HomeMy WebLinkAboutContract 56759-CO1 CSC No. 56759-COl FORT WORTH City of Fort Worth Change Order Request Project Name 1 2021 Bridge Rehabilitation Contract 1 City Sec# 56759 Client Project#(s) 103098 Project Description Bridge Rehabilitation at Eight Locations Contractor Ragle,Inc. Change Order# 1 Date 11/29/2022 City Project Mgr. Tariqul Islam City Inspector Ozzie Ouimette Contract Time Dept. TPW Totals (CD) Original Contract Amount $444,053.84 $444,053.84 150 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $444,053.84 $444,053.84 150 Amount of Proposed Change Order $0.00 $0.00 20 Revised Contract Amount $444,053.84 $444,053.84 170 Original Funds Available for Change Orders $25,000.00 $25,000.00 Remaining Funds Available for this CO $25,000.00 $25,000.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $555,067.30 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order is to add$0 dollar and 20 calendar days to contract#56759. During construction it was identified that the fabrication of missing old handrail per plan at E.Seminary Or(north side)needs compromise to type of material.The fabrication of the rail post needs significant additional effort to match with old design also.Considering these issues,for E.Seminary Or bridge,it was decided to install TxDOT approved T1 F metal rail instead of old nonstandard handrail.Also,as south side handrail of the same bridge was completely damaged prior to start construction by an accident,it was decided to install same type of handrail(T1 F)on both sides of the bridge. A quote for T1 F metal handrail was received from contractor and compared with last few months TxDOT average bid price for same item and found reasonable.To cover the cost of additional work,a portion of construction allowance has been deleted,and railroad coordination pay item also deleted as it was not required in this contract.This change order also includes a guardrail retrofit item for Vickery Blvd bridge. To fabricate and install additional 188.5 LF of T1 F type handrail and guardrail retrofit work,20 calendar days are proposed to add to the contract. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractors Company Name Contractor(Name) Contract Signature I Date Ragle,Inc. Nishant Gupta I Dec 5,2022 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date 14-4almette Dec 6,2022 � Dec 6,2022 °.,mom� �,�„� �.m Program Manager Date Senior Capital Project Officer Date Dec 6,2022 Dec 6,2022 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date �! �.+r4--� •.•..� Dec 7,2022 - -. Dec 7,2022 Assistant City Attorney Date Assistant City Manager Date Dec 9,2022 Dec 8,2022 �-�+ Council Action(if required) ,oa'p9�nnbL M&C Number M&C Date Approved R r�YaO ATTEST: a�.o OFF �o10 OFFICIAL RECORD Jannette Goodall,City Secretary p* 000 v V o°*�o CITY SECRETARY b aa44E7CAs°o4" FT.WORTH,TX FORT WORTH City of Fort worth t`—- Change Order Additions Project Name 2021 Bridge Rehabilitation Contract 1 City Sec# 56759 ### Client Project# 103098 Contractor Bridge Rehabilitation at Eight Locations PM Tariqul Islam Inspector Oaie Ouimette Ragle,Inc. O Date 1112912022 4/28/2022 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total ew Retrofit Plate rgua rai 30-New Type T1 F Steel Handrail TPW 377.00000000 LF 235.16 55. TPW $96,997.21 Sub Total Additions 96,997.21 Change Order Additions Page 2 of 4 FOR; TH City of Fort worth Change Order Deletions Project Name 2021 Bridge Rehabilitation Contract 1 City Sec# 56759 ### Client Project# 103098 Contractor Bridge Rehabilitation at Eight Locations PM Tadqul Islam Inspector Oaie Ouimette Regis,Inc. O7 Date 1112912022 412812022 DELETIONS ITEM DESCRIPTION DEPT Qty Unit UnitCost Total 5 Replace Steel Ran .5 5, 5. 27 Railroad Coordination TPW 1.00000000 LS 50,000.00 28 Paving Construction Allowance TPW 0.22364420 LS 50,000.00 TPW 1 $96,997.21 Sub Total Deletions 96,997.21 Change Order Deletions Page 3 of 4 MISBE for this Change Order M/SBE Sub Type of Service Amount for this CO 2021 Bridge Rehabilitation Contract 1 103098 Bridge Rehabilitation at Eight Locations Total $0.00 Ragle, Inc. Previous Change Orders Co# DATE AMOUNT Total $0.00 Q c N m m L CM M co aP 7 CO co" v, m E N Q N O 6l> 619. 619. 619. 