Loading...
HomeMy WebLinkAboutContract 44629 Ulu SECRETARY WIM"CT N06 ,,,•, CITY OF FORT'WORTH, TEXAS STANDAR D AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES This AGREEMENT is between the City of Fort Worths, a Texas o eras e municipality (thee " l' "),,, and Kim ley-Horn rn rid Associate, Inc. , authorized to do business in Texas, the "ENGINEER"), for a PROJECT generally described s N. Riverside Drive and Northern Cross B ullev rd Roundabout Design. Article I Scope of Services A. The Scope of Services is set forth in Attachment A. Art"Isle II' Co ensat A. The ENGI N EER's compensation shall be In the amount 145,1`F as set forth in Attachment ment . Art*lcle III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient d ocumentation, including but not limited t o meeting the requirements, set forth in Attachment D to, this AGREEMENT,, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article 1, the final payment of any balance will be dare within 30 days of receipt of the final' invoice. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Official'Release Cafe; 1/28/2013 JUL Paige I of 16 LOFFICIAL IIECORD']% RECEIVED C TY 3 F 0 CITY SECRETARY F T aW TH Ta WORTH,TX —Ww� 15 2013 I (4) I'n the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will he paid. The CITE"' will exercise reasonableness in contesting any bill or portion thereof. No interest will' accrue on any contested portion of the blililinig until mutually resolved. (51) If the CITY fails to make payment in full to ENGINEER for billings, contested, in good faith within 60 days of the amount due, t'he ENGINEER may, after diving iving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full, In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of'services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consuiltation and advice and furnishing customary services incidental thereto. Bi. Standard of Care The standard of care applicable to the ENGINEER's services will be, the degree of skill and diligence, normally emp,loyed in the State of Texas by professional engineers or consultants performing the same or similar I services at the time such services are performed, C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test boring's, or other subsurface investigations in connection with design and engineering work to be, performed hereunder. The E,N'GINEE,R shall also advise the CITY concerning the results of same. Such surveys, tests,, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. City of Fort Worth,,Texas Standard Agreement for Engineering Related Design Services PMO Official R lease Date:1/28/'2013 Page 2 of 16 (2) In soils, foundation,, grou�ndwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points, and sample intervals and at locations other than where observations,, exploration,, and inivelst,ig�ations have been made. Because of the inherent, uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cos execution of are not the responsibility of the ENGINEER. D. Preparation of EngineeHing, Draw*inns The, ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible myla,r sheets and electronic files in df format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings foir any project other than the PROJECT described herein. E,. Engineer's Personnel at ConstrucUlon Site (1) The presence or duties of the ENGINEER's, personnel at a construction site, whether as on-site representatives or otherwise,, do not make the ENGINEER or its persoinnel in any way responsible for those duties, that belong to the CITY and/or the CITY's construction contractors or other entities,, and, do not relieve the construction contractors or any other entity of their obligations, duties, and respionsib,illities, including, but not limited' to,, all construction methods, means, techniques, sequences, and procedures necessary for coordlinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work., The ENGINEER and its personnel, have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed, in a manner indicating, that the PROJECT, when completed, will be in accordance with, the Contract Documents,, nor shall anything in the Contract Documents or L he agreement between CITY and ENGINEER be construed as requiring City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services PM O Official Release Date: 112812013 Page 3 of 16 ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on-site o:bservation(s) of a, deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equi,pment is reasonably required to performl the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance critieri'a to be required in the Contract Documents. F. OP111nions, of Probable Cost, Financial Considerations, and Schedules (1) The, ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In prolvidinig opinions of cost, 'financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or, latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bi'dldling procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of' operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's, actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER'S opinions, analyses,, projections, or estimates. G. Constructi"on Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the, ENGINEER's knowledge,, information, and