CHANGE ORDER NO.
�
CITY OF FORT WORTH CITY SECRETARIf � ,
CHANGE ORDER REQUEST C��6� N�o �11.��C��
DATE D.O.E. NO. PROTECT NO. City Project 01839
November 20, 2012 N/A P?5f3 5412�� 7�
PROJECT DESCRIPTION: Village Creek WRF Secondary Clarifier 1— 9 Weir Replacement CITY SECRETARY CONTRACT NO.
43128
ORIGINAL CONTRACT AMOUNT ...........................................$ 339.600.00
EXTRAS TO DATE ...............................................$ 48.430.61
CREDITS TO DATE ..............................................$ 0.00
CONTRACTCOST TO DATE .............................................................................................................................................................. $ 438.030.61
AMOLTNT OF PROPOSED CHANGE ORDER .................................................................................................................................... $ 5.800.53
REVISEDCONTRACT AMOiJNT ....................................................................................................................................................... $ 443,831.14
ORIGINAL FLJNDS AVAILABLE FOR CHANGE ORDERS ............................................................................................................. $ 19.480.00
ADDITIONAL FLJNDING (IF NECESSARY) .........................................................................................................................:............ $ 5.800.53
REMAINING FLINDS AVAILABLE FOR CHANGE ORDER ............................................................................................................ $ 0.00
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete,
functional, and operational plant. These changes are as listed below. Further descriptions and Cost Breakdowns are attached.
CMR-003 CLARIFIER 3 WALL ADJUSTMENTS ------------------------------------------------------------------- ------------------------------ $5,800.53
The Contractor shall adjust the elevations of the weir wall in Final Clarifiers 3 as necessary to allow a minimum of one-inch solid plate under
the v-notch in the new weirs. The existing wall is uneven and must be ground down in places to provide the clearance. The Contractor
provided a cost of $5,800.53 for this work and requested no additional contract time.
------TOTAL COST FOR
The Completion date for the contract is October 19, 2012. by ��
� ��
J. Kayser, City S �
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents�
costs arising out of, or incidental to, the Change Order.
ORIGMAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACT T[ME TO DATE
170 Calendar Days NONE 170 Calendar Days
CONTRACTOR �. ,;�1 1 :' '
� J"� %�-�•,::.c_.
Archer Western Con�tructiori,yLLC
Madelene
F
irector
ji-06-12 P0?:33 I��
DATE
� i��" �,�' � / "�_
DATE.
� �/3d%� Z-
DATE
!L y �Z
DATE
/�.S�.G
FIELD ENGINEER/
L
F.iny Robinson, PE, C P
DIRECTOR/MANAGING DEPT.
COUNCIL ACTION (IF REQUIRED):
❑ APPROVED ❑ DISAPPROVED
���� ------- $5,800.53
� oo�000000a�� ��-
�o°� �o�Vi�
� o°��
o� o .��!-�
°�o n�° ��'yp'
�r10IQf9fkS�� i�ip�"'3nd money) for aIl
� �S �.a
ADDIT TIME FOR THIS CHANGE ORDER
NONE
D TE �
��,� ll 30 �z
DATE
DATE
r L � 'Z
DATE
�
�OTHER N/A
OFFICIAL RECOfiD
CITI( SECRETARY
% WORTH, iX
DM
�m�th
100 Throckmorton Street, Suite 600
Fort worth, Texas 76102
tel: Sll332-8727
fax: 317 320-0450
September 5, �oia
Ms. Madelene Rafalko
Fort Worth Water Department
i000 Throckmorton Street
Fort Worth, Texas 76ioz
Subject: City Secretary Contract No. 43ia8 (M&C Gz547�, March o6, zoiz)
City of Fort Worth Village Creek Water Reclamation Facility
Secondary Weir i-9 Replacement
City Project No. oi839
Contractor's Modification Request —Grind Top of Wail at Clarifier 3
Dear Madelene:
Transmitted herewith please find a copy of Archer Western's contract modification request (CMR) to grind
the walis at Clarifier 3 to accommodate the new weirs. The top of wall elevation varied around the clarifier
and adjustments needed to be made tq accommodate the new weirs. The pricing includes additional labor
and material cost to grid a portion of the weir wall. The cost associated with this work is $5,800.53. No
change to Contract Time has been requested.
CDM Smith has reviewed this price proposal and is of the opinion that it is a fair and equitable price. CDM
Smith recommends the City accept this cost and issue a Change Order in the amount of $5,800.53. Pfease
advise if the Water Department desires this CMR be incorporated in a Change Order.
Very truly yours,
Q��d��
Amy Robinson, PE
Senior Project Manager
CDM Smith
TBPE Firm No. 3043
cc: Kent Riker, CDM
PW File o5i5-833=43-�7•06•4�
�.
��
�VATER � ENVIRONMENT +TRANSPORTAT(ON + ENERGY+ FACILlTIES
CMR
vILIAGE CREEK WWTP
bYeir Replacement
OWNER: GITY OF FORT WORTH TEXAS � `�NORK DESCRIPTION:
Cut antl Gnnd Top of W alls at Clanfier 3
ENGINEER: COM Smith
1
CONTRACTOR: ARCHER WESTERN CONTRACTORS, LT�
2121 AVENUE J, SUITE #103
ARUNGTON, TEXAS 76006