HomeMy WebLinkAboutContract 54212-FP1 Fo R T WORTH, TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION City Secretary No: 54212 -FPI Date Received: 12/29/2022 City Project Ns?: 101477 Regarding contract 54212 for 2018 Year 2 Contract 17 as required by the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 06/23/2020 through M&C 20-0457 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as complete. Original Contract Prices: $6,771,551.30 Amount of Approved Change Orders: $429,113.50 Na 5 Revised Contract Amount: $7,200,664.80 Total Cost Work Completed: $6,651,911.70 Less Deductions: Liquidated Damages: 0 Days @$650.00/Day Pavement Deficiencies: Total Deduction Amount: $0.00 Total Cost Work Completed: $6,651,911.70 Less Previous Payments: $6,319,316.11 Final Payment Due $332,595.59 Dec 28,2022 Recommended for Acceptance Date Asst. Director, TPW - Capital Delivery Lauren Prieur(Dec 26,202216:06 CST) Dec 28,2022 Accepted Date Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT Client Department William Johnson(De 9,202209:06CST) Dec 29,2022 Asst. City Manager Date Comments: OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX C-620 Signature Page Contractor's Application for Payment Invoice No. 26 FINAL To(011—) City of Fort Worth Invoicing Period(From-To): Invoice Date: Nov.1 2022 Ou s Non,30 202E 12A/2022 P.O. FW020-0000004321 I—(Conwdor): Remit to(If Not Automatic Deposit): Number. STABILE&WINN INC Project: 101477 CenwctesCFW Vend.No.: 0000007645 City Secremry ContractN—bc,. 54212 C,nwet 2018 CIP YEAR 2 CONTRACT 17 PART 1 Number. Nome: Application For Payment Chang,Order Summary Approved Change Or-ders 1.ORIGINAL CONTRACT PRICE..........................................................-S S637I,551.30 Number Additions Deletions 2.Net change by Change Orders...................................................................S S429,113.50 1 $78,670.00 $36,520.00 3.Current Contract Price(Line 1 t 2).........................................................S S7,200,664,80 2 $505,039,00 $182,400.00 4.TOTAL COMPLETED AND STORED TO DATE 3 S4,780.00 S4,780.00 (Progress Estimate,Construed..Allowance and Change Orden).......S S6,651,911.70 4 S64,324.50 S.RETAINAGE: 5 S3,791.00 S3,791.00 a. X S6,651,911.70 We,],Completed........, S 6 b. X Not Used S 7 c.Total Relninaga(Line 5a+Line 5b)................................S 8 6.Ah10UNT ELIGIBLE TO DATE(Line 4-Line 5c)..............................S S6,651,911.70 TOTALS $656,604.50 $227,491.00 7.LESS PREVIOUS PAYMENTS(Line 6 from prior Application)........S S6,319,316.11 NFTCHANGEBY $429,113.50 S.AMOUNT DUE THIS APPLICATION..................................................S S332,595.59 CHANGE ORDERS 9.BALANCE TO FINISH,PLUS RETAINAGE (Column G on Progress Estimate+CA+COs+Line 5 above)...............S 5548,753.10 Contractor's Cestifsention 10.CONTRACT TIIIIE; The Contractor certifies with the submittal of this document and associated Payment Request Submittal a. Days A—rdcd 450 on the City of Fort Worth Buasaw system that to the best of their lamviedge:(1)all previous progress b. Dap Added by CO 177 payments received from Owner on account ofWork done under the Convect have been applied on Total Dnys 627 amount to discharge Convectors legitimate obligations incurred in connection with Work covered by e• prior Applications for Payment;(2)title of all Work,materials and equipment incorporated in said Work or other ise listed in or covered by this Application for Payment sill pass to Owner at time of Da Charged paymentfi e andelearofoll Liens,security interests and encumbronecs(except suehasare covered by d. )s627 a Bond acceptable to Owner indemnifying Owner against any such Liens,security interest or e, Days Remaining umbrances);and(3)all Work covered by this Application for Payment is in accordance with the Co ntract Documents and is not de@etive. Liquidated Damages S650.00 x day This document has been modified from its original form as an EJCDC document and the user did not highlight the modifications.You are encouraged to read the document carefully and consult Legal Counsel prior to its execution. e oo 00000000 aoaoaa W0a0y0 s0o0o0 a0m0m00o0 a0s0 a00a0a0o0 a0 s0a0 000000 000000 0 3W s '" � � m o 0o a 0000�em000 000 00000 �m000000 Weoo o� oo�000W omo �- 88 0 3 x�m 9 og QAA� �F�000000 S$g d8m oho 08 0 800800$000 o88 o.o.088 o0000000 o800.o 88 8888080 880 So C �sw n 8R 8 888888m'8 8A8 sawi 8n0000�x e88 R8 888�88. 8R800 U use at aixi aia�xi» »a»� „� »� Ayy » F� 9 ®U 9 g E eR " 888888m�o 161 "li 91 e o " ym16 66 �y««89 ror-IF-Io «, z � 88 8 8888�8�888i 888 88�i8R 8�8888111 �i�88 �8 88R888� 888 8 > gi 111�11$1 o as gj 8 8 88 8 8888888888 888 88888 88888888 8888 88 8888888 888 8 �� a qq 6 r 4 a ��m w ®� 000000000800000000 wddjdddododo 5 �88memmeme��8m8m8me n �8����mdo8m a� e� S�SSSSSSSS o0000 o B� �z �8�8m8me «88R'8 9 a N gm WR' �a ° "e J M � M JJaa >U> Qi yZ� o�J q N LL K a z 000 1 8 i H m W i p O W. $2 0 W J F O FF �0YMW F > ww� 2 O 2 AV Zi " MgWF ° W W O 22� y • y �"qqW zo z ~ aw 8 g w �pjjj pq O N O Z Y Y Y iw+ NQdU0,a�p�yl NHzie Eg:�q>et waazHa3a�WrQ3 wazWra3 azWra3 ra3zw_�°��Wra3�WoWrCo�Wo�Co�WWrCo 0OrW���c�'wac��ac�'�ac�'x d_ra'_raqr-ra-r Jw K�2zLL Q3zQ3z rJ>oz�Ow zjr zjr>qa� �O z-°W>zJg-zopwwc�•e c�n�ggaz°p~¢��qB�Me aa���5uu F5zwWam Wiz wi�aOo Wrao�w��Wmu F»z-w°sz rJO_csWi a3Vz&Y» Uy'nOza°>wDx ww�Uzwwz�ra3 O°UfW'z°r4¢p��e dGJJswrCo�uOFgJ3QwOxz Y0w�o�Coa Y0w�o�Coa YE 0w�o�Coa W Ud WJ OZ q ;W2kz � E ww wz�0 o E 2 wwww q 4 w WW a w oFF WolWo VWF aozwww r3Mo �Z�w a oO �-gW° �� -Qgr¢°>» z"zkz www) aW 1°0w� a 0 � -a> SO araa �i wq. ro;.MM6 . - 1 iN wwvvva»oeaa W m b r. a o —.00 —0 00 000000000.. 00 Q Q Q Q Q Q W Q Q 0 Q Q Q o Q wo .-0. 