HomeMy WebLinkAboutContract 58557 CSC No. 58557
Form 9-1482 U.S. DEPARTMENT OF THE INTERIOR
Revised (October 2002) U.S. Geological Survey
Agreement Number Mary's_Ck_10/19/2022
AGREEMENT FOR INSTALLATION AND MAINTENANCE OF GAGING STATION*
The landowner agrees that the U.S. Geological Survey(USGS), Texas Water Science Center
may install and maintain a gaging station on the landowner's property at a mutually agreed-
upon site at the location listed below. The landowner also agrees that the USGS will have
access to the site, as it reasonably deems necessary for streamflow measuring and/or water-
quality sampling during the life of this agreement.
Description of the gaging station, located on Mary's Creek in Z. Boaz South Park, Tarrant
County, Texas 76126 (Location Map and Equipment Photos attached)
Excavation and/or installation of the gaging station, at the USGS's own expense, may begin any
time after this agreement is fully executed. The gaging station shall be excavated, installed, and
properly maintained by the USGS. This Agreement shall be regarded as granting a license in
favor of USGS to enter landowner's property for the purposes noted herein.
At the expiration of this agreement, the gaging station may be disposed of in one of the following
ways:
1 - Removal by the USGS, at its own cost and expense, within a reasonable time after the
expiration of this agreement. Upon removal of the station, the USGS shall restore the
landowners property, also at its own expense, as nearly as possible to the condition when
installed, or
2 - Transfer to a state, local, or tribal government agency or Federal Energy Regulatory
Commission licensee under a separate written agreement, if approved by the landowner and the
USGS Regional Executive.
During the life of this agreement, the Federal Government will be liable for any loss related to
the installation, operation, maintenance, and other activities associated with the gaging station
described above in accordance with, and to the extent permitted under, the Federal Tort Claims
Act(28 U.S.C. &&1346(b) and 2671 et seq).
This agreement shall become effective when fully executed and shall remain in full force for 10
year(s) 0 month(s) unless terminated earlier by USGS upon 60 days written notice. After 10
year(s) 0 month(s), the agreement will continue in force until terminated by either the USGS or
the landowner upon 60 days written notice to the other party.
* For the purpose of this agreement, "gaging station" includes all stilling wells and structure,
including cableways and equipment, used in the operation and maintenance of the monitoring
site. The layout of station equipment must be approved by the Park&Recreation Department
Director or that person's designee prior to installation.
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
All notices required or permitted under this Agreement shall be conclusively determined to have
been delivered when (i) hand-delivered to the other party, its agent, employee, servant, or
representative, or (ii) received by the other party by reliable overnight courier or United States
Mail, postage prepaid, return receipt requested, at the address stated below or to such other
address as one party may from time to time notify the other in writing.
City of Fort Worth Park & Recreation Department, Director
Address 4200 South Freeway, Suite 2200
Telephone Number 817-392-5700
City of Fort Worth Department of Law
Address 200 Texas Street
Telephone Number 817-392-7600
USGS Water Science Center Director Roussel, Meghan (Acting)
Address 1505 Ferguson Lane, Austin, Texas 78754
Telephone Number 512-927-3500
USGS Project Chief Sunvison, Milton
Address 1505 Ferguson Lane, Austin, Texas 78754
Telephone Number 512-927-3533
[SIGNATURE ON FOLLOWING PAGE]
By executing this Agreement, the Parties agree to and accepts the terms, conditions and
provision contained herein.
CITY OF FORT WORTH: U.S. GEOLOGICAL SURVEY:
Digitally signed by
MEGHAN MEGHAN ROUSSEL
Date:20
B Y C)P� B y : ROUSSEL 112:0932-06'00'a
Jesica McEachem
Assistant City Manager
Date: Dec 6, 2022 Date:
REVIEWED BY:
gy : )99Ie
fa--,
Dave Lewis
Interim Director
Park& Recreation Department
By : ,�—
Joel McElhany
Assistant Director
Park& Recreation Department
APPROVED AS TO FORM
AND LEGALITY:
Taylor Paris
Assistant City Attorney ooq�40R
�0&°F o000000
ATTESTED BY: ���►o° 00���
�asK�-S. Croor7a�G P~0
o=
,IA-10
o
JannetteS.Goodall(Dec8,202213:22CST) %Y o0
Janette Goodall d `
City Secretary o�000000 o ICY
EXA a
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible for the monitoring and administration
of this contract, including ensuring all performance and reporting requirements.
David B.Todvay
David B. Jodray
Park Planner
Contract Authorization:
No M&C Required OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
U.S. DEPARTMENT OF THE INTERIOR
U.S. Geological Survey
Water Quality Monitoring Station
Z Boaz South Community Park(5250 Old Benbrook Road, Fort Worth 76126)
-
{
9 0 0
r
r =.rw�
Water Quality Station
Map—Water Quality Monitoring Station Location
Water Quality Monitoring Station Equipment
f4
-S
8
Approximate Station Tower Dimensions: Approximate Tube Dimensions:
6'wide x 6'depth x 10'height 3'wide x 30'length x I'height
(Footers mounted 6'below ground in concrete)
�a. �
Signature:
Email: joel.mcelhany@fortworthtexas.gov