum products , telephone or othe r communications , cable television, water, wastewater, stor m water, othe r liquid s or che micals , or traffic or othe r control systems. 69 Unit Pric e Work —Se e Paragraph 11.03 of thes e General Conditions for definition. 70. Weekend Working Hour s – Hour s beginning at 9:0 0 a.m. and ending at 5:0 0 p.m., Saturday, Sunda y or lega l holiday, as approve d in advanc e by the City. 71. Work —The entir e construction or the various separately identifiable parts thereof require d to be provide d unde r the Contrac t Documents . Wor k include s and is the result of perfor min g or providing all labor, services, and documentation necessary to produc e suc h construction includin g any Change Orde r or Field Order , and furnishing, installing , and incorporating all materials and equipment int o suc h construction, all as require d by the Contrac t Documents. 72. Workin g Day – A working da y is define d as a day, not includin g Saturdays , Sundays , or legal holidays authorize d by the Cit y for contrac t purposes , in whic h weather or othe r conditions not unde r the control of the Contractor will permit the performanc e of the principa l unit of work underwa y for a continuous perio d of not les s tha n 7 hour s between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not define d but, whe n use d in the Biddin g Require ments or Contrac t Documents , have the indicate d meaning. B. Inten t o f Certai n Terms or Adjectives: CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 7 of 63 1. The Contrac t Documents includ e the terms “a s allowed,” “a s approved,” “a s ordered,” “as directed” or terms of lik e effect or import to authorize an exercise of judgment by City . In addition, the adjectives “reasonable,” “suitable,” “acceptable,” “proper,” “satisfactory,” or adjectives of lik e effect or impor t are use d to describ e an action or determinatio n of Cit y as to the Work. It is intende d tha t suc h exercise of professiona l judgment, action, or determination will be solely to evaluate, in general, the Work for complianc e wit h the in formatio n in the Contrac t Documents and wit h the desig n conce pt of the Projec t a s a functioning whole as show n or indicate d in the Contrac t Documents (unles s ther e is a specific statement indicating otherwise). C. Defective: 1. The wor d “defective,” whe n modifying the word “Work,” refers to Work tha t is unsatis factory, faulty , or de ficien t in tha t it: a. doe s not conform to the Contrac t Documents ; or b. doe s not meet the require ments of any applica ble inspection, referenc e standard, test, or approva l referred to in the Contrac t Documents ; or c. ha s bee n da mage d prio r to City’s written acceptance. D. Furnish , Install, Perform, Provide: 1. The wor d “Furnish” or the word “Install” or the wor d “Perform” or the wor d “Provide ” or the wor d “Supply,” or any combinatio n or simila r directiv e or usage thereof , shall mean furnishing and incorporating in the Wor k includin g all necessary labor, materials, equipment, and everything necessary to perfor m the Wor k indicated, unles s specifically limite d in the context used. E. Unles s state d otherwis e in the Contrac t Docume nts , words or phrase s tha t have a well-known technical or construction industr y or trade meaning are use d in the Contrac t Documents in accordance wit h suc h recognize d meaning. ARTICLE 2 – PRELIMINARY MATTERS 2.01 Copies of Documents Cit y shall furnis h to Contractor one (1) origina l executed copy and one (1) electronic copy of the Contrac t Documents , and four (4) additiona l copies of the Drawings . Additiona l copie s will be furnishe d upon reques t at the cos t of reproduction. 2.02 Commencement of Contract Time ; Notic e to Proceed The Contrac t Time will commenc e to run on the da y indicate d in the Notic e to Proceed. A Notic e to Proceed may be give n no earlier than 14 days afte r the Effective Date of the Agree ment, unless agreed to by both parties in writing. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 8 of 63 2.03 Startin g th e Work Contractor shall start to perform the Wor k on the date whe n the Contrac t Time commences to run. No Wor k shall be done at the Sit e prio r to the date on whic h the Contrac t Time commences to run. 2.04 Before Startin g Construction Baselin e Schedules: Submit in accordance wit h the Contrac t Documents , and prio r to starting the Work. 2.05 Preconstruction Conference Befor e any Wor k at the Sit e is started, the Contractor shall attend a Preconstruction Conferenc e as specifie d in the Contrac t Documents. 2.06 Public Meeting Contractor may not mobiliz e any equipment, materials or resource s to the Sit e prio r to Contractor attending the Public Meeting as schedule d by the City. 2.07 Initia l Acceptance o f Schedules No progres s payment shall be made to Contractor until acceptable schedule s are submitte d to Cit y in accordance wit h the Schedule Specification a s provide d in the Contrac t Documents. ARTICLE 3 – CONTRACT DOCUMENTS : INTENT, AMENDING, REUSE 3.01 Intent A. The Contrac t Documents are comple mentary; wha t is require d by one is as binding as if required by all. B. It is the inten t of the Contrac t Documents to describe a functionally complet e projec t (or part thereof) to be constructe d in accordance wit h the Contrac t Documents . Any labor, documentation , services, materials, or equipment tha t reasonably may be inferred from the Contrac t Documents or from prevailin g custom or trade usage as bein g require d to produc e the indicate d result will be provide d whethe r or not specifically calle d for , at no additiona l cos t to City. C. Clarification s and interpretations of the Contrac t Documents shall be issued by City. D. The Specifications ma y var y in for m, format and style . Some Specification sections may be written in varying degree s of strea mline d or declarative style and some sections ma y be relatively narrative by comparison. Omissio n of such words and phrase s as “the Contractor shall,” “in confor mit y with,” “a s shown,” or “a s specified ” are intentiona l in strea mlined sections . Omitte d words and phrase s shall be supplie d by inference. Simila r type s of provisions may appea r in various parts of a section or article s within a part depending on the format of the CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 9 of 63 section. The Contractor shall not take advantage of any variatio n of for m, format or style in makin g Contrac t Claims. E. The cros s referencing of specification sections unde r the subparagraph heading “Related Sections includ e but are not necessarily limite d to:” and elsewhere within each Specification section is provide d as an aid and convenienc e to the Contractor . The Contractor shall not rely on the cros s referencing provide d and shall be responsible to coordinate the entir e Wor k unde r the Contrac t Documents and provide a complet e Projec t whethe r or not the cros s referencing is provide d in each section or whethe r or not the cros s referencing is complete. 3.02 Reference Standards A. Standards , Specifications, Codes , Laws, and Regulations 1. Reference to standards , specifications, manuals , or code s of any technical society, organization , or association, or to Laws or Regulations , whethe r suc h reference be specific or by implication , shall mean the standard, specification, manual, code , or Laws or Regulations in effect at the time of opening of Bid s (or on the Effective Date of the Agree ment if there were no Bids), except as may be otherwis e specifically state d in the Contrac t Documents. 2. No provision of any suc h standard, specification, manual, or code , or any instructio n of a Supplier, shall be effective to change the duties or responsibilitie s of City , Contractor , or any of their subcontractors , consultants , agents , or employees , from thos e set forth in the Contract Documents . No suc h provision or instructio n shall be effective to assign to City , or any of its officers, directors , me mbers , partners , employee s, agents , consultants , or subcontractors , any duty or authority to supervis e or direc t the perfor manc e of the Wor k or any duty or authority to undertake responsibilit y inconsistent wit h the provisions of the Contrac t Documents. 3.03 Reportin g and Resolvin g Discrepancies A. Reportin g Discrepancies: 1. Contractor’s Revie w o f Contract Documents Befor e Starting Work : Before undertaking each part of the Work, Contractor shall carefully study and compar e the Contrac t Documents and check and verif y pertinent figure s therein agains t all applicable field measurements and conditions . Contractor shall promptly repor t in writin g to Cit y any conflict , error, ambiguity, or discrepanc y whic h Contractor discovers , or ha s actual knowledge of , and shall obtain a written interpretation or clarificatio n from Cit y be for e proceeding wit h any Wor k affected thereby. 2. Contractor’s Revie w o f Contract Documents Durin g Performance o f Work : If, during the perfor manc e of the Work, Contractor discover s any conflict , error, ambiguity, or discrepancy within the Contrac t Documents , or between the Contrac t Documents and (a) any applicable La w or Regulatio n , (b) any standard, specification, manual, or code , or (c) any instructio n of any Supplier, the n Contractor shall promptly report it to Cit y in writing . Contractor shall not procee d wit h the Wor k affected thereby (except in an emergenc y as require d by Paragraph CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 10 of 63 6.17.A ) until a n amendment or supple ment to the Contrac t Documents ha s bee n issued by one of the methods indicate d in Paragraph 3.04. 3. Contractor shall not be liable to Cit y for failure to report any conflict , error, ambiguity, or discrepanc y in the Contrac t Documents unles s Contractor ha d actual knowledge thereof. B. Resolvin g Discrepancies: 1. Except as may be otherwis e specifically state d in the Contrac t Documents , the provisions of the Contrac t Documents shall take precedence in resolvin g any conflict , error, ambiguity, or discrepanc y between the provisions of the Contrac t Documents and the provisions of any standard, specification, manual, or the instruction of any Supplie r (whethe r or not specifically incorporate d by reference in the Contrac t Documents). 2. In case of discrepancies, figure d dimensions shall gover n ove r scaled dimensions , Plan s shall govern ove r Specifications, Supple mentary Condition s shall govern ove r General Conditions and Specifications, and quantitie s show n on the Plan s shall gover n ove r thos e show n in the proposal. 3.04 Amendin g and Supplementing Contract Documents A. The Contrac t Documents ma y be amende d to provide for additions , deletions , and revision s in the Wor k or to modif y the terms and conditions thereof by a Change Order. B. The require ments of the Contrac t Documents ma y be supple mented, and mino r variation s and deviations in the Wor k not involvin g a change in Contrac t Pric e or Contrac t Time, may be authorized, by one or mor e of the followin g ways: 1. A Field Order; 2. City’s revie w of a Submitta l (subjec t to the provisions of Paragraph 6.18.C); or 3. City’s writte n interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplie r shall not: 1. have or acquir e any title to or ownership rights in any of the Drawings , Specifications , or othe r documents (or copie s of any thereof ) prepared by or bearing the seal of Engineer, includin g electronic media editions ; or 2. reus e any suc h Drawings , Specifications, othe r documents , or copie s thereof on extensions of the Projec t or any othe r projec t without writte n consent of Cit y and specific written verificatio n or adaptation by Engineer. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will sur viv e fina l payment, or terminatio n of the Contract. Nothing herein shall preclude Contrac tor from retainin g copie s of the Contract Documents for record purposes. 3.06 Electronic Data A. Unles s otherwis e stated in the Supple mentary Conditions , the dat a furnishe d by Cit y or Engineer to Contractor , or by Contractor to Cit y or Engineer , tha t may be relie d upon are limite d to the printe d copie s include d in the Contrac t Doc uments (als o know n as har d copies ) and other Specifications referenced and located on the City’s on-line electronic document manage ment and collaboratio n system site . File s in electronic media for mat of text, data , graphics , or othe r types are furnishe d only for the convenienc e of the receiving party. Any conclusion or informatio n obtaine d or derive d from suc h electronic files will be at the user’s sole risk . If there is a discrepanc y between the electronic file s and the hard copies , the har d copie s govern. B. Whe n transferring documents in electronic media for mat, the transferring party make s no representations as to lon g term compatibility , usability , or readabilit y of documents resulting from the us e of software applicatio n packa ges, operating systems, or compute r hardware differing from thos e use d by the data’s creator. ARTICLE 4 – AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL COND ITIONS ; REFERENCE POINTS 4.01 Availability of Lands A. Cit y shall furnis h the Site . Cit y shall notif y Contractor of any encumbrance s or restriction s not of genera l applicatio n but specifically related to us e of the Sit e wit h whic h Contractor mus t comply in perfor min g the Work. Cit y will obtain in a timely manne r and pa y for easements for per manent structure s or permanent change s in existin g facilities. 1. The Cit y ha s obtaine d or anticipates acquisit ion of and/or access to right-of -way, and/or easements . Any outstanding right-of -way and/or easements are anticipated to be acquire d in accordance wit h the schedule set forth in the Supple mentary Conditions . The Project Schedule submitted by the Contractor in accordanc e wit h the Contrac t Documents must conside r any outstanding right-of-way, and/or easements. 2. The Cit y ha s or anticipates re moving and/or re locatin g utilities , and obstructions to the Site. Any outstanding re mova l or relocation of utilitie s or obstructions is anticipated in accordance wit h the schedule set forth in the Supple mentary Conditions . The Projec t Schedule submitted by the Contractor in accordance wit h the Contract Documents mus t conside r any outstanding utilitie s or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable writte n request, Cit y shall furnis h Contractor wit h a current state ment of record lega l title and lega l descriptio n of the land s upon whic h the Wor k is to be perfor med. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 12 of 63 C. Contractor shall provide for all additiona l land s and access thereto tha t may be require d for construction facilitie s or storage of materials and equipment. 4.02 Subsurface an d Physical Conditions A. Reports and Drawings : The Supple mentary Conditions identify: 1. thos e reports know n to Cit y of explorations and tests of subsurfac e conditions at or contiguous to the Site ; and 2. thos e drawings know n to Cit y of physica l conditions relatin g to existin g surfac e or subsurfac e structure s at the Sit e (except Underground Facilities). B. Limite d Relianc e b y Contractor on Technical Data Authorized : Contractor may rely upon the accuracy of the “technical data ” containe d in suc h report s and drawings , but suc h reports and drawings are not Contrac t Docume nts . Suc h “technical data ” is identifie d in the Supple mentary Conditions . Contractor may not make any Contrac t Claim agains t City , or any of their officers, directors , members , partners , employees , agents , consultants , or subcontractor s wit h respect to: 1. the completeness of suc h reports and drawings for Contractor’s purposes , including , but not limite d to, any aspects of the means, methods , techniques , sequences, and procedure s of construction to be employe d by Contractor , and safety precautions and progra ms incident thereto; or 2. othe r data , interpretations , opinions , and infor matio n containe d in suc h reports or show n or indicate d in suc h drawings ; or 3. any Contractor interpretation of or conclusion draw n from any “technical data ” or any such othe r data , interpretations , opinions , or infor mation. 4.03 Differin g Subsurface o r Physica l Conditions A. Notice : If Contractor believe s tha t any subsurfac e or physica l condition tha t is uncovere d or revealed either: 1. is of suc h a natur e as to establis h tha t any “technical data ” on whic h Contractor is entitle d to rely as provide d in Paragraph 4.02 is materially inaccurate; or 2. is of suc h a natur e a s to requir e a change in the Contrac t Documents ; or 3. differs materially from tha t show n or indicate d in the Contrac t Documents ; or 4. is of a n unusua l nature , and differs materially from conditions ordinarily encountere d and generally recognize d as inherent in wor k of the character provide d for in the Contract Documents; CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 13 of 63 the n Contractor shall, promptly after becomin g aware thereof and befor e furthe r disturbing the subsurfac e or physica l conditions or performin g any Wor k in connection therewith (except in an emergenc y as require d by Paragraph 6.17.A), notif y Cit y in writin g about suc h condition. B. Possible Price and Time Adjustments Contractor shall not be entitle d to any adjustment in the Contrac t Pric e or Contrac t Time if: 1. Contractor kne w of the existenc e of suc h conditions at the time Contractor made a final commit ment to Cit y wit h respect to Contrac t Pric e and Contrac t Time by the submissio n of a Bid or becomin g bound unde r a negotiate d contract; or 2. the existenc e of suc h condition could reasonably have bee n discovere d or revealed as a result of the exa minatio n of the Contrac t Documents or the Site ; or 3. Contractor faile d to giv e the written notic e as require d by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown o r Indicated: The informatio n and data show n or indicate d in the Contrac t Documents wit h respect to existin g Underground Facilitie s at or contiguous to the Sit e is base d on infor matio n and data furnishe d to Cit y or Enginee r by the owners of suc h Underground Facilities , includin g City , or by others . Unles s it is otherwis e expressly provide d in the Supple mentar y Conditions: 1. Cit y and Enginee r shall not be responsible for the accuracy or completeness of any such infor matio n or data provide d by others ; and 2. the cos t of all of the followin g will be include d in the Contrac t Price , and Contractor shall have full responsibilit y for: a. reviewin g and checking all suc h infor matio n and data; b. locatin g all Underground Facilitie s show n or indicate d in the Contrac t Documents; c. coordination and adjustment of the Wor k wit h the owners of suc h Underground Facilities , includin g City , during construction; and d. the safety and protection of all suc h Underground Facilitie s and repairin g any da mage thereto resultin g from the Work. B. Not Shown or Indicated: 1. If an Underground Facilit y whic h conflict s wit h the Wor k is uncovere d or revealed a t or contiguous to the Sit e whic h was not show n or indicated, or not show n or indicate d with reasonable accuracy in the Contrac t Documents , Contractor shall, promptly afte r becoming aware thereof and before furthe r disturbing conditions affected thereby or perfor min g any CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 14 of 63 Work in connection therewith (except in an emergenc y as require d by Paragraph 6.17.A), identif y the owne r of suc h Underground Facilit y and giv e notic e to tha t owne r and to City. Cit y will revie w the discovere d Underground Facilit y and determin e the extent, if any, to whic h a change may be require d in the Contrac t Documents to reflect and document the consequence s of the existenc e or locatio n of the Underground Facility . Contractor shall be responsible for the safety and protection of suc h discovere d Underground Facility. 2. If Cit y conclude s tha t a change in the Contract Documents is required, a Change Orde r may be issued to reflect and document suc h consequences. 3. Verificatio n of existin g utilities , structures , and servic e line s shall includ e notificatio n of all utilit y companie s a minimum of 48 hour s in advanc e of construction includin g exploratory excavation if necessary. 4.05 Reference Points A. Cit y shall provide engineering surveys to establis h reference points for construction, whic h in City’s judgment are necessary to enable Contrac tor to procee d wit h the Work. Cit y will provide construction stake s or othe r customary method of markin g to establis h lin e and grade s for roadwa y and utilit y construction, centerlines and benchmarks for bridgework. Contractor shall protec t and preserve the establishe d reference points and property monuments , and shall make no change s or relocations . Contractor shall repor t to Cit y wheneve r any reference point or property monument is los t or destroye d or require s relocation because of necessary change s in grade s or locations . The Cit y shall be responsible for the replacement or relocation of reference points or property monument s not carelessly or willfully destroye d by the Contractor . The Contractor shall notif y Cit y in advanc e and wit h sufficien t time to avoid delays. B. Whenever, in the opinion of the City , any referenc e point or monument ha s bee n carelessly or willfull y destroyed, disturbed, or remove d by the Contractor or any of his employees , the full cos t for replacing suc h points plu s 25% will be charge d agains t the Contractor, and the full a mount will be deducte d from payment due the Contractor. 4.06 Hazardous Environmenta l Conditio n a t Site A. Reports and Drawings : The Supple mentary Conditions ide ntif y thos e report s and drawings know n to Cit y relatin g to Hazardous Environmenta l Conditions tha t have bee n identifie d at the Site. B. Limited Reliance by Contractor o n Technical Data Authorized : Contractor may rely upon the accuracy of the “technical data ” containe d in such reports and drawings , but suc h reports and drawings are not Contrac t Documents . Suc h “technical data ” is identifie d in the Supple mentary Conditions . Contractor may not make any Contrac t Claim agains t City , or any of their officers, directors , members , partners , employees , agents , consultants , or subcontractors wit h respect to: 1. the completeness of suc h reports and drawings for Contractor’s purposes , including , but not limite d to, any aspects of the means, methods , techniques , sequence s and procedure s of CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 15 of 63 construction to be employe d by Contractor and safety precautions and progra ms incident thereto; or 2. othe r data , interpretations , opinions and infor matio n containe d in suc h reports or show n or indicate d in suc h drawings ; or 3. any Contractor interpretation of or conclusion draw n from any “technical data ” or any such othe r data , interpretations , opinions or infor mation. C. Contractor shall not be responsible for a ny Hazardous Environmenta l Condition uncovere d or revealed at the Sit e whic h was not show n or indica ted in Drawings or Specification s or identif ied in the Contrac t Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmenta l Condition created wit h any materials brought to the Sit e by Contractor , Subcontractors , Suppliers , or anyone els e for whom Contractor is responsible. D. If Contractor encounter s a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmenta l Condition, Contractor shall immediately: (i) secure or otherwis e isolat e suc h condition; (ii) stop all Work in connection with suc h condition and in any area affected thereby (except in an emergenc y as require d by Paragraph 6.17.A); and (iii) notify Cit y (and promptly thereafter confirm suc h notic e in writing). Cit y may conside r the necessity to retain a qualifie d exper t to evaluate suc h condition or take corrective action, if any. E. Contractor shall not be require d to resume Wor k in connection wit h suc h condition or in any affected area until afte r Cit y ha s obtaine d any require d permit s related thereto and delivered writte n notic e to Contractor: (i) specifyin g tha t suc h condition and any affected area is or has bee n rendere d suitable for the resumptio n of Work; or (ii) specifyin g any special conditions unde r whic h suc h Work may be resumed. F. If afte r receipt of suc h writte n notic e Contractor doe s not agre e to resume suc h Work base d on a reasonable belie f it is unsafe , or doe s not agree to resume suc h Wor k unde r suc h special conditions , the n Cit y ma y orde r the portion of the Wor k tha t is in the are a affected by such condition to be deleted from the Work. Cit y may have suc h deleted portion of the Work performed by City’s ow n forces or others. G. To th e fulles t extent permitte d by Law s and Re gulations, Contractor shall indemnify and hold harmless City , from and against all claims, costs, losses, and damages (including but not limited to all fees and charges o f engineers, architects, attorneys, and other professionals and all court o r arbitratio n o r other dispute resolutio n costs) arisin g out o f o r relatin g to a Hazardous Environmental Condition created b y Contractor or b y anyone for whom Contractor is responsible. Nothin g in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual o r entity from and against th e consequences o f tha t individual’s o r entity’s own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovere d or revealed at the Site. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 16 of 63 ARTICLE 5 – BOND S AND INSURANCE 5.01 Licensed Suretie s and Insurers All bonds and insuranc e require d by the Contrac t Documents to be purchase d and maintaine d by Contractor shall be obtaine d from surety or insur anc e companie s tha t are duly license d or authorized in the State of Texa s to issue bonds or insura nce policie s for the limit s and coverage s so required. Suc h surety and insuranc e companie s shall als o meet suc h additiona l require ments and qualifications as may be provide d in the Supple mentary Conditions. 5.02 Performance, Payment, and Maintenanc e Bonds A. Contractor shall furnis h perfor manc e and payment bonds , in accordance wit h Texa s Government Code Chapte r 2253 or successor statute , each in an amount equa l to the Contrac t Pric e as security for the faithful perfor manc e and payment of all of Contractor’s obligations unde r the Contrac t Documents. B. Contractor shall furnis h maintenanc e bonds in a n amount equa l to the Contrac t Pric e as security to protec t the Cit y agains t any defects in any portion of the Wor k describe d in the Contract Documents . Maintenanc e bonds shall remain in effect for tw o (2) years a fte r the date of Final Acceptance by the City. C. All bonds shall be in the for m prescribe d by the Contrac t Document s except as provided otherwis e by Laws or Regulations , and shall be executed by suc h suretie s as are na med in the list o f “Companie s Holdin g Certificates of Authority as Acceptable Suretie s on Federal Bonds and a s Acceptable Reinsurin g Companies ” as published in Circula r 570 (amended) by the Financial Manage ment Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by a n agent or attorney-in -fac t mus t be accompa nie d by a sealed and date d powe r of attorney whic h shall show tha t it is effective on the date the agent or attorney-in -fact signe d each bond. D. If the suret y on any bond furnishe d by Contractor is declared bankrupt or becomes insolvent or it s righ t to do busines s is terminate d in the State of Texa s or it ceases to meet the require ments of Paragraph 5.02.C, Contractor shall promptly notif y Cit y and shall, within 30 days afte r the event givin g ris e to suc h notification , provide anothe r bond and surety, both of whic h shall comply wit h the require ments of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall delive r to City , wit h copie s to each additiona l insure d and los s paye e identifie d in th e Supple mentary Conditions , certificates of insura nc e (othe r evidenc e of insuranc e requested by Cit y or any othe r additiona l insured) in at least the minimum amount as specified in the Supplementary Conditions whic h Contractor is require d to purchas e and maintain. 