Loading...
HomeMy WebLinkAboutContract 58557 CSC No. 58557 Form 9-1482 U.S. DEPARTMENT OF THE INTERIOR Revised (October 2002) U.S. Geological Survey Agreement Number Mary's_Ck_10/19/2022 AGREEMENT FOR INSTALLATION AND MAINTENANCE OF GAGING STATION* The landowner agrees that the U.S. Geological Survey(USGS), Texas Water Science Center may install and maintain a gaging station on the landowner's property at a mutually agreed- upon site at the location listed below. The landowner also agrees that the USGS will have access to the site, as it reasonably deems necessary for streamflow measuring and/or water- quality sampling during the life of this agreement. Description of the gaging station, located on Mary's Creek in Z. Boaz South Park, Tarrant County, Texas 76126 (Location Map and Equipment Photos attached) Excavation and/or installation of the gaging station, at the USGS's own expense, may begin any time after this agreement is fully executed. The gaging station shall be excavated, installed, and properly maintained by the USGS. This Agreement shall be regarded as granting a license in favor of USGS to enter landowner's property for the purposes noted herein. At the expiration of this agreement, the gaging station may be disposed of in one of the following ways: 1 - Removal by the USGS, at its own cost and expense, within a reasonable time after the expiration of this agreement. Upon removal of the station, the USGS shall restore the landowners property, also at its own expense, as nearly as possible to the condition when installed, or 2 - Transfer to a state, local, or tribal government agency or Federal Energy Regulatory Commission licensee under a separate written agreement, if approved by the landowner and the USGS Regional Executive. During the life of this agreement, the Federal Government will be liable for any loss related to the installation, operation, maintenance, and other activities associated with the gaging station described above in accordance with, and to the extent permitted under, the Federal Tort Claims Act(28 U.S.C. &&1346(b) and 2671 et seq). This agreement shall become effective when fully executed and shall remain in full force for 10 year(s) 0 month(s) unless terminated earlier by USGS upon 60 days written notice. After 10 year(s) 0 month(s), the agreement will continue in force until terminated by either the USGS or the landowner upon 60 days written notice to the other party. * For the purpose of this agreement, "gaging station" includes all stilling wells and structure, including cableways and equipment, used in the operation and maintenance of the monitoring site. The layout of station equipment must be approved by the Park&Recreation Department Director or that person's designee prior to installation. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX All notices required or permitted under this Agreement shall be conclusively determined to have been delivered when (i) hand-delivered to the other party, its agent, employee, servant, or representative, or (ii) received by the other party by reliable overnight courier or United States Mail, postage prepaid, return receipt requested, at the address stated below or to such other address as one party may from time to time notify the other in writing. City of Fort Worth Park & Recreation Department, Director Address 4200 South Freeway, Suite 2200 Telephone Number 817-392-5700 City of Fort Worth Department of Law Address 200 Texas Street Telephone Number 817-392-7600 USGS Water Science Center Director Roussel, Meghan (Acting) Address 1505 Ferguson Lane, Austin, Texas 78754 Telephone Number 512-927-3500 USGS Project Chief Sunvison, Milton Address 1505 Ferguson Lane, Austin, Texas 78754 Telephone Number 512-927-3533 [SIGNATURE ON FOLLOWING PAGE] By executing this Agreement, the Parties agree to and accepts the terms, conditions and provision contained herein. CITY OF FORT WORTH: U.S. GEOLOGICAL SURVEY: Digitally signed by MEGHAN MEGHAN ROUSSEL Date:20 B Y C)P� B y : ROUSSEL 112:0932-06'00'a Jesica McEachem Assistant City Manager Date: Dec 6, 2022 Date: REVIEWED BY: gy : )99Ie fa--, Dave Lewis Interim Director Park& Recreation Department By : ,�— Joel McElhany Assistant Director Park& Recreation Department APPROVED AS TO FORM AND LEGALITY: Taylor Paris Assistant City Attorney ooq�40R �0&°F o000000 ATTESTED BY: ���►o° 00��� �asK�-S. Croor7a�G P~0 o= ,IA-10 o JannetteS.Goodall(Dec8,202213:22CST) %Y o0 Janette Goodall d ` City Secretary o�000000 o ICY EXA a Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. David B.Todvay David B. Jodray Park Planner Contract Authorization: No M&C Required OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX U.S. DEPARTMENT OF THE INTERIOR U.S. Geological Survey Water Quality Monitoring Station Z Boaz South Community Park(5250 Old Benbrook Road, Fort Worth 76126) - { 9 0 0 r r =.rw� Water Quality Station Map—Water Quality Monitoring Station Location Water Quality Monitoring Station Equipment f4 -S 8 Approximate Station Tower Dimensions: Approximate Tube Dimensions: 6'wide x 6'depth x 10'height 3'wide x 30'length x I'height (Footers mounted 6'below ground in concrete) �a. � Signature: Email: joel.mcelhany@fortworthtexas.gov