HomeMy WebLinkAboutContract 55813-FP1 City Secretary Contract No. 55813 -FPI FORT WORM., Date Received Dec 20,2022 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Deer Creek City Project No.: 102958 Improvement Type(s): M Paving M Drainage M Street Lights ❑ Traffic Signals Original Contract Rice: $1,701,116.50 Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: $1,701,116.50 .9.20220628CSn Dec 19, 2022 Contractor Date Project Manager Title Conatser Construction TX, L.P. Company Name Robert Riley(Dat L19.202207:02 CS-n Dec 19, 2022 Project Inspector Date �a w.&e,Pc- Dec 19, 2022 Project Manager Date Al-4 -.-z'le?k�F" Du'-� Dec 19, 2022 Rebecca Diane Owen(Dec 19,2022 09,45 CS-n CFA Manager Date A.,5a- Dec 19 2022 Lauren Prieur(Dec 19,202210:11 CST Interim TPW Director Date Dec 19 2022 William Johnwn(DerA9,202214.45 Un 7 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Page 1 of 2 Notice of Project Completion Project Name: Deer Creek City Project No.: 102958 City's Attachments Final Pay Estimate Change Order(s): ❑ Yes ® N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 140 WD Days Charged: 211 Work Start Date: 7/15/2021 Work Complete Date 12/05/2022 Completed number of Soil Lab Test: 386 Completed number of Water Test: 15 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name DEER CREEK Contract Limits Project Type DRAINAGE,PAVING,LIGHTING City Project Numbers 102958 DOE Number 2958 Estimate Number 1 Payment Number 1 For Period Ending 12/15/2022 WD City Secretary Contract Number Contract Time 12UM Contract Date 6/4/2021 Days Charged to Date 211 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors CORDOVA,R / RILEY,R Friday,December 16,2022 Pagel of 5 City Project Numbers 102958 DOE Number 2958 Contract Name DEER CREEK Estimate Number 1 Contract Limits Payment Number 1 Project Type DRAINAGE,PAVING,LIGHTING For Period Ending 12/15/2022 Project Funding UNIT IQ:DRAINAGE IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 10'CURB INLET 13 EA $3,400.00 $44,200.00 13 $44,200.00 2 15'CURB INLET 1 EA $4,200.00 $4,200.00 1 $4,200.00 3 4'STORM JUNCTION BOX 3 EA $5,000.00 $15,000.00 3 $15,000.00 4 YSTORM JUNCTION BOX 2 LF $6,000.00 $12,000.00 2 $12,000.00 5 6'STORM JUNCTION BOX 1 LF $7,000.00 $7,000.00 1 $7,000.00 6 7X4 BOX CULVERT 525 LF $420.00 $220,500.00 525 $220,500.00 7 21"RCP CLASS III 240 LF $68.00 $16,320.00 240 $16,320.00 8 24"RCP CLASS III 535 LF $73.00 $39,055.00 535 $39,055.00 9 30"RCP CLASS III 295 LF $98.00 $28,910.00 295 $28,910.00 10 42"RCP CLASS III 260 LF $145.00 $37,700.00 260 $37,700.00 11 48"RCP CLASS lII 410 LF $160.00 $65,600.00 410 $65,600.00 12 54"RCP CLASS lII 290 ;F $210.00 $60,900.00 290 $60,900.00 13 CONCRETE COLLAR 1 EA $1,000.00 $1,000.00 1 $1,000.00 14 TRENCH SAFETY 2555 LF $1.00 $2,555.00 2555 $2,555.00 15 21"4:1 SLOPED END HEADWALL 2 EA $4,000.00 $8,000.00 2 $8,000.00 16 26"4"1 SLOPED END HEADWALL 3 EA $4,500.00 $13,500.00 3 $13,500.00 17 54"4:1 SLOPED END HEADWALL 1 EA $8,500.00 $8,500.00 1 $8,500.00 18 7-7"X4'PW-S WINGWALL 2 EA $58,500.00 $117,000.00 2 $117,000.00 19 RIPRAP 534 SY $115.00 $61,410.00 534 $61,410.00 --------------------------------------- Sub-Total of Previous Unit $763,350.00 $763,350.00 --------------------------------------- UNIT IV:PAVING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 6"REINFORCED CONC PVMT 16695 SY $37.50 $626,062.50 16695 $626,062.50 2 HYDRATED LIME(30#/SY PER GEOTECH) 267 TN $185.00 $49,395.00 267 $49,395.00 3 6"LIME TREATMENT 17802 SY $3.25 $57,856.50 17802 $57,856.50 4 BARRIER FREE RAMP TYPE P-1 8 EA $1,500.00 $12,000.00 8 $12,000.00 5 BARRIER FREE RAMP TYPE R-1 4 EA $1,400.00 $5,600.00 4 $5,600.00 6 5"CONC SIDEWALK 4357 SF $3.50 $15,249.50 4357 $15,249.50 Friday,December 16,2022 Page 2 of 5 City Project Numbers 102958 DOE Number 2958 Contract Name DEER CREEK Estimate Number 1 Contract Limits Payment Number 1 Project Type DRAINAGE,PAVING,LIGHTING For Period Ending 12/15/2022 Project Funding 7 FURNISHANSTALL ALUM SIGN GROUND 8 EA $750.00 $6,000.00 8 $6,000.00 MOUNT 8 FURNISHANSTALL ALUM SIGN GROUND 10 EA $750.00 $7,500.00 10 $7,500.00 MOUNT 9 TOPSOIL 434 CY $28.00 $12,152.00 434 $12,152.00 10 BLOCK SOD PLACEMENT 72 SY $8.00 $576.00 72 $576.00 11 TRAFFIC CONTROL 1 MO $3,500.00 $3,500.00 1 $3,500.00 12 ROAD BARRICADE 2 EA $1,000.00 $2,000.00 