Loading...
HomeMy WebLinkAboutContract 53607-CO3 Attest: lgnnslf ls-S. dogy)A& Jannette S.Goodall(Dec 8,202213:23 CST) Dec 8,2022 �p�FORT��a CSC No.53607-0O3 p o000000aao FORT WD RT H °� o G-oo ,�1d Pvo o=0 PAS*0000 0e*�d daaIl�EXA`•�o4p �naag4a 000000 City Of Fort Worth Change Order Request Facility and project Park Maintenance Facility Phase 2 City Sec No. 53607 Description: Funding(FID)34018 0800450 5740010101010 004480 999918020111 City Proj.No. 101010 No.(s) Contractor:I Muckleroy&Falls Construction Company Change Order#F-3 J Date: 1112812022 City Project Mgr.I Ronnie Clements City Inspector: JDonIsaacs Phone Number:(817)392-8014 Phone Number: (817)392-8498 Contract Time (CD) Original Contract Amount ---- $9,099,973.00 365 Extras to Date ---- $69,924.00 45 Credits to Date ------ $0.00 0 Pending Change Orders(in M&C Process) ---- $0.00 0 Contract Cost to Date ---- $9,169,897.00 0 Amount of Proposed Change Order ----- $9,869.00 0 Revised Contract Amount $9,179,766.00 410 Original Funds Available for Change Orders--- $0.00 Remaining Funds Available for this CO ---- $0.00 Additional Funding(if necessary) $0.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.876% MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $11,374,966.25 JUSTIFICATION(REASONS)FOR CHANGE ORDER The purpose of Change Order#3 is to install low clearance racks on the overhead doors that were obstructed by the required PEMB structure.Change Orders No.1,2,&3 increases the original contract($9,099,973.00)by$79,973.00 for a revised contract amount of $9.179,766.00.A 0.876 percent increase to the original contract price. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order. Nov 28,2022 Muckleroy&Falls Dustin Vardaman -—.0 �n Contractor's Company Name Contractor Name Contractor Signature Date Da Nov 28,2022 Nov 29,2022 PMD Inspector Date Architecural Services Manager Date Z?-ta2 Nov 28,2022 Dec 2,2022 PMD Superintendent Date Director Property Management Department Date e-MCA—tl Nov 28,2022 sr Dec 7,2022 PMD Project Manager Date Assistant City Attorney Date buyta� Nov 29,2022 Dec 72022 Dana fti hde(O-1,- :SOCS1 f Project Architect Date Assistant City Manager Date OFFICIAL RECORD M&C Number N/A M&C Date Approved N/A CITY SECRETARY Contract Compliance Manager: FT.WORTH,TX By signing I acknowledge that I am the person responsible ►�/yy�� �• 64'3t J for the monitoring and administration of this contract,including Brian R.Glass,AIA ensuring all performance and reporting requirements. Assistant Director,Property Managemei Change Order Request LIM I Detailed(with Breakdown of PCOs),Grouped by Each MUCKLEROY LEROY FALLS Number CoFW Park Maintenance Facility-Phase II Project# 19636 HM&MF Ltd.,d/b/a MUCKLEROY&FALLS 5189 James Ave.Fort Worth TX,76115 Tel: Fax: Change • • 037 D. 1112312022 To: James Diestel From: Dustin Vardeman City of Fort Worth HM&MF Ltd.,d/b/a MUCKLEROY&FALLS 401 W 13th St 3200 Riverfront Dr Fort Worth,TX 76102 Suite 200 Fort Worth,TX 76107 Description Category Status Low Clearance Overhead Door Tracks Reference Required By Days Req Amt Req 11/30/2022 0 9,869 Notes PCO No Date Reference Amt Prop Days Req Category Reason Description Notes PCO 37 11/23/2022 9,869 0 Low Clearance Overhead Door Tracks This PCO is to install low clearance tracks on overhead doors obstructed by required PEMB structure.This is to provide a tighter seal at the heads of the overhead doors. This PCO is issued to incorporate the revisions as specifically detailed on the attached cost summary and supporting documents.If additional costs become apparent at a later date,or additional information regarding this scope of work become available,we reserve the right to price any additional cost and/or schedule impacts as they become known. Item No Item Description Amt Prop Reference 001 Owner Contingency-Low Clearance Overhead Door -3,808 Tracks 002 Texas Overhead Door-Low Clearance Overhead 13,677 Door Tracks Approved By: Signature Name Date Prolog Converge Printed on: 11/23/2022 MuckleroyFallsProlog Page 1 COMMERCIAL lSERVICE0 MANAGER HOUS DIVISION ell Sanders, 17 - TEXAS® Dale Overbay,83126- 5 dsandersO-txohd.com OVERHEAD DOOR doverbav(&txohd.com SECURITY SALES COMMERCIAL&RFSIDF vTinL ESTIMATOR Jesse Collier,817-295-0216 Don DeKing,800-715-8781 jcollier txohd.com CORPORATE OFFICE ddekinq(@txohd.com ERIC FLETCHER ESTIMATOR 122 NW Hillery Street,Burleson,TX 76028 ESTIMATOR Mark Bateman,817-295-0216 817-295-0216/efletcher(ftcohd.com Linsey Golden,817-295-0216 mbateman(@__txohd.com Igolden(@__txohd.com PROPOSAL DATE: November 17, 2022 TO: Dustin Vardeman Mark Pagel Muckleroy&Falls DVardeman(&muckleroyfalls.com MPagel@muckleroyfalls.com PROJECT: FORT WORTH PARD PHASE II Change Below Doors to Double Low Headroom In lieu of Originally Installed Tracking System(Parts as mfg. by Clopay Building Products) (3)8'x 12'Sectional Doors (1) 12'x 12'Sectional Doors TOTAL $9,877.00 Tax Excluded Change One Door to Double Low Headroom ahead of the remaining doors to get final approval from GC and Owner TOTAL $3,800.00 Tax Excluded ***ELECTRICAL WIRE OR WIRING LOW OR HIGH VOLTAGE BY OTHERS*** Important Note:Specialty Product Requires from the Manufacturer a 309,66 Down Payment on Material Portion Only This quotation is based on current pricing from our suppliers and includes surcharges levied by the steel industry.Surcharges are subject to change and final pricing will be determined at the time the order is released for fabrication YOUR CONTACT FOR THIS PROJECT IS: ERIC FLETCHER, 817-295-0216 EMAIL: efletcher@txohd.com ........................................................................................................................................ OVERHEAD SECTIONAL AND ROLLING DOORS - HIGH SPEED ROLLING DOORS FULL LINE OF DOCK EQUIPMENT - INDUSTRIAL HANGAR, BI-FOLD,AND BLAST DOORS Please visit our website: www.txohd.com LG