HomeMy WebLinkAboutContract 58535-PM1FORTWORTH.
CONTRACT
FOR
THE CONSTRUCTION OF
Chisholm Trail Ranch Section 3 Phase 1A
CSC No. 58535-PM1
Water, Sanitary Sewer, Storm Sewer, Pavement & Street Light Improvements
IPRC22-0055
O F
.................
..........
RUBY RODRIGUEZ
................................
13ro02
12/08/22
City Project No. 103826
FID No. 30114-0200431-103826-EO7685
File No. W-2829
X-27288
Mattie Parker David Cooke
Mayor City Manager
Chris Harder
Director, Water Department
William Johnson
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
October 2022
LA14
LJA ENGINEERING
TEXAS REGISTRATION F-1386
6060 North Central Expressway Suite 400
Dallas, TX 75206
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 5
SECTION 00 00 10
TABLE OF CONTENTS
DEVELOPER AWARDED PROJECTS
Division 00 - General Conditions
nn�3 kwit ie t Bidders
nn�3 t
Last Revised
03/20/2020
00 41 00
00 42 43
0043 3
Inst ,metiors Bidders
Bid F-E)fvA
Proposal Form Unit Price
Bid Bon
03/20/2020
0402,12014
05/22/2019
0402,12014
Prequalification Statement
09/01/2015
0045 12
nno0 4 5 13
Bidder- v -egtt lifi .a4iE K+ kW iPa
03 in v
00 45 26
Contractor Compliance with Workers' Compensation Law
04/02/2014
nQi
00 4540
00 52 43
Minerity Business Enterprise Goal
Agreement
a
06/16/2016
00 61 25
Certificate of Insurance
07/01/2011
00 62 13
Performance Bond
01/31/2012
00 62 14
Payment Bond
01/31/2012
00 62 19
Maintenance Bond
01/31/2012
i ii i ii
00 72 00
00 73 00
Generai Conditions
Supplementary Conditions
T
07/01/2011
0073 10
Standard City Conditions of the Construction Contract for Developer
01/10/2013
Awarded Projects
Division 01- General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
01 25 00
Substitution Procedures
08/30/2013
01 31 19
Preconstruction Meeting
08/30/2013
�
013120
PYO_�Ot Meetings
mini ,120 in
01 32 33
Preconstruction Video
08/30/2013
01 33 00
Submittals
08/30/2013
01 3= 13
Spoolal. Ilojeet Pr-,,eedt e
09/ �
01 45 23
Testing and Inspection Services
03/20/2020
01 5000
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
07/01/2011
01 57 13
Storm Water Pollution Prevention Plan
07/01/2011
01 60 00
Product Requirements
03/20/2020
01 66 00
Product Storage and Handling Requirements
04/07/2014
01 70 00
Mobilization and Remobilization
04/07/2014
01 71 23
Construction Staking
04/07/2014
01 74 23
Cleaning
04/07/2014
01 77 19
Closeout Requirements
04/07/2014
01 78 23
Operation and Maintenance Data
04/07/2014
01 78 39
Project Record Documents
04/07/2014
CITY OF FORT WORTH Chisholm Trail Ranch Phase lA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 103826
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 5
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
NONE
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
httv:Hfortworthtexas.2ov/ti)w/contractors/
or
htti)s:Hauus.fortworthtexas.2ov/Proi ectResources/
Division 02 - Existing Conditions
Last Revised
0241 13
117�4
Selective Site Demolition
D l / A 1..,.,..1.,f
12/20/2012
/7zzr20/201z
0241 15
o.v...y
Utility ff epA
Paving Removal
1 2
02/02/2016
Division 03
- Concrete
03 30 00
Cast -In -Place Concrete
12/20/2012
0334 13
Controlled Low Strength Material (CLSM)
12/20/2012
03 34 16
Concrete Base Material for Trench Repair
12/20/2012
03 80 00
Modifications to Existing Concrete Structures
12/20/2012
Division 26
- Electrical
26 05 00
Common Work Results for Electrical
11/22/2013
2605 10
Demolition for Electrical Systems
12/20/2012
26 05 33
Raceways and Boxes for Electrical Systems
12/20/2012
26 05 43
Underground Ducts and Raceways for Electrical Systems
07/01/2011
26 05 50
Communications Multi -Duct Conduit
02/26/2016
Division 31
- Earthwork
31 1000
Site Clearing
12/20/2012
3123 16
Unclassified Excavation
01/28/2013
31 2213 2,2
Beffe
01,
2 1�
r2,,,,,�, 1 ant
� 1�V (Z'��ri� TitJ
01 8,L2013
vx�-avrsvz�
31 25 00
Erosion and Sediment Control
12/20/2012
12,E
I2,�
31 37 00
Gabiens
Riprap
12/20/2012
Division 32
27�
- Exterior Improvements
Do«..-.... It Do..ai
12/7zzr�0/20Q
3201 18
ei4 Asphalt Paving
Temporary Asphalt Paving Repair
12/20/2012
32 01 29Paving
iopa,ir
1��12
Z7�3
1 r
�'i`'YLlI'Sia �a%�vcii�cv
1�i�n O�
rL,zvravzz
32 1129
Lime Treated Base Courses
12/20/2012
32 1133
Cement Treated Base Courses
12/20/2012
2'7
3 L 11 � ,
Liquid TYoa� od mil ft�kili��
0&2 L201 c
��
32 12 16
Asphalt Paving
12/20/2012
32 1273
Asphalt Paving Crack Sealants
12/20/2012
CITY OF FORT WORTH Chisholm Trail Ranch Phase lA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 103826
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
32 13 13
Concrete Paving
12/20/2012
32 1320
Concrete Sidewalks, Driveways and Barrier Free Ramps
06/05/2018
32 1373
Concrete Paving Joint Sealants
D..vin
12/20/2012
12/QO/2012
32 14 16
32 16 13
Briek Unit
Concrete Curb and Gutters and Valley Gutters
10/05/2016
32 1723
Pavement Markings
11/22/2013
37�5
37�
323126 26
�- �•
a� Puln�Isg
(+t,ai Fences .-ada-ad Ga4es
Wire Fences Gates
11 04/2013
12/7Q0/20Q
Q'12l1Pll117
�rzv
3232 13
and
raek'in PVea Gene -ete Retaining ing Walls
r�-avravzz
86,1054201$
3291 19
Topsoil Placement and Finishing of Parkways
12/20/2012
32 92 13
Hydro -Mulching, Seeding, and Sodding
12/20/2012
32 93 43
Trees and Shrubs
12/20/2012
Division 33 - Utilities
33 01 30
Sewer and Manhole Testing
12/20/2012
33 01 31
Closed Circuit Television (CCTV) Inspection
03/03/2016
33�o
3 Pu ng of Existing Sewer- Systo,v.�
P. V.
17�7zz90/2012
014 �10
33 �`7
33 0'71
Joint Bonding and Electrical Isolation
/''.,,-,-.,.,io C=ef.f.e Tort Stations
>\aagnesi , Aaede tt,,
12/20/2012
12/7
12i�12
33 04 12
33 04-30
33 04 40
C die Protection System
T,,,f,,.,.ra+y Wa4ef Sefvie
Cleaning and Acceptance Testing of Water Mains
0710T
02/06/2013
33 04 50
Cleaning of Sewer Mains
12/20/2012
3305 10
Utility Trench Excavation, Embedment, and Backfill
12/12/2016
3305 12
Water Line Lowering
12/20/2012
3305 13
Frame, Cover and Grade Rings — Cast Iron
01/22/2016
3305 13.10
Frame, Cover and Grade Rings — Composite
01/22/2016
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to
3305 14
3 3�0
Grade
/''.,ne -ete
12/20/2012
1 7 �7rc�-20/2
3305 17
Water- Vaults
Concrete Collars
12/20/2012
33 05 20
Auger Boring
12/20/2012
33 05 21
Tunnel Liner Plate
12/20/2012
33 05 22
33 23
Steel Casing Pipe
T,,,,,,o4ag
12/20/2012
12i20/2012
05
33 05 24
Hand
Installation of Carrier Pipe in Casing or Tunnel Liner Plate
06/19/2013
33 05 26
Utility Markers/Locators
12/20/2012
33 05 30
Location of Existing Utilities
12/20/2012
33 11 05
Bolts, Nuts, and Gaskets
12/20/2012
33 11 10
Ductile Iron Pipe
12/20/2012
33 11 11
Ductile Iron Fittings
12/20/2012
33 11 12
Polyvinyl Chloride (PVC) Pressure Pipe
11/16/2018
3 11 3
!'' a Pipe Bar- Wr-apped, Steel (`.,1inde,- Type
1'1/20/' 01-
3� 1 1 1 4
Bufie,l Stool Pipe .,n.1 F-44i g
1'1/7zzrzO/2012
33 1210
Water Services 1-inch to 2-inch
02/14/2017
13 12 11
r afge vas, tef Metefs
1 � i�12
33 1220
Resilient Seated Gate Valve
12/20/2012
CITY OF FORT WORTH Chisholm Trail Ranch Phase lA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 103826
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 5
33 1225
Connection to Existing Water Mains
02/06/2013
33 1230
Combination Air Valve Assemblies for Potable Water Systems
12/20/2012
33 1240
Fire Hydrants
01/03/2014
33 1250
Water Sample Stations
12/20/2012
33 1260
3331 12
22�
Standard Blow off Valve Assembly
Cured in Place Pipe (CIPP)
> ibefgl neinf Pipe for- Gr-a ity Sanitary eo
064942013
12/20/2012
12i2�12
ss fee,1
22�
3331 20
High Density Polyethylene (14DPE) Pipe for- Samna,- Sewe,-
12,9042z
06/19/2013
Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe
333121 21
�rzT
Polyvinyl Chloride (PVC) Closed Profile Gr-avity Sanitary Sewer-
Npe
12/2!1/2l112
rtravravzz
21 -14
Sanitary Se sr S r, T imktg
1212/2�012
22�3
Sanitary Se eor Pro L,YIl:-gement
12/2 -2
33 31 50
Sanitary Sewer Service Connections and Service Line
04/26/2013
22�0
Combination i-[7.,1.,o for Fun-tw Sewe,.lr& Tif.,�
12Qz
3339 10
Cast -in -Place Concrete Manholes
12/20/2012
33 39 20
22�0
Precast Concrete Manholes
Fiber -glass Manholes
12/20/2012
12/2 z
22�0
33 39 60
Wastewa4e,. eeess ri.,,mbe,. (WAG)
Epoxy Liners for Sanitary Sewer Structures
12L2 z
12/20/2012
3341 10
Reinforced Concrete Storm Sewer Pipe/Culverts
07/01/2011
22�41 11
High Teasit-, Polyethylene (14PPE) Pipe F ,- t Drv-r-
12/2 z
22�2
De.� f ,-ee.7 D,.l..e+1 le,�e (�PE) Pi�v
11 /lrrrr�ivi5
33 4600
F/ai U2\.c�-nago
1 2 �2� 2
22 4601
Slotted 9 0rm Dru1:43
07iO ,i2011n
33 4602
T+e-no'.S Dtwuno
07i0n
3349 10
Cast -in -Place Manholes and Junction Boxes
12/20/2012
33 49 20
Curb and Drop Inlets
12/20/2012
33 49 40
Storm Drainage Headwalls and Wingwalls
07/01/2011
Division 34 -
34�0
34 n�011
Transportation
Tr-af fie Signal's
Attaehfneat A Gantr-elleF Cabinet
10/1�15
12n�15
�02 r
24 41 10.02
24 41 10.03
cro
n �t1:aE�1�y14t� E6i�tPeln@i'vpvEifiC-&ti9n
n
Ott&Ehfnent-G S6€twar-ecro
-��eifie-ati9n
TQ"xr, X[lr`,, rr,-. fF��
Q
01,12012
11 i2�t3
�03 �
34 41 11
?/I i 1 13
Removing Tpaffie Signals
1212Q2
?/I 11 15
2A�o
Ree�angular R-ap/ia Flashing Be,,eo
1 1 i2�,0n
1 1 i2�n
34 41 20
Pedestrian 14ybr-id Signal.
Roadway Illumination Assemblies
12/20/2012
34 41 20.01
Arterial LED Roadway Luminaires
06/15/2015
24 4120.02
�
Freeway LED ne,,dw ., r -,
�.�inil�,aros
0 6/ 5/2n1��e
34 41 20.03
Residential LED Roadway Luminaires
06/15/2015
34 41 30
Aluminum Signs
11/12/2013
34 41 50
Single -Mode Fiber Optic Cable
02/26/2016
3471 13
Traffic Control
11/22/2013
CITY OF FORT WORTH Chisholm Trail Ranch Phase lA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 103826
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 5 of 5
Appendix
—GC 401 A ,nilablit,of 1= t s
GC-4.02 Subsurface and Physical Conditions
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH Chisholm Trail Ranch Phase lA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 103826
Revised March 20, 2020
CONATSER
(WATER, SEWER, STORM, & PAVING)
Chisholm Trail Ranch Phase IA
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidlist Item
No.
Project item information
Description
00 42 43 Utilities and Paving
DAP - BID PROPOSAL
Page 1 of 10
Bidder's Application
Bidder's Proposal
Specification Unit of I Bid Unit Price Bid Value
Section No. Measure I Quantity
UNIT I: WATER INPROVEME VTS
1
—2—
3305.0003
8" Waterline Lowering _ _
��
133 05 12
_ EA—
�9�
$1,800.00
$16,200.00
3305.0109
Trench-Safetyr ---
33 05 10
i3
LF
6421
4
$1.00
$6,421 00
-3-
3311.0001
Ductile Iron Water Fittings w/_Restraint
11 11
—TON —_
_
— $6,500.00
$26,000 00
4
_ 33_11.0261
8" PVC Water Pipe —
Pire
_
3311 12
LF
6421
$48.00
_ $308,208.00
_5
3312.0001
Install Hydrant
_
33 12 40
EA
16
$4,800.00
!$76_,80000
6
3312.2003
1" Water Service
33 12 10
EA
150—
$165,000.00
7
3312.3003
8" Gate Valve
33 12 20
_ EA
33—,
_$1,100.00
=$1,450.00 .
_
$47,850.00
_ 8
3312.0117
Connection to Existing 4"-12" Water Main
33 12 25
EA_
3
$4,500.00
, $13,500.00
9
3312.3105 12"Cut-in-Gate Valve
33,12 0
EA—
_2 _
$4,50_—D.00
$9,D00.00
10
3110.0101
Site Clearing
I31 10 00
LS_
.
$5502.20
11
3305.0110
_ — -
Utility Markers
33 05 26
LS
—1—
1
—$5_,_50220
_ $4,5500.00
$4.500.00
12
3305.1202
20"Casing By Other than Open Cut
33 05 26
LF
80.00 _-
$52000
$41,600.00
13
3305.2002
8" Water Carrier Pipe
33 11 12
— LF
�-
_8'0,00_
$62,.00
14
-1.4�
16
_17,.
-
18-
.
-
--
-1g—
-.2a—
21
22
_23—
_
—
25
6
_
—
_�2
28
29
- —
_
30
-
�31i
.32
_
i 34
35
36
37
-
—
-=38.
_
39
-T
—
42
43
_
44
45_
TOTAL U 41T I: WATER IMPROVEMENTS
$725,541.20
CITY OF FORT WORTH
STANDARD CONSTRUCTION
SPECIFICATION DOCUMENTS - DEVELOPER AWARDED
PROJECTS
Forth Version
May 22, 2019
DAP Form
with Conaster Prices
for 24in PVC Extended xls
Chisholm Trail Ranch Phase IA
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Project Item Information
00 42 43 Ultlities and Paving
DAP -BID PROPOSAL
Pagc 2 of 10
Bidder's Application
Bidder's Proposal
Bidlist Item
Description
Specification
Unit of
Bid
Unit Price
Bid Value
No.
Section No.
Measure
Quantity
UNIT IB: BREWER BLVD WATER IMPROVEMENTS (CITY COST PARTICIPATION)
1
3311.0664 24" PVC C905 Water Pipe (Restrained
3311 12
_
Joints) , _ _
— �F_
_188600 ,
$360.00
— $676,800.00
2
3312.3008 24" Gate Valve w/ Vault
33 12 20�
EA
1
$59,500.00
$59,500.00
3
3311.0001 Ductile Iron Water Fittings w/ Restraint
33 11 11
TON
3.500
$12,500.00
$43,750.00
4
3312.1003 4" Combination Air Valve Assembly for Water 33 12 30
EA
1
$28,500.00
$28,500.00
5
3201.0127 10' Wide Asphalt Repair, Arterial
3201 17
LF
100
$100.00
$10,000.00
6
0241.0100 Remove Sidewalk
0241 15
SF -
100
— $2.00
—
$200.00
7
3213.0301 4" Conc Sidewalk
32 13 20
SF
100
$4.00
$400.00
8
3312.0108 Connection to Existing 24" Water Main
33 12 25—
_
1 _
_ $61500.00
— $6,500,00
9
3305.0109 Trench Safety
33 05 10
—EA
LF
1840.00
$2.00
$3,680.00
10
9999.0001 CSS Backfill (Per 20 LF)
_ _
33 05 10y
_--- _.
CY—
_ _
_ 21.80
$196.00
$4,272.80
11
—
13
14
15
_
16
_
17-
—
-1$—
19
20
21
—
22
23
24
25
-
—.:Z6
27
28
29
30
--
31
32
R 33
34
35
36
-
37
38
_
39
40
41
42
43
TOTAL UNIT IB: BREWER BLVD WATER
IMPROVEMENTS
$833,602.80
CITY OF FORT WORTH
STANDARD
CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED
PROJECTS
Form Version
May 22, 2019
DAP Form with Comwer Prices
for 24in PVC Extended .xis
Chisholm Trail Ranch Phase IA
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Project Item Information
00 42 43 Utilities and Paving
DAP - BID PROPOSAL
Page 3 of 10
Bidder's Application
Bidders Proposal
Bidlist Item
Description
Specification I
Unit of
Bid
Unit Price
Bid Value
No.
Section No.
Measure
Quantity
UNIT II: SANITARY SEWER IMPROVEMENTS
1
- t
3301.0002 Post -CCTV Inspection
- -- - _. _._
00 00 00
_.._- -
LF
- -
9284.00
-----
- $3.00
$27,852.00
2
3301.0101 Manhole Vacuum Testing
33 01 30
EA
52.00
$150.00
$7,800.00
3305.0109 Trench Safety
9
33 05 10
LF
9284.00
$2.00
$18,568.00
-3
4
- _ _. - -_._... - .
3339.1001 4' Drop Manhole
_...� ,_�.._-....�-_..
33 39 10,
EA
4.00
_-_
$6,000.00
-._..,,.__,_ __.:
$24,000.00
5
3339.1001 4' Manhole
33 39 10,
EA
$5,000.00 .-$235,000.00
- _
6
_^ -
3339.0001 Epoxy Manhole Liner
_
33 39 60
s
VF
_47.00
148.00
$445.00
$65,860.00
7
3305.0112 Concrete Collar
33
EA
5,00._
$750.00
$3,750.00
8
3331.4115 8" Sewer Pipe (SDR-26, ASTM D_3034)
33 31 20
-
LF
_
9284.00
$60.00
$557,040.00
9
3331.4116 8" Sewer Pipe, CSS Backfill
3331 20�
LF
850.00._
- $70.00-i$59,500.00
10_
3331.3101 4" Sewer Service
3331 50
EA
218.00
$850.00
$185,300.00
11
3305,0113 Trench Water Stops _ - --
T_.-:_ .._....__.
33 05 15
EA
24.00
..
„$300,00
, $7,200.00.
12
3339.1003 4' Extra Depth Manhole
333910,
VF
155.00
- - . $.205.00
_ _ $31..775.00
13
9999.0003 Hydraulic Slide F
9_9 99 02 -
�EA�
,7�00 _
-$2,500.00
__$17,500.00
14
9999.0004 4' Manhole with Bolt Down Lid
999903
EA
1.00
$6,500.00
$6,500.00
15
16
_..l 7
18
19
20
_
-
_ 2.1 _
22
23
-
-
24
_..25
-
26
27
- 28
29
-- -
30
--
31
32
33
_
34
-
35
36
37
38
39
40
41
42
43
TOTAL UNIT II: SANITARY SEWER
IMPROVEMENTS
$1,247,645.00
CITY OF FORT WORTH
STANDARD
CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version
May 22, 2019
DAP Form with Consster Prices for 24in PVC Extended .xls
Chisholm Trail Ranch Phase IA
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidlist Item
No.
Project Item Information
Description
00 42 43 Utilities and Paving
DAP - BID PROPOSAL
Page 4 of 10
Bidder's Application
Bidder's Proposal
Specification I Unit of I Bid
Section No. I Measure I Quantity Unit Price Bid Value
UNIT III: DRAINAGE IMPROVEMENTS
1
3349.5001 10' Curb Inlet
33 49 20
EA
11
$3,600.00
$39,600.00
2
3341.0201 21" RCP, Class III
3341 10
LF
513
$68.00
$34,884.00
3
3341.0205 24" RCP, Class III
3341 10i
LF,
_1882-_$73.00
_ $137,386.00
4
3341.0302 30" RCP, Class III. _
-
3341 10 _
-
LF
_ 662
-
__--$88.00
$58,256.00
5
3341.0,k6 36" RCP, Class III
33 41 10
LF
39
$115.00
$4,485.00
6
3341.0409 48" RCP, Class III
3341 10
LF
1140
$185.00
$210,900.00
7
3341.0502 54" RCP, Class III
3341 10
LF
94
$245.00
$23,030.00
_ 8
3341.1103 4x4 Box Culvert-
33 41 10
LF
- ` 876 -
_ $265.00
- $232,140;00
9
3341.1203 5x5 Box Culvert
33 41 10
LF
1181
$335.00
$395,635A0,
10-
3341.1403 7x5 Box Culvert -_ - - -
3341 10 _
LF
i 546
- $490.00
_ $267,540.00
-
11
8,
3341.1502 5 Box Culvert
33 41 10
LF
418
$530.00
$221,540.00
12
3305.0169 Trench Safety
33 05 10
LF
7351
$1.00
$7,351.00
13
3349.0001 4' Storm Junction Box
33 49 10 _
EA
5
$6,500.00
_ $32,500.00
-
m---
14
_--,-: __....., _ ....:.