6l-:).too- 0 W V CR 3 Z °1 s as a `'' Vo rn CO d2C) G 00 cn 0 o c �a Of N O N m f6 d C O S O. t� IL N G N W (/� A m Z a V O t` r W CD v 2 V� CM O R Wcm '� c J O LU m Z O O O O O A A O A fh O O O! f N R f`7 R N W m A N m A A OD w N H3 H3 V3 V3 H3 EA EA EA EH EH EA EH N EH N EA N EH N NQ G N O A A A O Z O � iD iD O iD N A! � E O m 0 3 � v3 vs vs vs vs va va <»vs�n �n va�n 0 N 0 C M a O G vl v3 m e a� e a o a N V3 V3 V3 V3 V3 EA EH EH EA EH N N EA N IA W N C O O O O m fG {+� N O N N C4 C C � iG iG �N p M� ' A A O OD E E o. v3 vs vs vs vs va<»va va va c o W 'e 7 t»t» C oo ecM+ .M 6a�o � N � iD f`7 W � O E a EJ9 EJY V3 V3 ef3l efDI N V N EA N p O O J N-W a e e e C C; N 7 V3 V3 Q Q 7 2 2 2 2 W W C O O O O O O I W •C 7 Q I I I N C I O � n e � Ve o I aV � 0 d N m °� o CL 0 L L a in t .'R w cy e p IF J lL .. .5 C C O t 2 S m L U U O.~ 2 '� O N N w C L Cf a L O !C !C Cm 0 •O Y y % .0 U U O O W O 9 U p N m �o �o Q c.� L w w w o o o 0 tt F � � � LU �� wJf V An co 629-2021 BID DATE 7/21/2021 REVISION ch002 JE CASEY,LLC DBE,SBE&HUB DBE/SBE/MBE Certification BMDB83337YO518 HUB Certification Number 1463368581400 629-2021 TARRANT CITY OF FT WORTH 2O21 BRIDGE REHAB 103098 Unit Bid Item Description UM QTY Price Extended *********CHANGE ORDER*********** 5406007 MTL BEAM GD FEN TRANS(TL2)CH002-T202 Retrofit Plates-required b/c wingwall is only 28 in EA 4.00 1054.00 4216.00 LINE 1 CH002-CORE DRILL 14 INCH DIAMETER HOLE, LEAVOUT IN RIPRAP AS REQUIRED FOR POST PLACEMENT EA 9.00 205.33 1847.97 TOTAL $6,063.97 Terms 0 All freight and all material INCLUDED,unless noted otherwise FURNISH AND INSTALL,unless noted otherwise STEEL portion of rail ONLY,concrete by others All material is stored at jobsite at the expense of other All permits provided by other Safety cable and installation provided by others when required Traffic Control provided by other Grading provided by others All concrete drilling is performed by hammer drilling,unless noted otherwise Rail installation will follow grade unless noted otherwise Any product modification shall be handled by contractor,unless noted otherwise If material is supplied by other, JEC is not resposible for material quantity,inspection,compliance, workmanship,offloading,nor rail placement.If equipment available,but no operator,JEC will provide equipment operator at cost. Installation schedule shall not be influenced by construction of mow strip,sidewalk,signs,curb,or any other construction task,which can prohibit JEC installation. Any location which does not allow for use of skid steer to install,due to height,grade,etc..,contractor is repsonible for providing adequate equipment to perform work CCA's unit price DO NOT INCLUDE concrete pad unless noted otherwise. FHWA equipment rental bluebook rate supplied by contractor This quote is valid for 30 days from date quoted. Prices do not include state or local sales or use taxes,should any apply. Prices quoted are FOB jobsite(unless noted otherwise)with full freight allowed. Upon credit approval,terms are COD with 1.1%late charge for accounts past 1 day. Out of state orders are required to pay 50%down&50%upon delivery of material pending credit approval Terms apply to partial shipments. Quote is to be taken as a whole.Changes in quantities,elimination and/or addition of line items may affect unit prices at JEC's discretior John Casey Accepted By 469-316-6851 Organization John casey@iecinstall.com Requested Date I.. O Q �' NLO cra p � z W N O O CD Gs IC O d Z CO OD °D No LO 04 It 0 m E N O a k N Coo O !. ` L(7 O S! a N r' `o E va 'xvo 00 � � J J ++� CD C5 O LCD O r- co O co 7 N O N m f0 a c o a � Q Z N W G N H LU J � a Z O LUO H � W ZO J_ J_ N ° J LU ° m ° CO) CO)za . y LULU U ► W Zara er ILa � �� �k as m _ C m � w A 0 C� O O O O O O M -e 0 V9 O N f� O O C C C C C CM " C � fV O O O O C M O N O N 10 fr f� 10 f ---O N W a N LO f W W � - N W w wwwww www ww ww wy�w w w yew M N y ~ ^ C O O e O O m` La L a C O O $ w w w w w w w w w w w w w u u T c d Q m O �N c� Q. �p N C N N M M w w w w w w w w w w N N w w N O C u M w 7 'O w o e e m m O N N N A O _ CI OE . w w w w w w w w w w w w N N w N C lO.' fN0 a CO7 e C 7 w 0 0 0 0 o e o e o e O a w w w w w w w w w N w w p O O O O O O J M M M M C c Oo c a_ N C w w w w w w C W 0 0 0 0 0 O O C 7 M O O .d V 21 aV � , W % a ' d c w 0 W aEi aEi aEi aEi E .. g o m m i J J J-Co LL Q� U w = *1 3 C N N N N N 2 (Q _ C ca tl! �1 O Y! W ? ? oa m L oa w a 2 2 2 2 2 a e a e +' JLiLiLiLirn w "a `� q) v'» rc cc car GSI Highway Products 720 W Wintergreen Road Hutchins,TX 75141 USA A Phone: (972)225-1660 P 1 G HWAY P RO n1.J C TS Fax: (972)225-6662 SBE Vendor number 11092 Quote No: 23704ADD2 What we build here SAVESLIVESI Thursday,November 3,2022 Page 1 of 2 attention: Maqsood Khan Makou,Inc. 7100 S. Cooper Street Suite 15 Arlington,TX 76001 TERMS: No Terms Established Phone: 817-798-5426 Prepay and Add FOB:GSI YARD Fax: 817-494-0404 Ship Payment Type:Prepay and Add July 22,2021 2021 Bridge Rehab Contract 1 103098 Fort Worth,TX. Bid Item Quantity Price Description Extended Line:4 189.00 LF 149.85000 T1 F Alum/Steel Rail $28,321.65 1 T1 F-LF STD Galvanized Galvanized Steel Post with Anodized Aluminum Rails. Excludes Epoxy. Line:5 1.00 EA 325.00000 Outbound Freight $325.00 FREIGHT REV1 Per Delivery. Estimate Only-Subject to change at time of Shipment. Salesperson: Reece,Steve Quote Total. $28,646.65 Prices are Valid Until Saturday,December 3,2022 GSI Highway Products 720 W Wintergreen Road Hutchins,TX 75141 USA A Phone: (972)225-1660 P 1 G HWAY P RO n1.J C TS Fax: (972)225-6662 SEE Vendor number 11092 Quote No: 23704ADD2 What we build here SAVESLIVESI Thursday,November 3,2022 Page 2 of 2 *This offer stipulates that delivery may be made in ONE SHIPMENT,any additional shipment changes or events will result in additional freight and handling charges per event and is governed by the terms and conditions below. 1. Unless noted otherwise,prices quoted are FOB as per above and do not include state or local sales or use taxes should any apply. 2. All material is estimated as being built in the most efficient manner for GSI;should contractor require the project to be built on a per structure basis a change order will apply. 3. GSI will store material up to the agreed upon ship date,any storage beyond that date will incur storage fees. 4. GSI reserves the right to request progress payments.Contractor's P.O. must specifically allow progress payments.GSI's normal terms,stated below,will apply. S. If drawings and/or material take-offs are to be submitted,no work shall commence on fabrication until full approval has been received.Submittals must be returned within 45 days of submission to maintain pricing for project.Any changes from original plans and specifications will consider the project canceled unless a proper change order has been executed.GSI CANNOT PROMISE ANY FIRM COMPLETION DATES UNTIL A FULL APPROVAL IS GIVEN ON ANY NECESSARY SUBMITTALS. 6. Terms are as listed above,with a 1 1/2%per month late charge for accounts past the listed term.Terms apply to partial shipments and progress payments. Payments are to be made at 720 West Wintergreen Rd,Hutchins Texas 75141.Customers with established credit terms with GSI may opt to pay with a credit card,however, 1-1/2%interest will be calculated from the date of shipment. 7. Freight is an Estimate Only-given our best efforts and may change. Freight charges will be at our cost+15%handling fee. Subject to change at time of Shipment. 8. A restocking Fee of 25%will be charged for any material returned in the same condition as sold,after material staging or booking. 9. Due to the volatility of the materials and steel markets,all GSI project prices in this proposal are firm for acceptance within 30 days of quotation date. 10. Should the base material and or steel cost increase by more than 2%between the time of quote,and the time of shipment,then the difference in excess of 2%will be evidenced and charged directly to the client. 11. No addenda are acknowledged unless otherwise noted. SPECIAL NOTES: Subject to material availability. SBE Vendor number 11092 Accepted By: Company: Requested Delivery Date: FORTWORTH. Routing and Transmittal Slip Transportation and Public Works Department DOCUMENT TITLE: 2021 Bridge Rehabilitation Contract 1 , CO 1 M&C CPN 103098 CSO # 56759 DOC# DATE: 11/29/2022 INITIALS DATE OUT To:Alexiz Ramirez „A Dec 2 , 2022 1. Ragle Inc 2. NG Dec 5, 2022 � 3.Ozzie Ouimette (Inspector) o° Dec 6, 2022 4.Tariqul Islam (PM) T.I. Dec 6, 2022 5 Omar Elbagalati (PGM) D Dec 6, 2022 s Leon Wilson (Interim SCPO) /-a) Dec 6, 2022 7. Michael Owen Interim AD M0 Dec 7, 2022 8. Lauren Prieur (Interim Director) L Dec 7, 2022 9 Doug Black (ACA) dw�YlY�fL Dec 8, 2022 10. William Johnson (ACM) WF. Dec 9, 2022 11, Jannette Goodall (CS) 4� Dec 9, 2022 DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: U Yes❑✓ No RUSH: ❑Yes ❑✓ SAME DAY: ❑Yes❑✓ No NEXT DAY: ❑Yes❑✓ No ROUTING TO CSO: ❑✓ Yes ❑No Action Required: ❑ As Requested ❑ Attach Signature, Initial and Notary Ta ■ Signature/Routing and or Recording ❑ Comment ❑ File Return to: Please call at ext. for pick up when completed. Thank you.