HomeMy WebLinkAboutContract 56582-CO5 CSC No. 56582-005
FORT WORTH City of Fort Worth
lw� Change Order Request
Project Name:[ Water and Sanitary Sewer Replacement Contract 2011 WSM-D Part 2 City Sec No.: 1 56582
Project No.(s):f 1929.2 DOE No, N/A City Proj.No.: i9z9
Project Descriplion: Replacing water line, Sanitary Sewer lines,Flat works and Paving on various streets.
Conlraclori Woody Contractors INC. Change Order# Date: 121712022
City Project Mgr. Preeti I<C Cily Inspector: I Tamara Vaughn
Phone Number: (817)392-5467 Phone Number 682 225 9106
Dept. Water Sewer TPW Totals Contract Time
(Calender days
Original Contract Amount $2,031,329.25 $914,697.25 $0.00 $2,946,026.50 365
Extras to Date $16,172.70 $45 685.00 $236,072.00 $297,929.70 150
Credits to Dale
Pending Change Orders(In M&C Process)
Contract Cost to Date $2,047,501.95 $960,382.25 $236,072.00 $3,243.956.20 515
Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00
Revised Contract Amount $2,047,501.95 $960,382.25 $236,072.00 $3,243,956.20 515
Original Funds Available for Change Orders $101,566.75 $45,733.75 $0.00 $147,300.50
Remaining Funds Available for this CO $86,394.05 1 $48.75 1 $0.00 1 $85,442.80
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 10.11%
MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $3,682,533.13
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order No. 5 will provide for 2 Major Manhole Adjustment that are necessary on Schadt Ave.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name _jQ9nt(ac1pr-Sjgnature Date
Woody Conlraclors INC. Troy Woody -a�
Inspector Date Project Mana r Date
Tamara Vaughn 12/8/22 la 12/08/2022
Director Water Dept) Date Construction Su ervisor TPW Dale
T-S. Dec 8,2022 4 7�4zaA& 12/8/22
Senior Assistant City Attorney Date Assistant City Manager Date
a.. �n Dec 9,2022 naeugM1„R u Dec 12,2022
Council Action If Required)
M&C Number NIA M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
F4(:)P,- ' WC lwfl '± City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer replacement Contract 2011 WSM-D Part 2 City Sec No.: 56532
Project No.(s): I 1929-2 DOE No, N/A City Proj.No.: 1929
Project I Replacing water line,Sanitary Sewer lines,Flat works and Paving on various streets,
Description
Contractor Woody Contractors INC, Change Order:0 Date: 121712022
City Project Mgr. Preeti KC City Inspector Tamara Vaughn
ADDITIONS
DESCRIPTION DEPT Qty Unit Unit Cost Total
56 Major Manhole Adjustment Sewer 2.00 EA $4,700.00 1$9,400.00
-- Water
Sewer $9,400,00
TPW
Page 2 of 4 Additions Sub Total
Fc)Y:-r W-"R`r m City of Fort Worth
--` Change Order Deletions
Project Name Water and Sanitary Sewer replacement Contract 2011 WSM-D Part 2 City Sec No.: 56582
Project No,(s): 1929-2 DOE No, = City Proj.No.: 1929
Project Description Replacing water line,Sanitary Sewer lines,Flat works and Paving on various streets.
Contractor Woody Contractors INC. Change Order; F5 Date 121712022
City Project Mgr. Preeli I<C City Inspector: Tamara Vaughn
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total _
18 4"Sewer Service Sewer 4.00 EA 1 $2,000.00 $8,000.00
44 Sanitary Sewer Construction Allowance Sewer 1.00 LS $1,400.00 $1,400.00
Water
Sewer $9,400.00
TPW
Page 3 of 4 Deletions Sub Total $9,400.00
M WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
ca�� DATE AMOUNT
Total
$0.00
Page 4 of 4
ax/�/xo2z
Water and Sanitary Sewer Replacement Contract 2011 WSM-D, Part 2
CPN 1929
Change Order 5 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable,
I
CONTRACT MODIFICATION REQUEST: 3
PROJECT: Westside Water Treatment Backup Generators DATE: 11/8/2022
CS#57314
ATTENTION: David Townsend, P.E.