0.0 R N*2 '1 '1 R qg I p.0 F i I�g i g g I 4 S 4 —8m o. 8-8d8d S.gsss. 8i 89.8 mg S 8 8 o.8 S w 8 e Q 2 a a 8 Q S o 8 8 8 . . liwm§ . . . . w Q - -g 10 - Q o g 6c �dm0 F Noz.Somo U use " m 0 w 00"80 "Wo 0 1m 1A w I 6 4 R— Q Q m. c -o Qc - m "m "o mv "m s s v g Or 4 m w Ro QQ Q w 1S7Sa815 9 91%Ct1 w mw m m m 9 w �m I8Y388 I 0--w Sig 8 1;`1 ail 11 �OQI Q o �� as 888 88888 888 888888 8 ggssss 8 8 8 8 8 8 8 8 o-8 8 8 8 Q-go 8 8 8 8 8-Q 8 8 8 8 8 A 00— oo 00 00 00 00 00 00 00 00 00 00§oo QQ QQ QQ QQ oo QQ QQ QQ oo QQ QQ QQ QQ oo 00 QQ QQ QQ oo QQ Q Q Q o 0 81 1 Zl 8 8 888 81 10 01 01 01 10 8 8888-8 Q,Q,Q,Q,81 Q,Q, a 81 IQ ml Q,Q,81 0... ... a a w W. v a o- F!i W- G m W lw w "o I Im m.w 00 00 00 00 00 00 8888888888 QQ QQ QQ QQ QQ QQ QQ QQ 00 QQ QQ QQ QQ Q o 0 i 1�d 6 d d d... g w Q Q o,-w"w 5 0 o Q w m "m-Q- IMQ-I-I-I .,Rq q IR Q Q m w U 2 1.wl 10 1"w lo N 'd d any" g lw";! —99"S m w QQ QQ QQ.QQ. 8Q QQ.QQ.QQ.QQ. QQ.QQ.Q. �4dWWdddw�dWdd4d d 6 MQ 00 A w d 4 4 d d 14 00 QQ QQ QQ QQ 00 00 QQ QQ QQ QQ 00 00 QQ QQ QQ QQ 00 QQ QQ QQ Q 0 0 Q Q Q qq 4 4 ­Q Q Q W" "W Qw ow- Q Q. Qw QQ Q. IT, TTT 11M.�-lq 9 9 I I'Tl IT I I I I I Z w wm UNO mmz �,z M..'4 Z, m>w I m 9" z O �w W> -Z 'm W� m 2 M a z 0 5 1 06mm i R I - z WR lmw wz Zo r-Zo ZM 0;, w w MEN. F. MUM. 'ZW ZMZ mpg LZZlW ZMP l.w zw w 1 Z. z cz cz z zo zo zo w W> z 0 R 0 80z, MOM— MMMM W. z 0 F F 0 P P P w 0 00 0 w w 00 MEMVEZ . . . . . . . I IZ ooe Q 0 0 Q Q A Q Q Q 0 Q Q Q 0 0 Q Q .999 9 9 9 . . . . . . . . . . . . . . . . . g g 6 6 6 6 g 6 6 6 gi 6 6 8 9 8 8 8 18 a P!a 9 9 R R R R c4 R q AA d -4�4 c; i c;8c;C; c; d d c; i E i 4 V i i i g i 9 oj� mo Qw ocici co wi ci use wi'd 16 a a v; w 16 6 li 88 v"w R88� R R R q q R R Q o."... l I C� 1% RJR FL o m 9 9 R �R as . ................. .. ............ ... . . . . . . . . . . . . QR �z SIBS $S SASS d d d.6 wi-4 "i "i'i 16 16 Cq Cq d d -11 mo lw 0 o w z z ' .0 o x W a o o o 0 2 2 2 23syy Iz m z 0 ZM 19 1 0 0 m z w Z MW w ZO 2 z 0 0 z Z . -Wwmwmm mww,. .. z Uz'z NEM 0 m w z Z 0 W mw zo m Z� Z zo Z 0 IZ Id mw s 0 w mw > zo o wz x x I I Z z 0 Z Z z M. z z zo 4z w WZ w 4,z WN 0 o o Z. w ww E I I x w 45 e m o mw z W>W> >> >m > > W W W>m w> 0 >> Z m z z >0 Id >> > 0 m- gq o 4 4.4..4 m zo zo 0 0 z mw mw z 'M.... z WO o o z 0 z S2 o z z z 00 W 0 0 m W, | \ � ,!) Q. `� �jk S �,! § ;; ■ k k )I ] z ! ! � � | K - ■ \ z 999 ) ]k ||| | !! ! - N« ;! /f § k K-li 4 d ! !)\ � ! ! , � � n ; # § { § ((� �k/ §� j §§§t§k pm ..e��0 ! � LL o` I II li I I I O N _ ��,° Il, lli I I Iill I, � i III 3 3 C$ I I Ecl E H N Q o of O G � d C � < O V U A z 0 3 w F F W i4, S0 d x � 3 � 1. o I � _ rlll� i ' i I O U l i I i III Ili I w '�O a o - y �= II I II � III I I SE q a �2 - 1I z a C N � 6 Z > ° Gool e I is t U U � z 0 FF N a _ UqR_ a �a y� y '-I WNrv � III III ! II I 1 ' i III ilil . f' ii Ei is � �I � III � it II I III III I�,, III 71 cn .3 , � 94 e � e � , O U � a m' N m - - - -.- - - - - - - - - - - O _ 3 U p o r' C o❑ «, U U _ ry SHIESS V —IF a= y a c o I I I s j -K ICI ICI - a �Z U E� - N oSS Its N _ E� � I I F" o '0 3 I N I 0 z � u "0 < e Ell - _ z ca o V � E 0 0 ? z a z ` m °un < °u � u o` U C � O U r � z U_ C. G L N Z O u L v Z Ili �Illi Iu � ,Iii ,llll III z i II I ma`s � s 3 9 N d E Oo 0 of om N cl Im of ryi �u 44 c v a L < i O a o, bD a ry O a w i� m o u _I�I ,r�,,o o` U � a m a � o o o s =� III, IIII I I � I II � III ! 'III , I ! IIII , L6 I IIII ! IIIII ! II II IIIIII � Illllllj ' ' I I ' i ❑ � it III m 7 U I €0 I I I EB "' €E z y= I I a � U � 0 ~ o �F+ O a L 8 c i �. ���I illi II III li I II ' �i o limul I I' III I I I IIII ' � I i i i I Y III i` ci Zf I = J .� Ai fi aF lip i III l E! E I I . t i i cl 94 s; iE e s9 �s i I � II �I � I I N N y O Z N N r � r R m 4c� d P Q 00 C U U N N ^ N O Q cn Q. O a z I W O N L p U _ � 07 CD N o O O O a C rnrn rr (D N V R _ C co N O O m .--1 O CO W r cD N co '7 O) N co co V r y EA M (A (A (A � EA EA ffl � N Q - zCD CD o 0 0 o 0 0 p mCO (o m i. d 00 CO r LO CD .- v ao z N E N r co Ih c0 N OD Lotij co co co N L N N U Uj M cfl (fl p a LL w o U N I rn rn rn O O i o O CDO co 2 W N O O) a) m m mO) D) N O O O D) O) m m m m m 0) O) .y O C U O O) O d) O) O) O m N D) 0) 0 0 o O 1` 0 0) D) O) O) Q) m O) (3) D) 0 M - OWW0) d00 coO) NO W U 00 o W O 00 00 O Or O) V' 00 rr V' co � � V , U N co U N CO O No0.0 O O o N y 0 0 0 N O CD CD N N N O O CD O (DO O O O (D O O c r r r r c r r r r r r r r carrrr mrrrr a v v v v c v v v v t v v d <t �o ❑- o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C. C.0 0 0 0 0 0 vvvv vvvv vvvv LO LO Lo LO LO LO o 0 0 o o 0 M M ch M Cl) M m Cl) m Cl) co m u O O O O O O O O O O O O V) O O Cl O O O O CDO O O CD r N N (D r N N (O 1- N N 0 0 0 0 O O O O 0 0 0 0 U O O O O O O O O O O O O (D (D V N (D (D V N (D (D 'IT N LO LO (M Lo 0 0 0 0 0 0 0 Lo m m m 0 0 0 0 0 0 0 LO cn M LO 0 0 0 0 0 0 0 N N � O Z N ti N I r 0 r, E O 7 0 C_ o Q � a Q N M 7 O a O Q O O N V) L �y rp, o 0 0 az c o 0)a c 00' F- rn 00 (6 E EE� r c U O 0 O O O O O V O co z t M 0) 00 w+ V V 'aN 60 4-/ O NO O � L N N U oLL a a, U0 N i CY) m 0) o O O O O O 0 T M N ti LL 0) O 0) O O O 0) m m N c 0) O W O O 0)0) 0) m d) O) a1 M 0) 0 O 0) ) V 0) 0) M 0) N (3) m (3) 0) M o O 0) m O d) O W O 0) 0) 0) O 0) U '2 00 0O0 00 c)ol 00 00 000 (D D W W 0O0 O O rNMw � rrNo�O o ^ rN W o - IO (D O o N O O O O N y 000 N ro c (D CD 0 0 0 0 0 0 0 0 0 0 � i°' ct� rr� r� crr� rr� crr� r� r 'v mr � � r �arrr- r mtirr � a Irvvvv i rvvvv .cvvvv Z ¢ c U o 0 0 o U o_ o_ o o V 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 LL o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v a v v vvvv v v v v c� LOLOr` � rrrrO r� rrrrr ID ID Oo CD (D Cl) Cl) M M M M M M Cl) M Cl) M 0 V V V V V V V 'IT d' 'a' 'd' V' 0 O O O O O O O O O O O O M O CD CD (D O O O O 0 0 0 0 ) M r N N (O 1 N N (D r N N O O O O 0 0 0 0 0 0 0 0 CD U O O O (D0 0 0 0 O O O CD (D(D V' N (D (D V' N (D (D 'IT N LO LO M LO 0 0 0 0 0 0 0 LO LO M LO 0 0 0 0 0 0 0 M In M M 0 0 0 0 0 0 0 N N � O Z N N r � I rr O i E Ca � o c z � •� y U d O D. a d r, N M O a O o z O N O (Tr N O W � O U a o � 7 C a z N E N O r U c O H �, L N }r O N E N N U O o LL w ; ,- o a z U :t' 00 U N m � m O O O O O O N mom 0)m0) mmm N O) o) O) D) O O Q) O) D) Q7 O W �• 'i7 C fD o) O) Q) Q) r 0 m o) 0) OD m d1 (3) m M o O � rn mrnrn OO Q) (3) rnrn rnrn N 0 a 0 Cl) 0 CD (D C) 0 0 0 Cl) Q. V 'a 00 co oOO 'D oo OOW O �a co co OOO o w O N0-0 O N 00 O N � I,C y a 0 (D N y 0 0(D N (D O O N O O O O O O O O cr,O O O O chi a Crrrr Crrrr !Crrrr — r r I-- r m r r r r m r r r r a m z d V o 0 0 CDU o 0 0 CDV CD 0 0 0 v ro 'LL o000 0000 o000 0(D 0 0 O o 0 0 o 0 0 0 oO CD 0 0 O o 0 0 o 0 0 0 U r r r r r r r r r r r r LO LO LO LO to to (n (n (n LO n n 0 0 0 0 0 0 Cl) M M M M (M M M Cl) m M m V T V V V V' O O O O 0 0 0 0 O O O C. (D 0 0 0 0 0 0 0 O O O O co r NN (D r NN (D r NN �(o 0 0 C. Cl (D 0 0 O O O O U N N c0 N N N co N N N w N O O O 0 0 0 0 0 0 0 0 0 0 CD CDO CDO CDO O (D (D 'd' N (D(D V' N (D (D V N (n (n M (n O O O O O O O (n Lo (M (D 0 0 0 0 0 0 0 (D (C) (1) (() 0 0 0 0 O O O Iq LO 0) N N d Cl) O N Z � N r 0 rn z o c m O Q N N Md O O O o z N o rS ^� N N 0 cr W O L m U n o O U CD C) CD CD O Q E U) V N o LO m "'( E �C9N 6 CO 699 Lo E N 63 fH U) a � �/� � N Q V) r O V O � z p y coCD 00 m Z o N (0 00 m O N E oai�C6 N O lfj r O co ((C L N N U EA 69"i v) p a Y o co w o a z U 00 C) 0 N m rn 0 0 0 w N LL O O m N m W O) 6) C o rnrnrnrn O C) C) Cl) y0, a. U OD 00 OD C) O N r V 00 w +(U-' 00 C) C) C) N 'O ,C O co O O O C ° ¢ o 0 0 0 z o000 LL o 0 0 0 o000 � <rvvv U LO LO C3 � 0 0 y Cl) Cl) M Cl) O O O O cn CD C) C) CD (O N N CDC)O O O U oor° o 0 o O C)(O (O V N LO LO C,) M 0 0 0 0 0 0 O CSC No.54212-COI rOR_ _TWOR'I'H,: City of Fort Worth Change Order Request Project Name 1 2018 CIP Year 2 Contract 17 City Sec If 1 54212 Client Project#(s)l 101477-1 Project Description This is a combined street paving improvements,storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 17 Project in Council District 9. Contractorl Stabile&Winn,Inc. Change Order#1 1 Dale 2/8/2021 City Project Mgr. Mary Hanna City Inspectorl William Mattegal Dept. Unit 1(Water) Unit 2(Sewer) Unit 3(Paving) Unit 4(Drainage) Contract Time Totals CD Original Contract Amount $1,675,777.50 $653,464.50 $4,217,834.30 $224,475.00 6,771,551.30 450 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,675,777.50 $653,464.50 $4,217,834.30 $224,475.00 $6,771,551.30 450 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 42,150.00 0.00 $42,150.00 28 Revised Contract Amount 1,675,777.50 $653,464.50 4,259,984.30 $224,475.00 6,813,701.30 478 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 $0.00 Additional Funding(if necessary) $42,150.00 $42,150.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.62% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $8,464,439.13 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order is due to conflicts with existing street light conduits.The existing conduits for the street lighting within the roadway paving limits in Irwin St,Magnolia Ave and Willing Ave are approx.12'deep and in conflict with the proposed paving improvements on these streets. This change order will add a new bid item to replace the street lighting conduit and wiring by tore.It also include a renegotiated bid price for the street light conduit by open cut since the quantity has increased significantly to warrant a revised pricing for that item.We also added a bid item for Electrical subcontractor mobilization to these new locations. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order.The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor Name Contract Signature Dale Stabile&Winn,Inc. Jerry Henderson 1.24 urndrrson Fen 1q zou Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Dale F017,— 4b17,— •Nw Feb 17,2021 Program Manager Date Senior Capital Project Officer Date LINE Feb 17,2021 Feb 17,2021 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date i�rsnvl nr,zrcr Feb 18,2021 Feb 18,2021 Assistant City Attorney Date Assistant City Manager Date �n Feb 22,2021 Feb 22,2021 Council Action if required) M&C Number N/A M&C Date Approved 0 ATTEST:ak (( Mary J.Kayser,City Secretary FORT NVOIi"fl_l City of Fort Worth ter— Change Order Additions Project Name 2018 CIP Year 2 Contract 17 City Sec# 54212 Client Project# 101477-1 Contractor Stabile&Winn,Inc. PMJ Mary Hanna Inspector William Mattegal Change Order Submittal# 0 Dale 2 812021 AUDITIONS ty nit Cost ota Conduit P ch (T)(Open Cut) Unit (Paving) LF Conduit PVCch (B (Bore) nrt —(Paving) F —5971 I- Mobilizations for Electric Sub Contractor nrt (Paving) E ,Unit 1(Water) $0.00 Unit 2(Sewer) $0.00 Unit 3(Paving) $78,670.00 Unit 4(Drainage) $0.00 Sub Total Additions 7 7. Change Order Additions Page 2 of 4 FuarW1ItI I City of Fort Worth —� r— Change Order Deletions Project Name 1 2018 CIP Year 2 Contract 17 City Sec# 54212 Client Project# 1 101477-1 Contractor Stabile&Winn,Inc. PM Mary Hanna Inspector William Matlegal Change Order Submittal# Date 28/2021 DELETIONS Unit Units o a 7 mt awng ml aving 5 Unit 1(Water) $0.00 Unit 2(Sewer) $0.00 U2il3(Paving) $36,520.00 Unit 4(Drainage) i $0.00 Sub I otal Deletrons $36,120 Change Order Deletions Page 3 of 4 MISBE for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 CSC No.54212-0O2 FO RT WO RT 1-4 --w — Change Order Request Project Name 2018 Bond,Street Reconstruction Contract 17 City Sec No. 54212 Project No,(s)56002.0600430/0700430.001780&34018.000431-002480 City Pro.No. 101477 Project Description Combined Street Paving and Water and Sewer Main Replacements for 2018 Bond Reconstruction Contract 17 Part 1 Coritfaclarl Stabile and Winn,Inc. Change Order 9 0 Dale: 6/30/2021 Cily Project ttigr.( Dena Johnson Cily Inspector F Aaron Yb ar ra Phone Number: 817-392-7866 Phone Number; 817-392.8306 Dept. UNIT i Water UNIT 2 Sewer UNIT 3 Paving UNIT 4 Drainage Totals Con1factl Time (Calenndardar Days) Original Conlracl Amounl $1,675,777.50 $653,464,501 $4,217,834,30 V"5,001 $6,771,551.301 450 Extras to Dale 1 $0.001 $0.001 $42,150,001 $0.001 $42,150.0 28 1 Credits to Dale Pending Change Orders(in M&C Process) Contract Cost to Dale $1,675,777.50 $653.464.50 $4,259.984.30 $224,475,00 $6,813,701.30 478 Amount of Proposed Change Order $0,00 $109,950.00 $0.00 $212,689,00 4322,639.00 50 Revised Contract Amount $1,675,777.50 $763,414.50 $4,259,984,30 $437,164.00 $7,136,340.30 528 Orig,Funds Available for Change Orders $83,789.00 $32,673.00 $210,892.00 $22,448.001 $349,802.00 Remaining Funds Available for this CO $83,789.00 $32,673.00 $168,742.00 $22,448.00 $307,662.00 Additional Funding(if necessary) 1 $0.00 $77,277.00 $0,00 $190,241A0 $267,518.