HomeMy WebLinkAboutContract 56669-CO1 CSC No. 56669-COI FQ RT WOO R F I--a City of Fort Worth Change Order Request Project Name: Emergency-Procurement of Thickening Equipment at VCWRF City Sec No,; 1 56669 Project No.(s):1 NIA I M&C; N/A City Pro].No,;I NIA Project Description: Emergency Procurement of Thickening Equipment at Village Creek Wastewater Reclamation Facility Contractor:1 Synagro of Texas CDR,Inc. Change Order It Dale; 12120/2022 City Project lvIgr.J Shannon Dunne City Inspector: I Nathan Gray Phone Number: 817.392-8299 Phone Number: 817-991.0629 Dept. Sewer Totals Contract Time (Calonder days) Original Contract Amount $850,000.00 $850,000,00 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $850,000.00 $850,000.00 Amount of Proposed Change Order $5001000.K $5001000.00 Revised Contract Amount . $1,350,000.00 $1,350,000.00 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding(if necessary) $500,000.00 $500,000-00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 58.82% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) J$1,062,500A JUSTIFICATION,(REASONS);FOR CHAN GEORDER Change Order No.1 provides additional funding In the amount of$500,000,00 via approved,attached supplement dated December 15,2022 to the October 21,2021 memorandum which authorized City Secretary Contract No,56669 with Synagro of Texas CDR,Inc,in the amount of $850,000.00 for emergency procurement of Thickening Equipment at Village Creek Wastewater Reclamation Facility,Funding In the arnount of$500,000.00 is necessary to compensate Synagro of Texas CDR,Inc.to extend rental of the thickening equipment until construction of the rotating drum thickeners(via another city project)is complele,sed upon thickening equipment required, I It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full(both time and money)for all costs arising out of,or Incidental to,Ilse above Change Order. Conlracfors Com 'ali Nan1e Conlracfo�Name;'. ..' ;Conlr 'tor Sl n.ture; Date:. Synagro of Texas CDR,Inc. Roosevelt Davis,Jr. I-- i 2 his actor Date , pro eclMana er Date Eduardo Aguirre 12/21/22 Shannon Dunne 12-20-22 `;Dlrector;,Watet[Dept) Date ..Construction•Supervisor, Date �, b Dec 22,2022 James McDonald 12/21/22 Sr,Assistant Cil Altorne Date Assislaltt Cit Mana er Date' Dec 22,2022 Cbuncll Action IhRe wired M&C Number NIA M&C Dale Approved i OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX }Fowr W"lz-Ci I City of fort Worth Change Order Additions Project Name Emergency-Procurement of Thickening Equipment at VCWRF City Sec No.: 50669 Project No.(s): NIA DOE No. N A City Pro].No.: NIA Project Emergency Procurement of Thickening Equipment at Village Creek Wastewater Reclamation Facility Description Contractor Synagro of Texas CDR,Inc. Change Order: Date: 1212012022 City Project Mgr. Shannon Dunne City Inspector Nathan Gray ADDITIONS ITEM DESCRIPTION DEPT Ql Unit Unit Cost Total 2 Additional thickening equipment Sewer 1.00 LS $500,000.00 $500,000.00 i r I 1 i Sewer 500,000.00 Page 2 of 4 Additions Sub Total 5 0, 0.0 F(DRT Woo R u14 City of Fort Worth Change Order Deletions Project Name Emergency-Procurement of Thickening Equipment at VCWRF City Sec.No 56669 Project No.(s): NIA DOE No. N/A City Prof.No.; NIA Project Description Emergency Procurement of Thickening Equipment at Village Creek Wastewater Reclamation Facility Contractor Synagro of Texas CDR,Inc. Change Order: Date 12/2012022 City Project Mgr. Shannon Dunne City Inspector; FNahart Gray DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1 I Sewer Page 3 of 4 Deletions Sub Total MMBE Breakdown for this Change Order MWBE Sub Type of Service ,; " Amount for'tiiis CO I i Total $0 00 i Previous Change Orders CO# DATE .:,AMOUNT,, j I I Total i 1 i Page 4 of 4 INTEROFFICE MEMO Date: December 15,2022 To: Dana Burghdoff,Assistant City Manager From: Chris Harder,P,E,,Water Director Subject: SUPPLEMENT TO OCTOBER 21, 2021 MEMORANDUM, CITY SECRETARY CONTRACT NO. 56669 FOR EMERGENCY RENTAL OF THICKENING EQUIPMENT In October of 2021,Water Plant Operation requested and received approval for an emergency expenditure to allow the construction contractor to rent biosolids thickening equipment, in the amount of$850,000.00, to process primary solids at Village Creek Water Reclamation Facility.A construction project is underway to replace the existing gravity thickeners with rotary drum thickeners. This process is necessary as it is a critical downstream element for the feedstock to the biosolids dryer facility. Although originally estimated to be complete by October of 2022,the construction project is now estimated to be complete in Spring 2023, thus, there is a need to extend rental of the thickening equipment until construction of the rotary drum thickeners is complete. This memo is submitted to request approval to increase the funding for continued rental of solids thickening equipment by an additional$500,000 to cover the extra time to complete the construction of the new rotary drum thickeners. A change order will be processed to the existing emergency contract with Synagro of Texas CDR,Inc.and actual costs will be reconciled at the end of the project. APPROVED FOR EMERGENCY PROCUREMENT: C�ri!In�trr Ya!d IUf<I5,1011 Vi.55[511 Recommended: Chris Haider,P.E.,Director,Water Department VA Approved as to form and Legality: 711.71 Douglas W.Black,Sr.Assistant City Attorney Approve: - Tony Rousseau,Acting Chief Officer,Purchasing Drtirn.8euri�oFF Approve: Dana Burghdoff,Assistant City Manager .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. TA do/o Signature Tony Sholola Name of Employee Assistant Water Director Title ATTEST: J ette S.Goodall(Dec 23,202218 CST) �,d4vnpp4� Jannette Goodall F.—R480 d °o0 City Secretary pro to °°° °° QQ °° 44 bEapS�bp OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX