HomeMy WebLinkAboutContract 45136-CO1 (2)���� s�c���yS13(�-�0 � ���►�+r �. FO RT ��O RT H City Secretary Copy Change Order Request Project Name Casino Beach and Watercress Drive Water and Sewer Improvements, Phase 1 City Sec No. 45136 PfOJ2Ct NO.�S� P�63-060163014108, P27470713018298 DOE No. �ppg City Pro. No. 01829 and P274707310182983 Project Installation of 12-inch water 8-inch sewer forced main, 8-inch gravity sewer main and lift station to serve areas around Lake Worth Description reviousl served b wells and se tic s stems. Contractor North Texas Contracting, Inc. Change Order# �1 Date: 3/19/2014 City Project Mgr. Paul Bounds City Inspector Ron Rackley Phone Number: 817-392-8567 Phone Number: 682-432-4992 �-� Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised ContractAmount Orig. Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) UNIT I UNIT II UNIT III UNIT IV ,708,570.00 $1,583,685.00 $145,860.00 $10,201 ,708,570.00 $1,583,685.00 $145,860.00 $10,20i 1,121,410.00 ,829,980.00 $1,583,685.00 $145,860.00 $10,20� $155,651.00 $155,651.00 UNIT V Totals $740,000.00 $5,188,315 $740,000.00 $5,188,315 $1,121,410 $740,000.00 $6,309,725 $155,651 $155,651 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 21.61 % MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $6,485,393.75 J CHANGE Contract Time (Calandar Days) 300 300 The change order provides for the installation of 30-inch water main across Lake Worth connecting to the Phase 1 water main at Casino Beach. Initially, this water main was scheduled for construction via another project. However, it was determined that the City could save money by having the Lake Worth dredging contractor install the pipe at the bottom of the lake, Lake Worth dredging contractor install the pipe at the bottom of the lake, while it was still on-site. North Texas Contracting, Inc. negotiated � ct with the dredging company for the installation of 1���,. � �� ..". the water main. � �� opmcoop� -----�,—� -_- O� � pc._. .._ __ _ � _ _ bYe . �o � � O ; - - - - �/ , �$ ;� !! �FFICIAL RE�OR�� i � m��— / � �'� � ° � � � � �s'Q'� S�G6i���6��' II � o� � �. �������, �:fl�1 � � °�3� ' �= _ _ ���o�o� � , ��,�` , _ . It is understood and agreed that the acceptance of this Change Order b� nstitutes an accord and satisfaction an� represerrts payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. FORT ��ORTH Clty of Fort WOrth Change Order Additions Project Name Casino Beach and Watercress Drive Water and Sewer Im rovements, Phase 1 City Sec No. 45136 Pro'ect No. s P163-060163014108, P274-70713018298 DOE No. � �� and P274-707310182983 7008 City Pro. No. 01829 Project Installation of 12-inch water 8-inch sewer forced main, 8-inch gravity sewer main and lift station to serve areas around Lake Description Worth previously served by wells and septic systems. Contractor North Texas Contractin , Inc. Change Order# �1 Date: 3/19/2014 City Project Mgr. Paul Bounds City Inspector Ron Rackle ADDITIDNS 32 30" DIPS DR-11 HDPE 33 30" DIPS DR-11 HDPE 34 Utility location, protectic 35 SWPPP 36 Boat and vehicle traffic �TA 1+40 - 3+20 and D 18+5 >TA 3+20 -18+50) In Water" and relocation control 37 Trench excavation safety system (not water) 38 24" gate valve W/6" Diameter concrete manhole 39 4' Diameter concrete manhole pressure port, gauze and misc. 40 12' wide articulating concrete mats (9" Thick) 41 Excavation transport and dispose excavated material 42 High water event - demob- - remob in two weeks 43 6' high chain-link fence 44 