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5,39% $8,464,439.13 JUSTIFICATI0N'(REASONS)FOR CHANGE ORDER Change Order No.2 provides for replacement of the failed backfill material for sanitary sewer main on West Shaw Street from Gordon Avenue to 100 feet east of West Shaw/Livingston Avenue intersection.The failed trench has caused pavement subsidence and creating a traffic hazard.Additionally,during construction,it was discovered that the existing storm drain was not located as shown on existing City records necessitating this Change Order for additional storm drain improvements. Staff concurs with the contractor's request for 50 additional calendar days for this change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In lull(both lime and money)for all costs arising out of,or incidental to,the above ange Order, Conlractor's,'Cbmpany,Hame Conlraclor Name. nl clot. nalure Dale Stabile and Winn,Inc. Jerry Henderson Inspector. Pr es' anager Dale )6 6/30/2021 pa,� �a Y, 7/9/21 D¢eetor(W,al(:r Dept) Corfslruclfop: ervisor(TPW Depl): 'Dale 6/30/2021 Asslslanl:Clly;Allomey i�sslsenl.Cily Manager Date "laff ,_.,..,_,. Ju120,2021 Ml,,k Gm 1s,zon 23,,w c m Council Acllon.(If requlred) M&C Number 29460 M&C Dale Approved 6122/2021 �_ 0P'T' Wb R'JC.)4 City of tort Worth Change Order Additions Project Name I 2018 ond,Stroal Mconstrotlon Contract 17 City Sec No, 54?.12 Project No,(s) 56002.060043010'100430.001780&34018.000431-002480 T DOE No, NIA_j City Pro.No, 1U1477 Project Descripllon Combined Street Paving and Water and Sewer Maln Replacements for 2018 Bond Reconstruction Contract 17,part 1 Contractor LStablie and Wfnn,Inc, I Change Order 1t [— 2� Date: 6/30/2021 City Project Mgr, Dena Johnson I City Inspector Aaron Ybarra ADDITIONS •+. - = T.- ¶-d8 epair Trerich WIGSS�aektill UNIT 2 Sewer 11,175.001 CY 1 •126.001• 0 $ $14a,o5o,00 1 I1-39 Ill'Pavement Pulverization (UNIT 2 Sewer I - 800,001 SY 1 $9.001 $7,200,001 II.40 CEM-LIME(@ 32 LB51SY) UNIT 2 Sewer 1 16.001 TN 1 $280,001 $3,9K00 II.41 Asp all PVMT Type"D" UNIT 2 Sewer 1 800,00 SY 1 $18.76 $151000,00 1.42 IManholeAdj,.Minor UNIT 2 Sewer 1 300 EA j $600,001 $1,500,00 1_ II-_3 ITemp.Asphalt Pvmt,Repair(2"HMAC on 6"Flexbase) IUNIT 2 Sewer 1 550.001 LF 1 $30,001 $16,500,001 ._ - . I I I I I I I 1 111Z ISTORM LINE GROUTING IUNfT 4 Drainage I 112,001 CY 1 $260,00j $29,120,001 1 I11-13 IPOST,CCTV INSPEC170N OF STORM LINE IUNIT 4 Drainage 1 280,001 LF 1 $10,001 $2,800,001 [I!22 REMOVE III"STORMLINE IUNIT 4 Drainage 1 65.001 LF 1 $35.0012,275.00� III-23 REMOV 4II"STORM LINE �UNIT4 Drainage 1 104,001 LF 1 $55.001 $5,720.00 1 111.24 ICONC,ENCASEMENT FOR UTILITY PIPES IUNIT 4 Dralnage 1 2,301 CY 1 $875.001 $2,012,501 1 111.26 124"RCP,CLASS III IUNIT 4 Drainage 1 84.001 LF 1 $145.001 $12,160A01 III-26 48"RCP,CLASS ill UNIT Dralnage 1 451,00 LF 1 $394.001 $177,694,00 III 27 CONCRETE COLLAR UNIT4Dralnage 1 2.00 EA 1 $500.00 $1,000.00 III-28 ITCMPORARY ASPHALT PA ING REPAIR 'H AC ON 6' F EXB E UNIT 4 Dralnage 1 836,00 LF 1 $35,001 $18,726,00 1 1I1-29 1EXPLORATORY EXCAVATION IUNIT 4 Drainage 1 1.001 EA 1 $1,600.001 $1,600.001 1 111-30 ITRENCH SAFETY IUNIT 4 Drainage 1 636,001 LF 1 $3,001 $1,606.001 I II1'31 (EXTRA DEPTH 5'SD JUNCTION BOX IUNIT 4 Drainage 1 13,001 LF 1 $700,001 $9,100.001 1 111-32 IEXTRA DEPTH 10'INLETS IUNIT 4 Drainage j 13.001 LF 1 $850.001 $11,060,001 1 111.33 111"Pavement Pulverization IUNIT 4 Drainage 1 1050,001 SY 1 $9,001 $9,450,001 1 11I-34 ICEM-LIME(@ 32 LBSISY) IUNITA Drainage 1 17,001 TN 1 $260,001 $4,420.001 1 III-35 13"Asphalt PVMT Type"D" IUNIT 4 Drainage 1 1050,001 SY 1 $18,76) $19,687,501 1 III-36 IREMOVE T CURB INLET IUNIT 4 Dralnag8 1 3.001 EA 1 $1,200.001 $3,600,001 1 111.37 IAS-BUILT SURVEY IUNIT 4 Drainage 1 1.001 LS 1 $850,001 $850.001 I I 1 I I f 1 I I I I i I 1 I 1 1 I I I I I I I I I I I I I I I I I I I IUNIT 1 Water I IUNIT 2 Sewer 1 $192,150A01 IUNIT 3 Paving I I IUNIT 4 Drainage 1 $312,889.001 (Additions Sub Total 1 $505,039,00 Page 2 of 4 1. N .r o wr wo.> T" City of Fort Worth Change Order Deletions Project Name 018 bon dot reel Reoon sf ruclirin Oo nt doll I City See No, Fb4212 Project No,(s) 58002-060043010700430.001780&24018-000431.002480 0QE No. El= City Pro.No. 101477 Project Description mbined Street Paving and Water and Sewer Main Replaoements for 2018 Bond Reconstruction Contract 17•Pert'( Contractor Stabile and Whn,Inc, - � Change order Date 1. 613012029 City Project Mgr. I Dena Johnson Cily Inspeelor Aaron Ybarra • p��.�TIDN� !1' - f:i� :C t; y}._-•i:l S:-• - nF,.:_.w.�9 ,.: 1 •liN. }s� II-4 IV MANHOLE IUNIT 2 Sewer 1 2,0001 EA 1 $6,000,001 $12,000,00 II-6 R Drop MANHOLE IUNIT 2 Sewer 1 1,001 EA 1 $7..200.001 $7,200,00 II-15 18"WATERLINE LOWERING IUNIT 2 Sewer I 3.001 EA 1 $7,9KO.'01 $23,700,00 If-24 IRf;MOVE 4'SEWER VAULT IUNIT'25.ewer 1 2.001 EA 1 $500,001 111,000.00 07 I UNIT 2Snwer I 0,70761 LS 1 $40,000.001 $28,300,00 III-6 1 REMOVE:IO"CURB INLET IUNIT 4 Drainage 3MI EA 1 $1,300,001 $3,000,00 III-1216X2 BOX CUI. RT I UNIT 4Dralnage 1 135,001 LF I $360A01 $48.600,00 111-16 142"RCP,CLASS III IUNIT 4 Dralnage 1 120,001 LF I $210,00 $2151200,00 111-21 1CONSTRUCTION ALLOWANCE 1UNIT 4 Drainage 1 0,75 LS 1 $30,900XI $22,600.00 I I I I I I I l i I I l l I I l I I 1 I 1 I i i I I I i i I 1 I I I I 1 I_..._.�....I J UNIT 1 Water —� IUNIT 2 Sewer I $82,200.00I IUNIT 3 Paving I IUNIT 4 Drainage, I $100,200.00� IDefel(ons Sub Total $182,400.001 Page 3 of 4 M/WBE Breakdown for this Change Order Total Previous Change Orders Total d Contract Compliance Manager By signing acknowledge thatl am the person responsible forth ,monitoring and administration of this contract,including ensming all performance and rap orti ng requirements, Signature //lJ Denajohnson Name ofLmployee Project Manager Title ATTEST: Ronald 1" 1-',2lPS Ronald Gonzales Acting City Secretary u a City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 22, 2021 REFERENCE NO.: **M&C 21-0460 LOG NAME: 602018CIPY2C17CO2-STABILEW SUBJECT: (CD 9)Authorize the Execution of Change Order No. 2 in the amount of$322,639.00 and the Addition of 50 Calendar Days to a Contract with Stabile and Winn, Inc., for Combined Street Paving Improvements, Storm Drain and Water and Sanitary Sewer Main Replacements for 2018 Bond Street Reconstruction Contract 17 Project, for a Revised Contact Amount of$7,136,340.30 and Adopt Attached Appropriation Ordinances RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Change Order No. 2 in the amount of$322,639.00 and the addition of 50 calendar days to City Secretary Contract No. 54212 with Stabile and Winn, Inc., for combined street paving improvements, storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 17 and 18 project for a revised contract amount of$7,136,340.30; 2. Adopt the attached appropriation ordinance adjusting appropriations in the 2018 Bond Program Fund in the amount of$555,811.00 by increasing appropriations in the 2018 Bond Street Reconstruction Contract 17 and 18 project (City Project No. 101477), and decreasing appropriations in the Street Construction/Reconstruction/Rehabilitation programmable project(City Project No. P130001) by the same amount; 3. Adopt the attached appropriation ordinance increasing appropriations in the Water and Sewer Capital Projects Fund in the amount of$109,950.00 transferred from available funds within the Water and Sewer Fund for the purpose of funding the 2018 Bond Street Reconstruction Contract 17 and 18 project(City Project No. 101477); and 4. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Stormwater Capital Projects fund by increasing appropriations in the 2018 Bond Street Reconstruction Contract 17 and 18 project (City Project No. 101477) for the amount of$212,689.00 and decreasing receipts and appropriations in the Drainage Improvements programmable project (City Project No. P00043) by the same amount, DISCUSSION: On June 23, 2020, Mayor and Council Communication (M&C 20-0457)the City Council authorized a contact with Stabile and Winn, Inc„ in the amount of$6,771,551.30 for the combined street paving improvements, storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 17 Project. The contract was subsequently revised by Change Order No. 1 in the amount of$42,150.00 administratively authorized February 22, 2021 that provided for the replacement of existing street light conduits that were encountered in direct conflict during roadway reconstruction on Irwin Street, Magnolia Avenue and Willing Avenue. Change Order No. 2 provides for replacement of the failed backfill material for sanitary sewer main on West Shaw Street from Gordon Avenue to 100 feet east of West Shaw/Livingston Avenue intersection. The failed trench has caused pavement subsidence and creating a traffic hazard. Additionally, during construction, it was discovered that the existing storm drain was not located as shown on existing City records necessitating this Change Order for additional storm drain improvements. Appropriations for the combined street paving improvements, storm drain and water and sanitary sewer http://apps.cfwnet.org/ecouncil/printme.asp?id=29009&print=true&DoeType=Print 7/9/2021 I main replacements for 2018 Bond Street Reconstruction Contract 17 Project will consist of the following: Fund Existing Additional Project Total* Appropriations Appropriations 2018 Bond Program - Fund $10,793,935.00 $0.00 $10,793,935,00 34018 Storm Water Capital Projects $711,369.00 $212,689.00 $924,058.00 Fund - 52002 Water& Sewer Capital Projects - $7,590,363.00 $109,950.00 $7,700,313.00 Fund 56002 Project Total $19,095,667.00 $322, 339.00 $19,418,306.00 *Numbers rounded for presentation purposes. Approval of Recommendation No. 2 would adjust appropriations between a programmable project and convert the 2018 Bond Street Reconstruction Contract 17 and 18 project(City Project No. 101477) into a static capital project. This action is needed as future funding for the 2018 Bond Street Reconstruction Contract 17 and 18 project(City Project No. 101477) is anticipated from other funding sources and the scope of this project differs from that of the current programmable project. Business Equity: A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable Ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible. This project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/ CERTIFICATION: The Director of Finance certifies that funds are available in the current operating budget in the Water & Sewer Fund and in the capital budget for the Drainage Improvement project within the Stormwater Capital Projects Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the Stormwater Capital Projects Fund and W&S Capital Projects Fund for the 2018 Bond Yr2-Contract 17&18 project to support the approval of the above recommendations and execution of the change order to the contract. Prior to an expenditure being incurred, the Transportation & Public Works and Water Departments have the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department ccoun Project Program ctivity Budget Reference# moun ID ID Year (Chartfield 2) FROM Fund Department ccoun Project Program ctivity Budget Reference # moun ID ID Year (Chartfield 2 I CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Dena Johnson (7866) 1 littp:Happs.cfwnet.org/ecouncil/printmc.asp?id=29009&print=true&DoeType=Print 7/9/2021 1 ATTACHMENTS 1. 602018CIPY2C17CO2-STABILEW FID Table (WCF 06.14.21).xlsx (CFW Internal) 2. 602018CIPY2C17CO2-STABILEW Form 1295.pdf (CFW Internal) 3. 602018CIPY2C17CO2-STABILEW funds availability.docx (CFW Internal) 4. 602018CIPY2C17CO2-STABILEW Map.pdf (Public) 5. 602018CIPY2C17CO2-STABILEW Waiver.pdf (CFW Internal) 6. 602018CIPY2C17CO2-STABILEW 34018 A021(r2)r.docx (Public) 7. 602018CIPY2C17CO2-STABILEW 52002 A021(r4)r.docx (Public) 8. 602018CIPY2C17CO2-STABILEW 56002 A021(r3).docx (Public) 9. Stabile&Winn SAM.pdf (CFW Internal) i http://apps.cfwnet.org/ecouncil/printmc.asp?id=29009&print=true&DoeType=Print 7/9/2021 0 T W 00 n In In Ln In V1 Ln In In ltl V7 N Ul U1 In W W N N ma) N N N N N N N O N l Ol O O O O O O p O O O O O 0 CD C) p o CD C) C) (D C:) o o CD CD o o N N N H N N N N N N N N N N Oo co C7 O 0 0 0 0 0 o p o 0 0 0 0 (D o y N N J J N N N N N N N N J J O O 0 0 O O O O O O O O O O O O O w O O O O O O O O O O 0 0 A A 4P O A .A A .P ? 