HomeMy WebLinkAboutContract 55427-CO4 CSC No.55427-004 Fl 'I'woi City of Fort Worth Change Order Request Project Name Kroger Drive Phase II(From Ray White to Park Vista Cir) City Sec# 1 55427 Client Project#(s) City Project Number 101015 Project Description Reconstruction of Kroger Drive from Ray White Road to Park Vista Circle and includes the following:2"mill and overlay,1 D"concrete pavement,lime treated base,storm drain culvert extensions and headwalls,three signalized intersections,and concrete trail Contractor dvillyChange Order# 4 Date 912812022 City Project Mgr. Brendan McInnes,PE City Inspector Eric Tinner Contract Time Dept. Ti Contract (CD) Original Contract Amount $3,211,162.73 $3,211,162.73 270 Extras to Date $694,789.57 $694,789.57 90 Credits to Date $386,091.05 $386,091.05 Pending Change Orders(in M&C Process) $0.00 Contract Cast to Date $3,519,861.25 $3,519,861.25 360 Amount of Proposed Change Order $57,493.42 $57,493.42 2 Revised Contract Amount $3,577,354.67 $3,577,354.67 362 Original Funds Available for Change Orders $385,339.53 $385,339.53 Remaining Funds Available for this CO $76,641.01 $76,641.01 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS Y.OF ORIGINAL CONTRACT 11.40% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,013,953.41 JUSTIFICATION(REASONS)FOR CHANGE 0 Existing pavement required replacement due to pavement cracking and failure due to heavy loads.Additional earthwork includes embankment for sidewalk shifts to avoid newly relocated power poles and sidewalk redesign.Sod and topsoil quantites were increased to accomadatre the sidewalk shift as well as designer errors in the original project quantity estiamtes.Additonal pedestrian push button was needed after barrier free ramp and signal pole revisions due to ADA spacing requiremnts.Striping was added to the outside lane of the project and was missed in the design phase as being required where there is no curbline. Contractor have provided provided quotes for subcontractors doing work items not previously in the contract. Cost- City of Fort Worth has compared the unit prices which are being proposed by the contractor to other similar items and accepts the unit costs. The difference in pricing can be justified by the current market pricing which is fluctuating on a monthly basis due to price escalation and inflation. The City finds that the prices that are being proposed by the contractor are fair and reasonable. The average pricing was compiled from similar items from the Texas Department of Transportation Average Low Bid Unit Prices effective August 2022 and existing similar items of differnt colors. Time - Additional contract time has been reviewed and the amount of days being granted is deemed reasonable for the work scope when reviewed in relation to the critical path of the work activities. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. ntractor's Company Namel MiSontractor(NamM 1IIIIIIIIIIIIIIIW Contract Signature D Reliable Paving,Inc. Quentin smith ",,, Dec 5,2022 Inspector/inspection Supervisor Date Prc'ect and Contract Compliance Manager Date ur r nAv Dec 5,2022 Dec 2,2022 .ma Program Manager Date Senior capital Project Officer Date Dec 6,2022 Dec 7,2022 Assistant Director(Dept) Date Director,Contracting De artment De t Date 2-,_'i+�6)- Dec 7,2022 �--I.,,,_ Dec 7,2022 Assistant City Attorney Date JAssistant City Manager Date Dec 9,2022 Dec 11,2022 Council Action if required) FpgT4�'i M&C Number 22-0690 1 Date Approved 9 13 2022 A;F0000000,lyLddd ATTEST: Tann&Ho S.ao alall �8 dVe b Jannette Goodall,City Secretary ddo* � OFFICIAL RECORD dIIp nEXAgo9' CITY SECRETARY FT.WORTH,TX r4)u i k4aEivi ii City of Fort Worth Change Order Additions Project Name Kroger Drive Phase II(From Ray White to Park Vista Cir) City Sec# 55427 Client Project# City Project Number 101015 Contractor KUM Did PM Brendan McInnes,PE Inspector Edc Tinner Change Order Submittal# ® Date 9I28I2022 ADDITIONS Unit Unit CostTotal Install e o e Assembly Powder Coat Black 21 0241.1100 Remove Asphalt Pavement TPW 71.00000000 BY 9,60 30 3103.0101 Unclassified Excavation by Plan(Roadway) TPW 8.00000000 CY 23,48 35 3211.0212 6"Flexible Base,Type B,7R-2 TPW 71.00000000 Y 16,82 40 3213.010310"Conc Pvmt TPW 71.00000000 SY 75,66 47 3291.0100 6"Topsoil TPW 705.00000000 Y 53,98 48 3292.0100 Block Sod Placement TPW 4,230.00000000 SY 4,23 31 3124.0101 Embankment by Plan TPW 165.00000000 CY s 18,24 16 3305.0107 Manhole Adjustment,Minor TPW 1.00000000 EA 345,00 166 3125.0101 WPPP>1 acre TPW 1.00000000 L 5,148,00 41 3213.01038"ConcPvmt TPW 18.90000000 SY 82,36 167 3217.9999 4"SLD Pvmt Marking HAS W TPW 4,600.00000000 LF 1 A3 168 321/.Ubw Fretormed I nermoplastic Contrast Markings- Crosswalk TPW 840.00000000 LF 21,64 TPW $99,636.62 Sub Total Additions $99,636.62 Change Order Additions Page 2 of 4 Tor4iWwi i City of Fort Worth Change Order Deletions Project Name Kroger Drive Phase I I(From Ray White to Park Vista Cir) City Sec# 55427 Client Project# City Project Number 101015 Contractordb PM Brendan McInnes,PE Inspector Eric Tinner Change Order Submittal# ® Date 9/28/2022 DELETIONS Unit UnitCost otai imported m e men ac i, 5 Irrigation Controller,pedestal oun ation ,5 vm Marking TPW $42,143.20 Sub Total Deletions 42,143.20 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT 1 8/6/2021 $78,060.85 2 11/9/2021 $154,656.61 3 3/25/2022 $75,981.06 Total $308,698.52 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORT 11 Create New From This M&C REFERENCE **M&C 22- 20KROGER DRIVE DATE: 9/13/2022 NO.: 0690 LOG NAME: PHASE 2 CHANGE ORDER 4 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 4)Authorize Execution of Change Order Number 4 in the Amount of$57,493.42 to the Contract with Reliable Paving, Inc., for Construction of Paving, Drainage and Traffic Signal Improvements for Kroger Drive Phase II From Ray White to Park Vista Circle for a Revised Contract Amount of$3,577,354.67 (2018 Bond Program) RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order Number 4 in the amount of$57,493.92 City Secretary Contract Number 55427 with Reliable Paving, Inc., for construction of paving, drainage, and traffic signal improvements for Kroger Drive Phase II from Ray White to Park Vista Circle for a revised contract amount of$3,577,354.67 (City Project No. 101015). DISCUSSION: On March 2, 2021, Mayor and Council Communication (M&C) 21-0147, the City Council authorized a contract with Reliable Paving, Inc. in the amount of$3,211,162.73 for construction of paving, drainage and traffic signal improvements for Kroger Drive Phase II from Ray White to Park Vista Circle (City Project No. 101015). The contract was subsequently revised by Change Orders No. 1, 2, and 3. Change Order No. 1 in the amount of$78,060.85 administratively authorized August 6, 2021 that provided for black powder coating of the proposed traffic signals and street lights, and boring of the electrical conduit across Kroger Drive rather than installing it by open cut. Change Order No. 2 in the amount of$154,656.61, Mayor and Council Communication (M&C)21- 0848, authorized 11/9/2021 that provided for changes in the type of upgraded traffic signal detection equipment, decreasing the amount of pedestrian rail required for the project. Change Order No. 2 also provided 50 additional calendar days due to delays associated with review and approval to incorporate the revisions. Change Order No. 3 in the amount of$75,981.06 administratively authorized March 25, 2022 that provided for relocation of 8"water main to clear a proposed culvert extension, and cost for installing electrical power supply. Change Order No. 4 provides changes to replace existing underlying pavement due to pavement failure encountered upon removal of surface; increasing embankment, sod, and topsoil due to sidewalk shifts to avoid utility conflicts as well as underestimated plan quantities; adding pedestrian push button to meet ADA requirements due to signal pole incorrect plan dimension; adding edge of pavement striping not deemed necessary previously. Change Order 4 also provides two additional calendar days due to the added work for the embankment, topsoil, and sod. Staff intends to pursue reimbursement by engineer for cost due to design errors. This project is included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 23209-05-2018)and subsequent actions