belief from selective sampling, and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents'; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to, ascertain how or for what purpose the construction, contractor has used the moneys paid,, that title to any of the work, materials, or equipment has passed to the CITY free and, clear of lions, claims, security interests, or encumbrances; or that there are not other City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services PM 01 Oifficial Release Date:1/28/2013 Page 4 of 16 —-- -_----- matters at issue between the CITY and the construction, contractor that affect,the amount that should be paid. H. Record Drawings, i Record drawings, if required, will be prepared, in part, on the basis of' Information compiled and furnished by others, rid may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is inc orporated into the record drawings. 11. Minority Business, and S all Business Enterprise (MBE)(SBE) PI a r It"i ci pat io n In accord with the City of Fort Worth Business Diversity Ordinance No. 20020-12-2 11 1, as amended, the City has goal's for the participation of minority business enterprises and/or small business enterprises in City contracts. Engineer acknowledges the MBE and SBE goals established, for this contract and its accepted written commitment to MBE and SBEI participation. Any misrepresentation of facts (other than a neigligenit misrepresentation,) and,/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of-time of not less than three (3): years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal' working hours to all necessary ENGINEER facilities and shall be provided, adequate and approprIate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable, advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultanit agreements, hereunder a provision to the effect that the subconsultanit, agrees that the CITY shall, until the expiration of five (5) years aft er final payment under the subcontract have access to and the right to examine and' photocopy any directly pertinent books, documents, papers and records of such subcoinsultan�t) involving transactions to the subcontract, and' further, that the CITY shall have access dluring normal working hours to all su,bcoinsultant City of Fort Wolrthi,Texas, Standard Agreement for Engineering Related Design Services PMO Official Release Date:1/28/2013 Page 5 of 16 facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subcon,sultant reasonable advance notice of intended audits. (3 ENGINEER and subiconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate, published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (C GL) and,, if necessary, commercial umbrella insurance with a limit of not less than $1 000,000.00 per each occurrence with a $2,0010,000.001 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. i., The CITY shall be included as an insured under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial' umbrella, if any. This insurance shall apply as primary insurance with respect to, any other insurance or self-insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions by endorsements that wou�ld alter or nullify: premises/operations,I prod ucts/colm pleted operations, contractual, personal injury, or advertizing injury, which, are normally contained within the pollicy, unless, the CITY approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b. Business Auto — the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $ 000,000 each accident. Such insurance shall cover liability arising out of "any auto", including owned, hired, and non-owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no, vehicles, coverage for hired or noin-evened is City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services l Official Release Date:1/28/2013 Page 8 of 16 acceptable. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the bus iness auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Wo rke rs' Compensation —ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not l�ess, than $100,,000.00 each accident for bodily injury by accident or $100,000.,0101 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents,, officers, directors and employees, for recovery of damages to the extent these damages are covered by w rkers compensation and empll oyer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agrelement. d. Professional Liability — the ENGINEER shall maintain professional liability, a claims-made policy, with a minimu�m of $11,,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing -this, project shall be submitted to the CITY for each year following compl tiionl f the contract. (2) GENERAL, INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to, the CITY prior to ENGINEER proceeding with the PROJECT. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees,, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documennted thereon. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 1/28/2013 Paige 7 of 16, d. Any failure on part of the CITY to request requiired insurance documentation shall not constitute a waiver of the insurance requirements., e. A minimum of thirty (30) days notice of cancellation or material change, in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable, in the event of non-payment of premium. Notice shall be sent to the respective Department C ire:ctor (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas, 76102. f. Insurers for all policies must be authorized to do business in the State of Texas ands have a minimum rating of AV or greater, in the current A.M. Best Key Rating Guiide or have reasonably equivalent financial strength and soilvency to the Satisfactions of Risk Management. g. Any deductible, or self insured retention in excess of $25,0001.00 that would change or alter the requirements, herein is subject to approval by the CITY in writing, if coverage is, not provided on a first-dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Appilicablle policies Shall cache be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i; The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER'S insurance plo!liciels including at the, CITY's discretion- the ENGINEER may endorsements, thereto and, I be req�uiired to, provide proof of insurance premium payments. ji. Lines of coverage, other than Professional Liability, underwritten on a claims-made basis, shall contain a, retroactive date coincident with or tulal agreement. prior to the date, of the cointrac The certificate of insurance shall state both the retroactive date and that the coverage is claims-made. k. Coverages, whether written on an occurrence or claims-made basis, Shall be maintained without interruption nor restrictive modification or changes from date of commencement of' the PROJECT until final payment and termination of any coverage required to be maintained after final payments. I. The CITY shall not be respoins,ible for the direct payment of any insurance premiums required by th�is, agreement. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 1/2812013 Page 8 of 1 6 m. oub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as reqluired for the ENGINEER. When sub consult,ants/subcontractors maintain insurance, co!verag,e, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing con-I'llicts of interest or potential conflicts of interest, in c,luding personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business, relationships w ith abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop s,ubiseq�uent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (11) If asbestos or hazardous su�bstances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions, of the PROJECT to permit testing and, e,v,allluatio:n. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. 01. Permi"tt'ling Authorities - Design Changes If permitting authorities requi,re design changes so, as to compily with published design cri�teiria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed,, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense,. However I if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an Uy of Fort Worth,Texas Standard Agreement for Englineering Related Design Series PMO Official Release Date:1128/2013 Page 9 of 16 amendment to this AGREEMENT., P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to,this AGREEMENT., Artilc,le V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of i the information pr i'd'ed' by the CITY., B. Access to Facilities and Property The CITY will make its facilities accessible, to the ENGINEER as required for the ENGI'N'E ER's performance of its services. The CITE" will perform, at no cost to the ENGINEER, such tests of equipment,j machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER'i s, services. The CITY will be responsible for all acts of the CITY's personnel,. C. Advertisements, Permits, and Access Unless, otherwise agreed to in the Scope of Services, the CITY will obta,in, ,arrange,, and pay for all advertisements, for blids; permits and licenses required by local, state,, or fedierall authorities; and land, easements, rights,- o:f-way, and access necessary for the ENGINE R's services or PROJECT' construction. City of Fort Worth,,Texas Standard Agreement for Engineering Related Design Services PMO Offiliciall Release Date: 1128/201'3 Paige 10 of 16 ................ U. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches,, drawings, specifications, proposals, and other documents; obtain advice of and attorney, insurance couinlselloir, accountant auditor, bond and financial advisors, and other, consultants as the CITY deems appropriate; and render in writing decisions required by, the CITY in a timely manner in accordance with the project schedle prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or, Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazard' us materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage,, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties, or employees of City, City hereby releases ENGINEER from any damage or liability related to the, presence, of such materials. (2) The release irequired above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's nlegl�i,g�ence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to, include iinl all constr cti nl contracts, the provis,ions of Art,isle ME. regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beineficiaries (1), The CITY agrees to include the following clause in all contracts with construction contractors and equilipment or materials suppliers.