4P A A A A W W W N W W W W W W W W W W H H O O H H H H H H H H O O h1 41 Ln 41 LD LO (LD (D (LO Loo (LD LD (LO In (n N In In (n In (n Ln a. N N m O) N N N N al O O O O O O O O O O O O O O O O O O C 'O H H C C 'O H C C 'O Z o 0 o Z Z o o Z Z o (D 0 o w v o Hp v v o v v o Hn o n W V J n n W J n n W V J J r � C v O Z n p N J O W co p r O w LD w N N N N N N N N N N N N w lD tD O O O O O O O O p p O O LO to LO N N N N N N N N N N N N lD lO LD H H H CO co O O O LD H LO wD i ij� VT to Vl {n 1n V� V}t/? SR N 1-' N N p H N H N H N H N F-• 0 0 to N N lD LCD o N N N N N N N N lD lD In m lD O1 Ol m 01 LD lD co 00 Q1 In m co co co O1 W Ol W In cn tO LO C, 0 lD l0 tD Lco o tO O O H __ O O O O O O 0 0 O - O O O O O O p O p O p O 0 0 C)LD O O c) O O c) ;o cu 'D co ;;l w C W �17 W m W ;lD W C C(D C CDC (D C Z C (D C O C M C z C M CC O C O C� O CO C < fl_ O Ll. < ❑. N 2 < d O Q < 0. W 2 < Q. O Q H Q O d (D DU O M N M M (D n O DV (D n -D n (D M O Dq -A Dq O 0t1 7 (D A (D 7 (D (D n (D (D C (D M D (D A (D J h O rt C rt W rt C rt m rt C ri W rt C �"�' m rt C rt W rt D D v (D D n 0 D v A tD D n A (o D D rt v N rt a (D rt a (D rt (D rt N U (D 0 ° w0 (D (D 0 D0v m F ° m l m a q m c o o 0 C 0 i o o C o 0 0 Z •o �' c v c Z -o v c •0 c Z -0 v c a v c cn 3 (D (D Ln 73. 3 m A �. (D (n �, 3 (D M °« 3 m J °+ m °+ 3 J °+ m Et 3 °rt, 3 M O Dl (D J O N (7 O w (D J O (D n O D( (D N N c 0 n a Q - . a C a' a D D D D m D D fD w n n a a 0 o o o 0 oQ o O O o 0 O O O 7 O O 0 O O n o :J 0 0 3 0 3 0 3 0 3 0 3 - �, 0 I H H W ru Ul Ul Ul Ul O O O O O O O O N N N N O O O O N J N N 00 O O A A A A w W W LO H O H H Ul Ul ? A A A to to O C) N N O O O O H H O ID O O H H H H H c O O O z H H HLn AJ V V D J J J m n 0 0 o c O o o z co J W N 00 00 CDcoCDO O C) O w lD �o LD LD LD LO LO M LD LO LO lD l0 LO lD LT N H N N H O H H lD 00 Ul co co lD O p l0 00 O O O O O ;;a Go c ua O O M C z C O 6 2 d O r°ru m m n n n D O O r -o ro N N O -p N O D 7 LT LT F V C W W J � A N N N N J O CD Ol O> > O C LO lD Q a O rr � o 0 �I Signature: il�ia'�g�r��ez Signature: Priscilla Ramirez(Jul 14,2021 16:18 CDT) S bl—\J�lAA�11X� Email: Priscilla.Ramirez@fortworthtexas.gov Email: allison.tidwell@fortworthtexas.gov Signature: Signature: Email: Vania.Soto@fortworthtexas.gov Email: Norma.Sauceda@fortworthtexas.gov Signature: Email: cheryl.howe@fortworthtexas.gov CSC No.54212-CO3 F0111'WORTH. City of Fort Worth 9101� Change Order Request Project Namel 2018 CIP Year 2 Contract 17 City Sec# 1 54212 Client Project#(s)l 101477-1 Project Description This is a combined street paving improvements,storm drain and water and sanitary sewer main replacements for 2018 Bond Street Reconstruction Contract 17 Project in Council District 9. Contractorl Stabile&Winn,Inc. Change Order#1 3 Date 6/26/2021 City Project Mgr. Mary Hanna City Inspectorl Aaron Ybarra Dept. Unit 1(Water) Unit 2(Sewer) Unit 3(Paving) Unit 4(Drainage) Contract Time Totals CD Original Contract Amount $1,675,777.50 $653,464.50 $4,217,834.30 $224,475.00 $6,771,551.30 450 Extras to Date $109.950.00 $42,150.00 $212,689.00 $364,789.00 78 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,675,777.50 $763,414.50 $4,259,984.30 $437,164.00 $7,136,340.30 528 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 $0.00 $0.00 0 Revised Contract Amount 1,675,777.50 $763,414.50 $437,164.00 7,136,340.30 528 Original Funds Available for Change Orders $83,789.00 $32,673.00 $210,892.00 $22,448.00 $349,802.00 Remaining Funds Available for this CO $83,789.00 $0.00 $168,742.00 $0.00 $252,531.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.39% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591o) $8,464,439.13 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order includes bid items to use cement and Roadbond material in Magnolia Avenue between Buck and Forest Park instead of Cem-Lime for subgrade soil stabilization. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractors Company Name Contractor Name Contract Signature I Date Stabile&Winn,Inc. Jerry Henderson Jul29,2021 InspectorAnspection Supervisor Date Project and Contract Compliance Manager Date Qar_n Yharra 7/!� Owc�r. Jul 29,2021 .,, Aug 2,2021 Program Manager Dale Senior Capital Project Officer Dale Aug 2,2021 Aug 2,2021 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date _.wren ?Ivor Aug 2,2121 Aug 3,2021 /n Assistant City Attorney Date Assistant City Manager Date Aug 4,2021 . ,,.,_',.,.., Aug 5,2021 Council Action ff required) /,/ M&C Number N/A M&C Date Approved ATTEST:�O`IaGl�l � GohzaGef Ronald P.Gonzales(Aug 6,20211028 CDT) Ronald P.Gonzales,Acting City Secretary Fo it CVO RTII City of Fort Worth T-- Change Order Additions Project Name 2018 CIP Year 2 Contract 17 City Sec# 54212 Client Project# 101477-1 Contractor Stabile&Winn,Inc. PMI Mary Hanna Inspector Aaron Ybana Change Order Submittal# Date 6/26/2021 ADDITIONS HEM DESCRIPTION ULHI ty Unit Unit Cost Total Cement( LB/ Y) Unit 3(Paving) T RonadBond EN- ( als/Y) nil Paving) 5. AL 5. Unit 1(Water) $0.00 Unit 2(Sewer) 50.00 Unit 3(Paving) 54,780.00 Unit4(Drainage) 50.00 bub Total A00insons 7 Change Order Additions Page 2 of 4 FuarR4nrl H City of Fort Worth �7`r Change Order Deletions Project Name 1 2018 CIP Year 2 Contract 17 City Sec# 54212 Client Project# 101477-1 Contractor Stabile&Winn,Inc. PM Mary Hanna Inspector Aaron Ybarra Change Order Submittal# Date 612612021 DELE I IONS nk Units o a nil awng it Unit 1(Water) $0.00 Unit 2(Sewer) $0.00 Unit 3(Paving) 14.780.00 Unil4(Drainage) $0.00 Sub I otal Deletions 7 Change Order Deletions Page 3 of 4 MISBE for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 CSC No.54212-CO4 FOR_ _1'WORTH,, City of Fort Worth �01*11 � Change Order Request Project Name 2018 CIP YEAR 2-CONTRACT 17 City Sec# 54212 Client Project#(s) 101477-Year 2 Contract 17 Project Description This is a combined street paving improvements and water and sanitary sewer main replacements project Contractor STABILE&WINN INC Change Order# 4 J Date 1118/2021 City Project Mgr. Jose A Orozco City Inspector Aaron Ybarra Dept. Water-Unit I Sewer-Unit II Paving-Unit III Storm-Unit IV Contract Time Totals (CD) Original Contract Amount $1,675,777.50 $653,464.50 $4,217,834.30 $224,475.00 $6,771,551.30 450 Extras to Date $0.00 $109,950.00 $42,150.00 $212,689.00 $364,789.00 78 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,675,777.50 $763,414.50 $4,259,9B4.30 $437,164.00 $7,136,340.30 528 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 $64,324.50 $0.00 $64,324.50 15 Revsed Contract Amount $1,675,777.50 $763,414.50 $4,324,308.80 $437,164.00 $7,200,664.80 543 Original Funds Available for Change Orders $83,789.00 $32,673.00 $210,892.00 $22,448.00 $349,802.00 Remaining Funds Available for this CO $83,789.00 $0.00 $168,742.00 $0.00 $252,531.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 6.3401, MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $8,464,439.13 JUSTIFICATION(REASONS)FOR CHANGE ORDER IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL: Furnish all labor and material as per attached proposed Change Order.This Change Order will adjust the scope to include the necessary bid items to remove buried Railroad ties in the pavement from an abandoned trolley system in Willing Ave from Devitt St to Cantey St. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor(Name) Contract Signature Date STABILE&WINN INC Jerry Henderson Nov 10,2021 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date Nov 10,2021 ,.,, Nov 10,2021 Program Manager Date Senior Capital Project Officer Date Nov 10,2021 Nov 10,2021 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date Nov 10,2021 J.AJ�l.— Nov 10,2021 Assistant City Attorney Date Assistant City Manager Date Nov 12,2021 Nov 13,2021 Council Action(f required) M&C Number M&C Date Approved 0 ATTEST: u�✓a n.6M>1 Ronald P Gonzales,Acting City Secretary FoltrWosru City of Fort Worth � --- Change Order Additions Project Name 2018 CIP YEAR 2-CONTRACT 17 City Sec# 54212 Client Project# 101477-Year 2 Contract 17 Contractor STABILE&WINN INC PMJ Jose A Orozco Inspecto Aaron Yharra Change Order Submittal# ® Date 1118/2021 ADDITIONS nd Unit Cost I ota Remove Railroad Ties awng- nit I I I it Water-Unit 1 $0.00 Sewer-Unit 11 $0.00 Paving-UnitIIl W,324.50 Storm-Unit IV $0.00 Sub I otal Additions .5 Change Order Additions Page 1 of 1 rota Y City of Fort Worth Change Order Deletions Project Name 2018 CIP YEAR 2-CONTRACT 17 City Sec# 54212 Client Project# 101477-Year 2 Contract 17 Contractor STABILE&WI NN INC PM Jose A Orozco Inspector Aaron Ybarra Change Order Submittal# ® Date 11/812021 DELETIONS HEM DESCRIPTION Ul,:P I CRY Unit Unit Cost Total Water-Unit I $0.00 Sewer-Unilll $0.00 Paving-Unit III $0.00 Stone-Unit N $0.00 Sub Total Deletions $0.00 Change Order Deletions Page 1 of 1 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CSC No.54212-CO5 ORTWORTH® City of Fort Worth Change Order Request Project Namel 2018 CIP Year 2-Contract 17 City Sec# 1 54212 Client Project#(s)l 101477-Year 2 Contract 17 Project This is a combined street paving improvements and water and sanitary sewer main replacements project Description Contractorl Stabile and Winn,Inc. Change Order#1 5 Datel 9/23/2022 City Project Mgr, Jose A Orozco City Inspectorl Aaron Ybarra Dept. Unit 1:Water Unit 2:Sewer Unit 3:Paving Unit 4:Storm Contract Time Totals (CD) Original Contract Amount $1,675,777.50 $653,464.50 $4,217,834.30 $224,475.00 6,771,551.30 450 Extras to Date $0.00 $109,950.00 $106,474.50 $212,689.00 $429,113.50 93 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,675,777.50 $763,414.50 $4,324,308.80 $437,164.00 $7,200,664.80 543 Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00 84 Revised Contract Amount $1,675,777.50 $763,414.50 $4,324,308.80 $437,164.00 $7,200,664.80 627 Original Funds Available for Change Orders $83,789.00 $32,673.00 $210,892.00 $22,448.00 $349,802.00 Remaining Funds Available for this CO $83,789.00 $0.00 $104,417.50 $0.00 $188,206.50 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 6.34% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $8,464,439.13 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order adds additional time and scope to the project to cover delays caused by several factors. The total number of days requested by the contractor was negotiated and vetted by the project management team. Additional time approval was considered justified for the following factors: 1)12 days for Construction Allowance#2 for sub-contractor to remobilize&relocate 10 existing water services along Willing Ave-12/2/2021-12/13/2021 2)19 days for Extended cold/freezing weather days-(2021)2111-2/19&(2022)1/20,2/3,214,2123-2/25 3)11 days for additional sidewalk curb scope at 3012,3009,3008,3004,300%2940 Willing-3/18/2022-3/28/2022 4)37 days for Concrete&material supplier issues limiting Concrete delivery;reduced from 200 CY/day to 50 CY/day;Beginning 8/2021&through project end. 5)5 days for AT&T delay to adjust manhole at Willing and Bowie-6/812022-6/1512022 In total,84 Callendar Days(CD)were approved. This change order will also add new bid item for'Remove and rest forms'at 3109 Willing as a result of changing scope to install retaining wall after the contractor installed the forms per the original scope.It will also add a bid item to'install Railroad cross ties and Backfill'at 3121 Willing to install railroad ties per the property owner request to match before project condition.The change order will also add new bid item'FH Stem Extension;for adjusting the existing Fire Hydrant at NE corner of Willing&Berry on a segment of the water line that was not replaced as part of this project. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor(Name) Contract Signature Date STABILL&WINN INC Jerry Henderson Sep 26,2022 Inspector/Inspection Supervisor Dale Project and Contract Compliance Manager Date �0'• — Sep 27,2022 > A 0 a Sep 26,2022 Program Manager g r Date Senior Capital Project Officer Date N Sep 27,2022 Sep 29,2022 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date »ate v„u Oct 1,2022 Oct 3,2022 Assistant City Attorney Date Assistant City Manager Date i fort worth Oct 3,2022 1,%ALV4 Oct 4,2022 Council Action if required) M&C Number M&C Date Approved 0 ATTEST: .TnnnMtn C./.'oodall Jannette Goodall,City Secretary Foerwoe'rn City of Fort Worth Change Order Additions Project Name 2018 CIP Year 2-Contract 17 City Sec# 54212 Client Project# 101477-Year 2 Contract 17 Contractorl Stabile and Winn,Inc. PMJ Jose A Orozco Inspector Aaron Ybarra Change Order Submittal# OS Date 9I23I2022 AUUI I IONS HEM DESCRIPTION utV I City Unit Unit Cost Total Fire Hydrant Stem Extension ni a er Remove and rest forms ni av{ng - 7—siall Railroadcross Ties and Backfillm aving Unit 1:Water $900.001 Unit 2:Sewer $0.00 Unit 3:Paving $2,891.00 Unit4:Storm $0.00 Sub Totallions Change Order Additions Page 2 of 4 FORT'WORTH City of Fort Worth — - — Change Order Deletions Project Name 2018 CIP Year 2-Contract 17 City Sec# 1 54212 Client Project# 101477-Year 2 Contract 17 Contractor Stabile and Winn,Inc. PM Jose A Orozco Inspector Aaron Ybarra Change Order Submittal# 05 Dale 912312022 UtLtIIUNJ Unit Unit Cost oral Construction Allowance ni a er Uonstructfion Allowance n- awng Und : at Unit 2:Sewer $0.00 Unit 3:Paving $2,891.00 Unit 4:Storm $0.00 Sub lotaleeons Change Order Deletions Page 3 of 4 MISBE for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 FQ RT WORTH' TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: 2018 CIP Year 2 Contract 17 CITY PROJECT NUMBER: 101477 WATER PIPE LAID SIZE TYPE OF PIPE LF Open Trench 8" PVC Pressure Pipe 6,555 LF Open Trench 1" Copper 5,000 LF FIRE HYDRANTS: 3 VALVES(16" OR LARGER) N/A PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: Passed NEW SERVICES: SEWER PIPE LAID SIZE TYPE OF PIPE LF Open Trench 8" HDPE 2,685 LF Open Trench 4" SDR-26 463 LF PIPE ABANDONED SIZE TYPE OF PIPE LF N/A N/A N/A N/A DENSITIES: Passed NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORT WORTH(H) TRANSPORTATION AND PUBLIC WORKS September 8, 2022 Stabil & Winn, Inc P.0 Box 79380 Saginaw,Texas 76179 RE: Acceptance Letter Project Name: 2018 CIP Year 2 Contract 17 Project Type: Paving, storm drain, water&sewer main replacements City Project No.: 101477 To Whom It May Concern: On September 8, 2022 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on November 16, 2022. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on November 16, 2022, which is the date of the punch list completion and will extend of two (2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-6685. Sincerely, ?_.A. O�� Jose Orozco P.E, Project Manager Cc: Aaron Ybarra, Inspector Donald Watson, Inspection Supervisor Edwin Rodriguez, Senior Inspector Mary Hanna P.E, Program Manager DUNAWAY, Consultant Stabil &Winn, Inc, Contractor COFW, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev.8/20/19 7 CONSENT OF SURETY COMPANY TO FINAL PAYMENT Bond #CA 3456047 Project: 2018 CIP Year 2, Contract 17, City Project No. 101477 To (Owner): City of Fort Worth, Texas 200 Texas Street Contract For: See above Ft Worth, TX 76102 Contract Date: June 23, 2020 Contractor: Stabile & Winn, Inc. P O Box 79380 Saginaw, TX 76179-0380 In accordance with the provision of the Contract between the Owner and the Contractor as defined above, the Great American Insurance Company of New York 301 E Fourth Street Cincinnati, OH 45202 ,Surety Company, on bond of Stabile &Winn,Inc. P O Box 79380 Saginaw,TX 76179-0380 ,Contractor , hereby approves of the final payment to the contractor and agrees that final payment to the contractor shall not relieve the Surety Companies of any of their obligations to the City of Fort Worth,Texas 200 Texas Street Ft Worth, TX 76102 ,Owner as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Companies have hereunto set their hand this 28th day of November, 2022. Great American Insurance Company of New York Witness: Surety Company F AlvI�' Tracy Tucker, Attorney-in-Fact GREAT AMERICAN INSURANCE COMPANY OF NEW YORK New York Administrative Office:301 E 4TH STREET • CINCINNATI,OHIO 45202 • 613-369-5000 • FAX 513-723-2740 The number of persons authorized by this power of attorney is not more than SIX No.0 14893 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK,a corporation organized and existing under and by virtue of the laws of the State of New York,does hereby nominate,constitute and appoint the person or persons named below its true and lawful attorney-in-fact,for it and in its name, place and stead to execute on behalf of the said Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond,undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. Name Address Limit of Power TRACY TUCKER STEVEN TUCKER ALL OF ALL W.LAWRENCE BROWN BENNETT BROWN FORT WORTH, $100,000,000.00 KEVIN J. DUNN ROBERTA ERB TEXAS This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above. IN WITNESS WHEREOF,the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 21ST day of APRIL 1 2020 Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK va SEAL Divisional Senior i ice President Assistant Secreiar7, MARK VICARIC(877-377-2405) STATE OF OHIO,COUNTY OF HAMILTON-ss: On this 21ST day of APRIL 2020 , before me personally appeared MARK VICARIO,to me known, being duly sworn,deposes and says that he resides in Cincinnati, Ohio,that he is a Divisional Senior Vice President of the Bond Division of Great American Insurance Company of New York,the Company described in and which executed the above instrument; that he knows the seal;that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name thereto by like authority. F ,,J 1USA8 A KOH011ST a Notary Public �] State of Ohio My Comm,Expires May 18,2025 This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company of New York by unanimous written consent dated May 14,2009. RESOLVED: That the Divisional President the several Divisional Senior Vice Presidents,Divisional Vice Presidents and Divisional Assistant Vice Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact to execute on behalf of the Company,as surety,any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof;to prescribe their respective duties and the respective limits of their authority;and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond, undertaking, contract of suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION I,STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company of New York,do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of May 14, 2009 have not been revoked and y"ye now in full force and effect. $ Signed and sealed this 28th day of November 2022 4t, +� 5E.3L „ Assistant Secrelmy S1185N(03/20I AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Jerry Henderson, Vice President Of Stabile & Winn, Inc., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; 2018 CIP Year 2 Contract 17 - City Proje t#101477 BY Jerry Henderson, Vice President Subscribed and sworn before me on this date Sth of December, 2022. DEBRA RODRIGUEZ Notary Public STATE OF TEXAS +'icy � ID#13171267-2 Notary Public M Comm.Ex .Se .7.2026 Tarrant, Texas