taken by the Mayor and Council. Funding is budgeted in the TPW Dept Highway&Streets Department's 2018 Bond Program Fund for http://apps.cfwnet.org/council_packet/mc review.asp?ID=30242&councildate=9/13/2022 9/21/2022 M&C Review Page 2 of 2 the purpose of funding the Basswood @US 377 & Kroger @377 project, as appropriated. Reliable Paving, Inc. agrees to maintain its initial M/WBE commitment of 17\% that it made on the original contract and extend and maintain that same M/WBE commitment of 17\% to all prior change orders up to and inclusive of this Change Order No. 4. Therefore Reliable Paving, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the 2018 Bond Program Fund for the Basswood @US 377 & Kroger @377 project to support the approval of the above recommendation and execution of the change order. Prior to any expenditure being incurred, the Transportation and Public Works Department has the responsibility to validate the availability of funds. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID i Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office by: Dana Burghdoff(8018) Originating Department Head: William Johnson (7801) Additional Information Contact: Monty Hall (8662) ATTACHMENTS 101015 KorgerDrive FID TABLE.XLSX (CFW Internal) 20KROGER DRIVE PHASE 2 CHANGE ORDER 4 funds availabilitypdf (CFW Internal) 220809 APC 101015 Kroger Drive Phase 2.pdf (CFW Internal) Form 1295_Executed_8.4.22.pdf (CFW Internal) M&C MAP KROGER DRIVE PHASE 2 (1).PDF (Public) SAM.pdf (CFW Internal) http://apps.cfwnet.org/council_packet/mc review.asp?ID=30242&councildate=9/13/2022 9/21/2022 101015-CNCO-Construction Change Order No. - Kroger Dr Phase II Final Audit Report 2022-12-09 Created: 2022-12-02 By: Andrea Munoz(Andrea.Mu noz@fortworthtexas.gov) Status: Canceled/Declined Transaction ID: CBJCHBCAABAAB3rg3CFhwoeYM7PVM5GSrXRUW4QzA6gW "101015-CNCO-Construction Change Order No. 4 - Kroger Dr P hase II" History ,i°J Document created by Andrea Munoz (Andrea.M u noz@fortworthtexas.gov) 2022-12-02-6:53:46 PM GMT-IP address:204.10.90.100 P Document emailed to Misty.Davila@fortworthtexas.gov for filling 2022-12-02-7:20:42 PM GMT Document emailed to Quentin Smith (quentin@reliablepaving.com) for signature 2022-12-02-7:20:42 PM GMT Document emailed to Eric.Tinner@fortworthtexas.gov for signature 2022-12-02-7:20:42 PM GMT Document emailed to brendan.mcinnes@fortworthtexas.gov for signature 2022-12-02-7:20:42 PM GMT Document emailed to Chad.Allen@fortworthtexas.gov for signature 2022-12-02-7:20:43 PM GMT Email viewed by brendan.mcinnes@fortworthtexas.gov 2022-12-02-8:23:28 PM GMT-IP address:70.241.106.163 Signer brendan.mcinnes@fortworthtexas.gov entered name at signing as Brendan McInnes 2022-12-02-8:23:50 PM GMT-IP address:70.241.106.163 Document e-signed by Brendan McInnes (brendan.mcinnes@fortworthtexas.gov) Signature Date:2022-12-02-8:23:52 PM GMT-Time Source:server-IP address:70.241.106.163 Email viewed by Chad.Allen@fortworthtexas.gov 2022-12-05-1:06:40 AM GMT-IP address:47.38.136.103 FORT WORTH, Powered by `� Adobe i Acrobat Sign Signer Chad.Allen@fortworthtexas.gov entered name at signing as Chad Allen 2022-12-05-1:07:53 AM GMT-IP address:47.38.136.103 Document e-signed by Chad Allen (Chad.Allen@fortworthtexas.gov) Signature Date:2022-12-05-1:07:55 AM GMT-Time Source:server-IP address:47.38.136.103 7_5 Email viewed by Quentin Smith (quentin@reliablepaving.com) 2022-12-05-12:36:43 PM GMT-IP address: 12.171.179.82 Crr; Document e-signed by Quentin Smith (quentin@reliablepaving.com) Signature Date:2022-12-05-12:37:10 PM GMT-Time Source:server-IP address: 12.171.179.82 Email viewed by Misty.Davila@fortworthtexas.gov 2022-12-05-1:44:23 PM GMT-IP address:204.10.90.100 Signer Misty.Davila@fortworthtexas.gov entered name at signing as Misty Monique Davila 2022-12-05-1:44:38 PM GMT-IP address:204.10.90.100 Form filled by Misty Monique Davila (Misty.Davila@fortworthtexas.gov) Form filling Date:2022-12-05-1:44:40 PM GMT-Time Source:server-IP address:204.10.90.100 C�Q Signer Eric.Tinner@fortworthtexas.gov entered name at signing as Eric Tinner 2022-12-05-5:56:59 PM GMT-IP address:204.10.90.100 C>r. Document e-signed by Eric