1. The certificate of insuranc e shall document the City , and all identifie d entitie s na med in the Supple mentary Conditions as “Additiona l Insured” on all liabilit y policies. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 17 of 63 2. The Contractor’s genera l liabilit y insuranc e shall includ e a, “pe r project ” or “pe r location”, endorse ment , whic h shall be identifie d in the certificat e of insuranc e provide d to the City. 3. The certificate shall be signe d by an agent authorize d to bin d coverage on behalf of the insured , be complet e in it s entirety, and show complet e insuranc e carrier na me s as liste d in th e current A.M. Best Property & Casualty Guide 4. The insurer s for all policie s mus t be license d and/or approve d to do busines s in the State of Texas. Except for workers ’ compensation, all insurer s mus t have a minimum ratin g of A-: VII in the current A. M. Best Key Ratin g Guid e or have reasonably equivalent financial strength and solvenc y to the satisfaction of Ris k Manage ment. If the ratin g is belo w that required, written approva l of Cit y is required. 5. All applicable policie s shall includ e a Waive r of Subrogation (Rights of Recovery) in favor of the City . In addition, the Contractor agrees to waiv e all rights of subrogation agains t the Enginee r (if applicable), and each additional insure d identifie d in the Supple mentary Conditions 6. Failur e of the Cit y to de mand suc h certificates or othe r evidenc e of full complianc e wit h the insuranc e require ments or failur e of the Cit y to identif y a deficiency from evidenc e tha t is provide d shall not be construe d as a waive r of Contractor’s obligatio n to maintain suc h lines of insuranc e coverage. 7. If insuranc e policie s are not writte n for specifie d coverage limits , an Umbrella or Excess Liabilit y insuranc e for any differences is required. Excess Liabilit y shall follo w form of the primary coverage. 8. Unles s otherwis e stated, all require d insuranc e shall be written on the “occurrenc e basis”. If coverage is underwritte n on a claims-made basis , the retroactive date shall be coincident with or prio r to the date of the effective date of the agreement and the certificate of insuranc e shall state tha t the coverage is claims-made and the retroactive date . The insuranc e coverage shall be maintaine d for the duration of the Contrac t and for thre e (3) years followin g Final Acceptance provide d unde r the Contrac t Documents or for the warranty period, whicheve r is longer. An annua l certificate of insuranc e submitte d to the Cit y shall evidenc e such insuranc e coverage. 9. Policie s shall have no exclusions by endorse ments , which , neithe r nullif y or a mend, the require d line s of coverage , nor decrease the limit s of said coverage unles s suc h endorse ments are approve d in writin g by the City . In the event a Contrac t ha s bee n bid or executed and the exclusions are determine d to be unacceptable or the Cit y desire s additiona l insurance coverage , and the Cit y desire s the contractor/enginee r to obtain suc h coverage , the contract pric e shall be adjuste d by the cos t of the pre miu m for suc h additiona l coverage plu s 10%. 10. Any self -insure d retention (SIR), in excess of $25,000.00, affecting require d insurance coverage shall be approve d by the Cit y in regards to asset valu e and stockholders ' equity. In CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 18 of 63 lie u of traditiona l insurance , alternative cover age maintaine d through insuranc e pools or risk retention groups , mus t als o be approve d by City. 11. Any deductible in excess of $5,000.00, for any polic y tha t doe s not provide coverage on a first-dolla r basis , mus t be acceptable to and approve d by the City. 12. City , at it s sole discretion , reserves the righ t to revie w the insuranc e require ments and to make reasonable adjust ments to insuranc e coverage’s and their limit s whe n dee med necessary and prudent by the Cit y base d upon change s in statutory law , court decisio n or the claims histor y of the industry as well as of the contracting party to the City . The Cit y shall b e require d to provide prio r notic e of 90 days , and the insuranc e adjustments shall be incorporate d int o the Wor k by Change Order. 13. Cit y shall be entitled , upon writte n reques t and without expense , to receive copie s of policies and endorse ments thereto and may make any reasonable requests for deletio n or revisio n or modification s of particula r polic y terms, conditions , limitations , or exclusions necessary to conform the polic y and endorse ments to the require ments of the Contract. Deletions, revisions , or modification s shall not be require d where polic y provisions are establishe d by la w or regulations binding upon eithe r party or the underwrite r on any suc h policies. 14. Cit y shall not be responsible for the direct payment of insuranc e pre miu m costs for Contractor’s insurance. 5.04 Contractor’s Insurance A. Worker s Compensation and Employers’ Liability. Contractor shall purchas e and maintain such insuranc e coverage wit h limit s consistent wit h statutor y bene fit s outline d in the Texa s Workers’ Compensation Act (Texa s Labor Code , Ch. 406, as amended), and minimum limit s for Employers ’ Liabilit y as is appropriate for the Wor k bein g per formed and as will provide protection from claims set forth belo w whic h may aris e out of or result from Contractor’s performanc e of the Wor k and Contractor’s othe r obligations unde r the Contrac t Documents, whethe r it is to be perfor med by Contractor, any Subcontractor or Supplier, or by anyone directly o r indirectly employe d by any of the m to perfor m any of the Work, or by anyone for whos e acts any of the m may be liable: 1. claims unde r workers ’ compensation, disabilit y benefits , and othe r simila r employe e benefit acts; 2. claims for da mage s because of bodily injury , occupationa l sicknes s or disease, or death of Contractor’s employees. B. Commercia l General Liability . Coverage shall includ e but not be limite d to covering liability (bodily injur y or property da mage ) arisin g from: pre mises/operations , independent contractors, products/complete d operations , persona l injury , and liabilit y unde r an insure d contract. Insurance shall be provide d on an occurrenc e basis , and as comprehensive as the current Insuranc e Services Office (ISO) policy . This insuranc e shall apply a s primary insuranc e wit h respect to any other CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 19 of 63 insuranc e or self-insuranc e progra ms afforde d to the City . The Commercial General Liability policy , shall have no exclusions by endorse ments that would alte r of nullif y pre mises/operations, products/complete d operations , contractual, per sona l injury , or advertisin g injury , whic h are normally containe d wit h the policy , unles s the Cit y approve s suc h exclusions in writing. For construction projects tha t present a substa ntia l complete d operation exposure , the Cit y may require the contractor to maintain complete d operations coverage for a minimum of no les s than thre e (3) years followin g the completio n of the projec t (if identifie d in the Supple mentary Conditions). C. Automobile Liability . A commercial busines s auto polic y shall provide coverage on “any auto”, define d as autos owned, hire d and non-owne d and provide inde mnit y for claims for da mages because bodily injur y or death of any person and or property da mage arisin g out of the work, maintenanc e or us e of any motor vehicle by the Contractor , any Subcontractor or Supplier , or by anyone directly or indirectly employe d by any of the m to perform any of the Work, or by anyone for whos e acts any of the m may be liable. D. Railroa d Protectiv e Liability. If any of the wor k or any warranty wor k is within the limit s of railroa d right-of-way, the Contractor shall comply wit h the require ments identifie d in the Supple mentary Conditions. E. Notificatio n of Policy Cancellation: Contractor shall immediately notif y Cit y upon cancellation or othe r los s of insuranc e coverage . Contractor shall stop wor k until replacement insuranc e has bee n procured. Ther e shall be no time credit for days not worke d pursuant to this section. 5.05 Acceptance o f Bond s and Insurance; Option to Replace If Cit y ha s any objectio n to the coverage afforded by or othe r provisions of the bonds or insurance require d to be purchase d and maintaine d by the Contractor in accordance wit h Article 5 on the basis of non-conformanc e wit h the Contrac t Documents , the Cit y shall so notify the Contractor in writing within 10 Busines s Days after receipt of the certificates (or othe r evidenc e requested). Contractor shall provide to the Cit y suc h additiona l infor matio n in respect of insuranc e provide d as the Cit y may reasonably request. If Contractor doe s not purcha se or maintain all of the bonds and insurance require d by the Contrac t Documents , the Cit y shall notify the Contractor in writin g of suc h failure prio r to the start of the Work, or of suc h failur e to maintain prio r to any change in the required coverage. ARTICLE 6 – CONTRACTOR’S RESPONSIBILITIES 6.01 Supervision an d Superintendence A. Contractor shall supervise , inspect, and direc t the Wor k competently and efficiently , devoting suc h attention thereto and applying suc h skills and expertis e a s ma y be necessary to per for m the Wor k in accordance wit h the Contrac t Documents . Contractor shall be solely responsible for the means, methods , techniques , sequences, and procedure s of construction. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 20 of 63 B. At all times during the progres s of the Work, Contractor shall assign a competent, English - speaking, Superintendent who shall not be replaced without writte n notic e to City . The Superintendent will be Contractor’s representative at the Sit e and shall have authority to act on behalf of Contractor. All communicatio n give n to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the Cit y 24 hour s prio r to moving areas during the sequenc e of construction. 6.02 Labor; Workin g Hours A. Contractor shall provide competent, suitably qualifie d personne l to perfor m construction as require d by the Contrac t Documents . Contractor shall at all time s maintain good disciplin e and orde r at the Site. B. Except as otherwis e require d for the safety or protection of persons or the Work or property at the Sit e or adjacent thereto, and except as otherwise state d in the Contrac t Documents , all Work at the Sit e shall be perfor med during Regula r Working Hours . Contractor will not permit the perfor manc e of Wor k beyond Regula r Working Hours or for Weekend Working Hours without City’s writte n consent (whic h will not be unrea sonably withheld). Written reques t (by letter or electronic communication) to perfor m Work: 1. for beyond Regula r Working Hours reques t mus t be made by noon at least two (2) Business Days prior 2. for Weekend Working Hour s reques t mus t be made by noon of the preceding Thursday 3. for lega l holidays reques t mus t be made by noon two Busines s Days prio r to the legal holiday. 6.03 Services, Materials, and Equipment A. Unles s otherwis e specifie d in the Contrac t Documents , Contractor shall provide and assume full responsibilit y for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools , appliances, fuel, power, light , heat, telephone , water, sanitary facilities, te mporar y facilities , and all othe r facilitie s and incidentals necessary for the per formance, Contractor require d testing, start-up, and completio n of the Work. B. All materials and equipment incorporate d int o the Wor k shall be as specifie d or , if not specified, shall be of good qualit y and new , except as other wis e provide d in the Contrac t Documents . All special warranties and guarantee s require d by the Specifications shall expressly run to the benefit of City . If require d by City , Contractor shall furnis h satisfactory evidenc e (includin g reports of require d tests ) as to the source , kind, and qualit y of materials and equipment. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 21 of 63 C. All materials and equipment to be incorporate d into the Wor k shall be stored, applied , installed, connected, erected, protected, used, cleaned, and conditione d in accordance wit h instructions of the applicable Supplier , except as otherwis e ma y be provide d in the Contrac t Documents. D. All ite ms of standar d equipment to be incorporate d int o the Work shall be the latest mode l at the time of bid , unles s otherwis e specified. 6.04 Projec t Schedule A. Contractor shall adher e to the Projec t Schedule establishe d in accordance wit h Paragraph 2.07 and the General Require ments as it may be adjuste d from time to time as provide d below. 1. Contractor shall submit to Cit y for acceptance (to the extent indicate d in Paragraph 2.07 and the General Require ments ) propose d adjustment s in the Projec t Schedule tha t will not result in changing the Contrac t Time . Suc h adjustme nts will comply wit h any provisions of the General Require ments applicable thereto. 2. Contractor shall submit to Cit y a monthly Projec t Schedule wit h a monthly progres s payment for the duration of the Contrac t in accordance wit h the schedule specification 01 32 16. 3. Propose d adjustments in the Projec t Schedule tha t will change the Contrac t Time shall be submitted in accordance wit h the require ments of Article 12. Adjustments in Contrac t Time may only be made by a Change Order. 6.05 Substitutes and “Or -Equals” A. Wheneve r an ite m of material or equipment is specifie d or describe d in the Contrac t Documents by usin g the na me of a proprietar y ite m or the na me of a particula r Supplier, the specificatio n or descriptio n is intende d to establis h the type, function, appearance, and qualit y required. Unless the specification or descriptio n contains or is followe d by words reading tha t no like , equivalent, or “or -equal” ite m or no substitution is per mitted, othe r ite ms of material or equipment of other Supplier s may be submitte d to Cit y for revie w unde r the circumstances describe d below. 1. “Or -Equal” Items : If in City’s sole discretio n an ite m of material or equipment propose d by Contractor is functionally equa l to tha t na med and sufficiently simila r so tha t no change in related Work will be required, it may be conside red by Cit y as an “or -equal” ite m, in which case revie w and approva l of the propose d ite m may, in City’s sole discretion , be accomplishe d without complianc e wit h some or all of the require ments for approva l of propose d substitute ite ms. For the purpose s of this Paragraph 6.05.A.1, a propose d ite m of material or equipment will be considere d functionally equa l to an ite m so na med if: a. the Cit y determine s that: 1) it is at least equa l in materials of construction, quality , durability , appearance, strength, and desig n characteristics; CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 22 of 63 2) it will reliably per form a t least equally well the function and achieve the results impose d by the desig n concept of the complete d Projec t a s a functioning whole ; and 3) it ha s a prove n record of performanc e and availabilit y of responsive service; and b. Contractor certifie s that, if approve d and incorporate d int o the Work: 1) there will be no increase in cos t to the Cit y or increase in Contrac t Time; and 2) it will confor m substantially to the detailed require ments of the ite m na med in the Contrac t Documents. 2. Substitute Items: a. If in City’s sole discretio n an ite m of material or equipment propose d by Contractor does not qualif y as an “or -equal” ite m unde r Paragraph 6.05.A.1, it may be submitte d as a propose d substitute ite m. b. Contractor shall submit sufficien t in for matio n as provide d belo w to allo w Cit y to determin e if the ite m of material or equipment propose d is essentially equivalent to that na med and an acceptable substitute therefor. Requests for revie w of propose d substitute ite ms of material or equipment will not be accepted by Cit y from anyone othe r than Contractor. c. Contractor shall make writte n applicatio n to Cit y for revie w of a propose d substitute item of material or equipment tha t Contractor seeks to furnis h or use . The applicatio n shall comply wit h Section 01 25 00 and: 1) shall certify tha t the propose d substitute ite m will: a ) perfor m adequately the functions and achie ve the result s calle d for by the general design; b) be simila r in substanc e to tha t specified; c) be suite d to the same us e as tha t specified; and 2) will state: a) the extent , if any, to whic h the us e of the propose d substitute ite m will prejudice Contractor’s achievement of fina l completio n on time; b) whethe r us e of the propose d substitute ite m in the Wor k will require a change in any of the Contrac t Documents (or in the provisions of any othe r direc t contract wit h Cit y for othe r wor k on the Projec t) to adapt the desig n to the proposed substitute ite m; CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 23 of 63 c) whethe r incorporation or us e of the propose d substitute ite m in connection with the Wor k is subjec t to payment of any licens e fe e or royalty; and 3) will identify: a) all variation s of the propose d substitute ite m from tha t specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an ite mize d estimate of all cos ts or credits tha t will result directly or indirectly from us e of suc h substitute ite m, includin g costs of redesign and Damage Claims of othe r contractor s affected by any resultin g change. B. Substitute Constructio n Methods o r Procedures: If a specific means, method, technique, sequence , or procedur e of construction is expressly require d by the Contrac t Documents, Contractor may furnis h or utiliz e a substitut e means , method, technique , sequence , or procedure of constructio n approve d by City . Contractor shall submit sufficien t in formatio n to allo w City , in City’s sole discretion , to determin e tha t the substitute propose d is equivalent to tha t expressly called for by the Contrac t Documents . Contractor shall make written applicatio n to Cit y for revie w in the same manne r as thos e provide d in Paragraph 6.05.A.2. C. City’s Evaluation : Cit y will be allowe d a reasonable time within whic h to evaluate each proposa l or submittal made pursuant to Paragraphs 6.05.A and 6.05.B . Cit y ma y require Contractor to furnis h additiona l data about the propose d substitute . Cit y will be the sole judge of acceptability. No “or -equal” or substitute will be ordered, installe d or utilize d until City’s review is complete , whic h will be evidence d by a Change Orde r in the case of a substitute and an accepted Submitta l for an “or -equal.” Cit y will advis e Contractor in writin g of it s determination. D. Special Guarantee: Cit y ma y require Contractor to furnis h at Contractor’s expens e a special per for manc e guarantee , warranty, or othe r surety wit h respect to any substitute . Contractor shall indemnify and hold harmless City and anyone directly o r indirectly employed b y them from and against any and all claims, damages, losse s and expenses (including attorney s fees ) arisin g out of th e use o f substituted materials or equipment. E. City’s Cost Reimbursement: Cit y will record City’s cost s in evaluating a substitute propose d or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.B . Whethe r or not City approve s a substitute so propose d or submitte d by Contractor , Contractor may be require d to reimburs e Cit y for evaluating each suc h propose d substitute . Contractor may als o be require d to reimburs e Cit y for the charge s for makin g change s in the Contrac t Documents (or in the provision s of any othe r direc t contrac t wit h City ) resultin g from the acceptance of each proposed substitute. F. Contractor’s Expense : Contractor shall provide all data in suppor t of any propose d substitute or “or -equal” at Contractor’s expense. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporate d to the Contrac t by Change Order. H. Time Extensions: No additiona l time will be grante d for substitutions. 6.06 Concerning Subcontractors, Suppliers , an d Others A. Contractor shall perfor m wit h his ow n organization , wor k of a valu e not les s tha n 35% of the valu e e mbraced on the Contract, unles s otherwis e approve d by the City. B. Contractor shall not emplo y any Subcontractor, Supplier , or othe r individua l or entity, whether initiall y or as a replacement, agains t whom Cit y may have reasonable objection. Contractor shall not be require d to emplo y any Subcontractor , Supplier, or othe r individua l or entit y to furnis h or perfor m any of the Wor k aga ins t whom Contractor ha s reasonable objectio n (excluding those acceptable to Cit y as indicate d in Paragraph 6.06.C). C. The Cit y may from time to time requir e the us e of certain Subcontractors , Suppliers , or other individuals or entitie s on the project, and will provide suc h require ments in the Supple mentary Conditions. D. Minority Busines s Enterprise Compliance: It is Cit y polic y to ensur e the full an d equitable participatio n by Minorit y Busines s Enterprise s (MBE) in the procure ment of goods and services on a contractua l basis . If the Contrac t Documents provide for a MBE goal, Contractor is require d to comply wit h the inten t of the City’s MBE Ordinance (a s amended) by the following: 1. Contractor shall, upon reques t by City , provide complet e and accurate infor matio n regarding actual work performed by a MBE on the Contrac t and payment therefor. 2. Contractor will not make additions , deletion s, or substitutions of accepted MBE without written consent of the City . Any unjustifie d change or deletio n shall be a material breach of Contrac t and may result in debarment in accordanc e wit h the procedure s outline d in the Ordinance. 3. Contractor shall, upon reques t by City , allo w an audit and/or exa minatio n of any books, records , or file s in the possession of the Contractor tha t will substantiate the actual work perfor med by an MBE. Material misrepresentation of any nature will be grounds for terminatio n of the Contrac t in accordanc e wit h Paragraph 15.02.A . Any such misrepresentation ma y be ground s for disqualificatio n of Contractor to bid on future contracts wit h the Cit y for a perio d of not les s tha n thre e years. E. Contractor shall be fully responsible to Cit y for all acts and omission s of the Subcontractors, Suppliers , and othe r individuals or entitie s per formin g or furnishing any of the Wor k jus t as Contractor is responsible for Contractor’s own acts and omissions . Nothing in the Contract Documents: CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 25 of 63 1. shall create for the bene fit of any suc h Subcontractor, Supplier, or othe r individua l or entity any contractua l relationship between Cit y and any suc h Subcontractor , Supplie r or other individua l or entity; nor 2. shall create any obligatio n on the part of Cit y to pa y or to see to the payment of any moneys due any suc h Subcontractor , Supplier , or othe r individua l or entit y except as may otherwise be require d by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Wor k of Subcontractors , Suppliers , and othe r individuals or entitie s per for min g or furnishing any of the Work unde r a direc t or indirec t contrac t wit h Contractor. G. All Subcontractors , Suppliers , and suc h othe r individuals or entitie s per formin g or furnishing any of the Wor k shall communicat e wit h Cit y through Contractor. H. All Work per formed for Contractor by a Subcontractor or Supplie r will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplie r whic h specifically binds the Subcontractor or Supplie r to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wag e Rates A. Duty to pay Prevailin g Wag e Rates. The Contractor shall comply wit h all require ments of Chapte r 2258, Texa s Government Code (as a mended), includin g the payment of not les s tha n the rate s determine d by the Cit y Council of the Cit y of Fort Worth to be the prevailin g wage rates in accordance wit h Chapte r 2258. Suc h prevailin g wage rate s are include d in thes e Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who doe s not pa y the prevailin g wage shall, upon de mand made by the City , pa y to the Cit y $60 for each worke r employe d for each calendar da y or par t of the da y tha t the worke r is paid les s tha n the prevailin g wage rates stipulate d in thes e contrac t documents . This penalt y shall be retained by the Cit y to offset its ad ministrativ e costs , pursuant to Texa s Government Code 2258.023. C. Complaints o f Violation s and City Determinatio n o f Goo d Cause. On receipt of infor mation, includin g a complain t by a worker, conce rnin g a n allege d violatio n of 2258.023, Texas Government Code , by a Contractor or Subcontractor , the Cit y shall make an initial determination , before the 31s t da y after the date the Cit y receives the information , a s to whether good cause exist s to believ e tha t the violatio n occurred. The Cit y shall notif y in writin g the Contractor or Subcontractor and any affected worker of it s initia l determination . Upon the City’s determinatio n tha t ther e is good cause to believ e the Contractor or Subcontractor ha s violated Chapte r 2258, the Cit y shall retain the full amounts claimed by the claimant or claimants as the difference between wage s paid and wage s due unde r the prevailin g wage rates, suc h amounts bein g subtracte d from successive progres s payments pending a fina l determinatio n of the violation. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 26 of 63 D. Arbitratio n Required if Violation Not Resolved. An issue relatin g to an allege d violatio n of Section 2258.023, Texa s Government Code , includin g a penalty owe d to the Cit y or an affected worker, shall be submitte d to binding arbitratio n in accordance wit h the Texa s General Arbitration Act (Article 224 et se q., Revise d Statutes) if the Contractor or Subcontractor and any affected worke r doe s not resolv e the issue by a greement befor e the 15th da y afte r the date the Cit y make s it s initia l determinatio n pursuant to Paragraph C above . If the persons require d to arbitrate unde r this section do not agre e on an arbitrator before the 11th da y after the date that arbitration is required , a distric t court shall appoint an arbitrator on the petitio n of any of the persons . The Cit y is not a party in the arbitr ation . The decisio n and award of the arbitrator is fina l and binding on all partie s and may be enforce d in any court of competent jurisdiction. E. Records to b e Maintained . The Contractor and each Subcontractor shall, for a perio d of thre e (3) years followin g the date of acceptance of the work, maintain records tha t show (i) the na me and occupation of each worke r employe d by the Contrac tor in the construction of the Wor k provided for in this Contract; and (ii) the actual pe r die m wage s paid to each worker . The records shall be ope n at all reasonable hours for inspectio n by the City . The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspectio n. F. Progress Payments. Wit h each progres s payment or payroll period, whicheve r is less , the Contractor shall submit an affidavit stating tha t the Contractor ha s complie d wit h the require ments of Chapte r 2258, Texa s Government Code. G. Postin g o f Wag e Rates. The Contractor shall pos t prevailin g wage rates in a conspicuous plac e at all times. H. Subcontractor Compliance. The Contractor shall includ e in it s subcontracts and/or shall otherwis e requir e all of it s Subcontractor s to comply wit h Paragraphs A through G above. 