Remove existing chain-link fence 45 As-built survey by professional s� 46 Lake water crossinq mobilizationl up/bonds UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I UNIT I LF LF 1840.00 LF 1840.00 LF 1.00 CY 310.00 LF 2.00 EA 2.00 EA 4200.00 SF 500.00 CY 1.00 LS 400.00 LF 100.00 LF 1.00 LS 1.00 LS $1.00 $1,840.00 $11.00 $20,240.00 $3,000.00 $3,000.00 $5.00 $1,550.00 $33,500.00 $67,000.00 $14,000.00 $28,000.00 $11.00 $46,200.00 $10,000.00 $24.00 $11,500. $10,000. $8,000.00 $40,000.00 NIT I NIT II NIT III NIT IV NIT V dditions Sub Total $1,121,41 $1,121,41 Page 2 of 4 FO RT ��O RT H Clty Of FOrt WOI'th Change Order Deletions Project Name Casino Beach and Watercress Drive Water and Sewer Improvements, Phase 1 Project No.(s) P163-060163014108, P274-70713018298 DOE No. 7008 and P274-707310182983 Project Description Contractor City Project Mgr City Sec No. City Pro. No. 45136 01829 Installation of 12-inch water 8-inch sewer forced main, 8-inch gravity sewer main and lift station to serve areas I around Lake Worth previously served by wells and septic systems North Texas Contracting, Inc. Change Order #�1 Date 3/19/2014 Paul Bounds City Inspector Ron Rackley DELETIONS Page 3 of 4 City of Fort Worth, Texas Mayor and Council Communication COUNCIL. ACTION: Approved on 3/18/2014 - Ortlinance Nos. 21175-03-2014 and 21176-03- 2014 DATE: Tuesday, March 18, 2014 REFERENCE NO.: C-26722 LOG NAME: 60CASINO BEACH AND WATERCRESS DRIVE PH1 CHANGE ORDER N0.1 SUBJECT: A.uthorize Change Order No.1 with North Texas Contracting, Inc., in the Amount of $1,121,410.00 for a Revised Total Contract in the Amount of $6,309,725.00 for the Installation of a Twenty-Four Inch Water Main Across Lake Worth, Authorize Transfer from the Lake Worth Gas Lease Capital Improvement Fund to the Water Capital Projects Fund, Provide for Construction Management and Inspection Costs and Adopt A.ppropriation Ordinances (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Lake Worth Gas Lease Capital Improvement Fund in the amount of $1,200,000.00 from Gas Well Revenues; 2. Authorize the transfer in the amount of $1,200,000.00 from the Lake Worth Gas Lease Capital Improvement Fund to the Water Capital Projects Fund; 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of $1,200,000.00; and 4. Authorize execution of Change Order No. 1 with North Texas Contracting, Inc., for the installation of a twenty-four inch water main across Lake Worth in the amount of $1,121,410.00. DISCUSSION: On November 5, 2013, the City Council authorized the execution of a contract with North Texas Contracting, Inc., in the amount of $5,188,315.00 for Phase 1 of the Casino Beach and Watercress Drive Water and Sewer Improvements Project. The proposed Change Order No. 1 includes the installation of 1,840 linear feet of 24 inch water main across Lake Worth connecting to the Phase 1 water main at Casino Beach. Initially this project was scheduled to follow the Phase 1 construction. However, it was determined that the City could save approximately $200,000.00 by utilizing the dredging contractor (Great Lakes Dredge and Dock) to excavate and install the water main on the bottom of the lake while they were still on-site. North Texas Contracting, Inc., has negotiated a subcontract Agreement with Great Lakes to excavate and install the 24 inch water main on the bottom of Lake Worth. The Water Department's consultants on this project have reviewed the proposed change order and determined that the stated amounts are fair