- "'"'Contractors, subcontractors and equip ant and materials suppliers on the PROJECT, or their sureties, shall maintain City of Fort Worth,,Texas Standard Agreement for Engineering Related Design Services PM0 Official Release Date: 1/28/2013 Page 11 of 16 no direct action against the ENGINEER, its officers, e,m!pl�oyees, and subcontractors,, for any claim arising out of,1 in connection with, or resulting from the engineering services performed. Only the, CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provis,ion, that such entity or person shall have no t,hird-party beneficiary rights under this Agreement. (4) Nothing contained in this section VA. shall be construed as a waiver of any right the CI TY has to bring a claim against ENGINEER. I. CITY's, Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with, the PROJECT. (2), The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. U11"gat'lion Assi"stancle The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be, negotiated between the parties. K. Changes The CITY may make, or approve changes within the general Scope of Services in this AGREEMENT. If such changes of the ENGINEER'S cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to, this AGREEMENT with appropriate CITY approval. City of Fort Worth,Texas Standard Agireement for Engineering Related Design Services, PM'O Official Release Date: 1/28/2013 Page 12 of 16 Article V11 General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. A. Authorization to Proceed ENGINEER shall be authorized to proceed with -this AGREEMENT upon receipt of'a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specif'i cations, documents, and other work products of the ENGINEER, whether in h rdi copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Meuse, change,, or alteration by the CITY or by others acting -through or on behalf of the CITY of any such instruments, of service, without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majoure The ENGINEER is not responsible for damages or delay in performance caused by acts olf' Gold, strikes,,, lockouts,,, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER'i s, performany ce of its obligations hereunder. Da Termination (1) This AGREEMENT may be terminated only by the City for convenience on 310 days' written notice. This AGREEMENT may be terminated by either the ,CITY or the ENGINEER for cause if either party fails, substantially to perform through no fault of the other and does, not commence correction of such nonperformance, with in 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or compilete studies, plans, specifications or other forms of ENGI JiEER'S work product-, City of Fort Wo�rth,Texas Standard Agreement for Engineering Related Des,ign Services, PIMIO Official Release Date:112812013 Page 13 of 16 b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies, or services, c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination, for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services,, the ENGINEER will submit to the CITY an itemized statement of all termination, expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT'S schedule, commitment and cost of the GI ER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnificabon In accordance with: Texas Local Government Code Section 271.,9�04, the ENGINEER shall indemnify, hold harmless, and defend the CITY against liability for any damage caused by or resulting from an act, of negligence, intentional tort, intellectual' property infringement, or failure to pay a subcontractor or supplier comm"Itted by the ENGINEER or ENGINEER'S agent, consultant under contract, or another entity over which the ENGINEER exercises control, G. Assignment Neither party shall assign gn all or any part of this AGREEMENT' without the prior written consent of the other party. H, Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories olf' relcovery, including breach of contract or warranty, tort including negligence, strict or statutory liablility, or any other cause of action, except for wil,l,ful, misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER and their officers, employees, agents, and subcontractors. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date', 1/28/2013 Page 14 of 16 J u rl'";sdliction The law of the State of Texas shall govern the val�idity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. J. Severabifity and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect,1 such invalidity, illegality, or unenforceability will not aff ect, any other provision, and this ,AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provi,sion had never been contained herein. Articles V.F'., VI.B., VI D., VI.F., VI.H., and V1.1. shall survive termination of this AGREEMENT for any cause. K. Observe and Comply ENGINEER sihalil, at all times observe and compily with all federal and State laws and regulations and with all City ordinances, and regulations which in, any way affect this AGREEMENT and the work hereu,nd,er, and shall observe and comply with all ordersy laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees, to defend, indemnify and hold ha,rmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance,' or regulation, whether it be by itself'or its employees. Article V11 Attachments, Schedules, and SmIgnatures, This AGREEMENT including its attachments and schedules, constitutes the entire AGREEMENT, supersedes ill prior written or oral understandings, and: may only be changed by a written amendment executed by both, parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B — Compensation City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date:1/28/2013 Page;15 of 1:16 10 Executed and effective i s `hey - Y- Y CITY OF FORT WORTH ENGINEER Kimley-Horn and Associates, Inc. awl Fernando Costa Glean a , P.E. Assistant City Manager Senior ice President 410w loom% Date. 7114 Date: APPROVAL RECOMMENDED: By: DA Dougla Directo , Department of Transportation/Public orbs APPROVED AS T FORM AND M&C No.