2 $2,000.00 13 PAVEMENT HEADER 62 LF $30.00 $1,860.00 62 $1,860.00 14 CONNECT TO EXISTING ASPHALT ROAD 138 LF $30.00 $4,140.00 138 $4,140.00 --------------------------------------- Sub-Total of Previous Unit $803,891.50 $803,891.50 UNIT V:STREET LIGHTING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 2"CONDT PVC SCH 80(T) 2275 LF $12.00 $27,300.00 2275 $27,300.00 2 FURNISHANSTALL LED LIGHTING FIXTURE 21 EA $600.00 $12,600.00 21 $12,600.00 3 RDWY ILLUM FOUNDATION TY 1 21 EA $1,200.00 $25,200.00 21 $25,200.00 4 RDWY ILLUM TY 11 POLE 21 EA $2,300.00 $48,300.00 21 $48,300.00 5 NO 10 INSULATED ELEC CONDR 2275 LF $3.00 $6,825.00 2275 $6,825.00 6 NO 6 INSULATED ELEC CONDR 4550 LF $3.00 $13,650.00 4550 $13,650.00 --------------------------------------- Sub-Total of Previous Unit $133,875.00 $133,875.00 --------------------------------------- Friday,December 16,2022 Page 3 of 5 City Project Numbers 102958 DOE Number 2958 Contract Name DEER CREEK Estimate Number 1 Contract Limits Payment Number 1 Project Type DRAINAGE,PAVING,LIGHTING For Period Ending 12/15/2022 Project Funding Contract Information Summary Original Contract Amount $1,701,116.50 Change Orders Total Contract Price $1,701,116.50 Total Cost of Work Completed $1,701,116.50 Less %Retained $0.00 Net Earned $1,701,116.50 Earned This Period $1,701,116.50 Retainage This Period $0.00 Less Liquidated Damages Days @ /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,701,116.50 Friday,December 16,2022 Page 4 of 5 City Project Numbers 102958 DOE Number 2958 Contract Name DEER CREEK Estimate Number 1 Contract Limits Payment Number 1 Project Type DRAINAGE,PAVING,LIGHTING For Period Ending 12/15/2022 Project Funding Project Manager NA City Secretary Contract Number Inspectors CORDOVA,R / RILEY,R Contract Date 6/4/2021 Contractor CONATSER CONSTRUCTION TxLP Contract Time 120 WD 5327 WICHITA ST Days Charged to Date 211 WD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,701,116.50 Less %Retained $0.00 Net Earned $1,701,116.50 Earned This Period $1,701,116.50 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,701,116.50 Friday,December 16,2022 Page 5 of 5 FORT WORTH. TRANSPORTATION AND PUBLIC WORKS December 15, 2022 Conatser Construction 5327 Wichita St Forest Hill,Tx 76119 RE: Acceptance Letter Project Name: Deer Creek Project Type: WTR,SS,SD,SL,PVG City Project No.: 102958 To Whom It May Concern: On May 25, 2022 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on December 5, 2022. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on December 5, 2022,which is the date of the punch list completion and will extend of two (2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2373. Sincerely, �e P Pc— Yogesh Patel, Project Manager Cc: Robert Riley, Inspector Gary Deyon, Inspection Supervisor Gary Deyon,Senior Inspector Victor Tornero, Program Manager Blake Bradley, Consultant Jacob Gatewood, Contractor Kyle Kirkwood, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev.8/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: DEER CREEK PH. 1 WATER, SANITARY SEWER, DRAINAGE, PAVING, & STREET LIGHT IMPROVEMENTS DOE#: N/A CFA PRJ#: 21-0036 CITY PROJECT #: 102958 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP Brock Huggin Subscribed and sworn to before me this 17'day of February, 2022. N T ARY P ROE PUBLIC Not Public in Tarrant County, Texas NOTARY PUBLIC ' ID#133467933 �"�•, �: Comm Vof118305.2025 'CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT SUR TY CONTRACTOR ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 0236872 PROJECT: (name, addreSS)Deer Creek Fort Worth, TX TO (Owner) DEER CREEK INTERESTS,LLC AND THE CITY OF ARCHITECT'S PROJECT NO: CFA#21-0036 FORT WORTH CONTRACT FOR: 10410 Windermere Lakes Blvd. Water,Sanitary Sewer, Drainage,Paving,&Street Lighting Improvements for Deer Creek Houston TX 77065 -J CONTRACT DATE: CONTRACTOR:CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) DEER CREEK INTERESTS, LLC AND THE CITY OF FORT WORTH 10410 Windermere Lakes Blvd. Houston TX 77065 , OWNER, as set forth in the said Surety Company's bond, IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this 16th day of February, 2022 BERKLEY INSURANCE COMPANY Surety Company Attest: (Seal): Signature of Authorized Representative Robbi Morales Attorney-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No.BI-7280j-el POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna;Don E. Cornell; Sophinie Hunter; Robbi Morales;Kelly A. Westbrook; Tina McEwan; Joshua A. Saunders,or Tonie Petranek of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S.Dollars(U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS 'WHEREOF, the Company has caused these presents to.