City of Fort Worth
Attention:
The following change in contract on this project is proposed:
A breakdown of cost SHALL be attached.
Il'orh shall not commence until authorized by the OWNER.
Description of the Proposed Change & Clarifications
Add a TPO roof to the electrical building
Acurva Roofing plans to have the high point in the center of the roof and taper to the outside edges, reducing the
amount of wood blocking required at the edge of the roof.
TOTAL AMOUNT $ 99,931
Todd C. Hoff
All work shall be in accordance with the terms, stipulations, and conditions of the
original Contract Documents. If the work herein provided for is Approved by
Change Order, the time of completion will be:
Increased By 0 Calendar Days
Decreased
Unchanged
ACCEPTED
City of Fort Worth Date
❑ REJECTED
CHANGE ORDER SUMMARY
Front Sheet
Westside WTP Plate Settler Expansion
CHANGE DESCRIPTION:Add a TPO roof to the electrical building
CONTRACTORS MODIFICATION REQUEST#003 Job#: 2021-06
Description Labor Material Equipment Subcontract Other Total
DIRECT COSTS 600 83,700 84,300
LABOR BURDEN&FRINGES 66% 330 330
SMALL TOOLS 8%OF LABOR 48 48
SAFETY SUPPLIES 3%OF LABOR 18 18
SUBTOTALS 930 83,700 66 84,696
CONTRACTOR MARKUP 140 - 12,555 12,695
BONDS&INSURANCE 3% 2,541
TOTAL 99,931
CLARIFICATIONS:
1
2
3
4
Total
Unit Unit Unit Unit Total Total Subs
Description Qty Un Labor Mat'I Equipment Labor Mat'I Equipment
LABOR
Project Superintendent &0 MH 75.00 600
Assistant Superintendent MH 60.00
Carpenter Foreman MH 75.00
Mechanical Foreman MFI 50.00
Project Manager MH 75.00
Assistant Project Manager MH 50.00
Surveyor MH 35.00 _
Safety Coordinator MH 50.00
Office Clerk MH 25.00
Rodman MH 25.00
Carpenter MH 35.00
Carpenter Helper MH 25.00
Crane Operator MH 35.00
Operator MH 30.00
MATERIAL
EQUIPMENT(Daily I Weekly/Monthly)Cost
(Fuel,Oil,Grease,&Maintenance Included)
SUBCONTRACTORS
ACUrava Roofing TPO Roof 1.0 LS 80,200
Gutters&Downspouts 1.0 LS 3,500
600 0 0 83,700
Job: FTW Westside Water Treatment Plant Backup Generators Item: 1/1 1/1 1/1
ACUPVAPOOFING
AM COMMERCIAL-INDUSTRIAL-SHEET METAL
Oct.14,2022
FTW Westside Water Treatment Plant
Scope of Work: Furnish and install — 3,100SF TPO Roofing System
Specifically Includes:
• Provide Taper insulation to provide proper water drainage.Low rise adhered to concrete deck.
• Provide and install 2X6 wood blocking on perimeter to match ISO height.
• Full adhere 4X4 Y2" Densdeck Prime Coverboard over Tapered ISO.
• Fully adhere 80mil Fleeceback GAF TPO.
• Fabricate and install 24ga Drip Edge metal around building perimeter.
• Provide and install TPO Strip flashing over Edge metal.
• Manufacturers 20-year NDL warranty.
• Manufacturers 20-year"Finish"warranty for all pre-finished sheet metal items.
• Acurva Roofing 2-year warranty for watertightness and craftmanship.
Total Price no tax included: $80,200.00
Add on: Fabricate and install Prefinished 24ga Gutter and Downspouts.
Add To Total Price: $3,500.00
Bid Bond add 2.5%
Exclusions:
• Any Framing, Structural Decking, or Light Gauge Metal Framing of any kind.
• Metallic colors
• Painting or coatings
1700 Surveyor Blvd, Ste 100, Carrollton TX 75006 www.acurvaroofing.com 469-835-8600
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Preetl KC
Name of Employee
Sr. Professional Engineer
Title a�440R���B
" 0000 0�4
ATTEST: pC�0 S
o o=d
d
.Tann&*h9 S. Goodall add n�nexASap�
Jannette S.Goodall(Dec 12,202215:19 CST)
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX