HomeMy WebLinkAboutContract 57886-CO1 FORT WORTH. City of Fort Worth
Change Order Request CSC No.57886-COl
Project Name Paving,Drainage&Park Improvements for Sycamore Park(Phase 1) City Sec# 57886
Client Project#(s) 101833&102014
Project Description Paving,Drainage&Park Improvements
Contractor Northstar Construction,LLC Change Order# 1 Date 11/2112022
City Project Mgr. Carlos M Gonzalez City Inspector Russell Rogers
Dept. PARD Contract Time
Totals CD
Original Contract Amount $1,285,533.00 $1,285,533.00 120
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,285,533.00 $1,285,533.00 120
Go to ADD&DEL Tabs to Enter CO Backup 45,030.00 $45,030.00 67
Revised Contract Amount $1,330,563.00 $1,330,563.00 187
Original Funds Available for Change Orders $45,030.00 $45,030.00
Remaining Funds Available for this CO $45,030.00 $45,030.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.50%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,606,916.25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
1. During construction,the city determined that additional concrete sidewalks at several locations had to be removed and replaced due to deterioration conditions and to
comply with accessibility standards.This change order will provide the concrete sidewalk necessary to stay within accessible means.
2. The plan and specs did not call for temporary parking for the local soccer associations.To provide the soccer league access to the site,the contractor installed temporary
parking,signage,and a path to the soccer fields during the construction phase.
3. During construction,the city determined that the soccer league vault container was causing damage to the park landscape and maintenance.The city will add a concrete
slab to the park site for a more effortless loading and unloading of the vault in the park and prevent any further damage to the park.
4. The construction plans call for the trail to taper down from a 12'wide path into an existing 8'trail next to the low water crossing.However,the low water crossing is 12'
wide.Therefore,removing and replacing the current 8'trial with a 12'path will provide a consistent trail width.
5. The plan and specs did not call for new sitting areas on the new trail.The contractor will purchase and install six(6)bench areas to provide this demand.
6. The city determined that the construction plans had a grade bust while installing the concrete sidewalk next to the parking lot.The proposed grades next to this walk would
require the removal of additional grading and the removal of the existing landscaping.To prevent this and to maintain the necessary grade slopes for city maintenance,it was
determined to add a 9"concrete curb next to the sidewalk trail.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor Name Contract Si nature Date
Northstar Construciton,LLC. Michael A.Heimlich 'aha&IA W1m-La 2p]31 Nov 22 2022
6:19 CS
Ins ector/Ins ction Supervisor Date Project and Contract Compliance Manager Date
Nov 22,2022�G:,,/..o� � ,,,,�.,/.� Nov 23,2022
Pro ram Manager Date Senior Capital Project Officer Date
Nov 29,2022 Nov 30,2022
tant Director(Dept) Date Director,Contracting Department(Dept) Date
f Dec 1,2022 Dec 5,2022
ssistant City Aftomey Date Assistant City Manager Date
Dec 5,2022 Dec 12 2022
Council Action if required)
M&C Number N/A M&C Date Approved
ATTEST�ls d+aodA
S.Goodall(Dec 12,202215:41 CST)
Jannette Goodall,City Secretary aoFF°Rr° aa OFFICIAL RECORD
a
CITY SECRETARY
FT.WORTH,TX
3d44 nEXosapp
FORr WORTH City of Fort Worth
-�-- Change Order Additions
Project Name Paving,Drainage&Park Improvements for Sycamore Park(Phase 1) City Sec# 57886
Client Project# 101833&102014
Contractor Northstar Construction,LLC PM Carlos M Gonzalez Inspectof Russell Rogers
Change Order Submittal# O1 Date 11/2112022
ADDITION5
Unit Unit Cost Total
Concrete Removal&Installation o Concrete Sidewalk .
Soccer Field Signage Installation
------
Soccer Field VaultConcrete Slab .
Soccer Field Temporary Access I rail
Concrete Removal&Installation o Concrete Sidewalk
Demo,Grading,Landscaping and Installation o i e Concrete I rail
ra ing and Installation o Benches w ncre e Pad
ra ing&Installation o ong x i e,with ono i is Curb
PARD 45,030.00
u o ions
Change Order Additions Page 2 of 4
FoR_�RTH City of Fort worth
Change Order Deletions
Project Name Paving,Drainage&Park Improvements for Sycamore Park(Phase 1) City Sec# 57886
Client Project# 101833&102014
Contractor Northstar Construction,LLC PM Carlos M Gonzalez Inspectof Russell Rogers
Change Order Submittal# O1 Date 11/2112022
DELETIONS
Unit Unit Cost Total
PARD $0.00
Sub TotalDeletions
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
N/A
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
e
0
S
C a6 r w'J �® N93
_ QV �m ✓ �cO �avU ® 3p m
Ir to M. momoa) £ O
Q f N Q
1
O N
No O O
C C
g v U 2
t I a3
o
g 3 aD o L
yak l\ oY p� ?i
maces-' o i D
o � m
o c a d c U V U
'o E Co) aa))U •�._
a)_ 06 6. o rn
pK7�m O O m U O oaa :
i ^EU a m
ID o aD
0
C m m p�
UFO m� �t•
oa)v 3
N
C Y al cn
`✓, J�\JJ �\
d
205 0 o
_o$,osr
U
o o a
� E�o�m —
x
- CCU O
,�J o_cq
3t9W9 3tlONY?AY • _ .O C Y�
4 U' at5 U p
O mOy
� fl J -E aUv rOT
— .._ ns a) 1�1
a) �' F p N'o U
� rn
a N co
o -p_�a
s
f f
8
s
s
z
LSAWAU.f
c3
M x
ti
`a o
Sll` 13O llVM JNINItl13a '8 JNIAVd m
add
d `oi c £ w
,�A ��0� 1N3WiNVd34 NOliV3N:D3N 19 NNVd
O�IIMO 3
(Y1 HINOM iNO=l 30 AIIO N
H _ H
O z w $
co > a
W
CL
U U
yo v
m I a
m U Y
u R21N oIr
=l6m U LL
L 44 1
.o
0 5 y
Z g — W
i z
W � s
w x
Z O
F Z z
W w
(J
coa
� 1�1
rrO�
c 8
82
8 a
s m szg 3 we
c�
W o3.S W
F w ZO
W F