3349.0002 5' Storm Junction Box
33 49 10
EA
4
$7,500.00
$30,000.00
15-
3349,0003-6' Storm Junction Box.
334910
- EA
2
_.__$9,500._00
- $19,000.00
16
3349.0004 7' Storm Junction Box
334910
EA
1
$12,500.00
$12,500.00
17
3349.0103 5' Manhole Riser
33 4910
EA
7
$6,500.00
$45,500.00
18
3349.7001 4' Drop Inlet
334920
EA
5
$6,000.00 _
$30,000.00
_
19
-
9999.0003 12" Rock RipRap
99 99 03
_ _
SY
297
$115.00
$34,155.00
20
9999.0004 TXDOT TYPE FW-S 8X5 WINGWALL
99 99 04
EA
1
$12,500 00 .._
_$12,500.00
21
9999.0005 TXDOT TYPE FW-S 5'X5' WINGWALL
99 99 05
EA
1
$9,500.00
$9,500.00
22
99 99.0006 TXDOT TYPE FW-S 4'X4' WINGWALL
99 99 06
EA
1
$8,500.00
$8,500.00
23
3349.5002 15' Curb Inlet
33 49 20
EA
3
$4,600.00
$13,800.00
24
3349.5003 20' Curb Inlet
33 49 20
EA
6
$6,000.00
$36,000.00
25
_ _
33412207 92X10 BOX CUVLERT
33 41 -1
LF
-116
$1,400.00
$165,200.00
26
9999.007 TXDOT TYPE FW-S 2-12'X10' ' WINGWALL
99 99 07
EA
2
$74,500.00
$149,000.00
27
33.49.70.02 5' Drop Inlet.
33 49 20
EA
1
$7,500.00
$7,500.00
28
3349.3012 54" Strai ht. Headwall
33 49 40
EA
1
$61500.00
$6,500.00
29
6946.6006 3' Drop Inlet
99 99 09
EA
1
$4,500.00
$4,500.00
30 _ -
31
32 -
33 _ R-
34 _
35 _
36 T
37
38 --
39
40
41 _
42
43
44
45
TOTAL UNIT 1 I: DRAINAGE IMPROVEMENTS $2,249,402.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 DAP Form with Conaster Prices for 24in PVC Extended .x1s
Chisholm Trail Ranch Phase 1 A
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Project Item Information
00 42 43 Utilities and Paving
DAP -BID PROPOSAL
Page 5 of 10
Bidder's Application
Bidder's Proposal
Bidlist Item
Description
I Specification
Unit of
Bid
Unit Price
Bid Value
No.
Section No.
Measure
Quantity
UNIT IIIB: McPHERSO_N DRAINAGE IMPROVEME
VTS
1
3305.0109 Trench Safety_
33 05 10
LF
426
$4.00
$1,704.00
— ? _
_
33-49.3,00-3. 24"Straight Headwall., 1_Pipe
33 49 40 _
_ EA _
1
i $3,500_00
_
$3,500.00
3
0241.4303 Remove 4' Grate Inlet
0241 14
EA
1
$1,500.00
$1,500.00
4_
3349.5001 10' Curb Inlet
33 4920
EA_
1
$3,600.00
$3,600.00
5
3349.5002 15' Curb Inlet
33 49 20
EA
1
$4,600.00
$4,600.00
_
6 V
_
334001 4'_Drop Inlet �-
9.7
334920
_
E.
_
~1
_
$6,000.00
_ 7_
3349.0001 4' Storm Junction Box
33 49 10
a_ EA
—2
_$6,0.L
$6,500.00
$13,000.00
8
_
3341.0201 21" RCP, Class III
3341 10
_
LF
_
155
$68.00
— $10,540.00
9
3341.0205 24" RCP, Class III
3341 10_
LF_
25
$8_5.00
$2,1_25.00
_
10
3341.0302 30" RCP, Class III
3341 10
_
LF
246
$88.00
$21,648.00
12
-
-
_13 ..
_14
15
�16
-
- - -
—17, -.
is
19
—20
—
• 2�
22
_
• 23
24-
25 _
26
29
30
31
—
—
3.1
—�
33
34
35
36
37
38
39
40
41
42
43
44
45
—
TOTAL UNIT IIIB: McPHERSON DRAINAGE
IMPROVEMENTS
$68,217.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
DAP Form with Conaster Prices for 24in PVC Extended .xls
Chisholm Trail Ranch Phase I A
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidlist Item
No.
-2
3
4
5
-6-
7
8
9
-T6-
11
12
i-3
14
15
16
17
18
1.9
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
n
- 39
46
41
42
43
00 42 43 Utilities and Paving
DAP - BID PROPOSAL
Page 6 of 10
Bidder's Application
Project Item Information Bidder's Proposal
Description
Specification I
Unit of
Bid
Unit Price
Bid Value
Section No.
Measure
Quantity
UNIT IV: PAVING IMPROVEMENTS
3213.0101 6" Reinforced Conc Pvmt
-0
32 13 13
Sy
18930
$42.00
$795,060.00
16 " Lime Treatment
3211.0501
3 2 1- i. 0-- 5
3211 29
- .
Sy
20154
-
$3.25
, - .
$65,500.50
. .
k§i-,61100 Topsoil—
32 921 9
Cy
12 . 6
$ 2 4. 00
$3 024. 00
3292.0100 Block Sod Placement
32 92 13
Sy
752
$8.00
$6,016.00
3213.0301 4" Conc Sidewalk
32 13 20
SF
5852
$4.00
$23,408.00
9466.061-6 Type Hi Barricade
99 99 10
EA
4
$1,000.00
$4,000.00
3137.0102 Large Stone Riprap, dry
31 3700
Sy
92
$115.00
$10,580.00
0400 Hydrated 14!nt,@0 tL§y per
11 29
TN
303
$215.00
$65,145.00
3213.0506 Barrier Free Ramp, Type P-1
32 13 20
EA
24
$1,800.00
$43,200.00
- -i--Oiee 32ii6bi'Barrier Ramp, Type R-1
32 13 20
EA
4
$1,600.00
$6,400.00
9999.0011 Furnish/install Alum Sig Ground Mount City
99 99 11
EA
Standard - R1-1 Stop Sign
16
$750.00
$12,000.00
9999,0012 Furnish/install Alum Sig Ground Mount City
99 99 12
Standard - Street Name Blade Pair
EA
32
$300.00
$9,600.00
32i-6-.0-10,1,6"Conc Curb and Gutter
321613-
LF
20
$30.00
$60 , 0.0 . 0
9999.0016 Furnish/install Alum Sig Ground Mount City
99 99 16
EA
Standard - R8-3R W/ Stickers
1
$750.00
$750.00
TOTAL UN T IV: PAVING IMPROVEMENTS $1,045,283.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 DAP Form with Conaster Prices for 24in PVC Extended xis
Chisholm Trail Ranch Phase 1A
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
1111k_i143:111 1111
Project Item Information
00 42 43 Utilities and Paving
DAP - BID PROPOSAL.
Page 7 of 10
Bidder's Application
Bidder's Proposal
Bidlist Item
Description
I Specification I
Unit of I
Bid
Unit Price
Bid Value
No
I
Section No. l
Measure
l Quantity
UNIT IVB: McPHERSON PAVING IMPROVEMENTS
1
3213.0105 10" Reinforced Conc Pvmt
32 13 13
SY
8200
$78.00
$639,600.00
2
3211.0502 8" Lime Treatment
321129
SY
8874
$4.00
$35 N496.00
_
3-
0241.0100 Remove Sidewalk - Y
02 41 13-
-.SF,.
1770
_
$2.00
_
$3,540.00
4
3211.0400 Hydrated Lime (36#/SY per Geotech)
32 11 29
TN
160
$215.00
$34,400.00
5
9999.0013 Furnish/install Alum Sig Ground Mount City
99 99 13
EA
Standard - R3-77 Sign
3
$750.00
. $2,250.00
6
- - g
9999.0014 8.5" Thick T e "D" & "B" Temora Asphalt
YP Temporary P
99 99 14
SF
1347
$10.00
$13,470.00
7
3217.1002 Lane Legend Arrow
00 00 00
EA
3
$500.00
$1,500.00
8
9999.0015 Furnish/install Alum Sig Ground Mount City
99 99 15
EA
Standard - R4-7 Sign _ _
- 1
$750.00
_ $750.00
9
32 13.0301 4" Conc Sidewalk
32 13 20
SF
21467
$4.00
$85,868.00
10
3291.0100 Topsoil
32 9219
CY
938
$24.00
$-22,512.00
11
3292.0100 Block Sod Placement
32 92 13
SY
5626
$8.00
$45,008.00
12
9999.0010 Type 11i Barricade
99 99 10
EA
1
$1.000.00
$1,000.00
13
3217.0001 4" SLD Pvmt Marking HAS (W)
00 00 00
LF
345
$2.00
$690.00
14
16
17
18
_
19
20
_
-
-
-
21
.22
-
23
24
-25-
-
26
27
28
29
30
31
-32-
-
33
34
35
36
37
. 38.
39
40
41
42
43
TOTAL UNIT IVB: McPHERSON PAVING IMPROVEMENTS
$886,084.00
CITY OF FORT WORTH
STANDARD
CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version
May 22, 2019
DAP Form with Conaster Prices
for 24in PVC Ea7ended .xls
Chisholm Trail Ranch Phase IA
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Project Item Information
00 42 43 Utilities and Paving
DAP-BrD PROPOSAL
Page 10 of 10
Bidder's Application
Bidders Proposal
Bidlist Item I Specification I Unit of Bid
Description Unit Price
Bid Value
No. Section No. 11 Measure Quantity
Bid Summary
UNIT I: WATER IMPROVEMENTS
$725,541.20
UNIT IB: BREWER BLVD WATER IMPROVEMENTS (CITY COST PARTICIPATION)
$833,602.80
UNIT II: SANITARY SEWER IMPROVEMENTS
$1,247,645.00
UNIT III: DRAINAGE IMPROVEMENTS
$2,249,402.00
UNIT IIIB: MASTER DRAINAGE IMPROVEMENTS
$68,217.00
UNIT IV: PAVING IMPROVEMENTS
$1,045,283.50
UNIT IVB: MCPHERSON PAVING IMPROVEMENTS
$886,084.00
UNIT V: STREET LIGHTING IMPROVEMENTS
UNIT VB: ARTERIAL STREET LIGHTING IMPROVEMENTS
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
Total Construction Bid
$7,055,775.50
This Bid is submitted by the entity named below:
BIDDER: BY: BROCK HUGGINS
Conaster Construction TX, L.P.
5327 Wichita Street
Aw 1^11-
Ft.Worth TX 76119 TITLE. P ,SIDENT
DATE:
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 205 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Forth Version May 22, 2019 DAP Form with Conaster Prices for 24in PVC Extended .As
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
00 45 12 - 1
PREQUALIFICATION STATEMENT
Page 1 of 1
SECTION 00 4512
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by
identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the
major work type(s) listed.
Major Work
T� 1v
Concrete
Con/Recon
Unlimited
Water and
Wastewater New
Development,
Rehabilitation,
and
Redevelopment
Open Cut (all
sizes)
Contractor/Subcontractor Company Name
Conatser Construction TX, L.P.
Conatser Construction TX, L.P.
Prequalification
Ex,,iration Date
1/3/23
10/31/22
I
The undersigned hereby certifies that the contractors and/or subcontractors described in
the table above are currently prequalified for the work types listed.
BIDDER:
Conatser Construction TX L.P._
Company
5327 Wichita Street
Address
Ft. Worth. TX 76119
City/State/Zip
By: 13vT,,de-- Hut--k l i n
(Please Print)
Signature:
Title: President
(Please Print)
Date: 12/08/22
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
Chisholm Trail Ranch Section 3 Phase IA
CPN 103826
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
004526-1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on City
Project No. 103826. Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worker's compensation coverage.
CONTRACTOR:
Conatser Construction TX L.P.
Company
5327 Wichita Street
Address
FL Worth. TX 76119
City/State/Zip
THE STATE OF TEXAS §
COUNTY OF TARRANT §
By: t3mo' v- i4t a Y,; n�
(Please Print)
Signature:
Title: President
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
B rO CA—' _ Li L p, I n s , known to me to be the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as
the act and deed of President for the purposes and consideration
therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of
` )c trbf -r , 207 -
aY KATHERINEBOSE }
NOTARY PUBLIC
* t * ID# 133467983 Notary Public in and for the State of Texas
State of Texas
s Comm, Exp. 11-30-2025
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised April 2, 2014
Chisholm Trail Ranch Section 3 Phase I
CPN 103826
00 52 43 - 1
Developer Awarded Project Agreement
Page 1 of 4
1 SECTION 00 52 43
2 AGREEMENT
3
4 THIS AGREEMENT, authorized on 12/08/22 is made by and between the Developer,
5 Meritage Homes of Texas LLC, authorized to do business in Texas ("Developer") , and Conatser
6 Construction TX, L.P. , authorized to do
7 business in Texas, acting by and through its duly authorized representative, ("Contractor").
8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
9 follows:
10 Article 1. WORK
11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
12 Project identified herein.
13 Article 2. PROJECT
14 The project for which the Work under the Contract Documents may be the whole or only a part is
15 generally described as follows:
16 Chisholm Trail Ranch Section 3 Phase IA
17 CFA22-0143 , CPN 103826
18 FID No.30114-0200431-103826-EO7685
19 Article 3. CONTRACT TIME
20 3.1 Time is of the essence.
21 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
22 Documents are of the essence to this Contract.
23 3.2 Final Acceptance.
24 The Work will be complete for Final Acceptance within _205_ working days after the date
25 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard
26 City Conditions of the Construction Contract for Developer Awarded Projects.
27 3.3 Liquidated damages
28 Contractor recognizes that time is of the essence of this Agreement and that Developer
29 will suffer financial loss if the Work is not completed within the times specified in
30 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
31 the Standard City Conditions of the Construction Contract for Developer Awarded
32 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
33 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
34 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees
35 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
36 Developer ZERO ($ o ) for each day that expires after the time specified in
37 Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase IA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED r CPN 103826
Revised June 16, 2016
00 52 43 - 2
Developer Awarded Project Agreement
Page 2 of 4
38 Article 4. CONTRACT PRICE
39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
40 Documents an amount in current funds of Seven Million Fifty -Five Thousand, Seven Hundred
41 and Seventy -Five and 501100 Dollars ($7,055,775.50).
42 Article 5. CONTRACT DOCUMENTS
�.��K�]►11Y�1►MIf.�
44
A. The Contract Documents which comprise the entire agreement between Developer and
45
Contractor concerning the Work consist of the following:
46
1.
This Agreement.
47
2.
Attachments to this Agreement:
48
a. Bid Form (As provided by Developer)
49
1) Proposal Form (DAP Version)
50
2) Prequalification Statement
51
3) State and Federal documents (project specific)
52
b. Insurance ACORD Form(s)
53
c. Payment Bond (DAP Version)
54
d. Performance Bond (DAP Version)
55
e. Maintenance Bond (DAP Version)
56
f. Power of Attorney for the Bonds
57
g. Worker's Compensation Affidavit
58
h. MBE and/or SBE Commitment Form (If required)
59
3.
Standard City General Conditions of the Construction Contract for Developer
60
Awarded Projects.
61
4.
Supplementary Conditions.
62
5.
Specifications specifically made a part of the Contract Documents by attachment
63
or, if not attached, as incorporated by reference and described in the Table of
64
Contents of the Project's Contract Documents.
65
6.
Drawings.
66
7.
Addenda.
67
8.
Documentation submitted by Contractor prior to Notice of Award.
68
9.
The following which may be delivered or issued after the Effective Date of the
69
Agreement and, if issued, become an incorporated part of the Contract Documents:
70
a. Notice to Proceed.
71
b. Field Orders.
72
c. Change Orders.
73
d. Letter of Final Acceptance.
74
75
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase IA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED r CPN 103826
Revised June 16, 2016
00 52 43 - 3
Developer Awarded Project Agreement
Page 3 of 4
i7. .Wm Frill lei 1J0luleIIWray.'%Y[Ile
77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
78 expense, the city, its officers, servants and employees, from and against any and all
79 claims arising out of, or alleged to arise out of, the work and services to be performed
80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
81 under this contract. This indemnification provision is specifically intended to operate
82 and be effective even if it is alleged or proven that all or some of the damages being
83 sought were caused, in whole or in part, by anv act, omission or negligence of the city.
84 This indemnity provision is intended to include, without limitation, indemnity for
85 costs, expenses and legal fees incurred by the city in defending against such claims and
86 causes of actions.
87
88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
89 the city, its officers, servants and employees, from and against any and all loss, damage
90 or destruction of property of the city, arising out of, or alleged to arise out of, the work
91 and services to be performed by the contractor, its officers, agents, employees,
92 subcontractors, licensees or invitees under this contract. This indemnification
93 provision is specifically intended to operate and be effective even if it is alleged or
94 proven that all or some of the damages being sought were caused, in whole or in part,
95 by anv act, omission or negligence of the citv.
96
97 Article 7. MISCELLANEOUS
98 7.1 Terms.
99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
100 the Construction Contract for Developer Awarded Projects.
101 7.2 Assignment of Contract.
102 This Agreement, including all of the Contract Documents may not be assigned by the
103 Contractor without the advanced express written consent of the Developer.
104 7.3 Successors and Assigns.
105 Developer and Contractor each binds itself, its partners, successors, assigns and legal
106 representatives to the other party hereto, in respect to all covenants, agreements and
107 obligations contained in the Contract Documents.
108 7.4 Severability.
109 Any provision or part of the Contract Documents held to be unconstitutional, void or
110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
111 remaining provisions shall continue to be valid and binding upon DEVELOPER and
112 CONTRACTOR.
113 7.5 Governing Law and Venue.
114 This Agreement, including all of the Contract Documents is performable in the State of
115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
116 Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase IA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED r CPN 103826
Revised June 16, 2016
00 5243 - 4
Developer Awarded Project Agreement
Page 4 of 4
117
118 7.6 Authority to Sign.
119 Contractor shall attach evidence of authority to sign Agreement, if other than duly
120 authorized signatory of the Contractor.
121
122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
123 counterparts.
124
125 This Agreement is effective as of the last date signed by the Parties ("Effective Date").
126
127
Contractor:
Conatser Construction TX, L.P.
BY:6911
,�.
(Si tare)
13rT)C-k 1-i u G n i n5
(Printed Name)
Developer:
Merita a Homes oi'Texas. LLC
B \,:
a re)
David?Auuhinbau.
(Printed Name)
Title: President Title: Vice President
Company Name: Conatser Construction Company name: Meritage Homes of Texas, LLC
TX, L.P.
Address: 5327 Wichita Street Address: 8840 C, tress Waters Blvd, Suite 100
City/State/Zip: Ft. Worth. TX 76119
12/08/22
Date
City/State/Zip: Dallas, TX 75019
lotto 122.
Date
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase IA
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED F CPN 103826
Revised June 16, 2016
006213-1
PERFORMANCE BOND
Page 1 of 2
1 SECTION 00 62 13
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, _Conatser Construction TX, L.P. , known as "Principal" herein and
g Berkley Insurance Company , a corporate surety(sureties, if more than one) duly authorized to
9 do business in the State of Texas, known as "Surety" herein (whether one or more), are held and
10 firmly bound unto the Developer, Meritage Homes of Texas LLC, authorized to do business in
11 Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the
12 penal sum of, Seven Million Fifty -Five Thousand, Seven Hundred and Seventy -Five and 501100
13 Dollars ($7, 055, 775.50), lawful money of the United States, to be paid in Fort Worth, Tarrant
14 County, Texas for the payment of which sum well and truly to be made jointly unto the
15 Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators,
16 successors and assigns, jointly and severally, firmly by these presents.
17 WHEREAS, Developer and City have entered into an Agreement for the construction of
18 community facilities in the City of Fort Worth by and through a Community Facilities
19 Agreement, CFA 22- 0143 ;and
20 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
21 the 08 day of December , 20 22 , which Contract is hereby referred to and made a
22 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
23 and other accessories defined by law, in the prosecution of the Work, including any Change
24 Orders, as provided for in said Contract designated as Chisholm Trail Ranch Phase IA.
25 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
26 shall faithfully perform it obligations under the Contract and shall in all respects duly and
27 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
28 specifications, and contract documents therein referred to, and as well during any period of
29 extension of the Contract that may be granted on the part of the Developer and/or City, then this
30 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase IA
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 103826
Revised January 31, 2012
066213•,
PiAl'ORMA NCF MAD
Paw � pl'-,
I PROVIDED FURTHER, that if any legal action be filed on this Bond. venue shall lie in
2 Tarrant Cotimy. Texas or the United States District Court for the Northern District o4" rexas. 1=ort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5
6
7
8
9
10
12
13
14
1�
16
17
18
19
20
21
,2
2;
24
m;
?6
27
28
29
30
3i
33
33
.14
3j
36
37
38
1
40
41
42
4.11
as
4a
46
-47
Texas Government Code. as amended. and ail liabilities on this band shall be determined in
accordance with the provisions of said statue.
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
this instrument by duly" authorized agents and officers on this the 08 dax of
December . 2022
PRi\CIPAL.
C onntser Construction '[ :\. L.P.
`
t31:':
"
Signature
ATTEST:
`
Brock HugeinsPresident
(Principl) Secretar'O�
Name and Title
Address:.._i327 Wichiltt Street
�Ft. �4orth. TX 761.19
A, f
Witness as to Principal
SURETY:
_Berkley_ Insurance Com an
. kt&
S1J,nattll'e
Robb�ol s, Attorney -in -fact
Name and Title
Address: LBJ Freewa Suite 1500
_5005
_Dallp.TX 75244,
t ' ti essas Surety
+ to
1X .
Telephone Number: 214/989 0000
*Note- If signed by an officer of the Surety Compam. there must be c,in tilt a certified extract
rrom the by-Iaws shooting that this person has authority to sign such obligation. if
Surety's physical address is dil erem from its mailing address. both must be provided.
The date of the bond shall not be prior to the date the Contract is a%\arded.
Chisholm Trail Ranch Seel ion 3 Pluse 1 A
Clh'i* tt ►R I"MsWrlI cry 1n3ACZh
tiIA-1,10RD(TIYCr)N1)IIuA'S-1)1:vI:IOI'I:RAWARUI:I)PROJI. 1:+
Itet3xJ Januun .11. 2+11
006214-1
PAYMENT BOND
Page 1 of 2
1 SECTION 00 62 14
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7
8 That we, _Conatser Construction TX, L.P. , known as "Principal"
9 herein, and Berkley Insurance Company , a corporate
10 surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known
11 as "Surety" herein (whether one or more), are held and firmly bound unto the Developer,
12 Meritage Homes of Texas LLC, authorized to do business in Texas "(Developer"), and the City of
13 Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Seven Million Fifty -Five
14 Thousand, Seven Hundred and Seventy -Five and 501100 Dollars ($7, 055, 775.50), lawful money
15 of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which
16 sum well and truly be made jointly unto the Developer and the City as dual obligees, we bind
17 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
18 firmly by these presents:
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth, by and through a Community Facilities
21 Agreement, CFA22-0143, and
22 WHEREAS, Principal has entered into a certain written Contract with Developer,
23 awarded the 08 day of December , 20 22 , which Contract is hereby
24 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
25 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
26 Work as provided for in said Contract and designated as Chisholm Trail Ranch Phase IA.
27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
29 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
31 force and effect.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase IA
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 103826
Revised January 31, 2012
1
2
_i
l
5
6
7
8
9
to
11
12
13
14
PAYMENT lit1N1)
PJL'e : (1I .2.
This bond is made and executed in compliance \\ ith the provisions of Chapter 2253 of the
Texas Government Code. as amended. and all liabilities on this bond shall be determined in
accordance +\ ith the provisions of said statute.
IN WITNESS WHEREOF, the Principal and Stn•ety have each SIGNED and SEALED
this instrument by dull authorized agents and officers on this the 08 day of
December . 2022
ATTEST
(Principal) Secretary
b T!i(ness as to Principal
ATTEST:
I Surety' ) Secretary
A`iyie: s rtti Io Surety
PRINCIPAL:
Conalser C mStructinli TN., L.P.
BY:
Signature
Brock Hu ins, President
Name and "Title
Address: M7 1i'ichita Street
Ft. Worth, T1 76119
SURETY:
Berkley Insurance Com an),
Si�mature
Rohbi 1Vlorales, Attorney-irt-fact
game and Title
Address: rmiss L Freeway, Suite 1500
Dallas, TX 75244�
Telephone Number: 214j 89-0000a
Note: It' siuted by an officer of the Suret ., there must be on file a certified extract from the
b\.la\\s shmking that this person has authority to sign such obligation. If Surety's ph\sical
address is different from its mailintf address. both must be provided.
1-lie date orthe bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FOR I l\'t)Rll! Chisholm Trail Ranch Smiun Z Phase ;A
til",\X13:\RU['I'I'\'C'UNI)ITIt)\C—I)1 VI:1.1)PJ:ai;\NARnlit)1'Iifl,IGCTS t'PX Ilt>>;_t,
Itevsed.lanUaD .+t 2012
006219-1
MAINTENANCE BOND
Page 1 of 3
1 SECTION 00 62 19
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7
8 That we Conatser Construction TX, L.P. known as "Principal"
9 herein and Berkley Insurance Company , a corporate surety (sureties, if
10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
I I (whether one or more), are held and firmly bound unto the Developer, Meritage Homes of Texas
12 LLC, authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas
13 municipal corporation ("City"), in the sum of Seven Million Fifty -Five Thousand, Seven Hundred
14 and Seventy -Five and 501100 Dollars ($7, 055, 775.50), lawful money of the United States, to be
15 paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made
16 jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves,
17 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
18 presents.
19
20 WHEREAS, Developer and City have entered into an Agreement for the construction of
21 community facilities in the City of Fort Worth by and through a Community Facilities
22 Agreement, CFA 22- 0143 ; and
23 WHEREAS, the Principal has entered into a certain written contract with the Developer
24 awarded the 08 day of December , 2022__, which Contract is
25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
26 materials, equipment labor and other accessories as defined by law, in the prosecution of the
27 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
28 the "Work") as provided for in said Contract and designated as Chisholm Trail Ranch Phase 1A;
29 and
30
31 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
32 accordance with the plans, specifications and Contract Documents that the Work is and will
33 remain free from defects in materials or workmanship for and during the period of two (2) years
34 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase IA
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 103826
Revised January 31, 2021
MAINTINANCE,
BOND
PaLe 2 ul'?
I
2 WHEREAS. Principal hinds itself to repair or reconstruct the Work in whole Orin part
Upon receiving notice from the Developer and/or City of the need thereof at any time within the
4 Maintenance Period.
6 NOW THEREFORE. the condition ofthis obligation is such that if Principal shall
7 remed} any defective ' AVork. for which timely notice was pro>, ided by Developer or City. to .a
8 completion satisfactory to the City. then this obligation shall beconle null and void: otherwise to
9 remain in Bill force and effeet.
10
I I PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct an, timely
12 noticed defective Work. it is agreed that the Developer or City ma\- cause am and all Buell
01 defective Work to be repaired and/or reconstructed A-.ith all associated costs thereofbeing borne
14 be the Principal and the Surety under this Maintenance Bond: and
I�;
IG PROVIDED FURTHER. that if any legal action be tiled on this Bond. Venue shall lie in
17 Tarrant County. 'Texas or the United States [district Court for the ;northern District of Texas. Tort
18 Worth Division: and
19
'_tl PROVIDED FURTHER, that this obligation shall be continuous in nature and
1 successive recoveries may be had hereon for successive breaches.
22
24
CI 11 Of, I•OR l W )R I I I Chi>halm Tnuil Ranch S mion : Phase I A
SFANNI)ARDCITYCONDI11ONS--DIATLOPERA%kARDf.DPROJFCIS LPN Inis_h
Re%iwdhnuan :1.2n21
M)(,_ W-3
MAINIINA\CI? IONP
I'av 3 ur3
I IN WITNESS WHEREOF. the Principal and the Surely have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the 08 day- of December
3 2022
5
6
7
8
9
10
Il
12
13
14
15
16
17
18
19
2(1
21
2'
23
24
26
27
28
29
30
31
1-3
34
i�
3;
36
37
:8
39
40
tl
4:
,VI-rr:ST:
(Principal)Szcretat•� �
N%Iiness as to Principal
A•rT>'s'r:
(Suret ) Secrelary
1 lu csz •s a4 to�Surct%
PRINCIPAL.:
Coitatser ConstructiCn3 TX. _L.P.
5ignature�
Brack Huggins, President
Name :ind ntie
Address: 5327 tt iehitn_Strec:t
Ft. Worth.TX :\ 76119
SURETY:
.Berkley Insurance.C.Qmpazny
Signature
_Robbi.Il_n_rates,. Attrn oey-in-fact
\ame and Title
Address: 5005 LBj Freeway, Suite 1500
TDa11a tX_ 75244
lelephoneNumber: _214/989_0000
I'Note: It'signed by an officer of the Surety Company, there must be on file a certified extract
from the bN -lads showing that this person has authority to sign such obligation. If
Surety's pl .ysical address is ditlerent from its trailing address. both must be provided.
The date ofthe bond shall not be prior to the date the Contract is awarded.
CI IN OF FOR I kko R'rit C hishalm'rrail Ranch Sceiion A 1111usc IA
STANDARD CI`I Y Ct)\DI I'It 1\S — DrVI:I.0111A AWARDED PRUJI.0 S CPS 103426
Rr�iK:dJ�nuan ?t.��)�t
CONASTER
LIGHTING
Chisholm Trail Ranch Phase 1 A
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Project Item Information
00 42 43 Lighting
DAP - BID PROPOSAL
Page 9 of 11
Bidder's Application
Bidder's Proposal
Bidlist Item
Description
Specification
Unit of
Bid
Unit Price
Bid Value
No.
Section No.
Measure
Quantity
UNIT V: STREET LIGHTING IMPROVEMENTS
1
3441.3301 Rdwy Illum Foundation TY 1
34 41 20
EA
27
$1,200.00
$32,400.00
2 _
�3
3441.n41 Rdwy Illum TY 11 Pole
34 41 20
_EA_
27
_ $1,800.00
$48,600.00
9999.0016 Type R2 Luminaire
999916
EA
`
25
$850.00
$21,250.00
9999A017 Type R_4 Luminaire
99 99 17
EA
2
$950.00 _
$1,900.00
_4 _
3441.1638 Type 336Arm
34 41 20—
EA —
_27
$600.00
$16,200.0_0
6
3605.3015 2" Condt PVC SCH 80 (j
26 05 33
LF
1605
$15.00
$24,075.00
8
9
-
10
13
-14-
-.
-
15
16
-16
--
18�
,1.9..
-
—21
22
— 23
24�
—
25
-
_26_-
27
— 28'
— 29-
30
—31
_ 32
33
34 .._
_35
36
_
_
37
— 38 -
-- —_
39
41
.43 -
—
--
44
TOTAL UNIT
V: STREET LIGHTING IMPROVEMENTS
$144,425.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
DAP Form with Conaster Prices for 24in PVC Extended .x1s
Chisholm Trail Ranch Phase IA
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Project Item Information
00 42 43 Lighting
DAP -BID PROPOSAL
Page 9 of I I
Bidder's Application
Bidder's Proposal
Bidlist Item
Description
Specification
Unit of
I Bid
Unit Price
Bid Value
No.
Section No.
Measure I
Quantity
UNIT VB: ARTERIAL STREET LIGHTING IMPROVEMENTS
1
9999.0018 Type R2 Luminaire
999918
EA
10
$850.00
$8,500.00
2,
-
3441.1632 Type 33A Arm
_
34 4120
_ _
EA
6
—
$500.00
$3,000.00
_ _
3
_
3341.3302 1 Rdwy Ilium Foundation TY 3
34 41 20
EA -
3
$1,500.00
$4—,500.00
_4_
3441.3342 Rd" lllum TY 18_Pole_ _—
344120
_
Fro—
3
200.00
_$2, �
--...._._
_i-$6,600.00
5
3605.3015 2" Condt PVC SCH 80 (T)
26 05 33
LF
1135
$15.00
$17,025.00
6
-
--7
9—.
9
- —
-
-
10
—
11
-
-
—12 �
13
—14-
- 15
-
16
17 —
-
-
18-
-
-
-19 —
-
_20 _
-
—22 •-
—
—
23 -
�24 —_
-
-25_
.-
27
—.28—•
29
30
— 31
33
v 34
35
36
37
--
— —
38
—
39
40
41
--
42.
43-
—
44
45
TOTAL UNIT VB: ARTERIAL STREET LIGHTING IMPROVEMENTS
$39,625.00
CITY OF FORT WORTH
STANDARD
CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED
PROJECTS
Form Version
May 22, 2019
DAP Form
with Conaster Prices
for 24m PVC Extended As
Chisholm Trail Ranch Phase l A
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Project Item Information
00 42 43 Lighting
DAP - BID PROPOSAL
Page 10 of 11
Bidder's Application
Bidder's Proposal
Bidlist Itemf
Description
f Specification f
Unit of I
Bid I
Unit Price
Bid Value
No.
I
I Section No. I
Measure
Quantity
UNIT VC: STREET LIGHTING IMPROVEMENTS (CITY COST PARTICIPATION)
1
3441.1632 Type 33A Arm 34 41 20
EA 4 -$500.00
$2,000.0.0
_
2
3341.3302 Rdwy Ilium Foundation TY 3 34 41 20�
EA 2 $1,500.00
�.
$3,000.00
—
3
3441.3342 Rdwy Ilium. TY 18 Pole — . _ _ _ . 34 41 20
_
EA 2 .� $2 200.00
-...-. —.s
$4,400. 00
5
-
— --
-7—
- -
- -8
- -
-
10
'12
J13
—14
15-
16
—
—
—
17
_
18
— — —
—
1_9
20
21
—
22
23
-
24 —
-25
2s_
—
_ 7 2
—
—
—
27
29
30
33
34
35
3
37
----
--
38
39
40
41
_
42
43
44
45
TOTAL UNIT VB: ARTERIAL STREET LIGHTING IMPROVEMENTS
$9,400.00
CITY OF FORT WORTH
STANDARD
CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version
May 22, 2019
DAP Fom with Conaster Prices
for 24in PVC Extended .xis
Chisholm Trail Ranch Phase IA
CPN 103826
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidlist Item)
No.
Project Item Information
Description
00 42 43 Lighting
DAP - BID PROPOSAL
Page 1 l of 11
Bidder's Application
Specification Unit of Bid
Section No. I Measure Quantity
Bid Summary
UNIT I: WATER IMPROVEMENTS
UNIT IB: BREWER BLVD WATER IMPROVEMENTS (CITY COST PARTICIPATION)
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IIIB: MASTER DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT IVB: MCPHERSON PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
UNIT VB: ARTERIAL STREET LIGHTING IMPROVEMENTS
UNIT VC: STREET LIGHING IMPROVEMENTS (CITY COST PARTICIPATION)
Total Construction Bid
This Bid is submitted by the entity named below:
Bidder's Proposal
Unit Price I Bid Value
$144,425.00
$39,625.00
�.:..-:-$9,400.00
$193,450.00
BIDDER: BY: BROCK HUGGINS
Conaster Construction TX, LP.
5327 Wichita Street
Ft. Worth TX 76119 TITLE: PRESIDENT�r
DATE:
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 45 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 DAP Form with Conaster Prices for 24in PVC Emended .As
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
004512-1
PREQUALIFICATION STATEMENT
Page I of 1
SECTION 00 4512
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by
identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the
major work type(s) listed.
Major Work Prequalification
Contractor/Subcontractor Company Name
T-Iiie— _ Expiration Date
Roadway & Conatser Construction TX, L.P. 1/26/24
Pedestrian
Li i •htimt�
The undersigned hereby certifies that the contractors and/or subcontractors described in
the table above are currently prequalified for the work types listed.
BIDDER:
Conatser Construction TX. L.P. By:. t?)Y-VC�—' Hl AC} C. , _
Company (Please Print)
5327 Wichita Street Signature: �-
Address
Ft. Worth. TX 76119 Title: President
City/State/Zip (Please Print)
Date: 12/08/22
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
Chisholm Trall Ranch
Section 3 Phase 1A
CPN 103826
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
004526-1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on City
Project No. 103826. Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worker's compensation coverage.
CONTRACTOR:
Conatser Construction TX. L.P.
Company
5327 Wichita Street
Address
Ft. Worth. TX 76119
City/State/Zip
THE STATE OF TEXAS §
COUNTY OFTARRANT §
By: 13V-C� t-tUQQ in �
(Please Print)
Signature:
Title: President
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
hYU C*- V j"C A q i f)S , known to me to be the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as
the act and deed of President for the purposes and consideration
therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of
nc inher , 202 —
NOTARY PUBLIC
ID# 13U67933 Notary Public in and for the State of Texas
Sake of Texas
comm. Exp.11-*2025
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised April 2, 2014
Chisholm Trail Ranch
Section 3 Phase 1A
CPN 103826
00 52 43 - 1
Developer Awarded Project Agreement
Page 1 of 4
1 SECTION 00 52 43
2 AGREEMENT
3
4 THIS AGREEMENT, authorized on 12/08/22 is made by and between the Developer,
5 Meritage Homes of Texas LLC, authorized to do business in Texas ("Developer") , and Conatser
6 Construction TX, L.P. , authorized to do
7 business in Texas, acting by and through its duly authorized representative, ("Contractor").
8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
9 follows:
10 Article 1. WORK
11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
12 Project identified herein.
13 Article 2. PROJECT
14 The project for which the Work under the Contract Documents may be the whole or only a part is
15 generally described as follows:
16 Chisholm Trail Ranch Phase IA
17 CFA22-0143 , CPN 103826
18 FID No.30114-0200431-103826-EO7685
19 Article 3. CONTRACT TIME
20 3.1 Time is of the essence.
21 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
22 Documents are of the essence to this Contract.
23 3.2 Final Acceptance.
24 The Work will be complete for Final Acceptance within _45_ working days after the date
25 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard
26 City Conditions of the Construction Contract for Developer Awarded Projects.
27 3.3 Liquidated damages
28 Contractor recognizes that time is of the essence of this Agreement and that Developer
29 will suffer financial loss if the Work is not completed within the times specified in
30 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
31 the Standard City Conditions of the Construction Contract for Developer Awarded
32 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
33 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
34 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees
35 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
36 Developer ZERO ($ o ) for each day that expires after the time specified in
37 Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS
Revised June 16, 2016
00 52 43 - 2
Developer Awarded Project Agreement
Page 2 of 4
38 Article 4. CONTRACT PRICE
39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
40 Documents an amount in current funds of One Hundred Ninety -Three Thousand, Four Hundred
41 and Fifty and 00/100 Dollars ($193,450.00).
42 Article 5. CONTRACT DOCUMENTS
�.�<K�]►YY�1►YIf.�
44
A. The Contract Documents which comprise the entire agreement between Developer and
45
Contractor concerning the Work consist of the following:
46
1.
This Agreement.
47
2.
Attachments to this Agreement:
48
a. Bid Form (As provided by Developer)
49
1) Proposal Form (DAP Version)
50
2) Prequalification Statement
51
3) State and Federal documents (project specific)
52
b. Insurance ACORD Form(s)
53
c. Payment Bond (DAP Version)
54
d. Performance Bond (DAP Version)
55
e. Maintenance Bond (DAP Version)
56
f. Power of Attorney for the Bonds
57
g. Worker's Compensation Affidavit
58
h. MBE and/or SBE Commitment Form (If required)
59
3.
Standard City General Conditions of the Construction Contract for Developer
60
Awarded Projects.
61
4.
Supplementary Conditions.
62
5.
Specifications specifically made a part of the Contract Documents by attachment
63
or, if not attached, as incorporated by reference and described in the Table of
64
Contents of the Project's Contract Documents.
65
6.
Drawings.
66
7.
Addenda.
67
8.
Documentation submitted by Contractor prior to Notice of Award.
68
9.
The following which may be delivered or issued after the Effective Date of the
69
Agreement and, if issued, become an incorporated part of the Contract Documents:
70
a. Notice to Proceed.
71
b. Field Orders.
72
c. Change Orders.
73
d. Letter of Final Acceptance.
74
75
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS
Revised June 16, 2016
00 52 43 - 3
Developer Awarded Project Agreement
Page 3 of 4
iffl.. m[rillIei1J0IuleIIWray.''%I[IleI
77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
78 expense, the city, its officers, servants and employees, from and against any and all
79 claims arising out of, or alleged to arise out of, the work and services to be performed
80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
81 under this contract. This indemnification provision is specificallv intended to operate
82 and be effective even if it is alleged or proven that all or some of the damages being
83 sought were caused, in whole or in part, by anv act, omission or negligence of the city.
84 This indemnity provision is intended to include, without limitation, indemnity for
85 costs, expenses and legal fees incurred by the city in defending against such claims and
86 causes of actions.
87
88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
89 the city, its officers, servants and employees, from and against any and all loss, damage
90 or destruction of property of the city, arising out of, or alleged to arise out of, the work
91 and services to be performed by the contractor, its officers, agents, employees,
92 subcontractors, licensees or invitees under this contract. This indemnification
93 provision is specifically intended to operate and be effective even if it is alleged or
94 proven that all or some of the damages being sought were caused, in whole or in part,
95 by anv act, omission or negligence of the citv.
96
97 Article 7. MISCELLANEOUS
98 7.1 Terms.
99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
100 the Construction Contract for Developer Awarded Projects.
101 7.2 Assignment of Contract.
102 This Agreement, including all of the Contract Documents may not be assigned by the
103 Contractor without the advanced express written consent of the Developer.
104 7.3 Successors and Assigns.
105 Developer and Contractor each binds itself, its partners, successors, assigns and legal
106 representatives to the other party hereto, in respect to all covenants, agreements and
107 obligations contained in the Contract Documents.
108 7.4 Severability.
109 Any provision or part of the Contract Documents held to be unconstitutional, void or
110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
111 remaining provisions shall continue to be valid and binding upon DEVELOPER and
112 CONTRACTOR.
113 7.5 Governing Law and Venue.
114 This Agreement, including all of the Contract Documents is performable in the State of
115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
116 Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS
Revised June 16, 2016
005243-4
Developer Awarded Project Agreement
Page 4 of 4
117
118 7.6 Authority to Sign.
119 Contractor shall attach evidence of authority to sign Agreement, if other than duly
120 authorized signatory of the Contractor.
121
122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
123 counterparts.
124
125 This Agreement is effective as of the last date signed by the Parties ("Effective Date").
126
127
Contractor:
Conatser Construction TX, L.P.
(Si =tore}
�C.k r#UCJJC�� YlS
(Printed Name)
Title: President
Company Name: Conatser Construction
TX, L.P.