and reasonable. This project will be funded with Gas Lease Revenue Funds in the amount of $1,200,000.00. M/WBE Office - A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the M/WBE Office, in accordance with the M/WBE or BDE Ordinance, Logname: 60CASINO BEACH AND WATERCRESS DRIVE PHl CHANGE ORDER NO.l Page 1 of 2 because the purchase of goods or services from source(s) where subcontracting or supplier opportunities exist is negligible. In addition to the contract amount, $78,590.00 is required for inspection and construction management. This project is located in COUNCIL DISTRICT 7, Mapsco 293. ISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budgets, as appropriated, of the Water Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers 1� C246 446200 601159990100 11C246 538070 601159990100 2&3)P163 541200 060163014108 2&3)P163 531200 060163014108 P163 511010 060163014108 2&3)P163 472246 060163014108 CERTIFICATIONS: FROM Fund/Account/Centers $1.200.000.00 4) P163 541200 060163014108 $1.200.000.00 � C246 538070 601159990100 $1,121,410.00 $48,590.00 $30,000.00 $1.200,000.00 Submitted for Citv Manager's Office by: Originating Department Head: A,dditional Information Contact: Fernando Costa (6122) S. Frank Crumb (8207) Paul Bounds (8567) $1.121.410.00 $1,200,000.00 A,TTACHMENTS 1. 60CASINO BEACH AND WATERCRESS DRIVE PH1 CHANGE ORDER NO 1 C246 AO COF (Public) 2. 60CASINO BEACH AND WATERCRESS DRIVE PH1 CHANGE ORDER NO 1 P163 AO.docx (Public) 3. FAR-00014 CIP#01829 P163.pdf (CFW Internal) 4. FUNDS VERIFICATION.pdf (CFW Internal) 5. Lake Crossina WL-Ex 1.pdf (Public) 6. MWBE Waiver for North Texas Contractinq.pdf (CFW Internal) Logname: 60CASINO BEACH AND WATERCRESS DRIVE PH1 CHANGE ORDER NO.1 Page 2 of 2 North Texas Contracting, inc. Job Name: Location: Bid Date: Bid Time: Revised 1 Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 /23/2014 1:39 PM Bid Bid Unit Unit Amount 24" DR-18 PVC (STA 1+00 - 1+40 & 19+00 -19+40) 30" DIPS DR-11 HDPE (STA 1+40 - 3+20 & 18+50 -19+00) 30" DIPS DR-11 HDPE (STA 3+20 -18+50) "IN WATER" UTILITY LOCATION, PROTECTION & RELOCATION SWPPP BOAT & VEHICLE TRAFFIC CONTROL PLAN TRENCH EXCAV SAFETY SYSTEM (NOT IN WATER) 24" GATE VALVE W/ 6' DIA CONC MANHOLE 4' DIA CONC MH, PRESSURE PORT, GAUGE & MISC. 12' WIDE ARTICULATING CONC MATS (9" THICK) EXCAV, TRANSPORT & DISPOSE EXCAVATED MATRL HIGH WATER EVENT - DEMOB - REMOB IN 2 WEEKS 6' HIGH CHAIN-LINK FENCE RMV EXIST CHAIN-LINK FENCE AS-BUILT SURVEY BY PROFESSIONAL SURVEYOR LAKE WATER CROSSING MOBILIZATION / START UP / BONDS TOTAL BID AMOUNT 80 LF 230 LF 1530 LF 1840 LF 1840 LF 1 LS 310 LF 2 EA 2 EA 4200 SF 500 CY 1 LS 400 LF 100 LF 1 LS 1 LS $ 1,121,410.00 QUALIFICATIONS / NOTES: BONDING OF WORK INCLUDED FUSION SERVICES FOR HDPE INCLUDED 1 MOBILIZATION FOR CONTINOUS WORK INCLUDED ONLY PRICE CONTINGENT UPON USE OF GREAT �AKES ONSITE DREGE / BARGE / EXCAV LEAD TIME ON HDPE IS 3-4 WEEKS AFTER APPROVED SUBMITTAL ASSUME CLOSURE OF 60,4T WAYS DURING PIPE SINKING OPERATION 0.00 90.00 176_00 540.00 1.00 11.00 3,000.00 5.00 33,500.00 14, 000.00 11.00 23.00 10,000.00 24.00 6.00 8,000.00 40, 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0_00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,200.00 40,480.00 826,200.00 1, 840.00 20,240.00 3,000.00 1, 550.00 67, 000.00 28, 000.00 46,200.00 11,500.00 10, 000.00 9,600.00 600.00 8, 000.00 40, 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PCM-01 - WATERLINE X-ING AT LAKE WORTH LAKE WORTH (FORT WORTH), TX 15-Jan-14 2:00 PM