-be signed and attested by its appropriate officers and its corporate seal hereunto affixed this end day of June 2020 Attest: Berkl Insurance Company r t m r S1 1I�oz By r By Ir Lederman S after 1915•F Executive Vice President&Secretary S ce resident �`t�LtiVlAQ `. STATE OF CON ECTICUT) ) ss: COUNTY OF FAIRFIELD ) Sworn to before me, a Notary Public in the State of Connecticut,this end day of June ,_2020 ,by Ira S.Lederman and Jeffrey M. Rafter who are sworn to me to be the Executive Vice President Secretary, and t e Senior Vice President, respectively,ofBerkley Insurance Company. ur Nora 'B c� MY CO CO CUT EXPIRES APHIL30,2024 - otary Public,State of Connecticut CERTIFICATE I7 the undersigned,Assistant Secretary of BERKLEY INSURAINCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attomey;that said Power of Attorney has not been revoked or rescinded anc)-rbattbe atrthwi.ty of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of ep ched,is in full force and effect as ofthis date. r. ! der my hand and seal of the Company,this 16th day of Februar 2022 197'. VincentP.Forte AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: DEER CREEK PH. 1 WATER, SANITARY SEWER, DRAINAGE, PAVING, & STREET LIGHT IMPROVEMENTS DOE#: N/A CFA PRJ#: 21-0036 CITY PROJECT #: 102958 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP Brock Huggin Subscribed and sworn to before me this 17'day of February, 2022. N T ARY P ROE PUBLIC Not Public in Tarrant County, Texas NOTARY PUBLIC ' ID#133467933 �"�•, �: Comm Vof118305.2025 'CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT SUR TY CONTRACTOR ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 0236872 PROJECT: (name, addreSS)Deer Creek Fort Worth, TX TO (Owner) DEER CREEK INTERESTS,LLC AND THE CITY OF ARCHITECT'S PROJECT NO: CFA#21-0036 FORT WORTH CONTRACT FOR: 10410 Windermere Lakes Blvd. Water,Sanitary Sewer, Drainage,Paving,&Street Lighting Improvements for Deer Creek Houston TX 77065 -J CONTRACT DATE: CONTRACTOR:CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) DEER CREEK INTERESTS, LLC AND THE CITY OF FORT WORTH 10410 Windermere Lakes Blvd. Houston TX 77065 , OWNER, as set forth in the said Surety Company's bond, IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this 16th day of February, 2022 BERKLEY INSURANCE COMPANY Surety Company Attest: (Seal): Signature of Authorized Representative Robbi Morales Attorney-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No.BI-7280j-el POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna;Don E. Cornell; Sophinie Hunter; Robbi Morales;Kelly A. Westbrook; Tina McEwan; Joshua A. Saunders,or Tonie Petranek of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S.Dollars(U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS 'WHEREOF, the Company has caused these presents to.-be signed and attested by its appropriate officers and its corporate seal hereunto affixed this end day of June 2020 Attest: Berkl Insurance Company r t m r S1 1I�oz By r By Ir Lederman S after 1915•F Executive Vice President&Secretary S ce resident �`t�LtiVlAQ `. STATE OF CON ECTICUT) ) ss: COUNTY OF FAIRFIELD ) Sworn to before me, a Notary Public in the State of Connecticut,this end day of June ,_2020 ,by Ira S.Lederman and Jeffrey M. Rafter who are sworn to me to be the Executive Vice President Secretary, and t e Senior Vice President, respectively,ofBerkley Insurance Company. ur Nora 'B c� MY CO CO CUT EXPIRES APHIL30,2024 - otary Public,State of Connecticut CERTIFICATE I7 the undersigned,Assistant Secretary of BERKLEY INSURAINCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attomey;that said Power of Attorney has not been revoked or rescinded anc)-rbattbe atrthwi.ty of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of ep ched,is in full force and effect as ofthis date. r. ! der my hand and seal of the Company,this 16th day of Februar 2022 197'. VincentP.Forte