6.08 Paten t Fees and Royalties A. Contractor shall pa y all licens e fees and royaltie s and assume all costs inciden t to the us e in the perfor manc e of the Work or the incorporation in the Wor k of any invention, design, process, product, or devic e whic h is the subjec t of patent rights or copyrights held by others . If a particula r invention, design, process , product, or devic e is specifie d in the Contrac t Documents for us e in the perfor manc e of the Work and if , to the actual knowledge of City , it s us e is subject to patent right s or copyrights callin g for the payment of any licens e fe e or royalty to others , the existenc e of suc h rights shall be disclose d by Cit y in the Contrac t Documents . Failur e of the City t o disclos e suc h infor matio n doe s not reliev e the Contractor from it s obligations to pa y for the us e of said fees or royaltie s to others. B. To th e fullest extent permitte d b y Laws and Regulations, Contractor shall indemnify and hold harmless City , from and against all claims, costs, losses, and damages (including but not limited to all fees and charges o f engineers, architects, attorneys, and other professionals and all court o r arbitratio n or other dispute resolutio n costs ) arising out o f o r relatin g to any infringement of patent rights o r copyrights incident to th e use in th e performance of th e Wor k o r resultin g from CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 27 of 63 th e incorporation in th e Wor k o f any invention , design, process, product, or device not specified in th e Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permit s and licenses. Contractor shall obtain and pa y for all construction permit s and license s except thos e provide d for in the Supple mentary Conditions or Contract Documents . Cit y shall assist Contractor , whe n necessary, in obtaining suc h per mit s and licenses. Contractor shall pa y all governmenta l charge s and inspectio n fees necessary for the prosecution of the Wor k whic h are applicable at the time of opening of Bids , or , if ther e are no Bids , on the Effective Date of the Agree ment, except for permit s provide d by the Cit y as specifie d in 6.09.B. Cit y shall pa y all charge s of utilit y owners for connections for providing permanent servic e to the Work. B. City obtained permit s and licenses. Cit y will obtain and pa y for all per mit s and license s as provide d for in the Supple mentary Conditions or Contrac t Documents . It will be the Contractor’s responsibilit y to carry out the provisions of the permit . If the Contractor initiate s change s to the Contrac t and the Cit y approve s the changes , the Contractor is responsible for obtaining clearances and coordinating wit h the appropriate regulatory agency. The Cit y will not reimburse the Contractor for any cos t associated wit h these require ments of any Cit y acquire d per mit . The followin g are per mit s the Cit y will obtain if required: 1. Texa s Department of Transportation Permits 2. U.S. Army Corps of Engineer s Permits 3. Texa s Commissio n on Environmenta l Qualit y Permits 4. Railroa d Company Permits C. Outstanding permit s and licenses. The Cit y anticipates acquisitio n of and/or access to permits and licenses. Any outstanding permit s and license s are anticipated to be acquire d in accordance wit h the schedule set forth in the Supple mentary Conditions . The Projec t Schedule submitte d by the Contractor in accordance wit h the Contr ac t Documents mus t conside r any outstanding per mit s and licenses. 6.10 Laws and Regulations A. Contractor shall giv e all notice s require d by and shall comply wit h all Laws and Regulations applicable to the performanc e of the Work. Except wher e otherwis e expressly require d by applicable Laws and Regulations , the Cit y shall not be responsible for monitoring Contractor’s complianc e wit h any Laws or Regulations. B. If Contractor perfor ms any Wor k knowing or having reason to know tha t it is contrary to Laws or Regulations , Contractor shall bea r all claims, costs , losses, and da mage s (includin g but not limite d to all fees and charge s of engineers , architects, attorneys , and othe r professionals and all CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 28 of 63 court or arbitratio n or othe r dispute resolutio n c osts) arisin g out of or relatin g to suc h Work. However, it shall not be Contractor’s responsibilit y to make certain tha t the Specifications and Drawings are in accordance wit h Laws and Regulations , but this shall not reliev e Contractor of Contractor’s obligations unde r Paragraph 3.02. C. Change s in Laws or Regulations not know n at the time of opening of Bid s having an effect on the cos t or time of perfor manc e of the Wor k ma y be the subjec t of an adjustment in Contract Price or Contrac t Time. 6.11 Taxes A. On a contrac t awarded by the City , an organization whic h qualifie s for exe mptio n pursuant to Texa s Tax Code , Subchapte r H, Sections 151.301-335 (as amended), the Contractor may purchase , rent or lease all materials, supplie s and equipment use d or consumed in the performanc e of this contrac t by issuin g to his supplie r an exe mptio n certificate in lie u of the tax, said exe mptio n certificate to comply wit h State Comptroller’s Rulin g .007. Any suc h exe mption certificate issued to the Contractor in lie u of the ta x shall be subjec t to and shall comply wit h the provision of State Comptroller’s Rulin g .011, and any othe r applicable ruling s pertainin g to the Texa s Tax Code , Subchapte r H. B. Texa s Ta x permit s and infor matio n may be obtaine d from: 1. Comptrolle r of Public Accounts Sale s Ta x Division Capito l Station Austin, TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use o f Site and Other Areas A. Limitatio n on Use o f Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of worker s to the Sit e and othe r areas permitte d by Laws and Regulations , and shall not unreasonably encumbe r the Sit e and othe r areas wit h construction equipment or othe r materials or equipment. Contractor shall assume full responsibilit y for any da mage to any suc h lan d or area, or to the owne r or occupant thereof, or of any adjacent lan d or areas resulting from the performanc e of the Work. 2. At any time when, in the judgment of the City , the Contractor ha s obstructe d or close d or is carrying on operations in a portion of a street, right-of-way, or easement greater tha n is necessary for prope r execution of the Work, the Cit y ma y requir e the Contractor to finis h the section on whic h operations are in progres s before work is commenced on any additional area of the Site. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 29 of 63 3. Should any Damage Claim be made by any suc h owne r or occupant because of the perfor manc e of the Work, Contractor shall promptly atte mpt to resolv e the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City , from and against all claims , costs , losses, an d damages arisin g out of or relating to any clai m or action , lega l or equitable, brought by any such owner o r occupant against City. B. Removal of Debris During Performance o f th e Work : Durin g the progres s of the Work Contractor shall kee p the Sit e and othe r areas free from accumulation s of waste materials, rubbish , and othe r debris . Remova l and disposa l of suc h waste materials, rubbish, and other debris shall confor m to applicable Laws and Regulations. C. Site Maintenance Cleaning : 24 hours afte r written notic e is give n to the Contractor tha t the clean-up on the jo b sit e is proceeding in a manne r unsatisfactor y to the City , if the Contractor fails to correct the unsatisfactory procedure , the Cit y may take suc h direc t action a s the City dee ms appropriate to correct the clean-up de ficiencie s cite d to the Contractor in the written notic e (by letter or electronic communication), and the costs of suc h direc t action, plu s 25 % of suc h costs , shall be deducte d from the monie s due or to become due to the Contractor. D. Fina l Site Cleaning: Prio r to Fina l Acceptance of the Wor k Contractor shall clean the Sit e and the Wor k and make it ready for utilizatio n by Cit y or adjacent property owner. At the completion of the Wor k Contractor shall remove from the Sit e all tools , appliances, construction equipment and machinery, and surplus materials and shall restore to origina l condition or bette r all property disturbe d by the Work. E. Loading Structures: Contractor shall not loa d nor permit any part of any structure to be loaded in any manne r tha t will endange r the structure , nor shall Contractor subjec t any part of the Work or adjacent property to stresses or pressure s tha t will endange r it. 6.13 Record Documents A. Contractor shall maintain in a safe plac e a t the Sit e or in a plac e designate d by the Contractor and approve d by the City , one (1) record copy of all Drawings , Specifications, Addenda , Change Orders, Field Orders, and written interpretations and clarification s in good orde r and annotate d to show change s made during construction. Thes e record documents togethe r wit h all approved Sa mple s and a counterpart of all accepted Submittals will be available to Cit y for reference. Upon completio n of the Work, thes e record documents , any operation and maintenanc e manuals, and Submittals will be delivere d to Cit y prio r to Fina l Inspection. Contractor shall include accurate location s for burie d and imbedde d ite ms. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating , maintainin g and supervising all safety precautions and progra ms in connection wit h the Work. Suc h responsibilit y doe s not relieve Subcontractors of their responsibilit y for the safety of persons or property in the performanc e of their work, nor for complianc e wit h applicable safety Laws and Regulations . Contractor shall CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent da mage , injur y or los s to: 1. all persons on the Sit e or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporate d therein, whethe r in storage on or off the Site ; and 3. othe r property at the Sit e or adjacent thereto, includin g trees, shrubs , lawns , walks, pave ments , roadways , structures , utilities , and Underground Facilitie s not designate d for removal, relocation, or replacement in the cours e of construction. B. Contractor shall comply wit h all applicable Law s and Regulations relatin g to the safety of persons or property, or to the protection of persons or property from da mage , injury , or loss ; and shall erect and maintain all necessary safeguards for suc h safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilitie s and othe r utilit y owners when prosecution of the Work may affect the m, and shall cooperate wit h the m in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply wit h the applicable require ments of City’s safety progra ms, if any. D. Contractor shall inform Cit y of the specific requirements of Contractor’s safety progra m, if any, wit h whic h City’s e mployee s and representatives mus t comply while at the Site. E. All da mage , injury , or los s to any propert y referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly , in whole or in part, by Contractor, any Subcontractor , Supplier , or any othe r individua l or entit y directly or indirectly employe d by any of the m to per for m any of the Work , or anyone for whos e acts any of the m may be liable , shall be remedie d by Contractor. F. Contractor’s dutie s and responsibilitie s for safety and for protection of the Wor k shall continue until suc h time as all the Work is complete d and Cit y ha s accepted the Work. 6.15 Safety Representative Contractor shall inform Cit y in writin g of Contrac tor’s designate d safety representative at the Site. 6.16 Hazard Communicatio n Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communicatio n informatio n require d to be made available to or exchange d between or among employer s in accordance wit h Laws or Regulations. 6.17 Emergencies and/or Rectification A. In e mergencies affecting the safety or protection of persons or the Wor k or property at the Sit e or adjacent thereto, Contractor is obligate d to act to prevent threatened da mage , injury , or loss. Contractor shall giv e Cit y prompt written notice if Contractor believe s tha t any significant CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 31 of 63 change s in the Wor k or variation s from the Contrac t Documents have bee n caused thereby or are require d a s a result thereof. If Cit y determine s tha t a change in the Contrac t Documents is require d because of the action take n by Contractor in respons e to suc h an emergency, a Change Orde r may be issued. B. Should the Contractor fail to respond to a reques t from the Cit y to rectify any discrepancies, omissions , or correction necessary to conform wit h the require ments of the Contrac t Documents, the Cit y shall giv e the Contractor writte n notic e that suc h work or change s are to be per formed. The writte n notic e shall direc t attention to the discrepant condition and reques t the Contractor to take remedia l action to correc t the condition. In the event the Contractor doe s not take positive steps to fulfill this writte n request, or doe s not show jus t cause for not takin g the prope r action, within 24 hours , the Cit y may take suc h remedia l action wit h Cit y forces or by contract. The City shall deduc t an amount equa l to the entir e costs for suc h remedia l action, plu s 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit require d Submittals to Cit y for revie w and acceptance in accordance wit h the accepted Schedule of Submittals (a s require d by Paragraph 2.07). Each submitta l will be identifie d as Cit y may require. 1. Submit numbe r of copie s specifie d in the General Require ments. 2. Data show n on the Submittals will be complet e wit h respect to quantities , dimensions, specifie d performanc e and desig n criteria , materials, and simila r data to show Cit y the services, materials, and equipment Contractor propose s to provide and to enable Cit y to revie w the informatio n for the limite d purpose s require d by Paragraph 6.18.C. 3. Submittals submitted as herein provide d by Contractor and reviewed by Cit y for conformanc e wit h the desig n concept shall be executed in confor mit y wit h the Contract Documents unles s otherwis e require d by City. 4. Whe n Submittals are submitte d for the purpos e of showing the installatio n in greater detail, their revie w shall not excus e Contractor from require ments show n on the Drawings and Specifications. 5. For-Infor mation -Only submittals upon whic h the Cit y is not expected to conduc t revie w or take responsive action ma y be so identifie d in the Contrac t Documents. 6. Submit require d numbe r of Sa mple s specifie d in the Specifications. 7. Clearly identif y each Sa mple as to material, Supplier , pertinent data suc h as catalog numbers, the us e for whic h intende d and othe r data as Cit y may requir e to enable Cit y to revie w the submitta l for the limite d purpose s require d by Paragraph 6.18.C. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 32 of 63 B. Wher e a Submitta l is require d by the Contrac t Documents or the Schedule of Submittals , any related Wor k perfor me d prio r to City’s revie w and acceptance of the pertinent submitta l will be at the sole expens e and responsibilit y of Contractor. C. City’s Review: 1. Cit y will provide timely revie w of require d Submittals in accordance wit h the Schedule of Submittals acceptable to City . City’s revie w and acceptance will be only to determin e if the ite ms covere d by the submittals will, after inst allatio n or incorporation in the Work, conform to the in for matio n give n in the Contrac t Documents and be compatible wit h the design concept of the complete d Projec t as a functionin g whole as indicate d by the Contract Documents. 2. City’s revie w and acceptance will not extend to means, methods , techniques , sequences, or procedure s of construction (except wher e a particula r means, method, technique , sequence, or procedure of construction is specifically and expressly calle d for by the Contract Documents ) or to safety precautions or progra ms inciden t thereto. The revie w and acceptance of a separate ite m as suc h will not indicat e approva l of the assembly in whic h the item functions. 3. City’s revie w and acceptance shall not relieve Contractor from responsibilit y for any variatio n from the require ments of the Contrac t Documents unles s Contractor ha s complied wit h the require ments of Section 01 33 00 and Cit y ha s give n writte n acceptance of each suc h variatio n by specific writte n notation thereof incorporate d in or accompanying the Submittal. City’s revie w and acceptance shall not reliev e Contractor from responsibilit y for complyin g wit h the require ments of the Contrac t Documents. 6.19 Continuing th e Work Except as otherwis e provided, Contractor shall carry on the Wor k and adhere to the Projec t Schedule during all dispute s or disagree ments wit h City. No Wor k shall be delaye d or postpone d pending resolutio n of any dispute s or disagree ments , except a s Cit y and Contractor ma y otherwis e agre e in writing. 6.20 Contractor’s General Warranty and Guarantee A. Contractor warrants and guarantee s to Cit y tha t all Wor k will be in accordance wit h the Contract Documents and will not be de fective. Cit y and it s officers, directors , me mbers , partners, employees , agents , consultants , and subcontractors shall be entitle d to rely on representation of Contractor’s warranty and guarantee. B. Contractor’s warranty and guarante e hereunde r exclude s defects or da mage caused by: 1. abuse , modification , or imprope r maintenanc e or operation by persons othe r tha n Contractor, Subcontractors , Suppliers , or any othe r individua l or entit y for whom Contractor is responsible ; or CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 33 of 63 2. nor mal wear and tea r unde r nor ma l usage. C. Contractor’s obligatio n to perfor m and complet e the Work in accordanc e wit h the Contract Documents shall be absolute . None of the followin g will constitute an acceptance of Work tha t is not in accordance wit h the Contrac t Documents or a release of Contractor’s obligatio n to perform the Work in accordance wit h the Contrac t Documents: 1. observations by City; 2. recommendation or payment by Cit y of any progres s or fina l payment; 3. the issuanc e of a certificate of Fina l Acceptance by Cit y or any payment related thereto by City; 4. us e or occupanc y of the Wor k or any part thereof by City; 5. any revie w and acceptance of a Submitta l by City; 6. any inspection, test, or approva l by others ; or 7. any correction of defective Wor k by City. D. The Contractor shall remedy any defects or da mage s in the Work and pa y for any da mage to othe r work or property resultin g therefrom whic h shall appea r within a perio d of two (2) years from the date of Fina l Acceptance of the Wor k unles s a longe r perio d is specifie d and shall furnis h a good and sufficien t maintenanc e bond, complyin g wit h the require ments of Article 5.02.B. The Cit y will giv e notic e of observed defects wit h reasonable promptness. 6.21 Indemnification A. Contracto r covenants and agree s to indemnify, hold harmles s and defend, at its o wn expense , the City, its officers , servants and employees , fro m and agains t any and all claims arising out of, o r allege d to aris e out of, the work and service s to be performe d by the Contractor, its officers , agents , employees , subcontractors, licenses or invitee s unde r this Contract . THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provisio n is intende d to include , without limitation, indemnit y fo r costs, expense s and legal fee s incurre d by the City in defending agains t suc h claims and cause s o f actions. B. Contracto r covenants and agree s to indemnify and hold harmless , at its o wn expense, the City, its officers , servant s and employees , fro m and agains t any and all loss , damag e or destruction of propert y o f the City, arising out of, o r allege d to aris e out of, the work and service s to be performe d by the Contractor, its officers , agents , employees , subcontractors, licensee s or invitee s unde r this Contract . THIS INDEMNIFICATION PROVISION IS CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegatio n of Professional Design Services A. Contractor will not be require d to provide professiona l desig n services unles s suc h services are specifically require d by the Contrac t Documents for a portion of the Work or unles s such service s are require d to carry out Contractor’s responsibilitie s for construction means, methods, techniques , sequence s and procedures. B. If professiona l desig n services or certifications by a desig n professiona l related to systems, materials or equipment are specifically require d of Contractor by the Contrac t Documents , City will specify all per formanc e and desig n criteria tha t suc h services mus t satis fy. Contractor shall cause suc h services or certifications to be provide d by a properly license d professional, whose signatur e and seal shall appea r on all drawings , calculations, specifications, certifications, and Submittals prepare d by suc h professional. Submittals related to the Wor k designe d or certifie d by suc h professional, if prepare d by others , shall bea r suc h professional’s writte n approva l when submitte d to City. C. Cit y shall be entitle d to rely upon the adequa cy, accuracy and completeness of the services, certifications or approvals perfor med by suc h desig n professionals , provide d Cit y ha s specified to Contractor perfor manc e and desig n criteria tha t suc h services mus t satisfy. D. Pursuant to this Paragraph 6.22, City’s revie w and acceptance of desig n calculations and design drawings will be only for the limite d purpos e of checking for confor manc e wit h perfor manc e and desig n criteria give n and the desig n concept expresse d in the Contrac t Documents . City’s review and acceptance of Submittals (except desig n calculation s and desig n drawings ) will be only for the purpos e state d in Paragraph 6.18.C. 6.23 Righ t to Audit A. The Contractor agrees tha t the Cit y shall, until the expiratio n of thre e (3) years after final payment unde r this Contract, have access to and the righ t to exa min e and photocopy any directly pertinent books , documents , papers , and records of the Contractor involving transactions relating to this Contract. Contractor agrees tha t the Cit y shall have access during Regula r Working Hours to all necessary Contractor facilitie s and shall be provide d adequate and appropriate wor k space in orde r to conduc t audits in complianc e wit h the provisions of this Paragraph. The Cit y shall giv e Contractor reasonable advanc e notic e of intende d audits. B. Contractor furthe r agrees to includ e in all it s subcontracts hereunde r a provision to the effect that the subcontractor agrees tha t the Cit y shall, until the expiratio n of thre e (3) years after final payment unde r this Contract, have access to and the righ t to exa min e and photocopy any directly pertinent books , documents , papers , and records of suc h Subcontractor, involving transactions to the subcontract, and further , tha t Cit y shall have access during Regula r Working Hours to all CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 35 of 63 Subcontractor facilities , and shall be provide d adequate and appropriate work spac e in orde r to conduc t audit s in complianc e wit h the provisions of this Paragraph. The Cit y shall give Subcontractor reasonable advanc e notic e of intende d audits. C. Contractor and Subcontractor agre e to photocopy suc h document s as may be requeste d by the City. The Cit y agrees to reimburs e Contractor for the cos t of the copie s as follow s at the rate publishe d in the Texa s Administrativ e Code in effec t as of the time copying is performed. 6.24 Nondiscrimination A. The Cit y is responsible for operating Public Transportation Progra ms and imple mentin g transit - related projects , whic h are funde d in par t wit h Federal financia l assistance awarded by the U.S. Department of Transportation and the Federal Transit Administratio n (FTA), without discriminatin g agains t any person in the Unite d States on the basis of race, color , or national origin. B. Title VI, Civil Rights Ac t of 1964 as amended: Contractor shall comply wit h the require ments of the Act and the Regulations as furthe r define d in the Supple mentary Conditions for any project receiving Federal assistance. ARTICLE 7 – OTHER WOR K AT THE SITE 7.01 Related Wor k at Site A. Cit y ma y perfor m othe r wor k related to the Projec t at the Sit e wit h City’s e mployees , or other Cit y contractors , or through othe r direc t contracts therefor , or have othe r work perfor me d by utilit y owners . If suc h othe r wor k is not note d in the Contrac t Documents , the n writte n notice thereof will be give n to Contractor prio r to starting any suc h othe r work; and B. Contractor shall afford each othe r contractor who is a party to suc h a direc t contract, each utility owner , and City , if Cit y is perfor min g othe r wor k wit h City’s e mployee s or othe r City contractors , prope r and safe access to the Site , provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of suc h othe r work, and properly coordinate the Work wit h theirs . Contractor shall do all cutting, fitting , and patching of the Work tha t may be require d to properly connec t or otherwis e make it s several parts come togethe r and properly integrate wit h suc h othe r work. Contractor shall not endange r any wor k of others by cutting , excavating, or otherwis e alterin g suc h work; provided, however, that Contractor may cut or alte r others ' wor k wit h the writte n consent of Cit y and the other s whose wor k will be affected. C. If the prope r execution or result s of any par t of Contractor’s Wor k depends upon wor k perfor med by other s unde r this Article 7, Contractor shall inspec t suc h othe r wor k and promptly repor t to Cit y in writin g any delays , defects, or deficiencies in suc h othe r work tha t rende r it unavailable or unsuitable for the prope r execution and result s of Contractor’s Work. Contractor’s failur e to so repor t will constitute an acceptance of suc h othe r wor k as fit and prope r for integratio n with Contractor’s Wor k except for latent defects in the wor k provide d by others. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 36 of 63 7.02 Coordination A. If Cit y intends to contrac t wit h other s for the perfor manc e of othe r work on the Projec t at the Site , the followin g will be set forth in Supple mentary Conditions: 1. the individua l or entit y who will have authorit y and responsibilit y for coordination of the activitie s among the various contractor s will be identified; 2. the specific matters to be covere d by suc h authority and responsibilit y will be ite mized ; and 3. the extent of suc h authority and responsibilitie s will be provided. B. Unles s otherwis e provide d in the Supple mentary Conditions , Cit y shall have authority for such coordination. ARTICLE 8 – CITY’S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwis e provide d in the Supple mentary Conditions , Cit y shall issue all communications to Contractor. 8.02 Furnish Data Cit y shall timely furnis h the dat a require d unde r the Contrac t Documents. 8.03 Pa y Whe n Due Cit y shall make payments to Contractor in accordance wit h Article 14. 8.04 Lands and Easements; Report s an d Tests City’s dutie s wit h respect to providing land s and easements and providing engineering surveys to establis h reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City’s identifyin g and makin g available to Contractor copie s of reports of explorations and tests of subsurface conditions and drawings of physica l conditions relatin g to existin g surface or subsurface structure s at or contiguous to the Sit e tha t have bee n utilize d by Cit y in preparing the Contract Documents. 8.05 Change Orders Cit y shall execute Change Orders in accordance wit h Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City’s responsibilit y wit h respect to certain inspections , tests, and approvals is set forth in Paragraph 13.03. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 37 of 63 8.07 Limitation s o n City’s Responsibilities A. The Cit y shall not supervise , direct, or have control or authority over , nor be responsible for, Contractor’s means, methods , techniques , sequence s, or procedure s of construction, or the safety precautions and progra ms inciden t thereto, or for any failur e of Contractor to comply wit h Laws and Regulations applicable to the perfor manc e of the Work. Cit y will not be responsible for Contractor’s failur e to perfor m the Wor k in accordance wit h the Contrac t Documents. B. Cit y will notif y the Contractor of applica ble safety plan s pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City’s responsibilit y wit h respect to an undisclos ed Hazardous Environmenta l Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While a t the Site , City’s e mployee s and representative s shall comply wit h the specific applicable require ments of Contractor’s safety progra ms of whic h Cit y ha s bee n in for med pursuant to Paragraph 6.14. ARTICLE 9 – CITY’S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City’s Projec t Manager Cit y will provide one or more Projec t Manager(s) during the construction period. The duties and responsibilitie s and the limitation s of authority of City’s Project Manager during construction are set forth in the Contrac t Documents . The City’s Project Manager for this Contract is identified in the Supplementary Conditions . 