Address: 5327 Wichita Street
Cict/State/Zih. Ft. Worth, TX 76119
12/08/22
Date
Developer:
Merita_e Homes o; -Texas. LLC
B\: _ _
(Si atu )
David Aughinbaug
(Printed Name)
Title: Vice President
Company name: Meritage Homes of Texas, LLC
Address: 8840 Cvi,ress Waters Blvd. Suite 100
Cite/State/Zip: Dallas, TX 75019
0 I co 2
Date
CITY OF FORT WORTH Chisholm Trail Ranch
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Section 3 Phase 1A
Revised June 16, 2016 CPN 103826
A`GIRL® CERTIFICATE OF LIABILITY INSURANCE DATE(MMlDOrvvnr)
10/05t2022
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT. If the certificate holder Is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT Joyce Womack
NAME:
The Sweeney Company PHONE E.tt, (817) 457 6700 F is No,: (817) 457-7246
l l21 E. Loop 620 South I Ll IRess: Joyce@thesweeneyco.com
ADDP O Box 8720 I INSURER(S) AFFORDING COVERAGE NAILS
Fort Worth TX 76124-0720 INSURERA: Bitco National Insurance Company 20109
INSURED INSURER B: Bitoo General Insurance Corporation 20095
Conatser Construction TX, LP; INSURER C :
P.O.Box 15448 I INSURER D:
i
INSURER E :
Fort Worth TX 76119-0448 I INSURER F:
COVERAGES CERTIFICATE NUMBER; REVISION NUMBER:
THIS IS TO CERTIFY THATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMEDABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECTTO WHICH THIS
CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
N$R TYPE OF INSURANCE POLICY NUMBER MMNONYYYI MMDrrSx'YYI I
Lrli n.�a 1"!'JU { I LIMITS
x COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE S 1,000,0DO
CLAIMS -MADE Fx OCCUR I PPREMISES {Eoccur RENTED we: E 100;000
X CONTRACTUAL, XCU I MED EXP rAny ane.rerson) $ 5,000
A X INDEP CONT, BFPD CLP 3 719 892 08/01/2022 08/01/2023 PERSONAL&ADV INJURY $ 1,000,OOD
I GENERALAGGREGATE
$ 2,000,000
GEN'LAGGREGATE LIMITAPPLIES PER:
POLICY JECTT LOC
I PRODUCTS -COMPfOP AGG
$ 2,DOO,000
x1 OTHER: $1,000 DED PER PD OCC
Sudden, Acc Pollution
$ 1,000,000
AUTOMOBILE LIABILITY
COMBIN-!� SINGLE LIMIT
(Ea accident
s 1,000,000
x ANYAUTO
BODILY INJURY(Perperson)
$
B OWNED
SCHEDULED
CAP 3 719 693 08101/2022 08/01/2023 I BODILY INJURY (Peracciden0
S
_ AUTOS ONLY
J HIRED
AUTOS
NON -OWNED
I PROPERTY DAMAGE
$
_ AUTOS ONLY
AUTOSONLY
Mer accident
I
$
R UMBRELLA LIAR
I OCCUR
I EACH OCCURRENCE
s 6,000,000
B EXCESS LIAB
�1 CLAIMS -MADE
CUP 2 821 982 08101/2022 08/01/2023 [AGGREGATE
S 5,000,000
DED X RETENTION $ 101000
JjI
$
WORKERS WMPANSATION
�/
1 /� . STATUTE , I FOR
AND EMPLOYERS' LIABILITY Y I N
ANY PROPRIETORMARTNERIEXECUTIVE
EL. EACH ACCIDENT
s 1,000,000
B OFFICERIMEMBER EXCLUDED? NIA
WC 3 OSl01/2022 OW0112023
E.L. DISEASE• EA EMPLOYEE
s 1,000,000
(Mandatory In NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L DISEASE- POLICY LIMB
S 1,0130, 000
Brock Huggins Pres, Jessie Martinez VP,
B Obed Gatewood VP, all office only
DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, maybe a Cached if more space is required)
Proi 103826 Chisholm Trail Ranch Sec. 3, Ph. 1A water, sanitary sewer, drainage, paving & street right improvements. WC, GL & auto include a blanket
automatic waiver of subrogation endt & the GI, auto include a blanket automatic additional insured endt providing additional insured & waiver of subrogation
status to the cert holder only when there is a written contract between the named insured & the cert holder that requires such status. The additional insured
endts contains special primary & noncontributory wording. Umbrella follows form additional insured & waiver of subrogation. The policies include an endt
providing 30 day notice of cancellation (10 days for non -pay of premium) to the cert holder.
CERTIFICATE HOLDER
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
CITY OF FORT WORTH
ACCORDANCE WITH THE POLICY PROVISIONS.
200 TEXAS ST
AUTHORIZED REPRESENTATIVE
FT WORTH
TX 76102
01988-2015 ACORD CORPORATION.
All rights reserved.
ACORD 25 (2016103)
The ACORD name and logo are registered marks ofACORD
ACC>Rbr CERTIFICATE OF LIABILITY INSURANCE f aatE(MMmomrr)
kl y ` 10/0512022
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement an
this certificate does not confer rights to the certificate holder in lieu of such endersement(s).
PRODUCER I CONTACT Joyce Womack
NAME:
The Sweeney Company I PHONE (817) 457-6700 FAx (817) 457-7246
Mir
Eatl' 'AJC Noe
1121 E. Loop 820 South I ADDRESS: Joyce@thesweeneyco.com
P O BOX 8720 1 INSURER(S) AFFORDING COVERAGE NAIC*
Fort Worth TX 76124-0720 INSURERA: Bdco National Insurance Company 20109
INSURED INSURER B • Bitco General Insurance Corporation 20D95
Conatser Construction TX, LP;
P.O.Box 15448
I INSURER C :
INSURER a:
INSURER E :
Fort Worth TX 76119-0448 1INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
I.reR f. u, POLICY EFF POLICY EXP LIMITS
L7r1 TYPE OF INSURANCE INSD W)"D POLICYNUMBER MMIDDIYYYY; IMMIDDlYYYYi
X COMMERCIAL GENERAL LIABILITY EAC/ta OCCUR
$ 1,000,000
,�,ENCE
OA GE TO Fi ENTLU
CLAIMS -MADE � OCCUR I PREMISES tEe occurrence+
S 100,000
X CONTRACTUAL, XCU I MED EXP An, one rersorr
$ 5,000
A X INDEP CONT, BFPD CLP37198B2 08101/2022 08/01/2023 (PERSONAL &ADVINJURY
$ 1,000,000
I GENERALAGGREGATE
$ 2,000,000
GEN'LAGGREGATE LIMITAPPUES PER:
POLICY IIEOT LOC I PRODUCTS-COMP/OPAGG
S 2,000,000
_
X1 OTHER: $1.000 DED PER PD OCC
I Sudden, Acc Pollution
s 1,000,000
AUTOMOBILE LIABILITY
COMBINED SINGLE LIMIT
!Ea acddenl-
$ 1,000,000
X ANYAUTO I BODILY INJURY (Per person)
$
B OWNED I SCHEDULED CAP 3 719 893 08101/2022 08/0112023
BODILY INJURY (Per accident)
$
— AUTOSONLY _ AUTOS
HIRED I NON-OwNED
PROPERTY DAMAGE
I
$
AUTOS ONLY I ONLY
IPeracddenl
ItA'UTOS
X UMBRELLALIAB
J(I OCCUR EACH OCCURRENCE
$ 5,000,000
B EXCESS LIAR
CIAIMS44ADE CUP 2 821 982 08/01/2D22 08/01/2023 AGGREGATE
$ 5,000,000
DED X RETENTION 8 101000
$
♦OT
WCSAkERS COMPENSATION X STATUTE
ERA
AND EMPLOYERS' LIABILITY Y I N
1,000,000
B ANY PROPRIETORIPARTNER/FXECUTIVE NIA WC 3 08/01/2022 08/01/2023 E.L. EACH ACCIDENT
OFFICER/MEMBER EXCLUDED?
s
(Mandatory in NH) E.L. DISEASE -EA EMPLOYEE
1,000,000
$
If yes, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT
$ 1,000,000
Brock Huggins Pres, Jessie Martinez VP,
B Obed Gatewood VP, all office only
DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (ACORD 1 %, Additional Remarks Schedule, may be attached if more space is required)
Proj 103826 Chisholm Trail Ranch Sec. 3, Ph. 1A water, sanitary sewer, drainage, paving & street light improvements. WC, G L & auto include a blanket
automatic waiver of subrogation endorsement & the GL, auto include a blanket automatic additional insured endorsement providing additional insured &
waiver of subrogation status to the certificate holder only when there is a written contract between the named insured & the certificate holder that requires
such status. The additional insured endorsements contains special primary & noncontributory wording. Umbrella follows form additional insured & waiver of
subrogation. The policies include an endorsement providing a 30 day notice of cancellation (10 for non -pay of premium) to the certificate holder, Forms & GL
policy attached.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
MERITAGE HOMES OF TEXAS LLC ACCORDANCE WITH THE POLICY PROVISIONS.
8840 CYPRESS WATERS BLVD
AUTHORIZED REPRESENTATIVE
STE
00
DAL A
ALLAS TX 75018 44N.1�
01988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD
006213-1
PERFORMANCE BOND
Page 1 of 2
1 SECTION 00 62 13
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, _Conatser Construction TX, L.P. , known as "Principal" herein and
8 Berkley Insurance Company , a corporate surety(sureties, if more than one) duly authorized to
9 do business in the State of Texas, known as "Surety" herein (whether one or more), are held and
10 firmly bound unto the Developer, Meritage Homes Of Texas LLC., authorized to do business in
11 Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the
12 penal sum of, One Hundred Ninety -Three Thousand, Four Hundred and Fifty and 00/100 Dollars
13 ($193,450.00), lawful money of the United States, to be paid in Fort Worth, Tarrant County,
14 Texas for the payment of which sum well and truly to be made jointly unto the Developer and the
15 City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and
16 assigns, jointly and severally, firmly by these presents.
17 WHEREAS, Developer and City have entered into an Agreement for the construction of
18 community facilities in the City of Fort Worth by and through a Community Facilities
19 Agreement, CFA 22- 0143 ; and
20 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
21 the 08 day of December , 2022 , which Contract is hereby referred to and made a
22 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
23 and other accessories defined by law, in the prosecution of the Work, including any Change
24 Orders, as provided for in said Contract designated as Chisholm Trail Ranch Phase IA.
25 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
26 shall faithfully perform it obligations under the Contract and shall in all respects duly and
27 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
28 specifications, and contract documents therein referred to, and as well during any period of
29 extension of the Contract that may be granted on the part of the Developer and/or City, then this
30 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
2
3
4
G
7
8
9
10
0
13
14
15
16
17
18
I9
20
'1
22
24
25
26
_27
28
29
30
31
32
34
16
.;7
;8
19
-10
41
42
43
44
45
46
47
A213-2
MAKIRMANCI: nt)xl)
Pace art
PROVIDED FURTHER, that ii'any legal action be tiled on this Bond. venue shall tie in
Tarrant County. Texas or the United States District Cotirt for the Not -them District of Texas. Fort
Worth Division.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code. as amended. and all liabilities on this bond shall be determined in
accordance ►%-Ith the provisions of said statue.
IN WITNESS' WHEREOF, the Principal and the Surety have SIGNED and SEALED
this instrument by duly authorized agents and offleers nn this the 08 daN of
December , 20 22.
PRINCIPAL:
'onatser Construction 't :X. 1-11.
BY: -A P 4✓
Sit�naturt v�
A'ii' s'n
—A , BxD k Hug jns, President
t Principal► Secrel4t►P ;game and Title
:address: { ,27 Wichita Street
T\ 7611)
kk1tness as tci Principal
st RrT�-:
BerWy Insurance Cotnany 4
BY: B�✓��1}�r
5ignatarc
Rabbi Moxales, Attorney;in-fact.
Name and Title
:address: 5005 LBJ Freeway, Suite 1500
_D_allas,TXs52d4
tit as to Suret\ Telephone Number: _ 214/989-0000
*Note: II'signed b% an officer of the Surety- Company, there must be on file a certified extract
from the h, -laws showing that this person has authority- to sign such obligation. If
Surety's physical address is different from its mailing address, both must he provided.
'rhe date of the bond ~hall not be prior to the data the Contract is awarded.
tiI 1 i)It t �t't )It rl l Chisholm Trail Ranch
ti 1 AM)ARI) 011' CONI)I 1 It NS — lll;� H 0111A AWARIA-1) PROX('7 ti Bzctidn 3 Phaae iR
CPN 103826
itoisiil.lanttan 31.:1112
006214-1
PAYMENT BOND
Page 1 of 2
1 SECTION 00 62 14
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7
8 That we, _Conatser Construction TX, L.P. , known as "Principal"
9 herein, and Berkley Insurance Company , a corporate
10 surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known
11 as "Surety" herein (whether one or more), are held and firmly bound unto the Developer,
12 Meritage Homes Of Texas LLC., authorized to do business in Texas "(Developer"), and the City
13 of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, One Hundred
14 Ninety -Three Thousand, Four Hundred and Fifty and 00/100 Dollars ($193,450.00), lawful
15 money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of
16 which sum well and truly be made jointly unto the Developer and the City as dual obligees, we
17 bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
18 firmly by these presents:
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth, by and through a Community Facilities
21 Agreement, CFA22- 0143, and
22 WHEREAS, Principal has entered into a certain written Contract with Developer,
23 awarded the 08 day of December , 2022 , which Contract is hereby
24 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
25 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
26 Work as provided for in said Contract and designated as Chisholm Trail Ranch Phase IA.
27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
29 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
31 force and effect.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
fin h? 14 - 2
PAYMENT BOND
Paw � of2
I This bond is made and eXecuted in compliance with the provisions of Chapter 2253) or the
2 Texas Go�^ernment Code. as amended. and all liabilities on this bond shall be determined in
3 accordance ikitb the provisions of said statute.
4 IN WITNESS WHEREOF, the Principal and Surety have each SIGN•FD and SEAL[-D
5 this instrument by duly authorized aLgents and officers on this dte� 08 dad of
G December 2022
►7
8
9
to
11
12
Ia
14
ATT1 SI':
(Principalecre%R-
witricss as to Principal
A'I"1'1;5'r:
(Surety') Secretan
Aiines-
as to Surety
PRINCIPAL.
Cnnaiser ('~ronstrunipn 7:„�' L.P��
BY:
Signature
Brock Hudgins, President
Name and 'Fitle
Address: 5327 Wichita Street
Ft. %horth. Tl 76119
SURETY:
Berkley Insurance Company
BY:
Signature
Robbi Morales, Attorney -in -fact
?game and Title
Address: 5005 LBI Freeway, Suite 1500
DaUas, TX 75244-�
Telephone Number: 214/989-0000
Note: if signed by an officer of the Surety. there trust he on rile a certified extract from the
bylaws showing that this person has authority to sign such obligation. H Surety's physical
address is different from its mailing address. both must he provided.
The date of the bond shall not be prior to the date the Contract is aN%arded.
END OF SECTION
CI rY cl1 Ft,�R'1' 1�t)It'rtl Chisholm Trail Ranch
S'l.ANDARD VI IN L'ONUrrtt)NS —Dig\'IiLu11t-R •-W AR1)IA V140.1111 S Section 3 Phase to
Re%iud January .11. N12 CPN 103826
006219-1
MAINTENANCE BOND
Page 1 of 3
1 SECTION 00 62 19
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7
8 That we Conatser Construction TX, L.P. known as "Principal"
9 herein and Berkley Insurance Company , a corporate surety (sureties, if
10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
11 (whether one or more), are held and firmly bound unto the Developer, Meritage Homes of Texas
12 LLC, authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas
13 municipal corporation ("City"), in the sum of One Hundred Ninety -Three Thousand, Four
14 Hundred and Fifty and 00/100 Dollars ($193,450.00), lawful money of the United States, to be
15 paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made
16 jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves,
17 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
18 presents.
19
20 WHEREAS, Developer and City have entered into an Agreement for the construction of
21 community facilities in the City of Fort Worth by and through a Community Facilities
22 Agreement, CFA 22- 0143 ; and
23 WHEREAS, the Principal has entered into a certain written contract with the Developer
24 awarded the 08 day of December , 2022 , which Contract is
25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
26 materials, equipment labor and other accessories as defined by law, in the prosecution of the
27 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
28 the "Work") as provided for in said Contract and designated as Chisholm Trail Ranch Phase IA;
29 and
30
31 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
32 accordance with the plans, specifications and Contract Documents that the Work is and will
33 remain free from defects in materials or workmanship for and during the period of two (2) years
34 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2021
006219-2
MAINTENANCE BOND
Page 2 of 3
1
2 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
3 upon receiving notice from the Developer and/or City of the need thereof at any time within the
4 Maintenance Period.
5
6 NOW THEREFORE, the condition of this obligation is such that if Principal shall
7 remedy any defective Work, for which timely notice was provided by Developer or City, to a
8 completion satisfactory to the City, then this obligation shall become null and void; otherwise to
9 remain in full force and effect.
10
11 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
12 noticed defective Work, it is agreed that the Developer or City may cause any and all such
13 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
14 by the Principal and the Surety under this Maintenance Bond; and
15
16 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
17 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
18 Worth Division; and
19
20 PROVIDED FURTHER, that this obligation shall be continuous in nature and
21 successive recoveries may be had hereon for successive breaches.
22
23
24
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2021
MAIN H-NANCU nt)\I)
Page 3 ol'}
Ill WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
r instrument by duly authorized agents and officers on this the 08 day- of'
a
4
G
7
9
lU
IE
13
1�
14
15
If
17
18
19
20
If
22
23
24
%�
26
27
28
29
30
31
32
1
34
:K
?6
37
38
39
40
41
42
December 20. 2 ,
ATTEST:
(Principal)e&1a"wo",
11'itnel;s as to Principal
XI -TEST:
ISuret�)-ecretar%
ess a:4 t0 Surety
PRI\CIPAL.
(-onatser Construction TX. L.P.
I31': -- 1
5ienature
Brock Hu4.gins. President
Name and Title
Address: i327 Wichita Street
>:t, 1* orth. TX 76119
SURETY:
-.$erkley-Wsgrance Co a,!y
sienature
_Rahbi Njox&s,-Attorney-in:fact
Name and Title
Address: _QpS.=LBj,Freewa. , Suite 1500
--Dal1as,_TX-Z5244
'Telephone Number: 214/989-0000
*Nole: If signed by an officer of the Surer' Company. there must be on rile it certified extract
froill the h%-lays shoeing that this person has authority to sign such obligation. if
Surety's ph,,sical address is different from its mailing address. both must he provided.
The date of the bond shall not be prior to the date the Contract is awarded.
Ctf1' t}I 1(llt'I' 11'URTtI
�1:\\[tr1RU('rll'C(1 1)I'1'It)\K 1)INVI0111-RAWARMI)PROJI.C'lS
Ro uwd bnuan M. 2021
Chisholm Trail Ranch
Section 3 Phase to
CPN 103826
No. $I-728. 0k
POWER OF AiTFORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning.found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and.existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted.
and appointed, and does by these presents make, constitute and appoint: Ricardo A Reyyna, Don E Conseil; Sophinie .Hwaet;
Robbi Morales; Kelly A. Westbrook; Tina McEivan; Joshua Sawn ers; Tame Petianek, or, Mikaela Peppers of Aon Risk
Services South ivest, -Inc; of Dallas; TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below
and to execute, seal, acknowledge and deliver any and .all bonds and undertakings, with the exception of Financial Guaranty
Insurance, providing that no single obligation shall exceed Fifty MiQIOR and 00f180 U.S. Dollars (U.S.S50,000,O80.00),. to the.
same .extent as if such bonds had been duly executed and .acknowledged 'by the regularly elected officers of the Company at its
principal office to their own proper persons.
This Power of, Attorney shall be construed and enforced in accordance with, and governed by, the laws' of the State of Delaware,
without giving effect to the principles of conflicts of laws tbereaf. This Power of Attorney is granted pursuant to the following
resoiutioiis wFtiich were dyly and Validly adopted at a rneeting of the Board of Directors ofthe Company held on January.25, 20'10:
RESOLVED, "that, with respect to the Surety business written by Berkley Suety, the Chairman of the Board, Chief
.Executive Officer, President or, any Vice President of the Company,. m conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact -named therein
to execute bonds, undertakings, recopizances, or other suretyship obligations on behalf of the Company, and to a$ix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said oiicers may remove any such
attorney -in -fact and revoke any power of atforney previously granted; and further
RESOLVED, that such, power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically namptl therein, and they Have no authority to bind the Company except in the
manner and to the extent therein stated,and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and
fuuther
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation .of the Company; and such signature and seal when so used shall have the.same force and _effect as
though manually affixed. The Company may continue fo use for the putposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such.at the time when such instruments shall be issued.
IN VM14PSS %TMIlEOP, the Company has caused these presents to be signed and' attestedby its appropriate officers imd its
corporate seal herMuto affixed Otis #`d'ay
Attest- ' Ber l -y Ruturanee Company
G'
(Seal) �y �� BY '� . .
irxS tman. Te r
Executive Vice President& Secretaryv k<•. " i sce._ sident
WARN:,TNG: THIS:'POWER:,iIYVA:)E: rD NOT P'RMTED ONiaLUE `*l h.RK ^' SECi1RtTY PApM
STATE OF CI3TIlrl_EC ICU i' }
): ss:
Ciat)NTY OF FAfR�D }
Sworn to before me, a- Notary Public, in the State of Connecticut, this 104dayof H a033 by Ira S. Lodtirman
and lefFrc} M. Hefter who are sworn to -me, to ba the Esxrti+ie Vice presii3ent Setaey; and `r 'Senior Vice PnesideaL
ra cetivel ; -of Berkle _ fnsurance.Company. to.a�a a au►�tiAacaur
sp 3 Y-'JOT v:atita:io
aortecr4t:ur _ .A .
twrcov+�xrtnea otar�,:Aiibiic;5tafe ofCoonnec{icpt
CJZRTIFICATE
% the undersigned;:Assistant secret by -of Btkn- y INSURANCE COMPANY, DO HEIZEBYCERI'>FY #hat h foregoing is a
true, corteet and complete copy of tl}e .or�iginot.yow er of Attorney; that said.Power of-AOo m . has nO beenrevoked or rescinded
and that the authority of the AAgrncy n-rsct ;set, forth thcrci n, iWxo� exc"did ihe'bond or uodeitaldng. to whidi- this Po► w of
Attorney is attached is;;"in fullfdrea;and•effeat xs brthis date.
Give3t under ,mylzatid<ahfd seal afthe Company; this day of _
(Seal) .r
Vincent'P_ Fare
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call Berkley Surety Group, LLC and its affiliates by
telephone for information or to make a complaint;
BERKLEY SURETY GROUP, LLC
Please send all notices of claim on this bond to:
Berkley Surety Group, LLC
(866) 768-3534
412 Mount Kemble Avenue, Suite 31ON
Morristown, NJ 07960
Attn: Surety Claims Department
You may contact the Texas Department of Insurance to obtain
information on companies, coverages, rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1.771
Web: http:llwww.tdi.state.tx.us
E-mail: ConsumerProtection;C1 tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or about a claim
you should contact your agent or Berkley Surety Group, LLC first. If
the dispute is not resolved, you may contact the Texas Department of
Insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and does not become a part or
condition of the attached document and is given to comply with Texas
legal and regulatory requirements.
STANDARD CITY CONDITIONS
OF THE CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Article 1 — Definitions and Terminology..........
1.01 Defined Terms ...............................
1.02 Terminology ..................................
Article 2 —
Preliminary Matters .......................
2.01
Before Starting Construction......
2.02
Preconstruction Conference........
2.03
Public Meeting ............................
Page
.............................................1
.............................................1
............................................. 5
....................................................... 6
....................................................... 6
....................................................... 6
....................................................... 6
Article 3 — Contract Documents and Amending............................................................................................... 6
3.01 Reference Standards..................................................................................................................... 6
3.02 Amending and Supplementing Contract Documents.................................................................. 6
Article 4 — Bonds and Insurance....................................................................................................................... 7
4.01 Licensed Sureties and Insurers..................................................................................................... 7
4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7
4.03 Certificates of Insurance............................................................................................................... 7
4.04 Contractor's Insurance.................................................................................................................. 9
4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12
Article 5 —
Contractor's Responsibilities........................................................................................................12
5.01
Supervision and Superintendent.................................................................................................12
5.02
Labor; Working Hours................................................................................................................13
5.03
Services, Materials, and Equipment...........................................................................................13
5.04
Project Schedule..........................................................................................................................14
5.05
Substitutes and "Or-Equals".......................................................................................................14
5.06
Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16
5.07
Concerning Subcontractors, Suppliers, and Others...................................................................16
5.08
Wage Rates..................................................................................................................................18
5.09
Patent Fees and Royalties...........................................................................................................19
5.10
Laws and Regulations.................................................................................................................19
5.11
Use of Site and Other Areas.......................................................................................................19
5.12
Record Documents......................................................................................................................20
5.13
Safety and Protection..................................................................................................................
21
5.14
Safety Representative.................................................................................................................21
5.15
Hazard Communication Programs.............................................................................................22
5.16
Submittals....................................................................................................................................22
5.17
Contractor's General Warranty and Guarantee..........................................................................23
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
5.18 Indemnification ............................................
5.19 Delegation of Professional Design Services
5.20 Right to Audit: .............................................
5.21 Nondiscrimination ........................................
Article 6 - Other Work at the Site.......
6.01 Related Work at Site .......
Article 7 - City's Responsibilities ............................................
7.01 Inspections, Tests, and Approvals .......................
7.02 Limitations on City's Responsibilities ................
7.03 Compliance with Safety Program ........................
Article 8 - City's Observation Status During Construction.......
8.01 City's Project Representative .................................
8.02 Authorized Variations in Work ..............................
8.03 Rejecting Defective Work ......................................
8.04 Determinations for Work Performed ......................
Article 9 - Changes in the Work ......................
9.01 Authorized Changes in the Work
9.02 Notification to Surety ...................
Article 10 - Change of Contract Price; Change of Contract Time
10.01 Change of Contract Price ...........................................
10.02 Change of Contract Time ...........................................
10.03 Delays.........................................................................
Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............
11.01 Notice of Defects..............................................................................................................
11.02 Access to Work.................................................................................................................
11.03 Tests and Inspections........................................................................................................
11.04 Uncovering Work.............................................................................................................
11.05 City May Stop the Work...................................................................................................
11.06 Correction or Removal of Defective Work......................................................................
11.07 Correction Period..............................................................................................................
11.08 City May Correct Defective Work...................................................................................
Article 12 - Completion ..........................................
12.01 Contractor's Warranty of Title ...........
12.02 Partial Utilization ................................
12.03 Final Inspection ...................................
12.04 Final Acceptance .................................
Article 13 - Suspension of Work .....................................
13.01 City May Suspend Work .............................
Article 14 - Miscellaneous .........................................
14.01 Giving Notice .........................................
CITY OF FORT WORTH
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
24
24
25
25
26
26
26
26
26
27
a
a
... 29
... 29
... 29
... 29
... 30
... 30
... 30
... 30
... 31
................................. 32
................................. 32
................................. 32
................................. 32
................................. 33
............................................................. 33
............................................................. 33
34
34
Chisholm Trail Ranch Section 3 Phase 1A
CPN 103826
14.02 Computation of Times ...........
14.03 Cumulative Remedies ............
14.04 Survival of Obligations..........
14.05 Headings .................................
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
34
34
35
35
Chisholm Trail Ranch Section 3 Phase 1A
CPN 103826
0073 10- 1
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 1 of 35
ARTICLE 1— DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed -defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos —Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsaw — City's on-line, electronic document management and collaboration system.
5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
8. Contract —The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
9. Contract Documents —Those items that make up the contract and which must include the
Agreement, and it's attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
0073 10-2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non -Resident Bidder
iii. Prequalification Statement
C. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
i. Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
1. Supplementary Conditions
in. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project's Contract Documents
o. Drawings
P. Documentation submitted by contractor prior to Notice of Award.
q. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are not Contract Documents.
10. Contractor —The individual or entity with whom Developer has entered into the Agreement.
11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer — An individual or entity that desires to make certain improvements within the
City of Fort Worth
13. Drawings —That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
14. Engineer —The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
0073 10- 3
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 3 of 35
16. Final Inspection — Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
17. General Requirements —A part of the Contract Documents between the Developer and a
Contractor.
18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
20. Milestone —A principal event specified in the Contract Documents relating to an
intermediate Contract Time prior to Final Acceptance of the Work.
21. Non -Participating Change Order —A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
22. Participating Change Order —A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
23. Plans — See definition of Drawings.
24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
25. Project —The Work to be performed under the Contract Documents.
26. Project Representative —The authorized representative of the City who will be assigned to
the Site.
27. Public Meeting — An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of the Project.
28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding legal holidays).
29. Samples Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
0073 10- 4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights -of -way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications —That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
Specifications may be specifically made a part of the Contract Documents by attachment or,
if not attached, may be incorporated by reference as indicated in the Table of Contents
(Division 00 00 00) of each Project.
33. Standard City Conditions — That part of the Contract Documents setting forth requirements
of the City.
34. Subcontractor —An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of apart of the Work at the Site.
35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent — The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions —That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having
a direct contract with Contractor or with any Subcontractor to furnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including but not limited to, those that convey
electricity, gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or
other control systems.
40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
0073 10- 5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of 35
41. Work —The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non -Participating Change Order, or Field
Order, and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or
legal holidays authorized by the City for contract purposes, in which weather or other
conditions not under the control of the Contractor will permit the performance of the
principal unit of work underway for a continuous period of not less than 7 hours between 7
a.m. and 6 p. m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective:
1. The word "defective," when modifying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
C. Furnish, Install, Perform, Provide:
1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
0073 10- 6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
ARTICLE 2 — PRELIMINARY MATTERS
2.01 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non -
Participating Change Orders occur.
2.02 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.03 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING
3.01 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers,
directors, members, partners, employees, agents, consultants, or subcontractors, any duty or
authority to supervise or direct the performance of the Work or any duty or authority to
undertake responsibility inconsistent with the provisions of the Contract Documents.
3.02 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Participating Change Order or a
Non -Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
0073 10- 7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City's written interpretation or clarification.
ARTICLE 4 — BONDS AND INSURANCE
4.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided Section 4.04.
4.02 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor's obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount
equal to the Contract Price as security to protect the City against any defects in any portion of the
Work described in the Contract Documents. Maintenance bonds shall remain in effect for two
(2) years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney -in -fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 4.01 and 4.02.C.
4.03 Certificates of Insurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of
insurance requested by City or any other additional insured) which Contractor is required to
purchase and maintain.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
0073 10- 8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
1. The certificate of insurance shall document the City, an as "Additional Insured" on all
liability policies.
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full
compliance with the insurance requirements or failure of the City to identify a deficiency
from evidence that is provided shall not be construed as a waiver of Contractor's obligation
to maintain such lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
0073 10-9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first -dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either parry or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
4.04 Contractor's Insurance
A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor's
performance of the Work and Contractor's other obligations under the Contract Documents,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
3. The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 10 of 35
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance
Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the City. The Commercial General
Liability policy, shall have no exclusions by endorsements that would alter of nullify
premises/operations, products/completed operations, contractual, personal injury, or advertising
injury, which are normally contained with the policy, unless the City approves such exclusions
in writing.
1. For construction projects that present a substantial completed operation exposure, the City
may require the contractor to maintain completed operations coverage for a minimum of no
less than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits of:
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance)
making the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U"
coverage's. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non -owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in
an amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired and non -owned.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 11
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 11 of 35
1) $1, 000, 000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the following requirements:
1. The Contractor's construction activities will require its employees, agents, subcontractors,
equipment, and material deliveries to cross railroad properties and tracks owned and
operated by: None
Write the name of the railroad company. (If none, then write none)
2. The Contractor shall conduct its operations on railroad properties in such a manner as not to
interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use
or operation of its/their trains or other property. Such operations on railroad properties may
require that Contractor to execute a "Right of Entry Agreement" with the particular railroad
company or companies involved, and to this end the Contractor should satisfy itself as to the
requirements of each railroad company and be prepared to execute the right -of -entry (if any)
required by a railroad company. The requirements specified herein likewise relate to the
Contractor's use of private and/or construction access roads crossing said railroad company's
properties.
3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions
shall provide coverage for not less than the following amounts, issued by companies
satisfactory to the City and to the Railroad Company for a term that continues for so long as
the Contractor's operations and work cross, occupy, or touch railroad property:
a. General Aggregate: None
Enter limits provided by Railroad Company (If none, write none)
b. Each Occurrence:: None
Enter limits provided by Railroad Company (If none, write none)
4. With respect to the above outlined insurance requirements, the following shall govern:
a. Where a single railroad company is involved, the Contractor shall provide one insurance
policy in the name of the railroad company. However, if more than one grade separation
or at -grade crossing is affected by the Project at entirely separate locations on the line or
lines of the same railroad company, separate coverage may be required, each in the
amount stated above.
b. Where more than one railroad company is operating on the same right-of-way or where
several railroad companies are involved and operated on their own separate rights -of -
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of 35
way, the Contractor may be required to provide separate insurance policies in the name
of each railroad company.
c. If, in addition to a grade separation or an at -grade crossing, other work or activity is
proposed on a railroad company's right-of-way at a location entirely separate from the
grade separation or at -grade crossing, insurance coverage for this work must be included
in the policy covering the grade separation.
d. If no grade separation is involved but other work is proposed on a railroad company's
right-of-way, all such other work may be covered in a single policy for that railroad, even
though the work may be at two or more separate locations.
5. No work or activities on a railroad company's property to be performed by the Contractor
shall be commenced until the Contractor has furnished the City with an original policy or
policies of the insurance for each railroad company named, as required above. All such
insurance must be approved by the City and each affected Railroad Company prior to the
Contractor's beginning work.
6. The insurance specified above must be carried until all Work to be performed on the railroad
right-of-way has been completed and the grade crossing, if any, is no longer used by the
Contractor. In addition, insurance must be carried during all maintenance and/or repair work
performed in the railroad right-of-way. Such insurance must name the railroad company as
the insured, together with any tenant or lessee of the railroad company operating over tracks
involved in the Project.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
4.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or
maintain all of the bonds and insurance required by the Contract Documents, the Developer or City
shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure
to maintain prior to any change in the required coverage.
ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES
5.01 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of 35
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
5.02 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
1. for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.03 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14 of 35
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time
for projects with City participation shall be made by participating change orders.
5.05 Substitutes and "Or -Equals "
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or "or -equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or -equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of 35
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 0125 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of 35
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 5.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or -equal" at Contractor's expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types
requiring pre -qualification
5.07 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enterprise Compliance:
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 17
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of 35
❑ Required for this Contract.
(Check this box if there is any City Participation)
❑ Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City's MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of 35
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.08 Wage Rates
❑ Required for this Contract.
® Not Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31 st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the
City's determination that there is good cause to believe the Contractor or Subcontractor has
violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or
claimants as the difference between wages paid and wages due under the prevailing wage rates,
such amounts being subtracted from successive progress payments pending a final determination
of the violation.
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of 35
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
5.09 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.01.
5.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of 35
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the
written notice (by letter or electronic communication), and shall be entitled to recover its cost in
doing so. The City may withhold Final Acceptance until clean-up is complete and cost are
recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor
and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated
to show changes made during construction. These record documents together with all approved
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 21 of 35
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or
among employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal
will be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 5.16.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For -Information -Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and
acceptance of a separate item as such will not indicate approval of the assembly in which the
item functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
5.17 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to
perform the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or final payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
4.02.13. The City will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers,
agents, employees, subcontractors, licenses or invitees under this Contract. THIS
INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE
AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME
OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY
ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by
the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be
performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees
under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY
INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR
PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE
CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF
THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor's responsibilities for construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified
by such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance
and design criteria given and the design concept expressed in the Contract Documents. City's
review and acceptance of Submittals (except design calculations and design drawings) will be
only for the purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing City funds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit -
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 26
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 26 of 35
ARTICLE 6 — OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any work of
others by cutting, excavating, or otherwise altering such work; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work will be affected.
C. If the proper execution or results of any part of Contractor's Work depends upon work
performed by others under this Article 7, Contractor shall inspect such other work and promptly
report to City in writing any delays, defects, or deficiencies in such other work that render it
unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's
failure to so report will constitute an acceptance of such other work as fit and proper for
integration with Contractor's Work except for latent defects in the work provided by others.
ARTICLE 7 — CITY'S RESPONSIBILITIES
7.01 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.02 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
7.03 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 5.13.
ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION
8.01 City's Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents.
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Work. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in general, if the Work is proceeding in accordance with the Contract Documents.
City's Project Representative will not be required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work. City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Work
will conform generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents.
8.02 Authorized Variations in Work
City's Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.03 Rejecting Defective Work
City will have authority to reject Work which City's Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or
completed.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 28
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 28 of 35
8.04 Determinations for Work Performed
Contractor will determine the actual quantities and classifications of Work performed. City's Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
ARTICLE 9 — CHANGES IN THE WORK
9.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, City may, at any time or
from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall
promptly proceed with the Work involved which will be performed under the applicable
conditions of the Contract Documents (except as otherwise specifically provided). Extra Work
shall be memorialized by a Participating Change Order which may or may not precede an order
of Extra work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a
project with City participation, a Field Order may be issued by the City.
9.02 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
10.01 Change of Contract Price
A. The Contract Price may only be changed by a Participating Change Order for projects with City
participation.
10.02 Change of Contract Time
A. The Contract Time may only be changed by a Participating Change Order for projects with City
participation.
10.03 Delays
A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 29
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 29 of 35
ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
11.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
11.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
11.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by
City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Work, as determined solely by
City.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other
similar negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor.
Developer/Contractor.
City will forward all invoices for retests to
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance
until the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contractor's
expense.
11.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
of any of them.
11.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee, if any, on said Work.
11.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 31 of 35
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end
of the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor's obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.08 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of 35
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 11.09.
ARTICLE 12 — COMPLETION
12.01 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.02 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Work that can be
used by City for its intended purpose without significant interference with Contractor's
performance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.03 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.04 Final Acceptance
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 — SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 — MISCELLANEOUS
14.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given i£
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
00 73 10- 35
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 35 of 35
14.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
14.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1A
Revised: January 10, 2013 CPN 103826
011100-1
DAP SUMMARY OF WORK
SECTION 01 11 00
SUMMARY OF WORK
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 3
1. Summary of Work to be performed in accordance with the Contract Documents
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract
2. Division 1 - General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Work Covered by Contract Documents
1. Work is to include furnishing all labor, materials, and equipment, and performing
all Work necessary for this construction project as detailed in the Drawings and
Specifications.
B. Subsidiary Work
Any and all Work specifically governed by documentary requirements for the
project, such as conditions imposed by the Drawings or Contract Documents in
which no specific item for bid has been provided for in the Proposal and the item is
not a typical unit bid item included on the standard bid item list, then the item shall
be considered as a subsidiary item of Work, the cost of which shall be included in
the price bid in the Proposal for various bid items.
C. Use of Premises
1. Coordinate uses of premises under direction of the City.
2. Assume full responsibility for protection and safekeeping of materials and
equipment stored on the Site.
Use and occupy only portions of the public streets and alleys, or other public places
or other rights -of -way as provided for in the ordinances of the City, as shown in the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equipment for construction
purposes may be stored in such space, but no more than is necessary to avoid
delay in the construction operations.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN 103826
Revised December 20, 2012
01 11 00 - 2
DAP SUMMARY OF WORK
Page 2 of 3
b. Excavated and waste materials shall be stored in such a way as not to interfere
with the use of spaces that may be designated to be left free and unobstructed
and so as not to inconvenience occupants of adjacent property.
c. If the street is occupied by railroad tracks, the Work shall be carried on in such
manner as not to interfere with the operation of the railroad.
1) All Work shall be in accordance with railroad requirements set forth in
Division 0 as well as the railroad permit.
D. Work within Easements
1. Do not enter upon private property for any purpose without having previously
obtained permission from the owner of such property.
2. Do not store equipment or material on private property unless and until the
specified approval of the property owner has been secured in writing by the
Contractor and a copy furnished to the City.
3. Unless specifically provided otherwise, clear all rights -of -way or easements of
obstructions which must be removed to make possible proper prosecution of the
Work as a part of the project construction operations.
4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,
lawns, fences, culverts, curbing, and all other types of structures or improvements,
to all water, sewer, and gas lines, to all conduits, overhead pole lines, or
appurtenances thereof, including the construction of temporary fences and to all
other public or private property adjacent to the Work.
5. Notify the proper representatives of the owners or occupants of the public or private
lands of interest in lands which might be affected by the Work.
a. Such notice shall be made at least 48 hours in advance of the beginning of the
Work.
b. Notices shall be applicable to both public and private utility companies and any
corporation, company, individual, or other, either as owners or occupants,
whose land or interest in land might be affected by the Work.
c. Be responsible for all damage or injury to property of any character resulting
from any act, omission, neglect, or misconduct in the manner or method or
execution of the Work, or at any time due to defective work, material, or
equipment.
6. Fence
a. Restore all fences encountered and removed during construction of the Project
to the original or a better than original condition.
b. Erect temporary fencing in place of the fencing removed whenever the Work is
not in progress and when the site is vacated overnight, and/or at all times to
provide site security.
c. The cost for all fence work within easements, including removal, temporary
closures and replacement, shall be subsidiary to the various items bid in the
project proposal, unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN 103826
Revised December 20, 2012
01 11 00 - 3
DAP SUMMARY OF WORK
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN 103826
Revised December 20, 2012
012500-1
DAP SUBSTITUTION PROCEDURES
SECTION 0125 00
SUBSTITUTION PROCEDURES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 4
The procedure for requesting the approval of substitution of a product that is not
equivalent to a product which is specified by descriptive or performance criteria or
defined by reference to 1 or more of the following:
a. Name of manufacturer
b. Name of vendor
c. Trade name
d. Catalog number
2. Substitutions are not "or -equals".
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid. No
separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Request for Substitution - General
1. Within 30 days after award of Contract (unless noted otherwise), the City will
consider formal requests from Contractor for substitution of products in place of
those specified.
2. Certain types of equipment and kinds of material are described in Specifications by
means of references to names of manufacturers and vendors, trade names, or catalog
numbers.
a. When this method of specifying is used, it is not intended to exclude from
consideration other products bearing other manufacturer's or vendor's names,
trade names, or catalog numbers, provided said products are "or -equals," as
determined by City.
3. Other types of equipment and kinds of material may be acceptable substitutions
under the following conditions:
a. Or -equals are unavailable due to strike, discontinued production of products
meeting specified requirements, or other factors beyond control of Contractor;
or,
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
012500-2
DAP SUBSTITUTION PROCEDURES
Page 2 of 4
b. Contractor proposes a cost and/or time reduction incentive to the City.