*. LEGALITY M&C ale: -. By-. aAA'(kt-4,/U 1114, � tas W., e Assistant it y Attorn U � F ATTEST: 0 4C Ilr Kays City Bursa %0%000 001 City of Fort Worth„Texas Standard Agreement for Engineering Related Design Services PMO Official ial Release[date:1/28/2013 OFFICIAL RECORD MIS 16 of 16 CITY SECRETARY FTe WORTH, I ATTACHMENT "A99 Soo pefor Enqineering Design Related' Services for Roundabout Design The scope set forth herein defines the work,to be performed by the ENGINEER in completing the project. Both the CITY and EN�G,IN�EER have attempted to clearly define the work to be performed and' address the needs of the Project. OBJECTIVE Prepare conceptual design services (up to 30%) for a modem dual-lane roundabout at the intersection of N. Riverside Drive and Northern Cross Boulevard. The project will be designed in parallel with two other intersections along N. Riverside Drive which will be bid as one package. The other two intersections will be designed by other consultants under a separate contract. The project will be completed as a two part agreement. The scope of services provided is for the initial conceptual design engineering services,* there will be a follow up task order to prepare construction documents. WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER ►il:l manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage, and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre-design project kickoff meeting with CITY staff to confirm and clarify scope,1 understand CITY objectives, and ensure economical and functional designs that meet CITY requirements • Attend a pre-design project site visit with CITY staff Conduct and document weekly project update meetings with ,IT Y Project Manager Conduct up to two (2) review meetings with the CITY to, go over the conceptual design, layout • Conduct and docurnent weekly design, team meetings City of Fort Worth,Texas Attachment A PMO Release Date:07.23.20,12 Page 1 of 6 Conduct and document weekly or bi-weekly design team meetings with other consultants to set standards for the project and coordinate project deliverables. Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit monthly in the format requested by the CITY. Prepare and submit weekly progress reports in the format provided by the respective CITY Department. Prepare and submit baseline Project Schedule initially, and Project Schedule updates witha schedule narrative weekly. Coordinate with other agencies and entities as necessary for the design: of the proposed infrastructure, and provide and obtain information, needed to prepare the desigin. ASSUMPTIONS * The duration for the conceptual design phase will be one month. DELIVERABLES, A. Meeting summaries with action items B. Monthly invoices C. Weekly progress reports D. Baseline design schedule E. Weekly schedule updates with schedule narrative describing any current or anticipated schedule changes I TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design all be submitted to CITY per the approved: Project Schedule. The purpose of the conceptual design is for the ENGINEER to identify, develop, communicate through the defined deliverables, and recommend the design concept that successfully addresses, the design problem, and to obtain the C,ITY's endorsement of this concept. ENGINEER wiill utilize concepts and criteria contained in the current CITY iSWM Criteria Manual for SiteDevelo omen and Construction for conceptual: planning and design.. ENGINEER will develop the conceptual design of the roundabout as follows. 2.1. Data Collection In addition to data obtained from the CITY, ENGINEER will research and make efforts to obtain pertinent information to aid, in, coordination of the proposed improvements with any planned future improvements that may influence the project. ENGINEER will also identify and seek to obtain data for existing i conditions that may impact the project including; utilities, agencies (TxD,OT and railroads), City Master Plans, and property ownership, as available from the Tax Assessor's office. City of Fort Worth,Texas Attachment A PM Release Date:07.23.2012 Page 2 of 6 • The ENGINEER may obtain hard copies of record drawings, from the CITY. The record drawings should include but not be limited to roadway plans, right-of-way information, and utility plans. If available, the CITY will furnish the ENGINEER electronic copies of the CAD -files of the exist,ing record drawings., • The ENGINEER will create a database in a form of a CAD drawing to compile the record drawing infoirmation gathered in Task 2.1 and the topographic survey information obtained from! the CITY,. • Obtain traffic volumes from the CITY. Obtain topographic survey from CITY. 01 Obtain geotechnical report from the CITY. 0 Perform up to three (3) project site, visits. 