9.02 Visits to Site A. City’s Projec t Manager will make visit s to the Sit e at intervals appropriate to the various stages of construction as Cit y dee ms necessary in orde r to observe the progres s tha t ha s been made and the qualit y of the various aspects of Contractor’s executed Work. Based on informatio n obtaine d during suc h visit s and observations , City’s Projec t Manager will deter mine , in general, if the Wor k is procee din g in accordance wit h the Contrac t Documents. City’s Projec t Manager will not be require d to make exhaustive or continuous inspections on the Sit e to check the qualit y or quantit y of the Work. City’s Projec t Manager’s efforts will be directed towar d providing Cit y a greater degre e of confidenc e tha t the complete d Work will confor m generally to the Contrac t Documents. B. City’s Projec t Manager’s visit s and observations are subjec t to all the limitation s on authority and responsibilit y in the Contrac t Documents includin g thos e set forth in Paragraph 8.07. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 38 of 63 9.03 Authorized Variation s in Work City’s Projec t Manager may authorize mino r variation s in the Wor k from the require ments of the Contrac t Documents whic h do not involve an adjustment in the Contrac t Pric e or the Contract Time and are compatible wit h the desig n concept of the complete d Projec t as a functioning whole as indicate d by the Contrac t Documents . Thes e may be accomplishe d by a Field Orde r and will be binding on Cit y and als o on Contractor , who shall perfor m the Wor k involve d promptly. 9.04 Rejectin g Defective Work Cit y will have authority to reject Wor k whic h Cit y’s Projec t Manager believe s to be de fective, or will not produc e a complete d Projec t tha t confor ms to the Contrac t Documents or tha t will prejudic e the integrit y of the desig n concept of the complete d Projec t as a functioning whole as indicated by the Contrac t Documents . Cit y will have authority to conduc t special inspectio n or testing of the Work as provide d in Article 13, whethe r or not the Wor k is fabricated, installed , or completed. 9.05 Determination s fo r Wor k Performed Contractor will determin e the actual quantitie s and classification s of Wor k per for med. City’s Project Manager will revie w wit h Contractor the preliminar y determination s on suc h matters be fore rendering a writte n recommendation. City’s writte n decisio n will be fina l (except as modifie d to reflect change d factual conditions or mor e accurate data). 9.06 Decision s on Requirements o f Contrac t Documents and Acceptability of Work A. Cit y will be the initia l interpret er of the require ment s of the Contract Documents and judge of the acceptability of the Wor k thereunder. B. Cit y will rende r a writte n decisio n on any issue referred. C. City’s writte n decisio n on the issue referred will be fina l and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 – CHANGES IN THE WORK ; CLAIMS; EXTRA WORK 10.01 Authorize d Changes in th e Work A. Without invalidatin g the Contrac t and without notic e to any surety, Cit y may, at any time or from time to time, orde r Extra Work. Upon notic e of suc h Extra Work, Contractor shall promptly procee d wit h the Work involve d whic h will be performed unde r the applicable conditions of the Contrac t Documents (except as otherwis e specifically provided). Extra Work shall be memorialize d by a Change Orde r whic h ma y or ma y not precede an orde r of Extra work. B. For mino r change s of Work not requirin g change s to Contrac t Time or Contrac t Price , a Field Orde r may be issued by the City. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 39 of 63 10.02 Unauthorized Change s in th e Work Contractor shall not be entitle d to an increase in the Contrac t Pric e or an extension of the Contract Time wit h respect to any wor k perfor med tha t is not require d by the Contrac t Documents as amended, modified , or supple mente d as provide d in Paragraph 3.04, except in the case of an e mergenc y as provide d in Paragraph 6.17. 10.03 Executio n o f Change Orders A. Cit y and Contractor shall execute appropriate Change Order s covering: 1. change s in the Wor k whic h are : (i) ordere d by Cit y pursuant to Paragraph 10.01.A , (ii) require d because of acceptance of defective Work unde r Paragraph 13.08 or City’s correction of defective Wor k unde r Paragraph 13.09, or (iii) agreed to by the parties; 2. change s in the Contrac t Pric e or Contrac t Time whic h are agreed to by the parties, including any undispute d sum or a mount of time for Wor k actually performed. 10.04 Extra Work A. Should a difference aris e as to wha t doe s or doe s not constitute Extra Work, or as to the payment thereof , and the Cit y insist s upon it s performance, the Contractor shall procee d wit h the work afte r makin g written reques t for writte n order s and shall kee p accurate account of the actual reasonable cos t thereof. Contrac t Claims regardin g Extra Wor k shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnis h the Cit y suc h installa tio n records of all deviations from the original Contrac t Documents as may be necessary to enable the Cit y to prepare for per manent record a corrected set of plan s showing the actual installation. C. The compensation agreed upon for Extra Work whethe r or not initiate d by a Change Orde r shall be a full, complet e and fina l payment for all costs Contractor incur s as a result or relatin g to the change or Extra Work, whethe r said costs are known, unknown, foreseen or unforesee n at that time, includin g without limitation , any costs for delay , extende d overhead, ripple or impac t cost, or any othe r effect on change d or unchange d wor k as a result of the change or Extra Work. 10.05 Notificatio n to Surety If the provisions of any bond requir e notic e to be give n to a surety of any change affecting the genera l scope of the Wor k or the provisions of the Contrac t Documents (including , but not limited to, Contrac t Pric e or Contrac t Time), the givin g of any suc h notic e will be Contractor’s responsibility . The amount of each applicable bond will be adjuste d by the Contractor to reflec t the effect of any suc h change. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 40 of 63 10.06 Contract Claims Process A. City’s Decisio n Required : All Contrac t Claims, except thos e waive d pursuant to Paragraph 14.09, shall be referred to the Cit y for decision. A decisio n by Cit y shall be require d as a conditio n precedent to any exercise by Contractor of any rights or remedie s he may otherwise have unde r the Contrac t Documents or by Laws and Regulations in respect of suc h Contract Claims. B. Notice: 1. Writte n notic e stating the genera l natur e of each Contrac t Claim shall be delivere d by the Contractor to Cit y no late r tha n 15 days afte r the start of the event givin g ris e thereto. The responsibilit y to substantiate a Contrac t Claim shall rest wit h the part y makin g the Contract Claim. 2. Notic e of the amount or extent of the Contrac t Claim, wit h supporting data shall be delivered to the Cit y on or before 45 days from the start of the event givin g ris e thereto (unles s the City allow s additiona l time for Contractor to submit additiona l or mor e accurate data in suppor t of suc h Contrac t Claim). 3. A Contrac t Claim for an adjustment in Contrac t Pric e shall be prepare d in accordance with the provisions of Paragraph 12.01. 4. A Contrac t Claim for an adjustment in Contrac t Time shall be prepare d in accordance with the provisions of Paragraph 12.02. 5. Eac h Contrac t Claim shall be accompanie d by Contractor’s written state ment tha t the adjustment claimed is the entir e adjustment to whic h the Contractor believe s it is entitle d as a result of said event. 6. The Cit y shall submit any respons e to the Contractor within 30 days after receipt of the claimant’s las t submittal (unles s Contrac t allow s additiona l time). C. City’s Actio n: Cit y will revie w each Contrac t Claim and, within 30 days afte r receipt of the last submitta l of the Contractor, if any, take one of the followin g actions in writing: 1. deny the Contrac t Claim in whole or in part; 2. approve the Contrac t Claim; or 3. notify the Contractor tha t the Cit y is unable to resolv e the Contrac t Claim if, in the City’s sole discretion , it would be inappropriate for the Cit y to do so. For purpose s of further resolutio n of the Contrac t Claim, suc h notic e shall be dee med a denial. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 41 of 63 D. City’s written action unde r Paragraph 10.06.C will be fina l and binding, unles s Cit y or Contractor invoke the dispute resolutio n procedur e set forth in Article 16 within 30 days of such action or denial. E. No Contrac t Claim for an adjustment in Contrac t Pric e or Contrac t Time will be valid if not submitte d in accordance wit h this Paragraph 10.06. ARTICLE 1 1 – COST O F THE WORK ; ALLOWANCES; UNI T PRICE WORK ; PLANS QUANTITY MEASUREMENT 11.01 Cost of th e Work A. Costs Included: The term Cos t of the Work means the sum of all costs , except thos e exclude d in Paragraph 11.01.B , necessarily incurre d and paid by Contractor in the prope r perfor manc e of the Work. Whe n the valu e of any Wor k covere d by a Change Order , the costs to be reimburse d to Contractor will be only thos e additiona l or incre menta l cost s require d because of the change in th e Work. Suc h costs shall not includ e any of the costs ite mize d in Paragraph 11.01.B, and shall includ e but not be limite d to the followin g ite ms: 1. Payroll cost s for e mployee s in the direc t e mploy of Contractor in the perfor manc e of the Work unde r schedule s of jo b classification s agreed upon by Cit y and Contractor . Such employee s shall include , without limitation , superintendents , foremen, and othe r personnel employe d full time on the Work. Payroll costs for employee s not employe d full time on the Work shall be apportione d on the basis of their time spent on the Work. Payroll costs shall include; a. salarie s wit h a 55% markup, or b. salarie s and wage s plu s the cos t of fringe benefits , whic h shall includ e socia l security contributions , une mployment, excise, and payroll taxes, workers ’ compensation, health and retirement benefits , bonuses , sic k leave, vacation and holida y pa y applicable thereto. The expense s of perfor min g Wor k outside of Regula r Working Hours , Weekend Working Hours , or lega l holidays , shall be include d in the above to the extent authorized by City. 2. Cos t of all materials and equipment furnishe d and incorporate d in the Work, includin g costs of transportation and storage thereof , and Suppliers ’ field services require d in connection therewith. 3. Rentals of all construction equipment and machinery, and the part s thereof whethe r rented from Contractor or other s in accordance wit h renta l agreements approve d by City , and the costs of transportation, loading, unloading, assembly , dis mantling , and remova l thereof . All suc h costs shall be in accordance wit h the terms of said renta l agreements . The renta l of any suc h equipment, machinery, or parts shall cease whe n the us e thereof is no longe r necessary for the Work. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 42 of 63 4. Payments made by Contractor to Subcontractors for Wor k perfor med by Subcontractors . If require d by City , Contractor shall obtain competitiv e bid s from subcontractors acceptable to Cit y and Contractor and shall delive r suc h bid s to City , who will the n determine , whic h bids, if any, will be acceptable. If any subcontrac t provide s tha t the Subcontractor is to be paid on the basis of Cos t of the Work plu s a fee, the Subcontractor’s Cos t of the Wor k and fee shall be determine d in the same manne r as Contractor’s Cos t of the Wor k and fee a s provide d in this Paragraph 11.01. 5. Costs of special consultants (includin g but not limite d to engineers , architects, testing laboratories , surveyors , attorneys , and accounta nts) employe d for services specifically related to the Work. 6. Supple menta l costs includin g the following: a. The proportion of necessary transportation, travel, and subsistenc e expense s of Contractor’s employee s incurre d in discharge of dutie s connecte d wit h the Work. b. Cost, includin g transportation and maintenance, of all materials, supplies , equipment, machinery, appliances, office , and te mporar y facilitie s a t the Site , and hand tools not owne d by the workers , whic h are consume d in the perfor manc e of the Work, and cost, less marke t value , of suc h ite ms use d but not consumed whic h remain the property of Contractor. c. Sales, consumer, use , and othe r simila r taxe s related to the Work, and for which Contractor is liable not covere d unde r Paragraph 6.11, as impose d by Laws and Regulations. d. Deposits los t for causes othe r tha n negligenc e of Contractor, any Subcontractor , or anyone directly or indirectly employe d by any of the m or for whos e acts any of the m ma y be liable , and royalty payments and fees for per mit s and licenses. e. Losses and da mage s (and related expenses ) caused by da mage to the Work, not compensate d by insuranc e or otherwise , sus taine d by Contractor in connection wit h the perfor manc e of the Work, provide d suc h losses and da mage s have resulte d from causes othe r tha n the negligenc e of Contractor , any Subcontractor , or anyone directly or indirectly employe d by any of the m or for whos e acts any of the m ma y be liable . Such losse s shall includ e settlements made wit h the writte n consent and approva l of City . No suc h losses, da mages, and expense s shall be include d in the Cos t of the Wor k for the purpos e of determinin g Contractor’s fee. f. The cos t of utilities , fuel, and sanitary facilitie s at the Site. g. Mino r expense s suc h as telegrams, lon g distanc e telephone calls , telephone and communicatio n services at the Site , expres s and courie r services, and simila r petty cash ite ms in connection wit h the Work. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 43 of 63 h. The costs of pre miu ms for all bonds and insuranc e Contractor is require d by the Contract Documents to purchas e and maintain. B. Costs Excluded : The term Cos t of the Wor k shall not includ e any of the followin g ite ms: 1. Payroll costs and othe r compensation of Contractor’s officers, executives, principals (of partnerships and sole proprietorships), genera l managers, safety managers, engineers, architects, estimators , attorneys , auditors , accountants , purchasing and contracting agents, expediters , timekeepers, clerks, and othe r personne l employe d by Contractor , whethe r a t the Sit e or in Contractor’s principa l or branc h offic e for genera l administratio n of the Work and not specifically include d in the agreed upon schedule of jo b classification s referre d to in Paragraph 11.01.A.1 or specifically covere d by Paragraph 11.01.A.4, all of whic h are to be considere d administrativ e costs covere d by the Contractor’s fee. 2. Expense s of Contractor’s principa l and branc h offices othe r tha n Contractor’s office a t the Site. 3. Any par t of Contractor’s capital expenses , includin g interest on Contractor’s capital employe d for the Work and charge s agains t Contractor for delinquent payments. 4. Costs due to the negligenc e of Contractor , any Subcontractor, or anyone directly or indirectly employe d by any of the m or for whos e acts any of the m ma y be liable , includin g but not limite d to, the correction of defective Work, disposa l of materials or equipment wrongly supplied, and makin g good any da mage to property. 5. Othe r overhea d or genera l expens e costs of any kind. C. Contractor’s Fee : Whe n all the Wor k is perfor med on the basis of cost-plus , Contractor’s fee shall be determine d as set forth in the Agree ment. Whe n the valu e of any Wor k covere d by a Change Orde r for an adjustment in Contrac t P ric e is determine d on the basis of Cos t of the Work, Contractor’s fee shall be determine d as set forth in Paragraph 12.01.C. D. Documentation: Wheneve r the Cos t of the Wor k for any purpos e is to be determine d pursuant to Paragraphs 11.01.A and 11.01.B , Contractor will establis h and maintain records thereof in accordance wit h generally accepted accounting practices and submit in a for m acceptable to City an ite mize d cos t breakdow n togethe r wit h supporting data. 11.02 Allowances A. Specifie d Allowance: It is understood tha t Contractor ha s include d in the Contrac t Pric e all allowances so na med in the Contrac t Documents and shall cause the Wor k so covere d to be perfor med for suc h sums and by suc h persons or entitie s as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 44 of 63 a. the pre -bid allowances includ e the cos t to Contractor of materials and equipment required by the allowances to be delivere d at the Site , and all applicable taxes; and b. Contractor’s costs for unloading and handling on the Site , labor, installation , overhead, profit, and othe r expense s conte mplate d for the pre -bid allowances have bee n include d in the allowances, and no de mand for additiona l payment on account of any of the foregoing will be valid. C. Contingency Allowance : Contractor agrees tha t a contingenc y allowance, if any, is for the sole us e of City. D. Prio r to fina l payment, an appropriate Change Orde r will be issued to reflect actual amounts due Contractor on account of Work covere d by allowances, and the Contrac t Pric e shall be correspondingly adjusted. 11.03 Unit Price Work A. Wher e the Contrac t Documents provide tha t all or par t of the Wor k is to be Unit Pric e Work, initiall y the Contrac t Pric e will be dee med to includ e for all Unit Pric e Work a n a mount equa l to the sum of the unit pric e for each separately identifie d ite m of Unit Pric e Wor k times the estimate d quantity of each ite m as indicate d in the Agree ment. B. The estimated quantitie s of ite ms of Unit Pric e Work are not guarantee d and are solely for the purpos e of compariso n of Bid s and determinin g an initia l Contrac t Price . Determination s of the actual quantitie s and classification s of Unit Pric e Wor k perfor med by Contractor will be made by Cit y subjec t to the provisions of Paragraph 9.05. C. Each unit pric e will be dee med to includ e an amount considere d by Contractor to be adequate to cove r Contractor’s overhea d and profit for each separately identifie d ite m. Work describe d in the Contrac t Documents , or reasonably inferred as require d for a functionally complet e installation, but not identifie d in the listin g of unit pric e ite ms shall be considere d incidenta l to unit price work liste d and the cos t of incidenta l wor k include d as part of the unit price. D. Cit y may make an adjustment in the Contrac t Pric e in accordance wit h Paragraph 12.01 if: 1. the quantity of any ite m of Unit Pric e Wor k perfor med by Contractor differs materially and significantly from the estimate d quantity of suc h ite m indicate d in the Agree ment; and 2. there is no corresponding adjustment wit h respect to any othe r ite m of Work. E. Increased o r Decreased Quantities: The Cit y reserves the righ t to orde r Extra Wor k in accordance wit h Paragraph 10.01. 1. If the change s in quantitie s or the alterations do not significantly change the character of wor k unde r the Contrac t Documents , the altered wor k will be paid for at the Contrac t unit price. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 45 of 63 2. If the change s in quantitie s or alterations significantly change the character of work, the Contrac t will be a mende d by a Change Order. 3. If no unit price s exist , this will be considere d Extra Work and the Contrac t will be a mended by a Change Orde r in accordance wit h Article 12. 4. A significan t change in the character of wor k occurs when: a. the character of wor k for any Item as altered differs materially in kin d or natur e from that in the Contrac t or b. a Majo r Ite m of work varie s by mor e tha n 25% from the origina l Contrac t quantity. 5. Whe n the quantity of wor k to be done unde r any Majo r Ite m of the Contrac t is mor e than 125% of the origina l quantity sta te d in the Contract , the n eithe r party to the Contrac t may reques t an adjustment to the unit pric e on the portion of the wor k tha t is above 125%. 6. Whe n the quantity of work to be done unde r any Majo r Ite m of the Contrac t is les s tha n 75% of the origina l quantity state d in the Contract, the n eithe r party to the Contrac t may request an adjustment to the unit price. 11.04 Plan s Quantity Measurement A. Plan s quantitie s may or may not represent the exact quantity of work perfor med or material moved , handled, or placed during the execution of the Contract. The estimate d bid quantitie s are designate d as fina l payment quantities , unles s revise d by the governing Section or this Article. B. If the quantity measured as outline d unde r “Pric e and Payment Procedures ” varie s by mor e than 25% (or as stipulate d unde r “Pric e and Payment P rocedures ” for specific Items) from the total estimated quantity for an individua l Item originally show n in the Contrac t Documents , an adjustment may be made to the quantity of authorize d work done for payment purposes . The party to the Contrac t requesting the adjustment will provide field measurements and calculations showing the fina l quantity for whic h payment will be made . Payment for revise d quantity will be made at the unit pric e bid for tha t Ite m, except as provide d for in Article 10. C. Whe n quantitie s are revise d by a change in desig n approve d by the City , by Change Order, or to correct an error, or to correct an error on the plans , the plan s quantity will be increased or decreased by the amount involve d in the change , and the 25% varianc e will apply to the new plans quantity. D. If the total Contrac t quantity multiplie d by the unit pric e bid for an individua l Ite m is les s than $250 and the Item is not originally a plan s quantity Ite m, the n the Ite m may be paid a s a plans quantity Ite m if the Cit y and Contractor agre e in writin g to fix the fina l quantity as a plans quantity. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 46 of 63 E. For callou t wor k or non-sit e specific Contracts , the plan s quantity measurement require ments are not applicable. ARTICLE 12 – CHANGE OF CONTRACT PRICE; CHANGE O F CONTRACT TIME 12.01 Change o f Contrac t Price A. The Contrac t Pric e may only be change d by a Change Order. B. The valu e of any Work covere d by a Change Orde r will be determine d as follows: 1. wher e the Wor k involve d is covere d by unit price s containe d in the Contrac t Documents , by applicatio n of suc h unit price s to the quantitie s of the ite ms involve d (subjec t to the provision s of Paragraph 11.03); or 2. where the Wor k involve d is not covere d by unit price s containe d in the Contrac t Documents, by a mutually agreed lu mp sum or unit pric e (whic h may includ e a n allowanc e for overhead and profit not necessarily in accordance wit h Paragraph 12.01.C.2), and shall includ e the cost of any secondar y impacts tha t are foreseeable at the time of pricin g the cos t of Extra Work; or 3. wher e the Work involve d is not covere d by unit price s containe d in the Contrac t Documents and agreement to a lu mp sum or unit pr ice is not reached unde r Paragraph 12.01.B.2, on the basis of the Cos t of the Wor k (determine d as provide d in Paragraph 11.01) plu s a Contractor’s fee for overhea d and profit (determine d as provide d in Paragraph 12.01.C). C. Contractor’s Fee: The Contractor’s additiona l fee for overhea d and profit shall be determine d as follows: 1. a mutually acceptable fixe d fee ; or 2. if a fixe d fee is not agreed upon, the n a fee based on the followin g percentages of the various portions of the Cos t of the Work: a. for costs incurre d unde r Paragraphs 11.01.A.1, 11.01.A.2. and 11.01.A.3, the Contractor’s additiona l fee shall be 15 percent except for: 1) renta l fees for Contractor’s ow n equipment usin g standard renta l rates; 2) bonds and insurance; b. for costs incurre d unde r Paragraph 11.01.A.4 a nd 11.01.A.5, the Contractor’s fe e shall be fiv e percent (5%); 1) where one or mor e tier s of subcontracts are on the basis of Cos t of the Wor k plu s a fee and no fixe d fe e is agreed upon, the inten t of Paragraphs 12.01.C.2.a and 12.01.C.2.b is tha t the Subcontractor who actually perfor ms the Work, a t whatever CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 47 of 63 tier , will be paid a fe e of 15 percent of the costs incurre d by suc h Subcontractor under Paragraphs 11.01.A.1 and 11.01.A.2 and tha t any highe r tie r Subcontractor and Contractor will each be paid a fee of fiv e percent (5%) of the amount paid to the next lowe r tie r Subcontractor, howeve r in no case shall the cumulativ e tota l of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs ite mize d unde r Paragraphs 11.01.A.6, and 11.01.B; d. the a mount of credit to be allowe d by Contractor to Cit y for any change whic h result s in a ne t decrease in cos t will be the amount of the actual ne t decrease in cos t plu s a deduction in Contractor’s fee by an amount equa l to fiv e percent (5%) of suc h net decrease. 12.02 Change o f Contrac t Time A. The Contrac t Time ma y only be change d by a Change Order. B. No extension of the Contrac t Time will be allowed for Extra Wor k or for claimed dela y unless the Extra Work conte mplate d or claimed dela y is show n to be on the critica l path of the Project Schedule or Contractor can show by Critica l Path Method analysis how the Extra Wor k or claime d dela y adversely affects the critica l path. 12.03 Delays A. Wher e Contractor is reasonably delaye d in the perfor manc e or complet ion of any part of the Work within the Contrac t Time due to dela y beyond the control of Contrac tor , the Contrac t Time may be extende d in an amount equa l to the time lost due to suc h dela y if a Contrac t Claim is made therefor . Delays beyond the control of Contractor shall include , but not be limite d to, acts or neglec t by City , acts or neglec t of utilit y owners or othe r contractors perfor min g othe r wor k as conte mplate d by Article 7, fires, floods , epide mics, abnor mal weather conditions , or acts of God. Suc h an adjustment shall be Contractor’s sole and exclusiv e remedy for the delays describe d in this Paragraph. B. If Contractor is delayed, Cit y shall not be liable to Contractor for any claims, costs , losses, or da mage s (includin g but not limite d to all fees and charge s of engineers , architects, attorneys , and othe r professionals and all cour t or arbitratio n or othe r dispute resolutio n costs ) sustaine d by Contractor on or in connection wit h any othe r projec t or anticipated project. C. Contractor shall not be entitle d to an adjustment in Contrac t Pric e or Contrac t Time for delays within the control of Contractor . Delays attributable to and within the control of a Subcontractor or Supplie r shall be dee me d to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrance s to the Work, except when direc t and unavoidable extr a cos t to the Contractor is caused by the failur e of the Cit y to provide infor matio n or material, if any, whic h is to be furnishe d by the City. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 48 of 63 ARTICLE 1 3 – TESTS AND INSPECTIONS; CORRECTION, REMOVA L OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notic e of all defective Wor k of whic h Cit y ha s actual knowledge will be give n to Contractor. Defective Wor k may be rejected, corrected, or accepted as provide d in this Article 13. 13.02 Access to Work City , independent testing laboratories , and governmenta l agencies wit h jurisdictiona l interests will have access to the Sit e and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide the m prope r and safe conditions for suc h access and advis e the m of Contractor’s safety procedure s and progra ms so tha t the y may comply therewith a s applicable. 13.03 Tests and Inspections A. Contractor shall giv e Cit y timely notic e of readines s of the Work for all require d inspections, tests, or approvals and shall cooperate wit h inspection and testing personne l to facilitat e required inspections or tests. B. If Contrac t Documents , Law s or Regulations of any public body having jurisdictio n requir e any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibilit y for arranging and obtaining suc h independent inspections , tests, retests or approvals , pa y all costs in connection therewith, and furnis h Cit y the require d certificates of inspection or approval; excepting, however , thos e fees specifically identifie d in the Supple mentary Condition s or any Texa s Department of Licensur e and Regulatio n (TDLR) inspections , whic h shall be paid as describe d in the Supple mentary Conditions. C. Contractor shall be responsible for arranging a nd obtaining and shall pa y all costs in connection wit h any inspections , tests , re-tests, or approvals require d for City’s acceptance of materials or equipment to be incorporate d in the Work; or acceptance of materials, mix designs , or equipment submitte d for approva l prio r to Contractor’s purchase thereof for incorporation in the Work. Suc h inspections , tests, re -tests, or approvals shall be perfor me d by organizations acceptable to City. D. Cit y may arrange for the services of a n ind ependent testing laborator y (“Testing Lab”) to perfor m any inspections or tests (“Testing”) for any part of the Work, as determine d solely by City. 1. Cit y will coordinate suc h Testing to the extent possible , wit h Contractor; 2. Should any Testing unde r this Section 13.03 D result in a “fail”, “did not pass ” or other simila r negative result , the Contractor shall be responsible for paying for any and all retests. Contractor’s cancellation without cause of Cit y initiate d Testing shall be dee med a negative result and requir e a retest. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 49 of 63 3. Any amounts owe d for any retest unde r this Section 13.03 D shall be paid directly to the Testing La b by Contractor . Cit y will forward all invoice s for retests to Contractor. 4. If Contractor fails to pa y the Testing Lab, Cit y will not issue Fina l Payment until the Testing La b is paid. E. If any Work (or the work of others ) tha t is to be inspected, tested, or approve d is covere d by Contractor without writte n concurrenc e of City , Contractor shall, if requeste d by City , uncover suc h Work for observation. F. Uncovering Wor k as provide d in Paragraph 13.03.E shall be a t Contractor’s expense. G. Contractor shall have the righ t to make a Contract Claim regarding any retest or invoic e issued unde r Section 13.03 D. 13.04 Uncovering Work A. If any Wor k is covere d contrar y to the Contrac t Documents or specific instructions by the City , it must, if requeste d by City , be uncovere d for City’s observation and replaced at Contractor’s expense. B. If Cit y consider s it necessary or advisable tha t covere d Work be observe d by Cit y or inspecte d or teste d by others , Contractor , at City’s request, shall uncover, expose , or otherwis e make available for observation, inspection, or testing as Cit y may require , tha t portion of the Wor k in question, furnishing all necessary labor , material, and equipment. 1. If it is found tha t the uncovere d Wor k is defective, Contractor shall pa y all claims, costs, losses, and da mage s (includin g but not limite d to a ll fee s and charge s of engineers , architects, attorneys , and othe r professionals and all cour t or othe r dispute resolutio n costs ) arisin g out of or relatin g to suc h uncovering, exposure , observation, inspection, and testing, and of satisfactory replacement or reconstruction (includin g but not limite d to all costs of repair or replacement of wor k of others); or Cit y shall be entitle d to accept defective Work in accordance wit h Paragraph 13.08 in whic h case Contractor shall still be responsible for all cost s associated wit h exposing, observing, and testing the defective Work. 2. If the uncovere d Work is not found to be defective, Contractor shall be allowe d an increase in the Contrac t Pric e or an extension of the Contrac t Time, or both, directly attributable to suc h uncovering, exposure , observation, inspection, testing, replacement, and reconstruction. 13.05 City May Sto p th e Work If the Work is defective, or Contractor fails to supply sufficien t skille d worker s or suitable materials or equipment, or fails to per for m the Work in suc h a way tha t the complete d Wor k will confor m to the Contrac t Documents , Cit y ma y orde r Contrac tor to stop the Work, or any portion thereof, until th e cause for suc h orde r ha s bee n eliminated; howeve r, this righ t of Cit y to stop the Wor k shall not giv e ris e to any duty on the par t of Cit y to exercise this righ t for the benefit of Contractor , any CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 50 of 63 Subcontractor , any Supplier , any othe r individua l or entity, or any surety for , or employe e or agent of any of the m. 13.06 Correctio n o r Removal o f Defectiv e Work A. Promptly afte r receipt of writte n notice , Contrac tor shall correct all defective Work pursuant to an acceptable schedule , whethe r or not fabricated, installed , or completed, or , if the Work has bee n rejected by City , remove it from the Projec t and replace it wit h Wor k tha t is not de fective. Contractor shall pa y all claims, costs , additional testing, losses, and da mage s (includin g but not limite d to all fees and charge s of engineers , architects, attorneys , and othe r professionals and all cour t or arbitratio n or othe r dispute resolutio n cos ts) arisin g out of or relatin g to suc h correction or remova l (includin g but not limite d to all costs of repair or replacement of wor k of others). Failur e to requir e the re mova l of any de fective Wor k shall not constitut e acceptance of such Work. B. Whe n correcting defective Wor k unde r the te rms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action tha t would void or otherwis e impair City’s special warranty and guarantee , if any, on said Work. 13.07 Correctio n Period A. If within two (2) years after the date of Fina l Acceptance (or such longe r perio d of time as may be prescribe d by the terms of any applicable special guarante e require d by the Contract Documents), any Wor k is found to be defective, or if the repair of any da mage s to the lan d or areas made available for Contractor’s us e by Cit y or per mitte d by Laws and Regulations as conte mplate d in Paragraph 6.10.A is found to be defective, Contractor shall promptly , without cos t to Cit y and in accordance wit h City’s written instructions: 1. repair suc h defective lan d or areas; or 2. correct suc h defective Work; or 3. if the defective Wor k ha s bee n rejected by City , remove it from the Projec t and replace it wit h Wor k tha t is not defective, and 4. satisfactorily correct or repair or remove and replace any da mage to othe r Work, to the work of other s or othe r lan d or areas resultin g therefrom. B. If Contractor doe s not promptly comply wit h the terms of City’s writte n instructions , or in an emergenc y wher e dela y would cause seriou s ris k of los s or da mage , Cit y may have the defective Wor k corrected or repaired or may have the rejected Wor k remove d and replaced. All claims, costs , losses, and da mage s (includin g but not limite d to all fees and charge s of engineers, architects, attorneys , and othe r professionals and all cour t or othe r dispute resolutio n costs) arisin g out of or relatin g to suc h correction or repair or suc h remova l and replacement (including but not limite d to all costs of repair or replacement of work of others ) will be paid by Contractor. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 51 of 63 C. In special circumstances where a particula r ite m of equipment is placed in continuous service befor e Fina l Acceptance of all the Work, the correction perio d for tha t ite m may start to run from an earlie r date if so provide d in the Contrac t Documents. D. Wher e defective Wor k (and da mage to othe r Work resultin g therefrom) ha s bee n corrected or remove d and replaced unde r this Paragraph 13.07, the correction perio d hereunde r wit h respect to suc h Work may be require d to be extende d for an additiona l perio d of one yea r afte r the end of the initia l correction period. Cit y shall provide 30 days written notic e to Contractor should such additiona l warranty coverage be required. Contractor may dispute this require ment by filin g a Contrac t Claim, pursuant to Paragraph 10.06. E. Contractor’s obligations unde r this Paragraph 13.07 are in additio n to any othe r obligatio n or warranty. The provisions of this Paragraph 13.07 shall not be construe d as a substitute for , or a waive r of, the provisions of any applicable statute of limitatio n or repose. 13.08 Acceptance o f Defectiv e Work If, instea d of requirin g correction or remova l and replacement of defective Work, Cit y prefers to accept it , Cit y may do so. Contractor shall pa y all claims, costs , losses, and da mage s (includin g but not limite d to all fees and charge s of engineers , architects, attorneys , and othe r professionals and all court or othe r dispute resolutio n costs ) attributa ble to City’s evaluation of and determinatio n to accept suc h defective Wor k and for the diminishe d valu e of the Wor k to the extent not otherwise paid by Contractor . If any suc h acceptance occur s prio r to Fina l Acceptance, a Change Orde r will be issue d incorporating the necessary revision s in the Contrac t Documents wit h respect to the Work, and Cit y shall be entitle d to an appropriate decrease in the Contrac t Price , reflectin g the diminished value of Wor k so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time a fter writte n notic e from Cit y to correc t de fective Work, or to remove and replace rejected Wor k as require d by Cit y in accordance wit h Paragraph 13.06.A , or if Contractor fails to perfor m the Work in accordance wit h the Contrac t Documents, or if Contractor fails to comply wit h any othe r provision of the Contrac t Documents , Cit y may, afte r seve n (7) days written notic e to Contractor , correct, or remedy any suc h de ficiency. B. In exercising the rights and remedie s unde r this Paragraph 13.09, Cit y shall proceed expeditiously. In connection wit h suc h corrective or remedia l action, Cit y may exclude Contractor from all or par t of the Site , take possession of all or part of the Wor k and suspend Contractor’s services related thereto, and incorporate in the Work all materials and equipment incorporate d in the Work, store d at the Sit e or for whic h Cit y ha s paid Contractor but whic h are stored elsewhere. Contractor shall allo w City , City’s representatives, agents , consultants, e mployees , and City’s othe r contractors , access to the Sit e to enable Cit y to exercise the rights and remedie s unde r this Paragraph. C. All claims, costs , losses, and da mage s (includin g but not limite d to all fees and charge s of engineers , architects, attorneys , and othe r professionals and all cour t or othe r dispute resolution CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 52 of 63 costs ) incurre d or sustaine d by Cit y in exercising the rights and remedie s unde r this Paragraph 13.09 will be charge d agains t Contractor, and a Change Orde r will be issued incorporating the necessary revision s in the Contrac t Documents wit h respect to the Work; and Cit y shall be entitle d to a n appropriate decrease in the Contrac t Price. D. Contractor shall not be allowe d an extension of the Contrac t Time because of any dela y in the perfor manc e of the Wor k attributable to the exercise of City’s rights and re medie s unde r this Paragraph 13.09. ARTICLE 1 4 – PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule o f Values The Schedule of Value s for lu mp sum contracts establishe d as provide d in Paragraph 2.07 will serve as the basis for progres s payments and will be inc orporate d int o a for m of Applicatio n for Payment acceptable to City . Progres s payments on account of Unit Pric e Wor k will be base d on the numbe r of units completed. 14.02 Progress Payments A. Applications fo r Payments: 1. Contractor is responsible for providing all infor matio n a s require d to become a vendor of the City. 2. At least 20 days befor e the date establishe d in the General Require ments for each progress payment, Contractor shall submit to Cit y for revie w an Applicatio n for Payment fille d out and signe d by Contractor covering the Work complete d as of the date of the Applicatio n and accompanie d by suc h supporting documentation as is require d by the Contrac t Documents. 3. If payment is requeste d on the basis of materials and equipment not incorporate d in the Work but delivere d and suitably store d a t the Sit e or a t anothe r locatio n agreed to in writing , the Applicatio n for Payment shall als o be accompanie d by a bill of sale , invoice , or other documentation warranting tha t Cit y ha s received the materials and equipment fre e and clear of all Lien s and evidenc e tha t the materials and equipment are covere d by appropriate insuranc e or othe r arrange ment s to protec t Cit y’s interest therein, all of whic h mus t be satisfactory to City. 4. Beginning wit h the second Applicatio n for P ayment, each Applicatio n shall includ e an affidavit of Contractor stating tha t previous progres s payments received on account of the Wor k have bee n applie d on account to dis c harge Contractor’s legitimate obligations associate d wit h prio r Application s for Payment. 5. The amount of retainage wit h respect to progress payments will be as described in subsection C. unless otherwise stipulated in the Contrac t Documents. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 53 of 63 B. Revie w o f Applications: 1. Cit y will, afte r receipt of each Applicatio n for Payment , eithe r indicat e in writin g a recommendation of payment or retur n the Application to Contractor indicatin g reasons for refusing payment. In the latte r case, Contractor may make the necessary corrections and resubmit the Application. 2. City’s processing of any payment requeste d in an Applicatio n for Payment will be base d on City’s observations of the executed Work, and on City’s revie w of the Applicatio n for Payment and the accompanying data and schedules , tha t to the bes t of City’s knowledge: a. the Work ha s progresse d to the point indicated; b. the qualit y of the Wor k is generally in accordanc e wit h the Contrac t Document s (subject to an evaluation of the Wor k as a functioning whole prio r to or upon Fina l Acceptance, the result s of any subsequent tests calle d for in the Contrac t Documents , a final determinatio n of quantitie s and classifications for Wor k perfor med unde r Paragraph 9.05, and any othe r qualification s state d in the recommendation). 3. Processing any suc h payment will not thereby be dee med to have represented that: a. inspections made to check the qualit y or the quantity of the Work as it ha s been perfor med have bee n exhaustive , extende d to every aspect of the Work in progress , or involve d detaile d inspections of the Wor k beyond the responsibilitie s specifically assigne d to Cit y in the Contrac t Documents ; or b. there may not be othe r matters or issues between the partie s tha t migh t entitle Contractor to be paid additionally by Cit y or entitle Cit y to withhold payment to Contractor; or c. Contractor ha s complie d wit h Laws and Regulations applicable to Contractor’s performanc e of the Work. 4. Cit y may refuse to proces s the whole or any par t of any payment because of subsequently discovere d evidenc e or the result s of subsequent inspections or tests, and revis e or revoke any suc h payment previously made , to suc h extent as may be necessary to protec t Cit y from los s because: a. the Wor k is de fective or complete d Wor k ha s bee n da mage d by the Contractor or subcontractors requirin g correction or replacement; b. discrepancies in quantitie s containe d in previous application s for payment; c. the Contrac t Pric e ha s bee n reduce d by Change Orders; d. Cit y ha s bee n require d to cor rect de fective Wor k or complet e Wor k in accordance with Paragraph 13.09; or CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 54 of 63 e. Cit y ha s actual knowledge of the occurrenc e of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts les s tha n $400,000 at the time of execution, retainage shall be te n percent (10%). 2. For contracts greater tha n $400,000 at the time of execution, retainage shall be fiv e percent (5%). D. Liquidated Damages. For each calendar da y tha t any wor k shall remain uncomplete d after the time specifie d in the Contrac t Documents , the sum pe r da y specifie d in the Agree ment will be assessed against the monie s due the Contractor , not a s a penalty, but as da mages suffered by the City. E. Payment: Contractor will be paid pursuant to the require ments of this Article 14 and payment will become due in accordance wit h the Contrac t Documents. F. Reductio n in Payment: 1. Cit y may refuse to make payment of the amount requeste d because: a. Lien s have bee n file d in connection wit h the Work, except wher e Contractor has delivere d a specific bond satisfactory to Cit y to secure the satisfaction and discharge of suc h Liens; b. ther e are othe r ite ms entitlin g Cit y to a set-off agains t the a mount recommended; or c. Cit y ha s actual knowledge of the occurrenc e of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If Cit y refuses to make payment of the amount requested, Cit y will giv e Contractor written notic e stating the reasons for suc h action and pa y Contractor any amount remainin g after deduction of the amount so withheld . Cit y shall pa y Contractor the amount so withheld , or any adjustment thereto agreed to by Cit y and Contractor, whe n Contractor remedie s the reasons for suc h action. 14.03 Contractor’s Warranty of Title Contractor warrants and guarantee s tha t title to all Work, materials, and equipment covere d by any Applicatio n for Payment, whethe r incorporate d in the Projec t or not, will pas s to Cit y no late r than the time of payment free and clear of all Liens. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 55 of 63 14.04 Partia l Utilization A. Prio r to Fina l Acceptance of all the Work, Cit y ma y us e or occupy any part of the Wor k whic h ha s specifically bee n identifie d in the Contrac t Documents , or which City determine s constitute s a separately functioning and usable part of the Work tha t can be use d for it s intende d purpos e without significan t interferenc e wit h Contractor’s performanc e of the re mainde r of the Work. Cit y a t any time ma y notify Contractor in writin g to permit Cit y to us e or occupy any suc h par t of the Wor k whic h Cit y determine s to be ready for its intende d use , subjec t to the followin g conditions: 1. Contractor at any time ma y notify Cit y in writin g tha t Contractor consider s any suc h par t of the Work ready for it s intende d use. 2. Within a reasonable time after notificatio n as enumerated in Paragraph 14.05.A.1, Cit y and Contractor shall make an inspectio n of tha t part of the Wor k to determin e it s status of completion . If Cit y doe s not conside r tha t par t of the Work to be substantially complete , City will notify Contractor in writin g givin g the reasons there for. 3. Partia l Utilizatio n will not constitute Fina l Acceptance by City. 14.05 Fina l Inspection A. Upon writte n notic e from Contractor tha t the entir e Wor k is Substantially Complet e in accordance wit h the Contract Documents: 1. Within 10 days , Cit y will schedule a Fina l Inspection wit h Contractor. 2. Cit y will notify Contractor in writin g of all particulars in whic h this inspectio n reveals that the Wor k is inco mplet e or de fective (“Punch List Items”). Contractor shall immediately take suc h measures a s are necessary to complet e suc h Wor k or remedy suc h deficiencies. B. No time charge will be made agains t the Contractor between said dat e of notificatio n to the City of Substantial Completion and the date of Fina l Inspection. 1. Should the Cit y determin e tha t the Work is not ready for Final Inspection, Cit y will notify the Contractor in writin g of the reasons and Contrac t Time will resu me. 2. Should the City concur that Substantial Completion has been achieved with the exception of any Punch List Items, Contract Time will resume for the duration it takes for Contractor to achieve Final Acceptance. 14.06 Fina l Acceptance Upon completio n by Contractor to City’s satisfaction, of any additiona l Work identifie d in the Final Inspection, Cit y will issue to Contractor a lette r of Fina l Acceptance. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 56 of 63 14.07 Fina l Payment A. Applicatio n for Payment: 1. Upon Fina l Acceptance, and in the opinion of City , Contractor ma y make an applicatio n for fina l payment followin g the procedur e for progres s payments in accordance wit h the Contrac t Documents. 2. The fina l Applicatio n for Payment shall be accompanie d (except as previously delivered) by: a. all documentation calle d for in the Contrac t Documents , includin g but not limite d to the evidenc e of insuranc e require d by Paragraph 5.03; b. consent of the surety, if any, to fina l payment; c . a lis t of all pending or released Damage Claims agains t Cit y tha t Contractor believe s are unsettled; and d. affidavit s of payments and complet e and legally e ffective releases or waivers (satisfactory to City ) of all Lie n rights aris ing out of or Lien s file d in connection wit h the Work. B. Payment Becomes Due: 1. Afte r City’s acceptance of the Applicatio n for Payment and accompanying documentation, requeste d by Contractor, les s previous payments made and any sum Cit y is entitled, includin g but not limite d to liquidate d da mages, will become due and payable. 2. Afte r all Damage Claims have bee n resolved: a. directly by the Contractor or; b. Contractor provide s evidenc e tha t the Damage Claim ha s bee n reporte d to Contractor’s insuranc e provide r for resolution. 3. The makin g of the fina l payment by the Cit y shall not reliev e the Contractor of any guarantee s or othe r require ments of the Contract Documents whic h specifically continue thereafter. 14.08 Fina l Completio n Delaye d and Partia l Retainag e Release A. If fina l completio n of the Wor k is significantly delayed, and if Cit y so confir ms, Cit y may, upon receipt of Contractor’s fina l Applicatio n for Payment, and without terminatin g the Contract, make payment of the balanc e due for tha t portion of the Wor k fully complete d and accepted. If the remainin g balanc e to be held by Cit y for Work not fully complete d or corrected is les s than the retainage stipulate d in Paragraph 14.02.C , and if bonds have bee n furnishe d as require d in Paragraph 5.02, the written consent of the surety to the payment of the balanc e due for that CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 57 of 63 portion of the Work fully complete d and accepted shall be submitte d by Contractor to Cit y with the Applicatio n for suc h payment. Suc h payment shall be made unde r the terms and conditions governing fina l payment, except tha t it shall not constitute a waive r of Contrac t Claims. B. Partia l Retainag e Release. For a Contrac t tha t provide s for a separate vegetative establish ment and maintenance, and test and perfor manc e periods followin g the completio n of all other construction in the Contrac t Documents for all Work locations , the Cit y may release a portion of the amount retained provide d tha t all othe r wor k is complete d as determine d by the City . Before the release, all submittals and fina l quantitie s mus t be complete d and accepted for all othe r work. An amount sufficien t to ensure Contrac t complianc e will be retained. 14.09 Waive r of Claims The acceptance of fina l payment will constitute a re lease of the Cit y from all claims or liabilities unde r the Contrac t for anything done or furnished or relatin g to the wor k unde r the Contract Documents or any act or neglec t of Cit y related to or connecte d wit h the Contract. ARTICLE 15 – SUSPENSIO N OF WOR K AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, Cit y may suspend the Wor k or any portion thereof by written notic e to Contractor and whic h may fix the date on whic h Wor k will be resumed. Contractor shall resume the Wor k on the date so fixed . Durin g te mporar y suspension of the Work covered by thes e Contrac t Documents , for any reason, the Cit y will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complet e a portion of the Projec t due to causes beyond the control of and without the fault or negligenc e of the Contractor, and should it be determine d by mutua l consent of the Contractor and Cit y tha t a solutio n to allo w construction to procee d is not available within a reasonable perio d of time , Contractor may reques t a n extension in Contract Time, directly attributable to any suc h suspension. C. If it should become necessary to suspend the Wor k for a n indefinit e period, the Contractor shall store all materials in suc h a manne r tha t the y will not obstruc t or impede the public unnecessarily nor become da mage d in any way, and he shall take every precaution to prevent da mage or deterioration of the work perfor med; he shall provide suitable drainage about the work, and erect te mporar y structure s where necessary. D. Contractor may be reimburse d for the cos t of moving his equipment off the jo b and returning the necessary equipment to the jo b whe n it is determine d by the Cit y tha t construction may be resumed. Suc h reimburse ment shall be base d on actual cos t to the Contractor of moving the equipment and no profit will be allowed . Reimburse ment may not be allowe d if the equipment is move d to anothe r construction projec t for the City. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 58 of 63 15.02 City May Terminate for Cause A. The occurrenc e of any one or mor e of the followin g events by way of exa mple , but not of limitation , may justif y terminatio n for cause: 1. Contractor’s persistent failur e to perfor m the Wor k in accordance wit h the Contract Documents (including, but not limite d to, failure to supply sufficien t skille d worker s or suitable materials or equipment, failur e to adher e to the Projec t Schedule establishe d under Paragraph 2.07 as adjuste d from time to time pursuant to Paragraph 6.04, or failur e to adhere to the City’s Business Diversity Enterprise Ordinance #20020-12-2011establishe d unde r Paragraph 6.06.D); 2. Contractor’s disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor’s repeated disregard of the authority of City ; or 4. Contractor’s violatio n in any substantia l way of any provisions of the Contrac t Documents; or 5. Contractor’s failur e to promptly make good any defect in materials or workmanship, or defects of any nature , the correction of whic h ha s bee n directed in writin g by the City ; or 6. Substantia l indicatio n tha t the Contractor ha s made an unauthorize d assignment of the Contrac t or any funds due therefrom for the benefit of any creditor or for any othe r purpose; or 7. Substantia l evidenc e tha t the Contractor ha s become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily ; or 8. Contractor commences lega l action in a cour t of competent jurisdictio n agains t the City. B. If one or more of the events identifie d in Paragraph 15.02A . occur, Cit y will provide written notic e to Contractor and Surety to arrange a conferenc e wit h Contractor and Surety to address Contractor 's failur e to perform the Work. Conferenc e shall be held not late r tha n 15 days , after receipt of notice. 1. If the City , the Contractor, and the Surety do not agre e to allo w the Contractor to procee d to per for m the construction Contract, the Cit y may, to the extent per mitte d by Law s and Regulations , declare a Contractor default and formally terminat e the Contractor 's righ t to complet e the Contract. Contractor default shall not be declared earlie r tha n 20 days after the Contractor and Suret y have received notic e of conferenc e to addres s Contractor's failur e to perfor m the Work. 2. If Contractor's services are terminated, Suret y shall be obligate d to take ove r and perfor m the Work. If Surety doe s not commenc e performanc e thereof within 15 consecutive calendar days afte r date of an additiona l writte n notic e de manding Surety's perfor manc e of its CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 59 of 63 obligations , the n City , without proces s or actio n at law , may take ove r any portion of the Work and complet e it as describe d below. a. If Cit y complete s the Work, Cit y may exclude Contractor and Surety from the sit e and take possession of the Work, and all materials and equipment incorporate d int o the Work store d at the Sit e or for whic h Cit y ha s paid Contractor or Surety but whic h are stored elsewhere, and finis h the Wor k as Cit y may dee m expedient. 3. Whethe r Cit y or Surety complete s the Work, Contractor shall not be entitle d to receive any furthe r payment until the Wor k is finished . If the unpaid balanc e of the Contrac t Price exceeds all claims, costs , losses and da mage s sustaine d by Cit y arisin g out of or resulting from completin g the Work, suc h excess will be pa id to Contractor . If suc h claims, costs, losses and da mage s exceed suc h unpaid balance, Contractor shall pa y the differenc e to City. Suc h claims , costs , losses and da mage s incurre d by Cit y will be incorporate d in a Change Order , provide d tha t whe n exercising any rights or remedie s unde r this Paragraph, Cit y shall no t be require d to obtain the lowes t pric e for the Work perfor med. 4. Neithe r City , nor any of it s respective consultants , agents , officers, director s or employees shall be in any way liable or accountable to Contractor or Surety for the method by whic h the completio n of the said Work, or any portion thereof, ma y be accomplishe d or for the price paid therefor. 5. City , notwithstanding the method use d in completin g the Contract, shall not forfeit the right to recove r da mage s from Contractor or Surety for Contractor's failur e to timely complet e the entir e Contract . Contractor shall not be entitle d to any claim on account of the method used by Cit y in completin g the Contract. 6. Maintenanc e of the Wor k shall continue to be Contractor 's and Surety's responsibilitie s as provide d for in the bond require ment s of the Contrac t Documents or any special guarantees provide d for unde r the Contrac t Documents or any othe r obligations otherwis e prescribe d by law. C. Notwithstanding Paragraphs 15.02.B, Contractor’s service s will not be terminate d if Contractor begins within seve n days of receipt of notic e of inten t to terminat e to correct it s failur e to perform and proceeds diligently to cur e suc h failur e within no mor e tha n 30 days of receipt of said notice. D. Wher e Contractor’s services have bee n so terminate d by City , the terminatio n will not affect any rights or remedie s of Cit y agains t Contractor then existin g or whic h may thereafter accrue. Any retention or payment of moneys due Contractor by Cit y will not release Contractor from liability. E. If and to the extent tha t Contractor ha s provide d a perfor manc e bond unde r the provisions of Paragraph 5.02, the terminatio n procedure s of tha t bond shall not supersede the provisions of this Article. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 60 of 63 15.03 City May Terminate Fo r Convenience A. Cit y may, without cause and without prejudic e to any othe r righ t or remedy of City , terminat e the Contract. Any terminatio n shall be effected by mailin g a notic e of the terminatio n to the Contractor specifyin g the extent to whic h perfor manc e of Wor k unde r the contrac t is terminated, and the date upon whic h suc h terminatio n become s effective. Receipt of the notic e shall be dee med conclusively presumed and establishe d whe n the lette r is placed in the Unite d States Posta l Servic e Mail by the City . Further, it shall be dee me d conclusively presumed and establishe d tha t suc h terminatio n is made wit h jus t cause as therein stated; and no proof in any claim, de mand or suit shall be require d of the Cit y regarding suc h discretionar y action. B. After receipt of a notic e of te rmination , and except as otherwis e directed by the City , the Contractor shall: 1. Stop wor k unde r the Contrac t on the date and to the extent specifie d in the notic e of termination; 2. plac e no furthe r order s or subcontracts for materials , services or facilitie s except as may be necessary for completio n of suc h portion of the Work unde r the Contrac t a s is not terminated; 3. terminat e all order s and subcontracts to the extent tha t the y relate to the per formanc e of the Wor k terminate d by notic e of termination; 4. transfer title to the Cit y and delive r in the manner , at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricate d parts , Wor k in progress , complete d Work, supplie s and othe r material produce d a s a part of , or acquire d in connection wit h the performanc e of, the Work terminate d by the notic e of the termination ; and b. the completed, or partially complete d plans , drawings , infor matio n and othe r property which , if the Contrac t ha d bee n completed, would have bee n require d to be furnishe d to the City. 5. complet e performanc e of suc h Work as shall not have bee n terminate d by the notic e of termination ; and 6. take suc h action as may be necessary, or as the Cit y may direct, for the protection and preservation of the property related to it s contrac t whic h is in the possession of the Contractor and in whic h the owne r ha s or may acquir e the rest. C. At a time not late r tha n 30 days after the terminatio n date specifie d in the notic e of termination, the Contractor may submit to the Cit y a list , certifie d as to quantity and quality , of any or all ite ms of terminatio n inventor y not previously dispose d of, exclusiv e of ite ms the dispositio n of whic h ha s bee n directed or authorize d by City. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 61 of 63 D. Not late r tha n 15 days thereafter, the Cit y shall accept title to suc h ite ms provided, tha t the list submitted shall be subjec t to verificatio n by the Cit y upon remova l of the ite ms or, if the ite ms are stored, within 45 days from the date of submissio n of the list , and any necessary adjustments t o correct the lis t as submitted, shall be made prio r to fina l settle ment. E. Not late r tha n 60 days afte r the notic e of termination , the Contractor shall submit his termination claim to the Cit y in the form and wit h the certificatio n prescribe d by the City . Unles s an extensio n is made in writin g within suc h 60 da y perio d by the Contractor, and grante d by the City, any and all suc h claims shall be conclusively dee med waived. F. In suc h case, Contractor shall be paid for (without duplicatio n of any ite ms): 1. complete d and acceptable Wor k executed in accordanc e wit h the Contrac t Documents prior to the effective date of termination , includin g fair and reasonable sums for overhea d and profit on suc h Work; 2. expense s sustaine d prio r to the effective date of terminatio n in perfor min g services and furnishing labor , materials, or equipment a s require d by the Contrac t Documents in connection wit h uncomplete d Work, plu s fair and reasonable sums for overhea d and profit on suc h expenses; and 3. reasonable expense s directly attributable to termination. G. In the event of the failur e of the Contractor and Cit y to agre e upon the whole amount to be paid to the Contractor by reason of the terminatio n of the Work, the Cit y shall determine , on the basis of infor matio n available to it , the amount, if any, due to the Contractor by reason of the terminatio n and shall pa y to the Contractor the amounts determined . Contractor shall not be paid on account of los s of anticipated profits or revenue or othe r economic los s arisin g out of or resultin g from suc h termination. ARTICLE 16 – DISPUTE RESOLUTION 16.01 Methods and Procedures A. Eithe r Cit y or Contractor ma y reques t mediation of any Contrac t Claim submitted for a decision unde r Paragraph 10.06 before suc h decisio n becomes fina l and binding. The reques t for mediatio n shall be submitted to the othe r party to the Contract. Timely submissio n of the request shall stay the effect of Paragraph 10.06.E. B. Cit y and Contractor shall participat e in the mediatio n proces s in good faith . The proces s shall be commenced within 60 days of filin g of the request. C. If the Contrac t Claim is not resolve d by mediation , City’s action unde r Paragraph 10.06.C or a denia l pursuant to Paragraphs 10.06.C.3 or 10.06.D shall become fina l and binding 30 days after terminatio n of the mediatio n unless , within tha t time period, Cit y or Contractor: CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 62 of 63 1. elects in writin g to invoke any othe r dispute resolutio n proces s provide d for in the Supple mentary Conditions ; or 2. agrees wit h the othe r party to submit the Contrac t Claim to anothe r dispute resolution process ; or 3. give s writte n notic e to the othe r party of the inten t to submit the Contrac t Claim to a court of competent jurisdiction. ARTICLE 1 7 – MISCELLANEOUS 17.01 Givin g Notice A. Wheneve r any provision of the Contrac t Documents require s the givin g of written notice , it will be dee med to have bee n validly give n if: 1. delivere d in person to the individua l or to a membe r of the fir m or to an office r of the corporation for whom it is intended; or 2. delivere d at or sent by registered or certified mail, postage prepaid, to the las t business addres s know n to the give r of the notice. B. Busines s addres s change s mus t be promptly made in writin g to the othe r party. C. Wheneve r the Contrac t Documents specifie s givin g notic e by electronic means suc h electronic notic e shall be dee me d sufficien t upon confirmatio n of receipt by the receiving party. 17.02 Computation of Times Whe n any perio d of time is re ferred to in the Contrac t Documents by days , it will be compute d to exclude the first and includ e the las t da y of suc h period. If the las t da y of any suc h perio d falls on a Saturda y or Sunda y or on a da y made a lega l holida y the next Working Day shall become the last da y of the period. 17.03 Cumulative Remedies The dutie s and obligations impose d by thes e General Conditions and the rights and remedies available hereunde r to the partie s hereto are in additio n to, and are not to be construe d in any way as a limitatio n of, any rights and remedie s available to any or all of the m whic h are otherwis e imposed or available by Laws or Regulations , by special warranty or guarantee , or by othe r provisions of the Contrac t Documents . The provisions of this Paragraph will be as effective as if repeated specifically in the Contrac t Documents in connection wit h each particula r duty, obligation, right, and remedy to whic h the y apply. CIT Y OF FOR T WORTH STANDARD CONST RU CT IO N SPECIFICATIO N DOCUMENTS Revision: 8/23/2021 00 72 00 - 1 GENERAL CONDITION S Page 63 of 63 17.04 Survival o f Obligations All representations , inde mnifications , warranties, and guarantee s made in , require d by, or give n in accordance wit h the Contrac t Documents , as well as all continuing obligations indicate d in the Contrac t Documents , will survive fina l payment, completion , and acceptance of the Wor k or terminatio n or completio n of the Contrac t or terminatio n of the services of Contractor. 17.05 Headings Article and paragraph headings are inserte d for convenienc e only and do not constitute parts of these General Conditions. 00 73 00 SUPPLEMENTARY CONDITIONS Page 1 of 5 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 101521 Revised March 9, 2020 SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the Gener al Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Condition s, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, “Resolving Discrepancies” Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., “Availability of Lands” The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of October 18, 2021: Outstanding Right-Of-Way, and/or Easements to Be Acquired PARCEL NUMBER OWNER TARGET DATE OF POSSESSION NONE The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the represent ations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. SC-4.01A.2, “Availability of Lands” Utilities or obstructions to be removed, adjusted, and/or relocated 00 73 00 SUPPLEMENTARY CONDITIONS Page 2 of 5 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 101521 Revised March 9, 2020 The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of October 18, 2021: EXPECTED OWNER UTILITY AND LOCATION TARGET DATE OF ADJUSTMENT NONE The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., “Subsurface and Physical Conditions” The following are reports of explorations and tests of subsurface conditions at the site of the Work: NONE The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: NONE SC-4.06A., “Hazardous Environmental Conditions at Site” The following are reports and drawings of existing hazardous environmental conditions known to the City: NONE SC-5.03A., “Certificates of Insurance” The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: Boydston Designs, Inc., 222 W. Exchange Ave. #101, Fort Worth, TX 76164 (3) Other: NONE [Obtain approval for the limits shown for SC 5.04A thru 5.04D. from City before finalizing Contract Documents] SC-5.04A., “Contractor’s Insurance” The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits Employer's liability $100,000 each accident/occurrence $100,000 Disease - each employee $500,000 Disease - policy limit SC-5.04B., “Contractor’s Insurance” 00 73 00 SUPPLEMENTARY CONDITIONS Page 3 of 5 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 101521 Revised March 9, 2020 5.04B. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance under Paragraph GC -5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2,000,000 aggregate limit The policy must have an endorsement (Amendment – Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide “X”, “C”, and “U” coverage’s. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., “Contractor’s Insurance” 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor’s Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250,000 Bodily Injury per person / $500,000 Bodily Injury per accident / $100,000 Property Damage SC-5.04D., “Contractor’s Insurance” The Contractor’s construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by Railroad company: NONE. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a “Right of Entry Agreement” with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor’s use of private and/or construction access roads crossing said railroad company’s properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor’s operations and work cross, occupy, or touch railroad property: (1) General Aggregate: N/A (2) Each Occurrence: N/A X Required for this Contract Not required for this Contract With respect to the above outlined insurance requirements, the following shall govern: 00 73 00 SUPPLEMENTARY CONDITIONS Page 4 of 5 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 101521 Revised March 9, 2020 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right -of-way or where several railroad companies are involved and operated on their own separate rights-of-way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company’s right-of-way at a location entirely separate from the grade separation or at - grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company’s right-of- way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company’s property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor’s beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right -of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addi tion, insurance must be carried during all maintenance and/or repair work performed in the railroad right -of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., “Project Schedule” Project schedule shall be tier 2 for the project. SC-6.07., “Wage Rates” The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: N/A A copy of the table is also available by accessing the City’s website at: https://apps.fortworthtexas.gov/ProjectResources/ You can access the file by following the directory path: 02-Construction Documents/Specifications/Div00 – General Conditions SC-6.09., “Permits and Utilities” SC-6.09A., “Contractor obtained permits and licenses” The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: CITY PARKWAY PERMIT SC-6.09B. “City obtained permits and licenses” The following are known permits and/or licenses required by the Contract to be acquired by the City: NONE 00 73 00 SUPPLEMENTARY CONDITIONS Page 5 of 5 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 101521 Revised March 9, 2020 SC-6.09C. “Outstanding permits and licenses” The following is a list of known outstanding permits and/or licenses to be acquired, if any as of October 18, 2021: Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION NONE SC-7.02., “Coordination” The individuals or entities listed below have contracts with the City for the performance of other work at the Site: NONE SC-8.01, “Communications to Contractor” NONE SC-9.01., “City’s Project Manager” The City’s Project Manager for this Contract is Yogesh Patel or his/her successor pursuant to written notification from the Director of Transportation and Public Works. SC-13.03C., “Tests and Inspections” NONE SC-16.01C.1, “Methods and Procedures” NONE END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., “City’s Project Representative” wording changed to City’s Project Manager. 3/9/2020 D.V. Magaña SC-6.07, Updated the link such that files can be accessed via the City’s website. CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 – Definitions and Terminology .......................................................................................................... 1  1.01 Defined Terms ............................................................................................................................... 1  1.02 Terminology .................................................................................................................................. 5  Article 2 – Preliminary Matters ......................................................................................................................... 6  2.01 Before Starting Construction ........................................................................................................ 6  2.02 Preconstruction Conference .......................................................................................................... 6  2.03 Public Meeting .............................................................................................................................. 6  Article 3 – Contract Documents and Amending ............................................................................................... 6  3.01 Reference Standards ..................................................................................................................... 6  3.02 Amending and Supplementing Contract Documents .................................................................. 6  Article 4 – Bonds and Insurance ....................................................................................................................... 7  4.01 Licensed Sureties and Insurers ..................................................................................................... 7  4.02 Performance, Payment, and Maintenance Bonds ........................................................................ 7  4.03 Certificates of Insurance ............................................................................................................... 7  4.04 Contractor’s Insurance .................................................................................................................. 9  4.05 Acceptance of Bonds and Insurance; Option to Replace ........................................................... 12  Article 5 – Contractor’s Responsibilities ........................................................................................................ 12  5.01 Supervision and Superintendent ................................................................................................. 12  5.02 Labor; Working Hours ................................................................................................................ 13  5.03 Services, Materials, and Equipment ........................................................................................... 13  5.04 Project Schedule .......................................................................................................................... 14  5.05 Substitutes and “Or-Equals” ....................................................................................................... 14  5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) ..................................... 16  5.07 Concerning Subcontractors, Suppliers, and Others ................................................................... 16  5.08 Wage Rates.................................................................................................................................. 18  5.09 Patent Fees and Royalties ........................................................................................................... 19  5.10 Laws and Regulations ................................................................................................................. 19  5.11 Use of Site and Other Areas ....................................................................................................... 19  5.12 Record Documents ...................................................................................................................... 20  5.13 Safety and Protection .................................................................................................................. 21  5.14 Safety Representative ................................................................................................................. 21  5.15 Hazard Communication Programs ............................................................................................. 22  5.16 Submittals .................................................................................................................................... 22  5.17 Contractor’s General Warranty and Guarantee .......................................................................... 23  CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ........................................................................................................................... 24  5.19 Delegation of Professional Design Services .............................................................................. 24  5.20 Right to Audit: ............................................................................................................................ 25  5.21 Nondiscrimination....................................................................................................................... 25  Article 6 – Other Work at the Site ................................................................................................................... 26  6.01 Related Work at Site ................................................................................................................... 26  Article 7 – City’s Responsibilities................................................................................................................... 26  7.01 Inspections, Tests, and Approvals .............................................................................................. 26  7.02 Limitations on City’s Responsibilities ....................................................................................... 26  7.03 Compliance with Safety Program ............................................................................................... 27  Article 8 – City’s Observation Status During Construction ........................................................................... 27  8.01 City’s Project Representative ..................................................................................................... 27  8.02 Authorized Variations in Work .................................................................................................. 27  8.03 Rejecting Defective Work .......................................................................................................... 27  8.04 Determinations for Work Performed .......................................................................................... 28  Article 9 – Changes in the Work ..................................................................................................................... 28  9.01 Authorized Changes in the Work ............................................................................................... 28  9.02 Notification to Surety .................................................................................................................. 28  Article 10 – Change of Contract Price; Change of Contract Time ................................................................ 28  10.01 Change of Contract Price ............................................................................................................ 28  10.02 Change of Contract Time............................................................................................................ 28  10.03 Delays .......................................................................................................................................... 28  Article 11 – Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 29  11.01 Notice of Defects ........................................................................................................................ 29  11.02 Access to Work ........................................................................................................................... 29  11.03 Tests and Inspections .................................................................................................................. 29  11.04 Uncovering Work ....................................................................................................................... 30  11.05 City May Stop the Work ............................................................................................................. 30  11.06 Correction or Removal of Defective Work ................................................................................ 30  11.07 Correction Period ........................................................................................................................ 30  11.08 City May Correct Defective Work ............................................................................................. 31  Article 12 – Completion .................................................................................................................................. 32  12.01 Contractor’s Warranty of Title ................................................................................................... 32  12.02 Partial Utilization ........................................................................................................................ 32  12.03 Final Inspection ........................................................................................................................... 32  12.04 Final Acceptance ......................................................................................................................... 33  Article 13 – Suspension of Work .................................................................................................................... 33  13.01 City May Suspend Work ............................................................................................................ 33  Article 14 – Miscellaneous .............................................................................................................................. 34  14.01 Giving Notice .............................................................................................................................. 34  CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.02 Computation of Times ................................................................................................................ 