Loading...
HomeMy WebLinkAboutContract 49485-A5CSC No. 49485-A5 AMENDMENT No . 5 TO CITY SECRETARY CONTRACT No. 49485 WHEREAS, the City of Fort Worth (CITY) and Neel -Schaffer, Inc., (ENGINEER) made and entered into City Secretary Contract No. 49485, (the CONTRACT) which was authorized by M&C C-28302 on the 1st day of August, 2017 in the amount of $ 458,204.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No.1 in the amount of $14,980.00 administratively authorized on May 30, 2018 and Amendment No.2 in the amount of $58,341.00 administratively authorized on December 18, 2018 and Amendment No.3 in the amount of $35,400.00 authorized by M&C 21-0352 on May 18, 2021 and Amendment No.4 in the amount of $31,254.00 administratively authorized on March 9, 2021; and WHEREAS, the CONTRACT involves engineering services for the following project: Churchill Road Water and Sanitary Sewer Improvements; and WHEREAS, it has become necessary to execute Amendment No.5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $16,535.00 (Sewer). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $614,714.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [Churchhill Road W/SS Improvements] Page 1 of 2 [CPN 1008881 EXECWTED and E� rCTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth 15"w- B"--OAc 044 Dana Burr-hdoff ( n 12, 20 09:50 CSTJ Dana Burghdoff Assistant City Manager DATE: Jan 12, 2023 APPROVAL chrisfopher Hardor Christopher Harder (Jan 3, 2023 07:36 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER IV'eel-Schaffer, Inc. James P. Amick, P.E. Engineering Manager DATE: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. -- 2i" a rence Hazdilton, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: �l Z Dk[ack (Jan 12, 2023 09:42 CST) Douglas W. Black Senior Assistant City Attorney 000nuu 4 FORrIlIIa p>a° o9�d ATTEST:o 57 °ono °�xd Ci%dBG%Z�:GfiCi aQ�4 nEXo°Aggq J ette S. Goodall (Jan 13, 2023 09 CST) Jannettce S. Goodall City Secretary Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 M&C : Date: Form 1295: N/A N/A N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX [Churchhill Road U/SS Improvements) [CPN 100008) III_ NEEL--SCHAFFER Solutions you can build upon November 28, 2022 Mr. Lawrence Hamilton, P.E. Sr. Professional Engineer City of Fort Worth - Water Department 311 West 10a' Street Fort Worth, Texas 76102 Reference: Churchill Road Water and Sanitary Sewer Improvements Contract Amendment 5 for Additional Services, CPN 100888, CSC 49485 Dear Lawrence: Neel -Schaffer, Inc. offers additional Professional Engineering Services for this project. These additional services were requested by the City of Fort Worth to address contractor construction and construction staking issues resulting in contractor installed curb and gutter not having sufficient grade to drain properly. These services included surveying of curb and gutter, design and staking of curb and gutter for L-4812, and design and staking of curb and gutter for L-4902. Neel -Schaffer, Inc. proposes to increase the contract amount by $16,535.00 for these additional services. All additional services will be performed in accordance with the original contract dated August 9, 2017. Summary of Contract Fee Original Contract Amount $458,204.00 Amendment No. 1 $14,980.00 Amendment No. 2 $58,340.00 Amendment No. 3 $35,400,00 Amendment No. 4 $31,254.00 Amendment No. 5 $16,535.00 Revised Contract Amount $614,713.00 If you have any questions or we may be of further service, please call me at 817/870-2422. Sincerely, NEEL-SCHAFFER, IN James P. Amick, P.E. Engineer Manager TBPELS PE Firm Reg. No. F-2697 TBPELS LS Firm Reg. No. 10027200 0:UoK14056 - Churchill Road Water and Sewer\Admin\Contract\Am 5\Amendment 5 Letter.doc ARLINGTON - DALLAS - FORT WORTH - HOUSTON engineers - planners - surveyors - environmental scientists - landscape architects 515 Houston St., Ste. 651 - Fort Worth, TX 76102 - ph: 817-870-2422 - fax: 817-870-2489 - www.neel-schaffer.com