2.3. The Conceptual Design Package shall include the following,.- Traffic Control Plan- Develop a traffic control sequencing plan options to present to the CITY. Provide a written summary of the diistinct phases, to take place during construction operations to include road and/or lane closures,, limited access to adjacent properties, and limited access to pedestrian and bicycle traffic. Also,: identify potential: staging conflicts, ( necessary) with the roundabout design at each intersection. 01 Conceptual iSWM Checklist in accordance with the current CITY iSWIVI Criteria Manual for Site Development and Construction. • Existing typical sections of'the roadway to, be constructed along with proposed typical sections which outline the proposed improvements for each leg of the intersection. Typical,l sections, shall include existing ROW,1 existing, and proposed lane widths and direction arrows, existing and proposed curbs, sidewalks, and retaining walls. • ENGINEER will establish the roundabout's lane configurations, lane markings, face of curb locations, crosswalks, spli,tter islands, sidewalks, A compliant curb ramps,, bike ramps, 'truck aprons, and other associated features of the roundabout for the intersection of N. Riverside Dr. and Northern Cross Boullevard. The roundabout geometry will be based on a WB-67 design vehicle. • Drainage area map with supporting drainage computation in the CITY"s standard tabular format. • ENGINEER will delineate the watershed based on contour data and field verification and docume�nt existing street, right-of-way and storm drain capacities for the subject site. A drainage area map will be drawn at maximum 1 200' scale from available 2-foo:t contour data with the contours labeled. Data source and year will be provided by the CITY., Calculations regarding street and right-of- way capacities and design discharges (5-year and 1 00-year-frequencies) at selected critical loc,a,t,ions will be provided. Other fre�q�uenciels, as required by, iSWIVI criteria may be appropriate for outfalls and sensitive locations. Capacities of existing storm drain will be calculated and shown. All calculations, shall conform to CITY criteria delineated in the CITY's current isWM Criteria Handal City of Fort Worth,Texas Attalchmienit A PMO Release Date-,07,23,2,012 Page 3 of 6 110 1 for Site Development and Construction. Ali local-ions in the! project area where 1'gg!-year runoff exceeds available s,toirm drain and right-of-way capacities shall be clearly identified. The ENGINEER's responsibility includes recommen�dations for improvements of the existing system as deemed reasonable and consistent with CITY standards. • Documentation of'key design decisions. i t ruction cost. • Estimates of probable cons 2.3., Stla�nd'�ard Landscape Conceptual Plan Prepare up to two (2) conceptual renderings of the landscape plan for the central island for N. Riverside Drive and Northern Cross Bou�llevard for review by the CITY based upon CITY design criteria. The plan will illustrate the proposed landscape and hardscape element's located within the central island of'the roundabout as the standard approach to each roundabout along -the corridor. The plan will be, prepared in an effort to, meet the design and budget, requirements set by the CITY. Graphic exhibits showing the landscape and hardscape concepts,from plan view and section view, one (1) view per concept. Opinion of Probable Construction Costs for each concept. 2.4., Public Meeting • After the conceptual layout plan has been reviewed and approved by the CITY, the ENGIINE,ER shall prepare project exhibits, and attend public meet�ing to help explain the proposed project to residents. The CITY shall selle�c�t a suitable location�, prepare and mail the invitation letters to the affected customers. The ENGINEER shall coordinate with the CITY G,IS staff to identify affected property olwners,/'resi,dents, and develop a spreadsheet listing addresses of those to, invite to the public, meeting., 2.51. Utility Clearance • The ENGINEER will consult with the IT "'s Transportation and Public Works Department, Water Department,, and other CITY departments,, public utilities, private utilities, private utilities and government agencies to determine -the approximate location of above and underground utilii1 t,ies, and other facilit,ies (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities, to avoid or minimize conflicts, with existing utilities, and where known and possible consider poltenitia�l future utilities in desig�ns. • The ENGINEER shall upload individual DWIF-files,fo�r the approved conceptual plan set to the designated project folder in Buzz,saw for forwarding to all utility companies which have facilities within the l'�imits of-the project., The D files should be created directly from the CAD files as, opposed to PDF files., ASS!U!MPTION�S 0 Attend one (1) Public Meeting City of Fort Worth,Texas A,ftachment A PIS O Release Date:07.23.2012 Page!4 of 6 0 All storm water calculations, and