34  14.03 Cumulative Remedies ................................................................................................................. 34  14.04 Survival of Obligations ............................................................................................................... 35  14.05 Headings ...................................................................................................................................... 35  00 73 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 1 – DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day – A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw – City’s on-line, electronic document management and collaboration system. 5. Calendar Day – A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) -–A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract—The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents—Those items that make up the contract and which must include the Agreement, and it’s attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement 00 73 10- 2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non-Resident Bidder iii. Prequalification Statement c. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions l. Supplementary Conditions m. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project’s Contract Documents o. Drawings p. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor—The individual or entity with whom Developer has entered into the Agreement. 11. Day or day – A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer – An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance – The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. 00 73 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 16. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements—A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non-Participating Change Order—A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order—A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans – See definition of Drawings. 24. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract Time. 25. Project—The Work to be performed under the Contract Documents. 26. Project Representative—The authorized representative of the City who will be assigned to the Site. 27. Public Meeting – An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 00 73 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 30. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site—Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions – That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent – The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions—That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours – Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 00 73 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 41. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non-Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day – A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word “defective,” when modifying the word “Work,” refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City’s written acceptance. C. Furnish, Install, Perform, Provide: 1. The word “Furnish” or the word “Install” or the word “Perform” or the word “Provide” or the word “Supply,” or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. 00 73 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 2 – PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non- Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 – CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non-Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 00 73 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. City’s or Engineer’s review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City’s written interpretation or clarification. ARTICLE 4 – BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor’s obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 00 73 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. The certificate of insurance shall document the City, an as “Additional Insured” on all liability policies. 2. The Contractor’s general liability insurance shall include a, “per project” or “per location”, endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers’ compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor’s obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the “occurrence basis”. If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In 00 73 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage’s and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor’s insurance. 4.04 Contractor’s Insurance A. Workers Compensation and Employers’ Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers’ Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers’ Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor’s performance of the Work and Contractor’s other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers’ compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor’s employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment – Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide “X”, “C”, and “U” coverage’s. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on “any auto”, defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor’s Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned. 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1) $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor’s construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: ____________________________________________________________ Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a “Right of Entry Agreement” with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor’s use of private and/or construction access roads crossing said railroad company’s properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor’s operations and work cross, occupy, or touch railroad property: a. General Aggregate: _____________________________________ Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence: : _____________________________________ Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights-of- 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company’s right-of-way at a location entirely separate from the grade separation or at-grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company’s right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company’s property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor’s beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 – CONTRACTOR’S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor’s representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City’s written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and “Or-Equals” A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or “or-equal” item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. “Or-Equal” Items: If in City’s sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an “or-equal” item, in which case review and approval of the proposed item may, in City’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City’s sole discretion an item of material or equipment proposed by Contractor does not qualify as an “or-equal” item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor’s achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City’s Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No “or-equal” or substitute will be ordered, installed or utilized until City’s review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an “or-equal.” City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor’s expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City’s Cost Reimbursement: City will record City’s costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor’s Expense: Contractor shall provide all data in support of any proposed substitute or “or-equal” at Contractor’s expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre-qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Required for this Contract. (Check this box if there is any City Participation) Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City’s MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor’s own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates Required for this Contract. Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City’s determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor’s compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor’s responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor’s obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City’s safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor’s safety program, if any, with which City’s employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor’s duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor’s designated safety representative at the Site. 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City’s review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City’s Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City’s review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 2. City’s review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City’s review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor’s General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor’s warranty and guarantee. B. Contractor’s warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor’s obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor’s obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor’s responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to City. 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City’s review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City’s review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 6 – OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City’s employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City’s employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor’s Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor’s Work. Contractor’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor’s Work except for latent defects in the work provided by others. ARTICLE 7 – CITY’S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City’s responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City’s Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor’s means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor’s failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 7.03 Compliance with Safety Program While at the Site, City’s employees and representatives shall comply with the specific applicable requirements of Contractor’s safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 – CITY’S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City’s Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City’s representative during construction are set forth in the Contract Documents. A. City’s Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor’s executed Work. Based on information obtained during such visits and observations, City’s Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City’s Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City’s Project Representative’s efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City’s Project Representative’s visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City’s Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City’s Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City’s Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City’s written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 – CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor’s responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 – CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ARTICLE 11 – TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City’s acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor’s purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory (“Testing Lab”) to perform any inspections or tests (“Testing”) for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a “fail”, “did not pass” or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor’s cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City’s observation and replaced at Contractor’s expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City’s special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor’s use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City’s written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City’s written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor’s obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 stored elsewhere. Contractor shall allow City, City’s representatives, agents, consultants, employees, and City’s other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City’s rights and remedies under this Paragraph 11.09. ARTICLE 12 – COMPLETION 12.01 Contractor’s Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor’s performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City’s satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor’s insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 – SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 – MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS – DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. 01 11 00 - 1 DAP SUMMARY OF WORK Page 1 of 3 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOC UMENTS – Developer Awarded Projects City Project # 101521 Revised December 20, 2012 SECTION 01 11 00 1 SUMMARY OF WORK 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes : 5 1. Summary of Work to be performed in accorda nce with the Contract Documents 6 B. Deviations from this City of Fort Worth Standard Specification 7 1. None. 8 C. Related Specification Sections include, but are not necessarily limited to: 9 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 10 2. Division 1 - General Requirements 11 1.2 PRICE AND PAYMENT PROCEDURES 12 A. Measurement and Payment 13 1. Work associated with this Item is considered subsidiary to the various items bid. 14 No separate payment will be allowed for this Item. 15 1.3 REFERENCES [NOT USED] 16 1.4 ADMINISTRATIVE REQUIREMENTS 17 A. Work Covered by Contract Documents 18 1. Work is to include furnishing all labor, materials, and equipment, and performing 19 all Work necessary for this construction project as detailed in the Drawings and 20 Specifications. 21 B. Subsidiary Work 22 1. Any and all Work specifically governed by documentary requirements for the 23 project, such as conditions imposed by the Drawings or Contract Documents in 24 which no specific item for bid has been provided for in the Proposal and the item is 25 not a typical unit bid item included on the standard bid item list, t hen the item shall 26 be considered as a subsidiary item of Work, the cost of which shall be included in 27 the price bid in the Proposal for various bid items. 28 C. Use of Premises 29 1. Coordinate uses of premises under direction of the City. 30 2. Assume full responsibility for protection and safekeeping of materials and 31 equipment stored on the Site. 32 3. Use and occupy only portions of the public streets and alleys, or other public places 33 or other rights-of-way as provided for in the ordinances of the City, as shown in the 34 Contract Documents, or as may be specifically authorized in writing by the City. 35 a. A reasonable amount of tools, materials, and equipment for construction 36 purposes may be stored in such space, but no more than is necessary to avoid 37 delay in the construction operations. 38 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOC UMENTS – Developer Awarded Projects City Project # 101521 Revised December 20, 2012 b. Excavated and waste materials shall be stored in such a way as not to interfere 1 with the use of spaces that may be designated to be left free and unobstructed 2 and so as not to inconvenience occupants of adjacent property. 3 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 4 manner as not to interfere with the operation of the railroad. 5 1) All Work shall be in accordance with railroad requirements set forth in 6 Division 0 as well as the railroad permit. 7 D. Work within Easements 8 1. Do not enter upon private property for any purpose without having previously 9 obtained permission from the owner of such property. 10 2. Do not store equipment or material on private property unless and until the 11 specified approval of the property owner has been secured in writing by the 12 Contractor and a copy furnished to the City. 13 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 14 obstructions which must be removed to make possible proper prosecution of the 15 Work as a part of the project construction operations. 16 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 17 lawns, fences, culverts, curbing, and all other types of structures or improvements, 18 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 19 appurtenances thereof, including the construction of temporary fences and to all 20 other public or private property adjacent to the Work. 21 5. Notify the proper representatives of the owners or occupants of the public or private 22 lands of interest in lands which might be affected by the Work. 23 a. Such notice shall be made at least 48 hours in advance of the beginning of the 24 Work. 25 b. Notices shall be applicable to both public and private utility companies and any 26 corporation, company, individual, or other, either as owners or occupants, 27 whose land or interest in land might be affected by the Work. 28 c. Be responsible for all damage or injury to property of any character resulting 29 from any act, omission, neglect, or misconduct in the manner or method or 30 execution of the Work, or at any time due to defective work, material, or 31 equipment. 32 6. Fence 33 a. Restore all fences encountered and removed during construction of the Project 34 to the original or a better than original condition. 35 b. Erect temporary fencing in place of the fencing removed whenever the Work is 36 not in progress and when the site is vacated overnight, and/or at all times to 37 provide site security. 38 c. The cost for all fence work within easements, including removal, temporary 39 closures and replacement, shall be subsidiary to the various items bid in the 40 project proposal, unless a bid item is specifically provided in the proposal. 41 01 11 00 - 3 DAP SUMMARY OF WORK Page 3 of 3 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOC UMENTS – Developer Awarded Projects City Project # 101521 Revised December 20, 2012 1.5 SUBMITTALS [NOT USED] 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE [NOT USED] 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.11 FIELD [SITE] CONDITIONS [NOT USED] 7 1.12 WARRANTY [NOT USED] 8 PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 END OF SECTION 11 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 01 11 00 - 1 DAP SUMMARY OF WORK Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 SECTION 01 11 00 SUMMARY OF WORK PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights-of-way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights-of-way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. 01 11 00 - 3 DAP SUMMARY OF WORK Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 25 00 - 1 DAP SUBSTITUTION PROCEDURES Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 01 25 00 SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or-equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or-equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or-equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, 01 25 00 - 2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. 01 25 00 - 3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer’s opinion, acceptance will require substantial revision of the original design d. In the City’s or Developer’s opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 25 00 - 4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended Recommended as noted Firm Not recommended Received late Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date 01 31 19 - 1 DAP PRECONSTRUCTION MEETING Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 01 31 19 PRECONSTRUCTION MEETING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor’s work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material l. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre-Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City’s representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments 01 31 19 - 3 DAP PRECONSTRUCTION MEETING Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 31 20 - 1 DAP PROJECT MEETINGS Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 SECTION 01 31 20 PROJECT MEETINGS [Specifier: This Specification is intended for use on projects designated as Tier 3 or Tier 4.] PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provisions for project meetings throughout the construction period to enable orderly review of the progress of the Work and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held when requested by the City, Engineer or Contractor. B. Pre-Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend 1 Public Meeting with affected residents to: a. Present projected schedule, including construction start date b. Answer any construction related questions 2. Meeting Location a. Location of meeting to be determined by the City. 3. Attendees 01 31 20 - 2 DAP PROJECT MEETINGS Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 a. Contractor b. Project Representative c. Other City representatives 4. Meeting Schedule a. In general, the neighborhood meeting will occur within the 2 weeks following the pre-construction conference. b. In no case will construction be allowed to begin until this meeting is held. C. Progress Meetings 1. Formal project coordination meetings will be held periodically. Meetings will be scheduled and administered by Project Representative. 2. Additional progress meetings to discuss specific topics will be conducted on an as- needed basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns b. Installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues e. Equipment approval 3. The Project Representative will preside at progress meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fully completing the attendance form to be circulated at the beginning of each meeting. 4. Attendance shall include: a. Contractor's project manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request d. Engineer's representatives e. City’s representatives f. Others, as requested by the Project Representative 5. Preliminary Agenda may include: a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. Items which impede construction schedule d. Review of off-site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with other construction contracts f. Corrective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j. Review submittal schedules k. Maintenance of quality standards l. Pending changes and substitutions m. Review proposed changes for: 1) Effect on construction schedule and on completion date 2) Effect on other contracts of the Project n. Review Record Documents o. Review monthly pay request 01 31 20 - 3 DAP PROJECT MEETINGS Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 p. Review status of Requests for Information 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. 1) Additional meetings may be held at the request of the: a) City b) Engineer c) Contractor 7. Meeting Location a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 32 16 - 1 DAP CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 SECTION 01 32 16 CONSTRUCTION PROGRESS SCHEDULE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. General requirements for the preparation, submittal, updating, status reporting and management of the Construction Progress Schedule 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance Document B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Definitions 1. Schedule Tiers a. Tier 1 - No schedule submittal required by contract. Small, brief duration projects b. Tier 2 - No schedule submittal required by contract, but will require some milestone dates. Small, brief duration projects c. Tier 3 - Schedule submittal required by contract as described in the Specification and herein. Majority of City projects, including all bond program projects d. Tier 4 - Schedule submittal required by contract as described in the Specification and herein. Large and/or complex projects with long durations 1) Examples: large water pump station project and associated pipeline with interconnection to another governmental entity e. Tier 5 - Schedule submittal required by contract as described in the Specification and herein. Large and/or very complex projects with long durations, high public visibility 1) Examples might include a water or wastewater treatment plant 2. Baseline Schedule - Initial schedule submitted before work begins that will serve as the baseline for measuring progress and departures from the schedule. 3. Progress Schedule - Monthly submittal of a progress schedule documenting progress on the project and any changes anticipated. 01 32 16 - 2 DAP CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 4. Schedule Narrative - Concise narrative of the schedule including schedule changes, expected delays, key schedule issues, critical path items, etc B. Reference Standards 1. City of Fort Worth Schedule Guidance Document 1.4 ADMINISTRATIVE REQUIREMENTS A. Baseline Schedule 1. General a. Prepare a cost-loaded baseline Schedule using approved software and the Critical Path Method (CPM) as required in the City of Fort Worth Schedule Guidance Document. b. Review the draft cost-loaded baseline Schedule with the City to demonstrate understanding of the work to be performed and known issues and constraints related to the schedule. c. Designate an authorized representative (Project Scheduler) responsible for developing and updating the schedule and preparing reports. B. Progress Schedule 1. Update the progress Schedule monthly as required in the City of Fort Worth Schedule Guidance Document. 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 3. Change Orders a. Incorporate approved change orders, resulting in a change of contract time, in the baseline Schedule in accordance with City of Fort Worth Schedule Guidance Document. C. Responsibility for Schedule Compliance 1. Whenever it becomes apparent from the current progress Schedule and CPM Status Report that delays to the critical path have resulted and the Contract completion date will not be met, or when so directed by the City, make some or all of the following actions at no additional cost to the City a. Submit a Recovery Plan to the City for approval revised baseline Schedule outlining: 1) A written statement of the steps intended to take to remove or arrest the delay to the critical path in the approved schedule 2) Increase construction manpower in such quantities and crafts as will substantially eliminate the backlog of work and return current Schedule to meet projected baseline completion dates 3) Increase the number of working hours per shift, shifts per day, working days per week, the amount of construction equipment, or any combination of the foregoing, sufficiently to substantially eliminate the backlog of work 4) Reschedule activities to achieve maximum practical concurrency of accomplishment of activities, and comply with the revised schedule 2. If no written statement of the steps intended to take is submitted when so requested by the City, the City may direct the Contractor to increase the level of effort in manpower (trades), equipment and work schedule (overtime, weekend and holiday work, etc.) to be employed by the Contractor in order to remove or arrest the delay to the critical path in the approved schedule. a. No additional cost for such work will be considered. 01 32 16 - 3 DAP CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 D. The Contract completion time will be adjusted only for causes specified in this Contract. a. Requests for an extension of any Contract completion date must be supplemented with the following: 1) Furnish justification and supporting evidence as the City may deem necessary to determine whether the requested extension of time is entitled under the provisions of this Contract. a) The City will, after receipt of such justification and supporting evidence, make findings of fact and will advise the Contractor, in writing thereof. 2) If the City finds that the requested extension of time is entitled, the City's determination as to the total number of days allowed for the extensions shall be based upon the approved total baseline schedule and on all data relevant to the extension. a) Such data shall be included in the next updating of the Progress schedule. b) Actual delays in activities which, according to the Baseline schedule, do not affect any Contract completion date shown by the critical path in the network will not be the basis for a change therein. 