Tinner(Eric.Tinner@fortworthtexas.gov) Signature Date:2022-12-05-5:57:01 PM GMT-Time Source:server-IP address:204.10.90.100 Document emailed to Raul.LopezRoura@fortworthtexas.gov for signature 2022-12-05-5:57:03 PM GMT Email viewed by Raul.LopezRoura@fortworthtexas.gov 2022-12-07-0:45:40 AM GMT-IP address: 172.58.179.41 Signer Raul.LopezRoura@fortworthtexas.gov entered name at signing as Raul E Lopez 2022-12-07-0:49:01 AM GMT-IP address: 172.58.179.41 r Document e-signed by Raul E Lopez (Raul.LopezRoura@fortworthtexas.gov) Signature Date:2022-12-07-0:49:03 AM GMT-Time Source:server-IP address: 172.58.179.41 Document emailed to Lissette.Acevedo@fortworthtexas.gov for signature 2022-12-07-0:49:05 AM GMT s Email viewed by Lissette.Acevedo@fortworthtexas.gov 2022-12-07-5:08:44 PM GMT-IP address:204.10.90.100 6� Signer Lissette.Acevedo@fortworthtexas.gov entered name at signing as Lissette Acevedo, P.E. 2022-12-07-5:09:56 PM GMT-IP address:204.10.90.100 FORT W❑RTU, Powered by `� Adobe i Acrobat Sign Document e-signed by Lissette Acevedo, P.E. (Lissette.Acevedo@fortworthtexas.gov) Signature Date:2022-12-07-5:09:58 PM GMT-Time Source:server-IP address:204.10.90.100 Document emailed to Michael.Owen@fortworthtexas.gov for signature 2022-12-07-5:09:59 PM GMT Email viewed by Michael.Owen@fortworthtexas.gov 2022-12-07-9:54:52 PM GMT-IP address:204.10.90.100 Crr; Signer Michael.Owen@fortworthtexas.gov entered name at signing as Michael Owen 2022-12-07-9:55:42 PM GMT-IP address:204.10.90.100 Lai, Document e-signed by Michael Owen (Michael.Owen@fortworthtexas.gov) Signature Date:2022-12-07-9:55:44 PM GMT-Time Source:server-IP address:204.10.90.100 Document emailed to Lauren.Prieur@fortworthtexas.gov for signature 2022-12-07-9:55:46 PM GMT Email viewed by Lauren.Prieur@fortworthtexas.gov 2022-12-07-10:00:41 PM GMT-IP address: 108.209.194.42 C�Q Signer Lauren.Prieur@fortworthtexas.gov entered name at signing as Lauren Prieur 2022-12-07-10:01:29 PM GMT-IP address: 108.209.194.42 Crr; Document e-signed by Lauren Prieur(Lauren.Prieur@fortworthtexas.gov) Signature Date:2022-12-07-10:01:31 PM GMT-Time Source:server-IP address: 108.209.194.42 Document emailed to Priscilla.Ramirez@fortworthtexas.gov for approval 2022-12-07-10:01:33 PM GMT Email viewed by Priscilla.Ramirez@fortworthtexas.gov 2022-12-07-10:08:20 PM GMT-IP address: 198.16.31.164 Signer Priscilla.Ramirez@fortworthtexas.gov entered name at signing as Priscilla Ramirez 2022-12-07-10:08:50 PM GMT-IP address: 198.16.31.164 r Document approved by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov) Approval Date:2022-12-07-10:08:52 PM GMT-Time Source:server-IP address: 198.16.31.164 Document emailed to Douglas.Black@fortworthtexas.gov for signature 2022-12-07-10:08:54 PM GMT s Email viewed by Douglas.Black@fortworthtexas.gov 2022-12-09-0:00:50 AM GMT-IP address:204.10.90.100 Document declined by Douglas.Black@fortworthtexas.gov Decline reason:CO3 was for$75.9K.This one puts you over the$100K threshold and requires an M&C. 2022-12-09-0:04:02 AM GMT-IP address:204.10.90.100 FORT W❑RTH•.. Powered by `� Adobe i Acrobat Sign FORT WORTH, Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Construction Change Order No. 4 - Kroger Dr Phase II M&C: 22-0690 CPN: 101015 CSO: 55427 DOC#: 1 Date: To: Name Department Initials Date Out 1. Bus. Support Partner—Misty Davila TPW-initial p Dec 5,2022 2. Quentin Smith—Contractor Contractor Dec 5,2022 3. Eric Tinner- Inspector TPW- sign E Dec 5,2022 4. Brendan McInnes—Project Manger TPW-initial M Dec 2,2022 5. Chad Allen—Contract Compliance Mngr TPW- sign P Dec 4, 2022 5. Raul Lopez—Program Manager TPW- sign 12 L Dec 6,2022 6. Lissette Acevedo—Interim Senior CPO TPW- sign Dec 7,2022 7. Michael Owen—Interim Asst. Director TPW- sign Dec 7,2022 8. Lauren Prieur—Interim Director TPW- sign 4P4 Dec 7,2022 9. Doug Black—City Attorney Legal - sign 4wW* Dec 9,2022 10. William Johnson -ACM CMO - sign W Dec 11,2022 11. Jannette Goodall - CSO CSO - sign J� Dec 12,2022 12. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File Return To: TPWContracts(a7fortworthtexas.gov, for pick up when completed;list "Please call Brendan ext#2817 for questions. Thank you." Dec 7,2022