1.5 SUBMITTALS
A. See Request for Substitution Form (attached)
B. Procedure for Requesting Substitution
1. Substitution shall be considered only:
a. After award of Contract
b. Under the conditions stated herein
2. Submit 3 copies of each written request for substitution, including:
a. Documentation
1) Complete data substantiating compliance of proposed substitution with
Contract Documents
2) Data relating to changes in construction schedule, when a reduction is
proposed
3) Data relating to changes in cost
b. For products
1) Product identification
a) Manufacturer's name
b) Telephone number and representative contact name
c) Specification Section or Drawing reference of originally specified
product, including discrete name or tag number assigned to original
product in the Contract Documents
2) Manufacturer's literature clearly marked to show compliance of proposed
product with Contract Documents
3) Itemized comparison of original and proposed product addressing product
characteristics including, but not necessarily limited to:
a) Size
b) Composition or materials of construction
c) Weight
d) Electrical or mechanical requirements
4) Product experience
a) Location of past projects utilizing product
b) Name and telephone number of persons associated with referenced
projects knowledgeable concerning proposed product
c) Available field data and reports associated with proposed product
5) Samples
a) Provide at request of City.
b) Samples become the property of the City.
c. For construction methods:
1) Detailed description of proposed method
2) Illustration drawings
C. Approval or Rejection
1. Written approval or rejection of substitution given by the City
2. City reserves the right to require proposed product to comply with color and pattern
of specified product if necessary to secure design intent.
3. In the event the substitution is approved, if a reduction in cost or time results, it will
be documented by Change Order.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
012500-3
DAP SUBSTITUTION PROCEDURES
Page 3 of 4
4. Substitution will be rejected if:
a. Submittal is not through the Contractor with his stamp of approval
b. Request is not made in accordance with this Specification Section
c. In the Developer's opinion, acceptance will require substantial revision of the
original design
d. In the City's or Developer's opinion, substitution will not perform adequately
the function consistent with the design intent
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. In making request for substitution or in using an approved product, the Contractor
represents that the Contractor:
1. Has investigated proposed product, and has determined that it is adequate or
superior in all respects to that specified, and that it will perform function for which it
is intended
2. Will provide same guarantee for substitute item as for product specified
3. Will coordinate installation of accepted substitution into Work, to include building
modifications if necessary, making such changes as may be required for Work to be
complete in all respects
4. Waives all claims for additional costs related to substitution which subsequently
arise
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
012500-4
DAP SUBSTITUTION PROCEDURES
Page 4 of 4
EXHIBIT A
REQUEST FOR SUBSTITUTION FORM:
PROJECT: DATE:
We hereby submit for your consideration the following product instead of the specified item for
the above project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Substitution:
Reason for Substitution:
Include complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Fill in Blanks Below:
A. Will the undersigned contractor pay for changes to the building design, including engineering
and detailing costs caused by the requested substitution?
B. What effect does substitution have on other trades?
C. Differences between proposed substitution and specified item?
D. Differences in product cost or product delivery time?
E. Manufacturer's guarantees of the proposed and specified items are:
Equal Better (explain on attachment)
The undersigned states that the function, appearance and quality are equivalent or superior to the
specified item.
Submitted By: For Use by City
Signature
as noted
Firm
Address
Date
Telephone
For Use by City:
Approved
City
Recommended Recommended
Not recommended Received late
By
Date
Remarks
Date
Rej ected
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013119-1
DAP PRECONSTRUCTION MEETING
SECTION 01 31 19
PRECONSTRUCTION MEETING
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 3
1. Provisions for the preconstruction meeting to be held prior to the start of Work to
clarify construction contract administration procedures
B. Deviations from this City of Fort Worth Standard Specification
1. No construction schedule required unless requested by the City.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Attend preconstruction meeting.
2. Representatives of Contractor, subcontractors and suppliers attending meetings
shall be qualified and authorized to act on behalf of the entity each represents.
3. Meeting administered by City may be tape recorded.
a. If recorded, tapes will be used to prepare minutes and retained by City for
future reference.
B. Preconstruction Meeting
1. A preconstruction meeting will be held within 14 days after the delivery of the
distribution package to the City.
a. The meeting will be scheduled and administered by the City.
2. The Project Representative will preside at the meeting, prepare the notes of the
meeting and distribute copies of same to all participants who so request by fully
completing the attendance form to be circulated at the beginning of the meeting.
3. Attendance shall include:
a. Developer and Consultant
b. Contractor's project manager
c. Contractor's superintendent
d. Any subcontractor or supplier representatives whom the Contractor may desire
to invite or the City may request
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
01 31 19 - 2
DAP PRECONSTRUCTION MEETING
Page 2 of 3
e. Other City representatives
f. Others as appropriate
4. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easements or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
f. Notice to Proceed
g. Construction Staking
h. Progress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
1. Insurance Renewals
m. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation of Pre -Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff. Temporary construction facilities
gg. MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
J. Questions or Comments
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013119-3
DAP PRECONSTRUCTION MEETING
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013233-1
DAP PRECONSTRUCTION VIDEO
Page 1 of 2
SECTION 0132 33
PRECONSTRUCTION VIDEO
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative and procedural requirements for:
a. Preconstruction Videos
B. Deviations from this City of Fort Worth Standard Specification
1. Though not mandatory, it is highly recommended on infill developer projects.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Preconstruction Video
1. Produce a preconstruction video of the site/alignment, including all areas in the
vicinity of and to be affected by construction.
a. Provide digital copy of video upon request by the City.
2. Retain a copy of the preconstruction video until the end of the maintenance surety
period.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
01 32 33 - 2
DAP PRECONSTRUCTION VIDEO
PART 3 - EXECUTION [NOT USED]
DATE NAME
END OF SECTION
Revision Log
SUMMARY OF CHANGE
Page 2 of 2
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
SECTION 0133 00
DAP SUBMITTALS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
013300-1
DAP SUBMITTALS
Page 1 of 8
General methods and requirements of submissions applicable to the following
Work -related submittals:
a. Shop Drawings
b. Product Data (including Standard Product List submittals)
c. Samples
d. Mock Ups
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Notify the City in writing, at the time of submittal, of any deviations in the
submittals from the requirements of the Contract Documents.
2. Coordination of Submittal Times
a. Prepare, prioritize and transmit each submittal sufficiently in advance of
performing the related Work or other applicable activities, or within the time
specified in the individual Work Sections, of the Specifications.
b. Contractor is responsible such that the installation will not be delayed by
processing times including, but not limited to:
a) Disapproval and resubmittal (if required)
b) Coordination with other submittals
c) Testing
d) Purchasing
e) Fabrication
f) Delivery
g) Similar sequenced activities
c. No extension of time will be authorized because of the Contractor's failure to
transmit submittals sufficiently in advance of the Work.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013300-2
DAP SUBMITTALS
Page 2 of 8
d. Make submittals promptly in accordance with approved schedule, and in such
sequence as to cause no delay in the Work or in the work of any other
contractor.
B. Submittal Numbering
When submitting shop drawings or samples, utilize a 9-character submittal cross-
reference identification numbering system in the following manner:
a. Use the first 6 digits of the applicable Specification Section Number.
b. For the next 2 digits number use numbers 01-99 to sequentially number each
initial separate item or drawing submitted under each specific Section number.
c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e.
A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical
submittal number would be as follows:
03 30 00-08-B
1) 03 30 00 is the Specification Section for Concrete
2) 08 is the eighth initial submittal under this Specification Section
3) B is the third submission (second resubmission) of that particular shop
drawing
C. Contractor Certification
Review shop drawings, product data and samples, including those by
subcontractors, prior to submission to determine and verify the following:
a. Field measurements
b. Field construction criteria
c. Catalog numbers and similar data
d. Conformance with the Contract Documents
2. Provide each shop drawing, sample and product data submitted by the Contractor
with a Certification Statement affixed including:
a. The Contractor's Company name
b. Signature of submittal reviewer
c. Certification Statement
1) `By this submittal, I hereby represent that I have determined and verified
field measurements, field construction criteria, materials, dimensions,
catalog numbers and similar data and I have checked and coordinated each
item with other applicable approved shop drawings."
D. Submittal Format
1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches.
2. Bind shop drawings and product data sheets together.
3. Order
a. Cover Sheet
1) Description of Packet
2) Contractor Certification
b. List of items / Table of Contents
c. Product Data /Shop Drawings/Samples /Calculations
E. Submittal Content
1. The date of submission and the dates of any previous submissions
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013300-3
DAP SUBMITTALS
Page 3 of 8
2. The Project title and number
3. Contractor identification
4. The names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section number, page and
paragraph(s)
6. Field dimensions, clearly identified as such
7. Relation to adjacent or critical features of the Work or materials
8. Applicable standards, such as ASTM or Federal Specification numbers
9. Identification by highlighting of deviations from Contract Documents
10. Identification by highlighting of revisions on resubmittals
11. An 8-inch x 3-inch blank space for Contractor and City stamps
F. Shop Drawings
1. As specified in individual Work Sections includes, but is not necessarily limited to:
a. Custom -prepared data such as fabrication and erection/installation (working)
drawings
b. Scheduled information
c. Setting diagrams
d. Actual shopwork manufacturing instructions
e. Custom templates
f. Special wiring diagrams
g. Coordination drawings
h. Individual system or equipment inspection and test reports including:
1) Performance curves and certifications
i. As applicable to the Work
2. Details
a. Relation of the various parts to the main members and lines of the structure
b. Where correct fabrication of the Work depends upon field measurements
1) Provide such measurements and note on the drawings prior to submitting
for approval.
G. Product Data
1. For submittals of product data for products included on the City's Standard Product
List, clearly identify each item selected for use on the Project.
2. For submittals of product data for products not included on the City's Standard
Product List, submittal data may include, but is not necessarily limited to:
a. Standard prepared data for manufactured products (sometimes referred to as
catalog data)
1) Such as the manufacturer's product specification and installation
instructions
2) Availability of colors and patterns
3) Manufacturer's printed statements of compliances and applicability
4) Roughing -in diagrams and templates
5) Catalog cuts
6) Product photographs
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013300-4
DAP SUBMITTALS
Page 4 of 8
7) Standard wiring diagrams
8) Printed performance curves and operational -range diagrams
9) Production or quality control inspection and test reports and certifications
10) Mill reports
11) Product operating and maintenance instructions and recommended
spare -parts listing and printed product warranties
12) As applicable to the Work
H. Samples
As specified in individual Sections, include, but are not necessarily limited to:
a. Physical examples of the Work such as:
1) Sections of manufactured or fabricated Work
2) Small cuts or containers of materials
3) Complete units of repetitively used products color/texture/pattern swatches
and range sets
4) Specimens for coordination of visual effect
5) Graphic symbols and units of Work to be used by the City for independent
inspection and testing, as applicable to the Work
I. Do not start Work requiring a shop drawing, sample or product data nor any material to
be fabricated or installed prior to the approval or qualified approval of such item.
1. Fabrication performed, materials purchased or on -site construction accomplished
which does not conform to approved shop drawings and data is at the Contractor's
risk.
2. The City will not be liable for any expense or delay due to corrections or remedies
required to accomplish conformity.
3. Complete project Work, materials, fabrication, and installations in conformance
with approved shop drawings, applicable samples, and product data.
J. Submittal Distribution
Electronic Distribution
a. Confirm development of Project directory for electronic submittals to be
uploaded to City's Buzzsaw site, or another external FTP site approved by the
City.
b. Shop Drawings
1) Upload submittal to designated project directory and notify appropriate
City representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
b) If Contractor requires more than 1 hard copy of Shop Drawings
returned, Contractor shall submit more than the number of copies listed
above.
c. Product Data
1) Upload submittal to designated project directory and notify appropriate
City representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distribution (if required in lieu of electronic distribution)
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013300-5
DAP SUBMITTALS
Page 5 of 8
a. Shop Drawings
1) Distributed to the City
2) Copies
a) 8 copies for mechanical submittals
b) 7 copies for all other submittals
c) If Contractor requires more than 3 copies of Shop Drawings returned,
Contractor shall submit more than the number of copies listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
c. Samples
1) Distributed to the Project Representative
2) Copies
a) Submit the number stated in the respective Specification Sections.
Distribute reproductions of approved shop drawings and copies of approved
product data and samples, where required, to the job site file and elsewhere as
directed by the City.
a. Provide number of copies as directed by the City but not exceeding the number
previously specified.
K. Submittal Review
1. The review of shop drawings, data and samples will be for general conformance
with the design concept and Contract Documents. This is not to be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, except as otherwise
provided herein
2. The review and approval of shop drawings, samples or product data by the City
does not relieve the Contractor from his/her responsibility with regard to the
fulfillment of the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City will
have no responsibility therefore.
3. The Contractor remains responsible for details and accuracy, for coordinating the
Work with all other associated work and trades, for selecting fabrication processes,
for techniques of assembly and for performing Work in a safe manner.
4. If the shop drawings, data or samples as submitted describe variations and show a
departure from the Contract requirements which City finds to be in the interest of
the City and to be so minor as not to involve a change in Contract Price or time for
performance, the City may return the reviewed drawings without noting an
exception.
5. Submittals will be returned to the Contractor under 1 of the following codes:
a. Code 1
1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or
comments on the submittal.
a) When returned under this code the Contractor may release the
equipment and/or material for manufacture.
b. Code 2
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013300-6
DAP SUBMITTALS
Page 6 of 8
1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of
the notations and comments IS NOT required by the Contractor.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the
final product.
c. Code 3
1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is
assigned when notations and comments are extensive enough to require a
resubmittal of the package.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the
final product.
b) This resubmittal is to address all comments, omissions and
non -conforming items that were noted.
c) Resubmittal is to be received by the City within 15 Calendar Days of
the date of the City's transmittal requiring the resubmittal.
d. Code 4
1) "NOT APPROVED" is assigned when the submittal does not meet the
intent of the Contract Documents.
a) The Contractor must resubmit the entire package revised to bring the
submittal into conformance.
b) It may be necessary to resubmit using a different manufacturer/vendor
to meet the Contract Documents.
6. Resubmittals
a. Handled in the same manner as first submittals
1) Corrections other than requested by the City
2) Marked with revision triangle or other similar method
a) At Contractor's risk if not marked
b. Submittals for each item will be reviewed no more than twice at the City's
expense.
1) All subsequent reviews will be performed at times convenient to the City
and at the Contractor's expense, based on the City's or City
Representative's then prevailing rates.
2) Provide Contractor reimbursement to the City within 30 Calendar Days for
all such fees invoiced by the City.
c. The need for more than 1 resubmission or any other delay in obtaining City's
review of submittals, will not entitle the Contractor to an extension of Contract
Time.
7. Partial Submittals
a. City reserves the right to not review submittals deemed partial, at the City's
discretion.
b. Submittals deemed by the City to be not complete will be returned to the
Contractor, and will be considered "Not Approved" until resubmitted.
c. The City may at its option provide a list or mark the submittal directing the
Contractor to the areas that are incomplete.
8. If the Contractor considers any correction indicated on the shop drawings to
constitute a change to the Contract Documents, then written notice must be
provided thereof to the Developer at least 7 Calendar Days prior to release for
manufacture.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013300-7
DAP SUBMITTALS
Page 7 of 8
9. When the shop drawings have been completed to the satisfaction of the City, the
Contractor may carry out the construction in accordance therewith and no further
changes therein except upon written instructions from the City.
10. Each submittal, appropriately coded, will be returned within 30 Calendar Days
following receipt of submittal by the City.
L. Mock ups
1. Mock Up units as specified in individual Sections, include, but are not necessarily
limited to, complete units of the standard of acceptance for that type of Work to be
used on the Project. Remove at the completion of the Work or when directed.
M. Qualifications
1. If specifically required in other Sections of these Specifications, submit a P.E.
Certification for each item required.
N. Request for Information (RFI)
1. Contractor Request for additional information
a. Clarification or interpretation of the contract documents
b. When the Contractor believes there is a conflict between Contract Documents
c. When the Contractor believes there is a conflict between the Drawings and
Specifications
1) Identify the conflict and request clarification
2. Sufficient information shall be attached to permit a written response without further
information.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
013300-8
DAP SUBMITTALS
Page 8 of 8
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
11101XIIwlX4011130
Revision Log
DATE NAME SUMMARY OF CHANGE
12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised August 30, 2013
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 1 of 2
SECTION 0145 23
TESTING AND INSPECTION SERVICES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Testing and inspection services procedures and coordination
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
a. Contractor is responsible for performing, coordinating, and payment of all
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the first Quality Assurance test performed by the City fails, the
Contractor is responsible for payment of subsequent Quality Assurance
testing until a passing test occurs.
a) Final acceptance will not be issued by City until all required payments
for testing by Contractor have been paid in full.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Testing
1. Complete testing in accordance with the Contract Documents.
2. Coordination
a. When testing is required to be performed by the City, notify City, sufficiently
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, notify City,
sufficiently in advance, that testing will be performed.
3. Distribution of Testing Reports
a. Electronic Distribution
1) Confirm development of Project directory for electronic submittals to be
uploaded to the City's document management system, or another form of
distribution approved by the City.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised March 20, 2020
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 2 of 2
2) Upload test reports to designated project directory and notify appropriate
City representatives via email of submittal posting.
3) Hard Copies
a) 1 copy for all submittals submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Project Representative with trip tickets for each delivered load of
Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Inspection
1. Inspection or lack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Documents.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded
through the City's document management system.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised March 20, 2020
015000-1
DAP TEMPORARY FACILITIES AND CONTROLS
Page 1 of 4
SECTION 0150 00
TEMPORARY FACILITIES AND CONTROLS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Provide temporary facilities and controls needed for the Work including, but not
necessarily limited to:
a. Temporary utilities
b. Sanitary facilities
c. Storage Sheds and Buildings
d. Dust control
e. Temporary fencing of the construction site
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Temporary Utilities
1. Obtaining Temporary Service
a. Make arrangements with utility service companies for temporary services.
b. Abide by rules and regulations of utility service companies or authorities
having jurisdiction.
c. Be responsible for utility service costs until Work is approved for Final
Acceptance.
1) Included are fuel, power, light, heat and other utility services necessary for
execution, completion, testing and initial operation of Work.
2. Water
a. Contractor to provide water required for and in connection with Work to be
performed and for specified tests of piping, equipment, devices or other use as
required for the completion of the Work.
b. Provide and maintain adequate supply of potable water for domestic
consumption by Contractor personnel and City's Project Representatives.
c. Coordination
1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised JULY 1, 2011
01 50 00 - 2
DAP TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
d. Contractor Payment for Construction Water
1) Obtain construction water meter from City for payment as billed by City's
established rates.
3. Electricity and Lighting
a. Provide and pay for electric powered service as required for Work, including
testing of Work.
1) Provide power for lighting, operation of equipment, or other use.
b. Electric power service includes temporary power service or generator to
maintain operations during scheduled shutdown.
4. Telephone
a. Provide emergency telephone service at Site for use by Contractor personnel
and others performing work or furnishing services at Site.
5. Temporary Heat and Ventilation
a. Provide temporary heat as necessary for protection or completion of Work.
b. Provide temporary heat and ventilation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persons on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclose and anchor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and waste so as not to cause nuisance or health
problem.
d. Haul sewage and waste off -site at no less than weekly intervals and properly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at completion of Project
C. Storage Sheds and Buildings
1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor
above ground level for materials and equipment susceptible to weather damage.
2. Storage of materials not susceptible to weather damage may be on blocks off
ground.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to permit easy access for identification,
inspection and inventory.
4. Equip building with lockable doors and lighting, and provide electrical service for
equipment space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
5. Fill and grade site for temporary structures to provide drainage away from
temporary and existing buildings.
6. Remove building from site prior to Final Acceptance.
D. Temporary Fencing
Provide and maintain for the duration or construction when required in contract
documents
E. Dust Control
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised JULY 1, 2011
01 50 00 - 3
DAP TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
1. Contractor is responsible for maintaining dust control through the duration of the
project.
a. Contractor remains on -call at all times
b. Must respond in a timely manner
F. Temporary Protection of Construction
1. Contractor or subcontractors are responsible for protecting Work from damage due
to weather.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A. Temporary Facilities
1. Maintain all temporary facilities for duration of construction activities as needed.
3.5 [REPAIR] / [RESTORATION]
3.6 RE -INSTALLATION
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES
A. Temporary Facilities
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised JULY 1, 2011
01 50 00 - 4
DAP TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
1. Remove all temporary facilities and restore area after completion of the Work, to a
condition equal to or better than prior to start of Work.
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised JULY 1, 2011
015526-1
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 1 of 3
SECTION 0155 26
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative procedures for:
a. Street Use Permit
b. Modification of approved traffic control
c. Removal of Street Signs
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 34 71 13 — Traffic Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES
A. Reference Standards
1. Reference standards cited in this specification refer to the current reference standard
published at the time of the latest revision date logged at the end of this
specification, unless a date is specifically cited.
2. Texas Manual on Uniform Traffic Control Devices (TMUTCD).
1.4 ADMINISTRATIVE REQUIREMENTS
A. Traffic Control
1. General
a. When traffic control plans are included in the Drawings, provide Traffic
Control in accordance with Drawings and Section 34 71 13.
b. When traffic control plans are not included in the Drawings, prepare traffic
control plans in accordance with Section 34 71 13 and submit to City for
review.
1) Allow minimum 10 working days for review of proposed Traffic Control.
B. Street Use Permit
1. Prior to installation of Traffic Control, a City Street Use Permit is required.
a. To obtain Street Use Permit, submit Traffic Control Plans to City
Transportation and Public Works Department.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised July 1, 2011
015526-2
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
1) Allow a minimum of 5 working days for permit review.
2) Contractor's responsibility to coordinate review of Traffic Control plans for
Street Use Permit, such that construction is not delayed.
C. Modification to Approved Traffic Control
Prior to installation traffic control:
a. Submit revised traffic control plans to City Department Transportation and
Public Works Department.
1) Revise Traffic Control plans in accordance with Section 34 71 13.
2) Allow minimum 5 working days for review of revised Traffic Control.
3) It is the Contractor's responsibility to coordinate review of Traffic Control
plans for Street Use Permit, such that construction is not delayed.
