HomeMy WebLinkAboutContract 57453-CO1 CSC No.57453-COl
FORT WORTH. City of Fort Worth
` — Change Order Request
Project Name 2022 Bridge Rehabilitation Contract 2 City Sec# 57453
Client Project#(s) 103456
Project Description Repair and maintenace of bridges at various locations in the city.
Contracto Gibson&Associates Inc. Change Order# 1 Date 1 112 312 02 2
City Project Mgr. Iretomiwa Otuyelu City Inspector Robert Riley
Dept TPW Contract Time
Totals (CD)
Original Contract Amount $679,646.60 $679,646.60 180
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $679,646.60 $679,646.60 180
Amount of Proposed Change Order $10,219.00 $10,219.00 30
Revised Contract Amount $689,865.60 $689,865.60 210
Original Funds Available for Change Orders $20,000.00 $20,000.00
Remaining Funds Available for this CO $20,000.00 $20,000.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.50%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $849,558.25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This Change Order is to increase the number of days,and scope of work in Construction Contract 57453.
Multiple RFI's were submitted by the contractor which resulted in modifications to the details provided for metal railings at two bridge locations.Contractor was unable to
proceed with fabrication until after receiving approved shop drawings.Time taken to provide answers to the RFIs,receive new shop drawings,and get them approved by the
engineer was approximately 42 days.
Fabricators are expected to deliver the metal rails by the end of the week ending on 1112512022.
PM also proposes to the replacement of two Guardrail End Treatment on E 1st St over West Fork Trinity River(#4)and Trinity Blvd WB over Railtran(#19)which were not
part of the original scope of work,but got damaged,by citizens,during construction.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor(Name) Contract Signature Date
Gibson&Associates Inc Trey Meador o� Dec 5,2022
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
Rob&&Riley Dec 5,2022 ' Dec 2,2022
Program Manager Date Senior Capital Project Officer Date
Dec 5,2022 wow. Dec 5,2022
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
-I- &.— Dec 5,2022 Dec 5,2022
Assistant City Attorney Date Assistant City Manager Date
a.U, ,.ma�,mom Dec 7,2022 J--, Dec 9,2022
Council Acdon(if required)
M&C Number M&C Date Approved
ATTEST:
.sue
Jannette Goodall,City Secretaryo
E Rt a
a 6. ° °°�Y�9dd OFFICIAL RECORD
0_6 -Ao'
w8 0 CITY SECRETARY
Oaf° °*" FT.WORTH,TX
dQn�nFXog4ap
FORT WORTH City of Fort worth
t'---- Change Order Additions
Project Name 2022 Bridge Rehabilitation Contract 2 City Sec# 57453
Client Project# 103456
Contractor Gibson&Associates Inc. PM Iretomiwa Otuyelu InspectoF Robert Riley
Change Order Submittal# O1 Date 1112312022
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
4$ UUAKUKAIL END TREATMENT(INSTALL) TPW EA 4,7 4.5 ,44 .
GUARDRAIL END TREATMENT(REMOVE) TPW 2.00000000 EA 5.
TPW $10,219.00
Sub Total Additions 10,2 99.00
Change Order Additions Page 2 of 5
FOR_ r WORTH City of Fort worth
Change Order Deletions
Project Name 2022 Bride Rehabilitation Contract 2 City Sec# 57453
Client Project# 103456
Contractor Gibson&Associates Inc. PM Iretamiwa Otuyelu Inspecto Robert Riley
Change Order Submittal# O7 Date 11I23I2022
DELETIONS
Unit ni as o
TPW 0.00
Sub TotalDeletions
Change Order Deletions Page 3 of 5
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
FORTWORTH
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: Change Order# 1 —2022 Bridge Rehab Contract 2
M&C CPN: 103456 CSO # 57453 DOC#_C01_
Date: 1113012022 FM Department Initials Date Out
To: Gibson &Associates Inc
1. TreyMeador Contractor treymO)gibsonassoc.net TM
� Dec 5, 2022
2. Robert Rile Inspector TPW-Si nature F__ Dec 5, 2022
3. Iretomiwa Otuyelu (PM) TPW-Si nature Dec 2,2022
4. Omar Elbagalati(PgM) TPW-Reviewer ilf— Dec 5,2022
5. Leon Wilson (Sr CPO) TPW-Reviewer Dec 5,2022
6. Michael Owen AD TPW-Si nature = Dec 5,2022
7. Lauren Prieur Director TPW-Si natures Dec 5,2022
8. Doug Black(ACA) LAW-Signature Dec 7,2022
9. William Johnsom (ACM) CMO-Si nature Dec 9,2022
10. Janette Goodall(CSO) CSO-Si nature Dec 9, 2022
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes X No
RUSH: ❑ Yes X No SAME DAY: ❑ Yes X No NEXT DAY: ❑ Yes X No
ROUTING TO CSO: ❑ Yes ❑ No
Action Required:
❑ As Requested ❑ Attach Signature, Initial and Notary Tabs
❑ For Your Information
X Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call Iretomiwa Otuyelu at ext. 6747 for pick up when completed. Thank you.