design shall conform to the CITY current iSWM Criteria Manual for Site Development and Con,struction, 0 3 sets of 11 JJx1 7); size, plans will be delivered for the 30% design. DWF files created from design CAD drawings, will be uploaded to the designated project folder in Buzz,saw. • DW'G files in Auto,CAD: 2013 will be uploaded to the designated project folder in Bu�z,zsaw. • ENGINEER shall not proceed with Preliminary Design activities without written approval by the CITY of the Conceptual Design Package. DEL,IVERABLES A. Conceptual Design Package B. Utility Clearance drawings C. Estimates of probable construction cost D. Public Meeting exhibits E. The pdf will consist of one file of the entire plan set. The dwf will consist of' individual', -files, one for each plan sheet, and will be numbered ands named in a manner similar to that of the plan set index. Additional Services not included in the exi,st*ln cope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above® However, ENGINEER can provide these services, if needed, upon the CIT written ritten request. Any additional amounts paid to the ENGINEER, as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: Negotiation of easements or property acquisition.. Operational analysis and report for the roundabout. Preparation of construction plans or contract documents. Conductinig SUE services. Performing geotechnical services. Performing topographic survey services. Bidding and construction phase services. Services related to development of the CITY's project financing and or budg�et,. Services related to disputes over pr,e-qualification, bid piroltes,ts,, bid rejection and re-bidding of the contract for construction. Construction management and inspection services Performance of materials testing or specialty testing services,. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. Services related to warranty claims, enforcement and inspection after final completion. City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 5 of 6 OervIce t su bring, defend, or assist in !litigation s o p port, pr epare, u docment, l io undertaken or defended by the CITY. Performance of miscellaneous and supplemental services related to the project as requested by the CITY., City of Fort Worth,Texas Attachment A PMO Release Date-017,23.20112 Page 6 of 6 ATTACHMENT B COMPENSATION Design Services for N. Riverside Drive and Northern Cross Boulevard Roundabout Design City Pr .No ect' 0 0.1 JBJZ Lump Sum Project 1. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $45,000 as summarized in Exhibit B-1 — Engineer Invoice and Section IV— Summary of Total Project Fees. The total lurnp, sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, ,and equipment necessary to deliver the services,. B. The ENGINEER shall be paid monthly payments as described in Section 11 - Method of Payment. 11. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's, approval of an invoice prepared and su�bir itted by the ENGINEER in the format and including content as presented in Exhibit 13-1, Progress Reports as required in item III. of this Attachment B, and the project schedule. B. The estimated current phys,ical percent complete as required on the invoice shall be calculated from the progress schedule and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee, payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice, shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. 111111. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of'the Transportation and Public Works Department, weekly progress reports and schedules in the format required by the City. City of Fort Worth,Texas Attachment B PMO Official Release Date:8,09.2012 Page 1 of 3 B-1 ATTACHMENT B COMPENSATION IV. Summary of Total Pro act Fees Firm Primary Responsibility Fee Amount Prime Consultant Fin ley-Horn and Roundabout conceptual $451000.00 1001% Associates,, Inc. design, project management Proposed MBE/SBE Su b-Consultants Non-MBE/SBE Consultants TOTAL $.45,000.00 100�%, ............................. Project Number & Name Total Fee MBE/SBE Fee Ill BE/SBE N. Riverside, Drive and I" rthern Cross $ 457000.00 $ 0 0 % Boulevard Roundabout Des,ign I I City MNVB,E Goal = An/a Consultant Committed Goal n/a City of Fort Worth,Texas Attachment B FA Official Release Date.,8.09.20,12 Page 2 of 31 B,-2 EXHIBIT "13-1$9 ENGINEER IWVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City olf Fort Worth,Texas Attachment B PMO Official Release Date.-8.019.2012 Page 3 of 3 Bi-3 C OD ° a E R co mm 0 Ch 0 C CL C 0 CL E " 031 4-4 C5 +.� LL as 0 E .; , ^) E c E Oi c CL C + CL .y 2 pN E w ci m Lo LO y ly > 1 o r "a C m < o cU ro .. 0 E m 4) AMJ 1 21 cr, �. .' cr 70 r i i L LL E 26 Ut f f a% T CL E 'XIIII 1, U ., .� 0 E c 5%o E � Lm ZA C) C) c. C> C: 4) c CO 4) C 4) C: CL E 0 41 c 0 > G E r m cr 0 C> 0 c -W 6 CD 4" 0 4) E to U) > 0 "r 1! CL CA r= CL 0 Go 4-0 t! c q mi tn N :3 c tn *0 0 to r= U) w u m CL x vi, m CL 0 c ui Z Lo, m E s. E 2 m > :3 'a 8 U) 0 r iL> a c d) owl n CA 0 > C� C o a <D C� t- E 5 LO m 0 15 0 N m :3 cn U. to L) c*)g� 0 C C: , I I tn 0 0 a. U) u U. co co co 0 U) M 43 E— 0 E 0 E W U. cu 0 co tun uj Q 4) ORY, C LM 01 ft E cr +a - ow m U W 0 >w 4; E z C to 4) 4) 5, 4)(1 0 4-A I- r- M CL = 0 'm 013 E E 0 C a >%E 0 0 cD M 0