2. Submit each request for change in Contract completion date to the City within 30 days after the beginning of the delay for which a time extension is requested but before the date of final payment under this Contract. a. No time extension will be granted for requests which are not submitted within the foregoing time limit. b. From time to time, it may be necessary for the Contract schedule or completion time to be adjusted by the City to reflect the effects of job conditions, weather, technical difficulties, strikes, unavoidable delays on the part of the City or its representatives, and other unforeseeable conditions which may indicate schedule adjustments or completion time extensions. 1) Under such conditions, the City will direct the Contractor to reschedule the work or Contract completion time to reflect the changed conditions and the Contractor shall revise his schedule accordingly. a) No additional compensation will be made to the Contractor for such schedule changes except for unavoidable overall contract time extensions beyond the actual completion of unaffected work, in which case the Contractor shall take all possible action to minimize any time extension and any additional cost to the City. b) Available float time in the Baseline schedule may be used by the City as well as by the Contractor. 3. Float or slack time is defined as the amount of time between the earliest start date and the latest start date or between the earliest finish date and the latest finish date of a chain of activities on the Baseline Schedule. a. Float or slack time is not for the exclusive use or benefit of either the Contractor or the City. b. Proceed with work according to early start dates, and the City shall have the right to reserve and apportion float time according to the needs of the project. 01 32 16 - 4 DAP CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 c. Acknowledge and agree that actual delays, affecting paths of activities containing float time, will not have any effect upon contract completion times, providing that the actual delay does not exceed the float time associated with those activities. E. Coordinating Schedule with Other Contract Schedules 1. Where work is to be performed under this Contract concurrently with or contingent upon work performed on the same facilities or area under other contracts, the Baseline Schedule shall be coordinated with the schedules of the other contracts. a. Obtain the schedules of the other appropriate contracts from the City for the preparation and updating of Baseline schedule and make the required changes in his schedule when indicated by changes in corresponding schedules. 2. In case of interference between the operations of different contractors, the City will determine the work priority of each contractor and the sequence of work necessary to expedite the completion of the entire Project. a. In such cases, the decision of the City shall be accepted as final. b. The temporary delay of any work due to such circumstances shall not be considered as justification for claims for additional compensation. 1.5 SUBMITTALS A. Baseline Schedule 1. Submit Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. a. Native file format includes: 1) Primavera (P6 or Primavera Contractor) 2. Submit draft baseline Schedule to City prior to the pre-construction meeting and bring in hard copy to the meeting for review and discussion. B. Progress Schedule 1. Submit progress Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit progress Schedule monthly no later than the last day of the month. C. Schedule Narrative 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit schedule narrative monthly no later than the last day of the month. D. Submittal Process 1. The City administers and manages schedules through Buzzsaw. 2. Contractor shall submit documents as required in the City of Fort Worth Schedule Guidance Document. 3. Once the project has been completed and Final Acceptance has been issued by the City, no further progress schedules are required. 01 32 16 - 5 DAP CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. The person preparing and revising the construction Progress Schedule shall be experienced in the preparation of schedules of similar complexity. B. Schedule and supporting documents addressed in this Specification shall be prepared, updated and revised to accurately reflect the performance of the construction. C. Contractor is responsible for the quality of all submittals in this section meeting the standard of care for the construction industry for similar projects. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 32 33 - 1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 01 32 33 PRECONSTRUCTION VIDEO PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 33 00 - 1 DAP SUBMITTALS Page 1 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 01 33 00 DAP SUBMITTALS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. General methods and requirements of submissions applicable to the following Work-related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. 01 33 00 - 2 DAP SUBMITTALS Page 2 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) “By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 ½ inches x 11 inches to 8 ½ inches x 11inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions 01 33 00 - 3 DAP SUBMITTALS Page 3 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom-prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City’s Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City’s Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing-in diagrams and templates 5) Catalog cuts 6) Product photographs 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 7) Standard wiring diagrams 8) Printed performance curves and operational-range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare-parts listing and printed product warranties 12) As applicable to the Work H. Samples 1. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on-site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City’s Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) 01 33 00 - 5 DAP SUBMITTALS Page 5 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 01 33 00 - 6 DAP SUBMITTALS Page 6 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non-conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor’s risk if not marked b. Submittals for each item will be reviewed no more than twice at the City’s expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative’s then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City’s discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. 01 33 00 - 7 DAP SUBMITTALS Page 7 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 01 33 00 - 8 DAP SUBMITTALS Page 8 of 8 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days 01 35 13 - 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project #101521 Revised August, 30, 2013 SECTION 01 35 13 1 SPECIAL PROJECT PROCEDURES 2 PART 1 - GENERAL 3 1.1 SUMMARY 4 A. Section Includes : 5 1. The procedures for special project circumstances that includes, but is not limited to: 6 a. Coordination with the Texas Department of Transportation 7 b. Work near High Voltage Lines 8 c. Confined Space Entry Program 9 d. Air Pollution Watch Days 10 e. Use of Explosives, Drop Weight, Etc. 11 f. Water Department Notification 12 g. Public Notification Prior to Beginning Construction 13 h. Coordination with United States Army Corps of Engineers 14 i. Coordination within Railroad permits areas 15 j. Dust Control 16 k. Employee Parking 17 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 – General Requirements 23 3. Section 33 12 25 – Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference 28 standard published at the time of the latest revision date logged at the end of this 29 Specification, unless a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 31 High Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) – Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Department of Transportation 36 1. When work in the right-of-way which is under the jurisdiction of the Texas 37 Department of Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work 39 therein in accordance with the provisions of the permit 40 01 35 13 - 2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project #101521 Revised August, 30, 2013 b. All work performed in the TxDOT right-of-way shall be performed in 1 compliance with and subject to approval from the Texas Department of 2 Transportation 3 B. Work near High Voltage Lines 4 1. Regulatory Requirements 5 a. All Work near High Voltage Lines (more than 600 volts measured between 6 conductors or between a conductor and the ground) shall be in accordance with 7 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 8 2. Warning sign 9 a. Provide sign of sufficient size meeting all OSHA requirements. 10 3. Equipment operating within 10 feet of high voltage lines will require the following 11 safety features 12 a. Insulating cage-type of guard about the boom or arm 13 b. Insulator links on the lift hook connections for back hoes or dippers 14 c. Equipment must meet the safety requirements as set forth by OSHA and the 15 safety requirements of the owner of the high voltage lines 16 4. Work within 6 feet of high voltage electric lines 17 a. Notification shall be given to: 18 1) The power company (example: ONCOR) 19 a) Maintain an accurate log of all such calls to power company and record 20 action taken in each case. 21 b. Coordination with power company 22 1) After notification coordinate with the power company to: 23 a) Erect temporary mechanical barriers, de-energize the lines, or raise or 24 lower the lines 25 c. No personnel may work within 6 feet of a high voltage line before the above 26 requirements have been met. 27 C. Confined Space Entry Program 28 1. Provide and follow approved Confined Space Entry Program in accordance with 29 OSHA requirements. 30 2. Confined Spaces include: 31 a. Manholes 32 b. All other confined spaces in accordance with OSHA’s Permit Required for 33 Confined Spaces 34 D. Use of Explosives, Drop Weight, Etc. 35 1. When Contract Documents permit on the project the following will apply: 36 a. Public Notification 37 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 38 prior to commencing. 39 2) Minimum 24 hour public notification in accordance with Section 01 31 13 40 E. Water Department Coordination 41 1. During the construction of this project, it will be necessary to deactivate, for a 42 period of time, existing lines. The Contractor shall be required to coordinate with 43 the Water Department to determine the best times for deactivating and activating 44 those lines. 45 01 35 13 - 3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project #101521 Revised August, 30, 2013 2. Coordinate any event that will require connecting to or the operation of an existing 1 City water line system with the City’s representative. 2 a. Coordination shall be in accordance with Section 33 12 25. 3 b. If needed, obtain a hydrant water meter from the Water Department for use 4 during the life of named project. 5 c. In the event that a water valve on an existing live system be turned off and on 6 to accommodate the construction of the project is required, coordinate this 7 activity through the appropriate City representative. 8 1) Do not operate water line valves of existing water system. 9 a) Failure to comply will render the Contractor in violation of Texas Penal 10 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 11 will be prosecuted to the full extent of the law. 12 b) In addition, the Contractor will assume all liabilities and 13 responsibilities as a result of these actions. 14 F. Public Notification Prior to Beginning Construction 15 1. Prior to beginning construction on any block in the project, on a block by block 16 basis, prepare and deliver a notice or flyer of the pending construction to the front 17 door of each residence or business that will be impacted by construction. The notice 18 shall be prepared as follows: 19 a. Post notice or flyer 7 days prior to beginning any construction activity on each 20 block in the project area. 21 1) Prepare flyer on the C ontractor’s letterhead and include the following 22 information: 23 a) Name of Project 24 b) City Project No (CPN) 25 c) Scope of Project (i.e. type of construction activity) 26 d) Actual construction duration within the block 27 e) Name of the contractor’s foreman and phone number 28 f) Name of the City’s inspector and phone number 29 g) City’s after-hours phone number 30 2) A sample of the ‘pre-construction notification’ flyer is attached as Exhibit 31 A. 32 3) Submit schedule showing the construction start and finish time for each 33 block of the project to the inspector. 34 4) Deliver flyer to the City Inspector for review prior to distribution. 35 b. No construction will be allowed to begin on any block until the flyer is 36 delivered to all residents of the block. 37 G. Public Notification of Temporary Water Service Interruption during Construction 38 1. In the event it becomes necessary to temporarily shut down water service to 39 residents or businesses during construction, prepare and deliver a notice or flyer of 40 the pending interruption to the front door of each affected resident. 41 2. Prepared notice as follows: 42 a. The notification or flyer shall be posted 24 hours prior to the temporary 43 interruption. 44 b. Prepare flyer on the contractor’s letterhead and include the following 45 information: 46 1) Name of the project 47 2) City Project Number 48 01 35 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project #101521 Revised August, 30, 2013 3) Date of the interruption of service 1 4) Period the interruption will take place 2 5) Name of the contractor’s foreman and phone number 3 6) Name of the Cit y’s inspector and phone number 4 c. A sample of the temporary water service interruption notification is attached as 5 Exhibit B. 6 d. Deliver a copy of the temporary interruption notification to the City inspector 7 for review prior to being distributed. 8 e. No interruption of water service can occur until the flyer has been delivered to 9 all affected residents and businesses. 10 f. Electronic versions of the sample flyers can be obtained from the Project 11 Construction Inspector. 12 H. Coordination with United States Ar my Corps of Engineers (USACE) 13 1. At locations in the Project where construction activities occur in areas where 14 USACE permits are required, meet all requirements set forth in each designated 15 permit. 16 I. Coordination within Railroad Permit Areas 17 1. At locations in the project where construction activities occur in areas where 18 railroad permits are required, meet all requirements set forth in each designated 19 railroad permit. This includes, but is not limited to, provisions for: 20 a. Flagmen 21 b. Inspectors 22 c. Safety training 23 d. Additional insurance 24 e. Insurance certificates 25 f. Other employees required to protect the right-of-way and property of the 26 Railroad Company from damage arising out of and/or from the construction of 27 the project. Proper utility clearance procedures shall be used in accordance 28 with the permit guidelines. 29 2. Obtain any supplemental information needed to comply with the railroad’s 30 requirements. 31 J. Dust Control 32 1. Use acceptable measures to control dust at the Site. 33 a. If water is used to control dust, capture and properly dispose of waste water. 34 b. If wet saw cutting is performed, capture and properly dispose of slurry. 35 K. Employee Parking 36 1. Provide parking for employees at locations approved by the City. 37 01 35 13 - 5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project #101521 Revised August, 30, 2013 1.4 SUBMITTALS [NOT USED] 1 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.6 CLOSEOUT SUBMITTALS [NOT USED] 3 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.8 QUALITY ASSURANCE [NOT USED] 5 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.10 FIELD [SITE] CONDITIONS [NOT USED] 7 1.11 WARRANTY [NOT USED] 8 PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 END OF SECTION 11 12 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.3.B – Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 13 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project #101521 Revised August, 30, 2013 EXHIBIT A 1 (To be printed on Contractor’s Letterhead) 2 3 4 5 Date: 6 7 CPN No.: 8 Project Name: 9 Mapsco Location: 10 Limits of Construction: 11 12 13 14 15 16 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 17 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 18 PROPERTY. 19 20 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 21 OF THIS NOTICE. 22 23 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 24 ISSUE, PLEASE CALL: 25 26 27 Mr. <CONTRACTOR’S SUPERINTENDENT> AT <TELEPHONE NO.> 28 29 OR 30 31 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 32 33 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 34 35 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 36 37 01 35 13 - 7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project #101521 Revised August, 30, 2013 EXHIBIT B 1 2 3 4 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 SECTION 01 45 23 TESTING AND INSPECTION SERVICES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City’s document management system, or another form of distribution approved by the City. 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City’s Project Representative 4. Provide City’s Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaña Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City’s document management system. 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City’s Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City’s established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off-site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on-call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE-INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 SECTION 01 55 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 34 71 13 – Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. 01 55 26 - 2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 1) Allow a minimum of 5 working days for permit review. 2) Contractor’s responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor’s responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City’s Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION 01 55 26 - 3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 Revision Log DATE NAME SUMMARY OF CHANGE 01 57 13 - 1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 SECTION 01 57 13 STORM WATER POLLUTION PREVENTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 31 25 00 – Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 31 25 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 31 25 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP 1. Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review 01 57 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 01 33 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 01 58 13 - 1 DAP TEMPORARY PROJECT SIGNAGE Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 58 13 TEMPORARY PROJECT SIGNAGE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City’s Standard Details for project signs. 01 58 13 - 2 DAP TEMPORARY PROJECT SIGNAGE Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 B. Materials 1. Sign a. Constructed of ¾-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION 01 58 13 - 3 DAP TEMPORARY PROJECT SIGNAGE Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M. Domenech Revised for DAP application 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 SECTION 01 60 00 PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City’s website at: https://apps.fortworthtexas.gov/ProjectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City’s Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City’s Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City’s Standard Product List. C. Although a specific product is included on City’s Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer’s standard product. D. See Section 01 33 00 for submittal requirements of Product Data included on City’s Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City’s Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magaña Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City’s website. 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer’s recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer’s recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City’s Project Representative. 5. Provide off-site storage and protection when on-site storage is not adequate. a. Provide addresses of and access to off-site storage locations for inspection by City’s Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers’ unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City’s Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City’s Project Representative. 01 66 00 - 3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non-Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor’s operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor’s personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor’s operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor’s personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor’s personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor’s operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor’s personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor’s operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor’s personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Specified Remobilization” in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 3. Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Work Order Mobilization” in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price per each “Work Order Emergency Mobilization” in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 71 23 - 1 DAP CONSTRUCTION STAKING AND SURVEY Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Certificates 1. Provide certificate certifying that elevations and locations of improvements are in conformance or non-conformance with requirements of the Contract Documents. a. Certificate must be sealed by a registered professional land surveyor in the State of Texas. 01 71 23 - 2 DAP CONSTRUCTION STAKING AND SURVEY Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 B. Field Quality Control Submittals 1. Documentation verifying accuracy of field engineering work. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the City. 2. Coordination a. Contact City’s Project Representative at least 2 weeks in advance for scheduling of Construction Staking. b. It is the Contractor’s responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes furnished by City. b. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed or disturbed, by Contractor’s neglect, such that the contracted Work cannot take place, then the Contractor will be required to pay the City for new staking with a 25 percent markup. The cost for staking will be deducted from the payment due to the Contractor for the Project. B. Construction Survey 1. Construction Survey will be performed by the City. 2. Coordination a. Contractor to verify that control data established in the design survey remains intact. b. Coordinate with the City prior to field investigation to determine which horizontal and vertical control data will be required for construction survey. c. It is the Contractor’s responsibility to coordinate Construction Survey such that construction activities are not delayed or negatively impacted. d. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. 1) City shall perform replacements and/or restorations. 3. General a. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work as it progresses for Project Records. b. The Contractor will need to ensure coordination is maintained with the City to perform construction survey to obtain construction features, including but not limited to the following: 1) All Utility Lines a) Rim and flowline elevations and coordinates for each manhole or junction structure 2) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Every 250 linear feet 01 71 23 - 3 DAP CONSTRUCTION STAKING AND SURVEY Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 (2) Horizontal and vertical points of inflection, curvature, etc. (All Fittings) (3) Cathodic protection test stations (4) Sampling stations (5) Meter boxes/vaults (All sizes) (6) Fire lines (7) Fire hydrants (8) Gate valves (9) Plugs, stubouts, dead-end lines (10) Air Release valves (Manhole rim and vent pipe) (11) Blow off valves (Manhole rim and valve lid) (12) Pressure plane valves (13) Cleaning wyes (14) Casing pipe (each end) b) Storm Sewer (1) Top of pipe elevations and coordinates at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. c) Sanitary Sewer (1) Top of pipe elevations and coordinates for sanitary sewer lines at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. (c) Cleanouts c. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work associated with meeting or exceeding the line and grade required by these Specifications. d. The Contractor will need to ensure coordination is maintained with the City to perform construction survey and to verify control data, including but not limited to the following: 1) Established benchmarks and control points provided for the Contractor’s use are accurate 2) Benchmarks were used to furnish and maintain all reference lines and grades for tunneling 3) Lines and grades were used to establish the location of the pipe 4) Submit to the City copies of field notes used to establish all lines and grades and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City to verify the guidance system and the line and grade of the carrier pipe on a daily basis. 6) The Contractor remains fully responsible for the accuracy of the work and the correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to City. 9) If the installation does not meet the specified tolerances, immediately notify the City and correct the installation in accordance with the Contract Documents. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 01 71 23 - 4 DAP CONSTRUCTION STAKING AND SURVEY Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. It is the Contractor’s responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 74 23 - 1 DAP CLEANING Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 74 23 CLEANING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 3. Section 32 92 13 – Hydro-Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. 01 74 23 - 2 DAP CLEANING Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. 01 74 23 - 3 DAP CLEANING Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on-site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re-seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 77 19 - 1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 77 19 CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City’s Project Representative. 01 77 19 - 2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 01 78 39 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion 01 77 19 - 3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor’s Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 01 78 23 - 1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 ½ inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer’s printed data, or neatly typewritten 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly-leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut-down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 – title of section removed 4/7/2014 M.Domenech Revised for DAP Application 01 78 39 - 1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 01 78 39 PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 – General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City’s Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". 01 78 39 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents 1. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 101521 Revised July 1, 2011 APPENDIX GC-4.01 Availability of Lands CITY OF FORT WORTH BIRCHMAN STREET PARKING STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 101521 Revised July 1, 2011 GC-4.01 Availability of Lands Being all of that property as described in a deed to Continental Farms, L.P., filed December 21, 2017 in Tarrant County Clerk’s Instrument No. D217293469, Tarrant County, Texas.