D. Removal of Street Sign
1. If it is determined that a street sign must be removed for construction, then contact
City Transportation and Public Works Department, Signs and Markings Division to
remove the sign.
E. Temporary Signage
1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
requirements of the latest edition of the Texas Manual on Uniform Traffic Control
Devices (MUTCD).
2. Install temporary sign before the removal of permanent sign.
3. When construction is complete, to the extent that the permanent sign can be
reinstalled, contact the City Transportation and Public Works Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Traffic Control Standards
1. Traffic Control Standards can be found on the City's Buzzsaw website.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised July 1, 2011
015526-3
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised July 1, 2011
015713-1
DAP STORM WATER POLLUTION PREVENTION
Page 1 of 3
SECTION 0157 13
STORM WATER POLLUTION PREVENTION
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Procedures for Storm Water Pollution Prevention Plans
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the
Contract
2. Division 1 — General Requirements
3. Section 3125 00 — Erosion and Sediment Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Construction Activities resulting in less than 1 acre of disturbance
a. Work associated with this Item is considered subsidiary to the various Items
bid. No separate payment will be allowed for this Item.
2. Construction Activities resulting in greater than 1 acre of disturbance
a. Measurement and Payment shall be in accordance with Section 3125 00.
1.3 REFERENCES
A. Abbreviations and Acronyms
1. Notice of Intent: NOI
2. Notice of Termination: NOT
3. Storm Water Pollution Prevention Plan: SWPPP
4. Texas Commission on Environmental Quality: TCEQ
5. Notice of Change: NOC
A. Reference Standards
1. Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specification, unless a date is specifically cited.
2. Integrated Storm Management (iSWM) Technical Manual for Construction
Controls
1.4 ADMINISTRATIVE REQUIREMENTS
A. General
1. Contractor is responsible for resolution and payment of any fines issued associated
with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised July 1, 2011
01 57 13 - 2
DAP STORM WATER POLLUTION PREVENTION
Page 2 of 3
B. Construction Activities resulting in:
1. Less than 1 acre of disturbance
a. Provide erosion and sediment control in accordance with Section 3125 00 and
Drawings.
2. 1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Small Construction Site Notice Required under general permit
TXR150000
a) Sign and post at job site
b) Prior to Preconstruction Meeting, send 1 copy to City Department of
Transportation and Public Works, Environmental Division, (817) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
5 acres or more of Disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
a) Sign and post at job site
b) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
2) TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
4) Once the project has been completed and all the closeout requirements of
TCEQ have been met a TCEQ Notice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
1.5 SUBMITTALS
A. SWPPP
1. Submit in accordance with Section 0133 00, except as stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as follows:
1) 1 copy to the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Works, Environmental Division for review
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised July 1, 2011
0157 13 -3
DAP STORM WATER POLLUTION PREVENTION
Page 3 of 3
B. Modified SWPPP
1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
in accordance with Section 0133 00.
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised July 1, 2011
SECTION 0160 00
PRODUCT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
01 60 00
DAP PRODUCT REQUIREMENTS
Page 1 of 2
1. References for Product Requirements and City Standard Products List
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A list of City approved products for use is available through the City's website at:
httDs://apps.fortworthtexas.2ov/ProiectResources/ and following the directory
path: 02 - Construction Documents\Standard Products List
A. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved products will only be allowed for use upon specific
approval by the City.
B. Any specific product requirements in the Contract Documents supersede similar
products included on the City's Standard Product List.
1. The City reserves the right to not allow products to be used for certain projects even
though the product is listed on the City's Standard Product List.
C. Although a specific product is included on City's Standard Product List, not all
products from that manufacturer are approved for use, including but not limited to, that
manufacturer's standard product.
D. See Section 0133 00 for submittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised March 20, 2020
01 60 00
DAP PRODUCT REQUIREMENTS
Page 2 of 2
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
10/12/12 D. Johnson Modified Location of City's Standard Product List
4/7/2014 M.Domenech Revised for DAP application
03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that the City approved products list is
accessible through the City's website.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised March 20, 2020
016600-1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 1 of 4
SECTION 0166 00
PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Scheduling of product delivery
2. Packaging of products for delivery
3. Protection of products against damage from:
a. Handling
b. Exposure to elements or harsh environments
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY AND HANDLING
A. Delivery Requirements
1. Schedule delivery of products or equipment as required to allow timely installation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3. Delivery trucks will not be permitted to wait extended periods of time on the Site
for personnel or equipment to receive the delivery.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 66 00 - 2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
4. Deliver products or equipment in manufacturer's original unbroken cartons or other
containers designed and constructed to protect the contents from physical or
environmental damage.
5. Clearly and fully mark and identify as to manufacturer, item and installation
location.
6. Provide manufacturer's instructions for storage and handling.
B. Handling Requirements
1. Handle products or equipment in accordance with these Contract Documents and
manufacturer's recommendations and instructions.
C. Storage Requirements
1. Store materials in accordance with manufacturer's recommendations and
requirements of these Specifications.
2. Make necessary provisions for safe storage of materials and equipment.
a. Place loose soil materials and materials to be incorporated into Work to prevent
damage to any part of Work or existing facilities and to maintain free access at
all times to all parts of Work and to utility service company installations in
vicinity of Work.
3. Keep materials and equipment neatly and compactly stored in locations that will
cause minimum inconvenience to other contractors, public travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide easy access for inspection.
4. Restrict storage to areas available on construction site for storage of material and
equipment as shown on Drawings, or approved by City's Project Representative.
5. Provide off -site storage and protection when on -site storage is not adequate.
a. Provide addresses of and access to off -site storage locations for inspection by
City's Project Representative.
6. Do not use lawns, grass plots or other private property for storage purposes without
written permission of owner or other person in possession or control of premises.
7. Store in manufacturers' unopened containers.
8. Neatly, safely and compactly stack materials delivered and stored along line of
Work to avoid inconvenience and damage to property owners and general public
and maintain at least 3 feet from fire hydrant.
9. Keep public and private driveways and street crossings open.
10. Repair or replace damaged lawns, sidewalks, streets or other improvements to
satisfaction of City's Project Representative.
a. Total length which materials may be distributed along route of construction at
one time is 1,000 linear feet, unless otherwise approved in writing by City's
Project Representative.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
016600-3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 ERECTION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL
A. Tests and Inspections
1. Inspect all products or equipment delivered to the site prior to unloading.
B. Non -Conforming Work
1. Reject all products or equipment that are damaged, used or in any other way
unsatisfactory for use on the project.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Protect equipment from exposure to elements and keep thoroughly dry if required by
the manufacturer.
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 66 00 - 4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
017000-1
DAP MOBILIZATION AND REMOBILIZATION
Page 1 of 4
SECTION 0170 00
MOBILIZATION AND REMOBILIZATION
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Mobilization and Demobilization
a. Mobilization
1) Transportation of Contractor's personnel, equipment, and operating supplies
to the Site
2) Establishment of necessary general facilities for the Contractor's operation
at the Site
3) Premiums paid for performance and payment bonds
4) Transportation of Contractor's personnel, equipment, and operating supplies
to another location within the designated Site
5) Relocation of necessary general facilities for the Contractor's operation
from 1 location to another location on the Site.
b. Demobilization
1) Transportation of Contractor's personnel, equipment, and operating supplies
away from the Site including disassembly
2) Site Clean-up
3) Removal of all buildings and/or other facilities assembled at the Site for this
Contract
c. Mobilization and Demobilization do not include activities for specific items of
work that are for which payment is provided elsewhere in the contract.
2. Remobilization
a. Remobilization for Suspension of Work specifically required in the Contract
Documents or as required by City includes:
1) Demobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly or temporarily securing
equipment, supplies, and other facilities as designated by the Contract
Documents necessary to suspend the Work.
b) Site Clean-up as designated in the Contract Documents
2) Remobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site necessary to resume the Work.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site necessary to resume the Work.
3) No Payments will be made for:
a) Mobilization and Demobilization from one location to another on the
Site in the normal progress of performing the Work.
b) Stand-by or idle time
c) Lost profits
3. Mobilizations and Demobilization for Miscellaneous Projects
a. Mobilization and Demobilization
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 70 00 - 2
DAP MOBILIZATION AND REMOBILIZATION
Page 2 of 4
1) Mobilization shall consist of the activities and cost on a Work Order basis
necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site for the issued Work Order.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site for the issued Work Order
2) Demobilization shall consist of the activities and cost necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly for each issued Work
Order
b) Site Clean-up for each issued Work Order
c) Removal of all buildings or other facilities assembled at the Site for
each Work Oder
b. Mobilization and Demobilization do not include activities for specific items of
work for which payment is provided elsewhere in the contract.
4. Emergency Mobilizations and Demobilization for Miscellaneous Projects
a. A Mobilization for Miscellaneous Projects when directed by the City and the
mobilization occurs within 24 hours of the issuance of the Work Order.
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
IRM97[yW.3077V/uIBlel89,11101111114'9V
A. Measurement and Payment
1. Mobilization and Demobilization
a. Measure
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and materials furnished in accordance with this Item
are subsidiary to the various Items bid and no other compensation will be
allowed.
2. Remobilization for suspension of Work as specifically required in the Contract
Documents
a. Measurement
1) Measurement for this Item shall be per each remobilization performed.
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Specified Remobilization" in accordance with Contract
Documents.
c. The price shall include:
1) Demobilization as described in Section 1.1.A.2.a.1)
2) Remobilization as described in Section 1.1.A.2.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 70 00 - 3
DAP MOBILIZATION AND REMOBILIZATION
Page 3 of 4
Remobilization for suspension of Work as required by City
a. Measurement and Payment
1) This shall be submitted as a Contract Claim in accordance with Article 10
of Section 00 72 00.
2) No payments will be made for standby, idle time, or lost profits associated
with this Item.
4. Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Mobilization" in accordance with Contract
Documents. Demobilization shall be considered subsidiary to mobilization
and shall not be paid for separately.
c. The price shall include:
1) Mobilization as described in Section 1.1.A.3.a.1)
2) Demobilization as described in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
Emergency Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement' will be paid for at the unit
price per each "Work Order Emergency Mobilization" in accordance with
Contract Documents. Demobilization shall be considered subsidiary to
mobilization and shall not be paid for separately.
c. The price shall include
1) Mobilization as described in Section 1.1.A.4.a)
2) Demobilization as described in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 70 00 - 4
DAP MOBILIZATION AND REMOBILIZATION
Page 4 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
017123-1
DAP CONSTRUCTION STAKING AND SURVEY
Page 1 of 4
SECTION 01 71 23
CONSTRUCTION STAKING AND SURVEY
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Requirements for construction staking and construction survey
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Construction Staking
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will
be allowed.
2. Construction Survey
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will
be allowed.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Submittals, if required, shall be in accordance with Section 0133 00.
B. All submittals shall be approved by the City prior to delivery.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS
A. Certificates
1. Provide certificate certifying that elevations and locations of improvements are in
conformance or non-conformance with requirements of the Contract Documents.
a. Certificate must be sealed by a registered professional land surveyor in the
State of Texas.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 71 23 - 2
DAP CONSTRUCTION STAKING AND SURVEY
Page 2 of 4
B. Field Quality Control Submittals
1. Documentation verifying accuracy of field engineering work.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Construction Staking
1. Construction staking will be performed by the City.
2. Coordination
a. Contact City's Project Representative at least 2 weeks in advance for
scheduling of Construction Staking.
b. It is the Contractor's responsibility to coordinate staking such that construction
activities are not delayed or negatively impacted.
3. General
a. Contractor is responsible for preserving and maintaining stakes furnished by
City.
b. If in the opinion of the City, a sufficient number of stakes or markings have
been lost, destroyed or disturbed, by Contractor's neglect, such that the
contracted Work cannot take place, then the Contractor will be required to pay
the City for new staking with a 25 percent markup. The cost for staking will be
deducted from the payment due to the Contractor for the Project.
B. Construction Survey
1. Construction Survey will be performed by the City.
2. Coordination
a. Contractor to verify that control data established in the design survey remains
intact.
b. Coordinate with the City prior to field investigation to determine which
horizontal and vertical control data will be required for construction survey.
c. It is the Contractor's responsibility to coordinate Construction Survey such that
construction activities are not delayed or negatively impacted.
d. Notify City if any control data needs to be restored or replaced due to damage
caused during construction operations.
1) City shall perform replacements and/or restorations.
General
a. Construction survey will be performed in order to maintain complete and
accurate logs of control and survey work as it progresses for Project Records.
b. The Contractor will need to ensure coordination is maintained with the City to
perform construction survey to obtain construction features, including but not
limited to the following:
1) All Utility Lines
a) Rim and flowline elevations and coordinates for each manhole or
junction structure
2) Water Lines
a) Top of pipe elevations and coordinates for waterlines at the following
locations:
(1) Every 250 linear feet
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 71 23 - 3
DAP CONSTRUCTION STAKING AND SURVEY
Page 3 of 4
(2) Horizontal and vertical points of inflection, curvature, etc. (All
Fittings)
(3) Cathodic protection test stations
(4) Sampling stations
(5) Meter boxes/vaults (All sizes)
(6) Fire lines
(7) Fire hydrants
(8) Gate valves
(9) Plugs, stubouts, dead-end lines
(10) Air Release valves (Manhole rim and vent pipe)
(11) Blow off valves (Manhole rim and valve lid)
(12) Pressure plane valves
(13) Cleaning wyes
(14) Casing pipe (each end)
b) Storm Sewer
(1) Top of pipe elevations and coordinates at the following locations:
(a) Every 250 linear feet
(b) Horizontal and vertical points of inflection, curvature, etc.
c) Sanitary Sewer
(1) Top of pipe elevations and coordinates for sanitary sewer lines at
the following locations:
(a) Every 250 linear feet
(b) Horizontal and vertical points of inflection, curvature, etc.
(c) Cleanouts
c. Construction survey will be performed in order to maintain complete and
accurate logs of control and survey work associated with meeting or exceeding
the line and grade required by these Specifications.
d. The Contractor will need to ensure coordination is maintained with the City to
perform construction survey and to verify control data, including but not
limited to the following:
1) Established benchmarks and control points provided for the Contractor's
use are accurate
2) Benchmarks were used to furnish and maintain all reference lines and
grades for tunneling
3) Lines and grades were used to establish the location of the pipe
4) Submit to the City copies of field notes used to establish all lines and
grades and allow the City to check guidance system setup prior to
beginning each tunneling drive.
5) Provide access for the City to verify the guidance system and the line and
grade of the carrier pipe on a daily basis.
6) The Contractor remains fully responsible for the accuracy of the work and
the correction of it, as required.
7) Monitor line and grade continuously during construction.
8) Record deviation with respect to design line and grade once at each pipe
joint and submit daily records to City.
9) If the installation does not meet the specified tolerances, immediately notify
the City and correct the installation in accordance with the Contract
Documents.
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 71 23 - 4
DAP CONSTRUCTION STAKING AND SURVEY
Page 4 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL
A. It is the Contractor's responsibility to maintain all stakes and control data placed by the
City in accordance with this Specification.
B. Do not change or relocate stakes or control data without approval from the City.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
SECTION 0174 23
CLEANING
PART1- GENERAL
1.1 SUMMARY
017423-1
DAP CLEANING
Page 1 of 4
A. Section Includes:
1. Intermediate and final cleaning for Work not including special cleaning of closed
systems specified elsewhere
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Scheduling
1. Schedule cleaning operations so that dust and other contaminants disturbed by
cleaning process will not fall on newly painted surfaces.
2. Schedule final cleaning upon completion of Work and immediately prior to final
inspection.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. Storage and Handling Requirements
1. Store cleaning products and cleaning wastes in containers specifically designed for
those materials.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 74 23 - 2
DAP CLEANING
Page 2 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART2- PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
2.2 MATERIALS
A. Cleaning Agents
1. Compatible with surface being cleaned
2. New and uncontaminated
3. For manufactured surfaces
a. Material recommended by manufacturer
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING
A. General
1. Prevent accumulation of wastes that create hazardous conditions.
2. Conduct cleaning and disposal operations to comply with laws and safety orders of
governing authorities.
3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
storm or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 74 23 - 3
DAP CLEANING
Page 3 of 4
6. Handle materials in a controlled manner with as few handlings as possible.
7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with
this project.
8. Remove all signs of temporary construction and activities incidental to construction
of required permanent Work.
9. If project is not cleaned to the satisfaction of the City, the City reserves the right to
have the cleaning completed at the expense of the Contractor.
10. Do not burn on -site.
B. Intermediate Cleaning during Construction
1. Keep Work areas clean so as not to hinder health, safety or convenience of
personnel in existing facility operations.
2. At maximum weekly intervals, dispose of waste materials, debris and rubbish.
3. Confine construction debris daily in strategically located container(s):
a. Cover to prevent blowing by wind
b. Store debris away from construction or operational activities
c. Haul from site at a minimum of once per week
4. Vacuum clean interior areas when ready to receive finish painting.
a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance.
5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which
may become airborne or transported by flowing water during the storm.
C. Exterior (Site or Right of Way) Final Cleaning
1. Remove trash and debris containers from site.
a. Re -seed areas disturbed by location of trash and debris containers in accordance
with Section 32 92 13.
2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
that may hinder or disrupt the flow of traffic along the roadway.
3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
junction boxes and inlets.
4. If no longer required for maintenance of erosion facilities, and upon approval by
City, remove erosion control from site.
5. Clean signs, lights, signals, etc.
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
DATE NAME
4/7/2014 M.Domenech
END OF SECTION
Revision Log
SUMMARY OF CHANGE
Revised for DAP application
01 74 23 - 4
DAP CLEANING
Page 4 of 4
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
SECTION 0177 19
CLOSEOUT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
017719-1
DAP CLOSEOUT REQUIREMENTS
Page 1 of 3
A. Section Includes:
1. The procedure for closing out a contract
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Guarantees, Bonds and Affidavits
1. No application for final payment will be accepted until all guarantees, bonds,
certificates, licenses and affidavits required for Work or equipment as specified are
satisfactorily filed with the City.
B. Release of Liens or Claims
1. No application for final payment will be accepted until satisfactory evidence of
release of liens has been submitted to the City.
1.5 SUBMITTALS
A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
017719-2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 CLOSEOUT PROCEDURE
A. Prior to requesting Final Inspection, submit:
1. Project Record Documents in accordance with Section 0178 39
2. Operation and Maintenance Data, if required, in accordance with Section 0178 23
B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section
01 74 23.
C. Final Inspection
1. After final cleaning, provide notice to the City Project Representative that the Work
is completed.
a. The City will make an initial Final Inspection with the Contractor present.
b. Upon completion of this inspection, the City will notify the Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Work is defective or incomplete.
2. Upon receiving written notice from the City, immediately undertake the Work
required to remedy deficiencies and complete the Work to the satisfaction of the
City.
3. Upon completion of Work associated with the items listed in the City's written
notice, inform the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, will make a subsequent
Final Inspection of the project.
4. Provide all special accessories required to place each item of equipment in full
operation. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oil and grease as required for the first lubrication of the equipment
c. Initial fill up of all chemical tanks and fuel tanks
d. Light bulbs
e. Fuses
f. Vault keys
g. Handwheels
h. Other expendable items as required for initial start-up and operation of all
equipment
D. Notice of Project Completion
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
017719-3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (if required)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
017823-1
DAP OPERATION AND MAINTENANCE DATA
Page 1 of 5
SECTION 0178 23
OPERATION AND MAINTENANCE DATA
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Product data and related information appropriate for City's maintenance and
operation of products furnished under Contract
2. Such products may include, but are not limited to:
a. Traffic Controllers
b. Irrigation Controllers (to be operated by the City)
c. Butterfly Valves
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Schedule
1. Submit manuals in final form to the City within 30 calendar days of product
shipment to the project site.
1.5 SUBMITTALS
A. Submittals shall be in accordance with Section 0133 00. All submittals shall be
approved by the City prior to delivery.
1.6 INFORMATIONAL SUBMITTALS
A. Submittal Form
1. Prepare data in form of an instructional manual for use by City personnel.
2. Format
a. Size: 8 1/2 inches x 11 inches
b. Paper
1) 40 pound minimum, white, for typed pages
2) Holes reinforced with plastic, cloth or metal
c. Text: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 78 23 - 2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
d. Drawings
1) Provide reinforced punched binder tab, bind in with text
2) Reduce larger drawings and fold to size of text pages.
e. Provide fly -leaf for each separate product, or each piece of operating
equipment.
1) Provide typed description of product, and major component parts of
equipment.
2) Provide indexed tabs.
f. Cover
1) Identify each volume with typed or printed title "OPERATING AND
MAINTENANCE INSTRUCTIONS".
2) List:
a) Title of Project
b) Identity of separate structure as applicable
c) Identity of general subject matter covered in the manual
3. Binders
a. Commercial quality 3-ring binders with durable and cleanable plastic covers
b. When multiple binders are used, correlate the data into related consistent
groupings.
4. If available, provide an electronic form of the O&M Manual.
B. Manual Content
Neatly typewritten table of contents for each volume, arranged in systematic order
a. Contractor, name of responsible principal, address and telephone number
b. A list of each product required to be included, indexed to content of the volume
c. List, with each product:
1) The name, address and telephone number of the subcontractor or installer
2) A list of each product required to be included, indexed to content of the
volume
3) Identify area of responsibility of each
4) Local source of supply for parts and replacement
d. Identify each product by product name and other identifying symbols as set
forth in Contract Documents.
2. Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identify data applicable to installation
3) Delete references to inapplicable information
3. Drawings
a. Supplement product data with drawings as necessary to clearly illustrate:
1) Relations of component parts of equipment and systems
2) Control and flow diagrams
b. Coordinate drawings with information in Project Record Documents to assure
correct illustration of completed installation.
c. Do not use Project Record Drawings as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent format under separate headings for different procedures.
b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 78 23 - 3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
5. Copy of each warranty, bond and service contract issued
a. Provide information sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties or bonds
C. Manual for Materials and Finishes
1. Submit 5 copies of complete manual in final form.
2. Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) Information required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
3. Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full information on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in final form.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut -down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 78 23 - 4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
i. Charts of valve tag numbers, with location and function of each valve
j. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
k. Other data as required under pertinent Sections of Specifications
3. Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1) Function, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Controls
3) Communications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
f. Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
4. Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Provide operation and maintenance data by personnel with the following criteria:
1. Trained and experienced in maintenance and operation of described products
2. Skilled as technical writer to the extent required to communicate essential data
3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 78 23 - 5
DAP OPERATION AND MAINTENANCE DATA
Page 5 of 5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31 /2012 D. Johnson 1.5.A.1 — title of section removed
4/7/2014 M.Domenech Revised for DAP Application
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
017839-1
DAP PROJECT RECORD DOCUMENTS
Page 1 of 4
SECTION 0178 39
PROJECT RECORD DOCUMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Work associated with the documenting the project and recording changes to project
documents, including:
a. Record Drawings
b. Water Meter Service Reports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
City's Project Representative.
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Accuracy of Records
1. Thoroughly coordinate changes within the Record Documents, making adequate
and proper entries on each page of Specifications and each sheet of Drawings and
other Documents where such entry is required to show the change properly.
2. Accuracy of records shall be such that future search for items shown in the Contract
Documents may rely reasonably on information obtained from the approved Project
Record Documents.
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
01 78 39 - 2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
3. To facilitate accuracy of records, make entries within 24 hours after receipt of
information that the change has occurred.
4. Provide factual information regarding all aspects of the Work, both concealed and
visible, to enable future modification of the Work to proceed without lengthy and
expensive site measurement, investigation and examination.
1.10 STORAGE AND HANDLING
A. Storage and Handling Requirements
1. Maintain the job set of Record Documents completely protected from deterioration
and from loss and damage until completion of the Work and transfer of all recorded
data to the final Project Record Documents.
2. In the event of loss of recorded data, use means necessary to again secure the data
to the City's approval.
a. In such case, provide replacements to the standards originally required by the
Contract Documents.
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART2- PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED]
2.2 RECORD DOCUMENTS
A. Job set
1. Promptly following receipt of the Notice to Proceed, secure from the City, at no
charge to the Contractor, 1 complete set of all Documents comprising the Contract.
B. Final Record Documents
1. At a time nearing the completion of the Work and prior to Final Inspection, provide
the City 1 complete set of all Final Record Drawings in the Contract.
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED
3.3 PREPARATION [NOT USED
3.4 MAINTENANCE DOCUMENTS
A. Maintenance of Job Set
1. Immediately upon receipt of the job set, identify each of the Documents with the
title, "RECORD DOCUMENTS - JOB SET".
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
017839-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 4
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable method for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for review
by the City, until start of transfer of data to final Project Record Documents.
c. Maintain the job set at the site of work.
3. Coordination with Construction Survey
a. At a minimum clearly mark any deviations from Contract Documents
associated with installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a "cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
Conversion of schematic layouts
a. hi some cases on the Drawings, arrangements of conduits, circuits, piping,
ducts, and similar items, are shown schematically and are not intended to
portray precise physical layout.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) However, design of future modifications of the facility may require
accurate information as to the final physical layout of items which are
shown only schematically on the Drawings.
b. Show on the job set of Record Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
ceiling plenum", "exposed", and the like).
3) Make all identification sufficiently descriptive that it may be related
reliably to the Specifications.
c. The City may waive the requirements for conversion of schematic layouts
where, in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Record Documents
Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Drawings to the
corresponding final documents, coordinating the changes as required.
b. Clearly indicate at each affected detail and other Drawing a full description of
changes made during construction, and the actual location of items.
c. Call attention to each entry by drawing a "cloud" around the area or areas
affected.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS Chisholm Trail Ranch Section 3 Phase 1 A
Revised April 7, 2014 CPN 103826
01 78 39 - 4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 4
d. Make changes neatly, consistently and with the proper media to assure
longevity and clear reproduction.
2. Transfer of data to other Documents
a. If the Documents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as final
Record Documents.
b. If any such Document is not so approved by the City, secure a new copy of that
Document from the City at the City's usual charge for reproduction and
handling, and carefully transfer the change data to the new copy to the approval
of the City.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP Application
CITY OF FORT WORTH Chisholm Trail Ranch Section 3 Phase 1A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJE( CPN 103826
Revised April 7, 2014
GC-4.02 Subsurface and Physical Conditions
Page 1 of 1
GC-4.02 SUBSURFACE AND PHYSICAL CONDITIONS
Chisholm Trail Ranch Section 3 Phase 1A
CPN 103826
GEOTECHNICAL EXPLORATION
CHISHOLM TRAIL RANCH SECTION 3 - PHASES IA, 111, AND 2
NWC of Brewer Boulevard and Stewart Feltz Road
Fort Worth, Texas
ALPHA Report No. W212453
January 26, 2022
Prepared for:
MERITAGE HOMES OF TEXAS, LLC
8840 Cypress Waters Boulevard, Suite 100
Dallas, Texas 75019
Attention: Mr. Robert Hall
Prepared By:
ALPN A #XTESTING
WHERE 1T ALL BEGINS
ALPHA/♦X
I
TESTING
WHERE IT ALL BEGINS
January 26, 2022
Geotechnical
Construction Materials
Environmental
TBPE Firm No. 813
Meritage Homes of Texas, LLC
8840 Cypress Waters Boulevard, Suite 100
Dallas, Texas 75019
Attention: Mr. Robert Hall
5058 Brush Creek Road Tel: 817-496-5600
Fort Worth, Texas 76119 Fax: 817-496-5608
www.alphatesting.com
Re: Geotechnical Exploration
Chisholm Trail Ranch Section 3 - Phases 1A, 1B, and 2
NWC of Brewer Boulevard and Stewart Feltz Road
Fort Worth, Texas
ALPHA Report No. W212453
Attached is the report of the geotechnical exploration performed for the project referenced above.
This study was authorized by Mr. Robert Hall and Mr. Steven Cook with Authorization Agreement
Contract No. 77337776 dated on August 19, 2021 and performed in accordance with ALPHA
Proposal No. 85839 dated August 11, 2021.
Please note; some areas of the site with deep cuts are excluded from this study until deeper borings
can be drilled to verify the underlying stratum. These areas are delineated on the Boring Location
Plan, Figures ]A and 1 B.
This report contains results of field explorations and laboratory testing and an engineering
interpretation of these with respect to available project characteristics. The results and analyses
were used to develop recommendations to aid design and construction of residential foundations.
ALPHA TESTING, LLC appreciates the opportunity to be of service on this project. If we can be
of further assistance, such as providing materials testing services during construction, please
contact our office.
Sincerely,
ALPHA TESTING, LLC
Karina Cohuo
Geotechnical Project Manager
KC/GSF-BJH/en
Copies: (1-PDF) Client
e" S OF 7-�'A
X, BRIAN J. HOYT
118748
January 26, 2022
Brian J. Hoyt, P.E.
Regional Manager
TABLE OF CONTENTS
ALPHA REPORT NO. W212453
1.0
PURPOSE AND SCOPE.................................................................................................... 1
2.0
PROJECT CHARACTERISTICS......................................................................................
1
3,0
FIELD EXPLORATION....................................................................................................
2
4.0
LABORATORY TESTS....................................................................................................
2
5,0
GENERAL SUBSURFACE CONDITIONS......................................................................
2
6,0
DESIGN RECOMMENDATIONS....................................................................................
3
6.1 Existing Fill and Backfilled pond...........................................................................
3
6.2 Slab -on -Grade Foundations....................................................................................
4
6.2.1 Subgrade Improvement Using Moisture Conditioning in
ZonesIII, IV, and V....................................................................................
6
6.3 Post -Tensioning Institute, Design of Post -Tensioned Slab -on -Grade ....................
7
6.4 Independent Drilled Piers Associated with Slab Foundations in
DeepFill Areas.......................................................................................................
7
6.4.1 Straight -Shaft Piers.....................................................................................
8
6.4.2 Helical Piers................................................................................................
8
6.5 Drainage and Other Considerations........................................................................
9
7.0
GENERAL CONSTRUCTION PROCEDURES AND GUIDELINES ...........................
10
7.1 Site Preparation and Grading................................................................................
11
7.2 Foundation Excavations........................................................................................
12
7.3 Fill Compaction....................................................................................................
13
7.4 Utilities..................................................................................................................14
7.5 Groundwater.........................................................................................................
14
$.0
LIMITATIONS.................................................................................................................15
APPENDIX
A-1 Methods of Field Exploration
Boring Location Plan — Figures IA and 1 B
B-1 Methods of Laboratory Testing
Logs of Borings
Key to Soil Symbols and Classifications
ALPHA Report No. W212453
1.0 PURPOSE AND SCOPE
The purpose of this geotechnical exploration is for ALPHA TESTING, LLC (ALPHA) to evaluate
for Meritage Homes of Texas, LLC (Client) some of the physical and engineering properties of
subsurface materials at selected locations on the subject site with respect to formulation of
geotechnical design parameters for the subject construction. The field exploration was
accomplished by securing subsurface samples from widely spaced test borings performed across
the project site. Engineering analyses were performed from results of the field exploration and
laboratory tests performed on representative samples. In addition, results of a Preliminary
Geotechnical Exploration performed at the site (Alpha Report No. W 192432 dated July 8, 2020)
were reviewed and incorporated into this current study.
Also included are general comments pertaining to reasonably anticipated construction problems
and recommendations concerning earthwork and quality control testing during construction. This
information can be used to evaluate subsurface conditions and to aid in ascertaining construction
meets project specifications.
Recommendations provided in this report were developed from information obtained in test
borings depicting subsurface conditions only at the specific boring locations and at the particular
time designated on the logs. Subsurface conditions at other locations may differ from those
observed at the boring locations, and subsurface conditions at boring locations may vary at
different times of the year. The scope of work may not fully define the variability of subsurface
materials and conditions that are present on the site.
The nature and extent of variations between borings may not become evident until construction.
If significant variations then appear evident, our office should be contacted to re-evaluate our
recommendations after performing on -site observations and possibly other tests
2,0 PROJECT CHARACTERISTICS
It is proposed to develop a residential subdivision (Chisholm Trail Ranch Section 3 - Phases IA,
I and 2) on a tract of land located on the northwest corner of Brewer Boulevard and Stewart Feltz
Road in Fort Worth, Texas. A site plan illustrating the subject site is provided as Figures lA and
1B, the Boring Location Plan, in the Appendix.
At the time the field exploration was performed, the site consisted of a vacant tract of land with
some scattered trees. A creek crosses the southern portion of the property, generally oriented in
the east -west direction. Review of historical images available from Google Earth® indicates a
pond in the southeast corner of the site, in the vicinity of Borings 99 and 100 was backfilled. Also,
an existing structure was demolished in the vicinity of Borings 4 and 10. No other information
regarding previous development of the site was provides to us.
Grading plans prepared by LJA Engineering, Inc. (LJA Project ID: NT680-0082, Phase 1A Sheets
45 through 48 and 54 through 58, Phase 1B Sheets 43 and 44, and Phase 2 Sheets 49 through 53
dated October 2021) indicate the site slopes down towards the northwest about 35 ft (approximate
elevation 860 ft to 825 ft). These grading plans also indicate cuts and fills of up to 18 ft will be
required to achieve final grade in the building pad areas.
1
ALPHA Report No. W212453
Present plans provide for the construction of new residential buildings. The new structures are
expected to create light loads to be carried by the foundations. We understand the new structures
will be supported using post -tensioned slab -on -grade foundations designed for potential seasonal
movements of 41/2 inches or less. No below grade slabs are planned.
10 FIELD EXPLORATION
Subsurface conditions on the site were explored by drilling a total of 116 test borings. Fifty-eight
(58) borings were drilled to a depth of about 15 ft and fifty-eight (58) borings were drilled to a
depth of about 20 ft. The borings were drilled in general accordance with ASTM Standard D 420
using standard rotary drilling equipment. The approximate location of each test boring is shown
on the Boring Location Plan, Figures 1A and 113, enclosed in the Appendix. Details of drilling
and sampling operations are briefly summarized in Methods of Field Exploration, Section A-1 of
the Appendix.
Subsurface types encountered during the field exploration are presented on the Log of Boring
sheets (boring logs) included in the Appendix. The boring logs contain our Field Technician's and
Engineer's interpretation of conditions believed to exist between actual samples retrieved.
Therefore, the boring logs contain both factual and interpretive information. Lines delineating
subsurface strata on the boring logs are approximate and the actual transition between strata may
be gradual.
4,0 LABORATORY TESTS
Selected samples of the subsurface materials were tested in the laboratory to evaluate their
engineering properties as a basis in providing recommendations for residential foundation design
and earthwork construction. A brief description of testing procedures used in the laboratory can
be found in Methods of Laboratory Testing, Section B-1 of the Appendix. Individual test results
are presented on the Log of Boring sheets in the Appendix.
5.0 GENERAL SUBSURFACE CONDITIONS
Based on geological atlas maps available from the Bureau of Economic Geology, published by the
University of Texas at Austin, the project site lies at the mapped interface of the undivided Washita
Group formation and the undivided Grayson Marl and Main Street Limestone formation. These
formations generally consist of interbedded limestone and marl (limey shale). Residual soils
associated with these formations generally consist of clay soils with moderate to very high
shrink/swell potential. Subsurface stratigraphy at geological interfaces can be highly variable as
evidenced on the boring logs.
Subsurface conditions encountered in about one-half of the borings generally consisted of clay,
calcareous clay, and shaly clay to depths of about 1 ft to 18 ft below the ground surface underlain
by limestone extending to the termination depth of the borings (15 ft to 20 ft). Subsurface
conditions encountered in the remaining borings generally consisted of clay, calcareous clay, and
shaly clay extending to the termination depth of the borings (15 ft to 20 ft). Subsurface conditions
encountered in Borings 13, 53, 89, 90, 101, 105, and 106 generally consisted of clay and shaly
clay to depths of about 2 ft to 5 ft below the ground surface underlain by limestone extending to
depths of about 12 ft to 18 ft. Shale was then encountered extending to the termination depth of
the borings (15 ft to 20 ft). Subsurface conditions encountered in Borings 17, 42, 49, 57, 58, and
PA
ALPHA Report No. W212453
116 generally consisted of limestone to depths of about 6 ft to 18 ft below the ground surface
underlain by clay and/or shaly clay extending to the termination depth of the borings (15 ft to 20
ft). Layers of limestone about 2 ft to 15 ft thick were encountered between the clay layers in
Borings 2, 7, 10, 11, 15, 16, 19, 23, 24, 26, 29, 31, 33, 36, 37, 39, 45, 47, 51, 59, 60, 63, 65, 67,
68, 73, 74, 75, 75, 77, 79, 82, 91, 94, 95, 100, 102, 103, 105, 107, 110, and 113 at depths of about
I ft to 18 ft below the ground surface. The upper 1 ft and 6 ft of clay encountered in Borings 19
and 28, respectively were classified as fill material. More detailed stratigraphic information is
presented on the attached Log of Boring sheets.
Most of the materials encountered in the borings are considered relatively impermeable and are
anticipated to have a relatively slow response to water movement. Therefore, several days of
observation would be required to evaluate actual groundwater levels within the depths explored.
Also, the groundwater level at the subject site is anticipated to fluctuate seasonally depending on
the amount of rainfall, prevailing weather conditions, and subsurface drainage characteristics.
Free groundwater was not encountered in the borings. However, it is common to encounter
seasonal groundwater in fill material, from natural fractures within the clayey matrix, at the
soil/rock (limestone and shale) interface or from fractures in the rock (limestone and shale),
particularly during or after periods of precipitation. If more detailed groundwater information is
required, monitoring wells or piezometers can be installed.
Further details concerning subsurface materials and conditions encountered can be obtained from
the boring logs provided in the Appendix.
6.0 DESIGN RECOMMENDATIONS
The following design recommendations were developed on the basis of the previously described
Project Characteristics (Section 2.0) and General Subsurface Conditions (Section 5.0). Should the
project criteria change, our office should conduct a review to determine if modifications to the
recommendations are required. Further, it is recommended our office be provided with a copy of
the final building plans and specifications for review prior to construction.
The following design recommendations were evaluated based on final grades as indicated on the
referenced grading plans and discussed in Section 2.0. Cutting and filling on the site other than
depicted on the referenced grading plans can alter the recommended foundation design parameters.
Therefore, it is recommended our office be contacted before performing other cutting and filling
on site to verify appropriate design parameters are utilized for final foundation design. Also, our
office should be provided with final grading plans to verify our recommendations.
6.1 Existinu Fill and Backfilled pond
As discussed in Section 5.0, existing fill was encountered to depths of about 1 ft and 6 ft below
the existing ground surface in Borings 19 and 28, respectively. Also, as discussed in Section 2.0,
historical aerial images available from Google Earth® indicate a pond was backfilled in the
vicinity of Borings 99 and 100.
If fill compaction records are not available for this backfill or any other fill possibly on the site, it
should be considered as uncontrolled fill. Uncontrolled fill is generally not considered suitable for
support of foundations due to the risk of under -compacted zones resulting in failures of weak soil
ALPHA Report No. W212453
and/or indeterminate levels of settlement. Any existing uncontrolled fill should be removed from
the building pad area and replaced with engineered fill as recommended in Section 6.2 or Section
7.3 as applicable. The excavated materials may be suitable for reuse as engineered fill provided
they are free of organics, boulders, rubble, and other debris. Sorting and/or processing of limestone
fragments encountered in the fill may be required if the fill is re -used. The lateral extent, depth
and nature of the existing fill are not known. Test pits could be performed prior to construction to
verify the presence, lateral extent, depth, and nature of the existing fill materials. ALPHA would
be pleased to provide this service if desired
Associated creeks to the previously filled pond were also observed at the site. It could be planned
to construct residences in the areas of the creeks. The creeks should be demucked and any soft,
organic soils or otherwise unsuitable materials should be removed to expose a firm subgrade prior
to backfilling. The depths of the ponds are not known. Even if fill is properly compacted, fills in
excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the
total fill thickness. This should be considered when backfilling creeks and ponds.
As discussed in Section 2.0, it appears structures may have been demolished on the site near
Borings 4 and 10. Any soil disturbed due to removal of structures or foundations should be re -
compacted in accordance with recommendations provided in Section 6.2 or Section 7.3 as
applicable. All foundation elements of the existing structures should be removed or cut off at least
1 ft below finished grade or 1 ft below the new structural elements, whichever is deeper. All
abandoned utility lines should be either removed or positively sealed to prevent possible water
seepage into subgrade soils.
6.2 Slab -on -Grade Foundations
Slab -on -grade foundations should be designed with exterior and interior grade beams adequate to
provide sufficient rigidity to the foundation system. A net allowable bearing pressure of 1.5 kips
per sq ft should be used for all grade beams bearing on undisturbed cuts in native soils, on general
fill placed as recommended in Section 7.3, on moisture improved soil placed as recommended in
Section 6.2.1 or on limestone. Grade beams should bear a minimum depth of 12 inches below
final grade and should have a minimum width of 10 inches considering the recommended bearing
capacity.
To reduce cracking as normal movements occur in foundation soils, all grade beams and slab
foundations should be adequately reinforced with steel (conventional reinforcing steel and/or post -
tensioned reinforcement). It is common to experience some minor cosmetic distress to structures
with slab -on -grade foundation systems due to normal ground movements. A properly designed
and constructed moisture barrier should be placed between the slabs and subgrade soils to retard
moisture migration through the slabs.
Conditions encountered in the test borings, the planned cut/fill within the building pads and results
of the laboratory tests reveal variations in highly expansive clay thickness and expansive properties
across the site. Such variations in clay thickness and expansive properties will directly affect
design parameters used for slab -on -grade foundations. Therefore, lots with apparently common
average clay thickness, similar expansive clay properties and similar corresponding estimated
potential movements have been grouped into Zones I through V and delineated on the Boring
Location Plan, Figures IA and 1B.
4
ALPHA Report No. W212453
Subgrade improvement in the respective Zones (see Figures 1A and 113) should be performed
using the information summarized in Table A.
TABLE A
Estimates of Potential Seasonal Movements and Required Subgrade Improvement
ZONE ESTIMATED POTENTIAL IMPROVEMENT REQUIRED TO REDUCE
MOVEMENT, INCHES MOVEMENTS TO 4% INCHES
I
Up to 41/2
II
Up to41/21
III
Up to about 6
IV
Up to about 8
V
More than 8
No Improvement Required
Cover General Fill with Plastic Sheeting'
4 ft of Moisture Conditioning
8 ft of Moisture Conditioning
10 ft of Moisture Conditioning
' Plastic sheeting (6 to 8 mil thickness) should be placed immediately after grading with general fill for
long-term maintenance of the moisture content of the general fill and underlying native soil. This
sheeting should be placed 8 to 12 inches below final grade and should also extend at least 5 ft beyond
the perimeter of the building pad. Potential movements could be about 6 inches in Zone II if plastic
sheeting is not placed as recommended.
Potential seasonal movements were estimated using results from absorption swell tests, in general
accordance with methods outlined by the Texas Department of Transportation (TxDOT) Test
Method Tex-124-E and engineering judgment and experience. Estimated movements were
calculated assuming the moisture content of the in -situ soil within the normal zone of seasonal
moisture content change varies between a "dry" condition and a "wet" condition as defined by
Tex-124-E. Also, it was assumed a 1 psi surcharge load from the floor slab acts on the subgrade
soils. Movements exceeding our estimates could occur if positive drainage of surface water is not
maintained or if soils are subject to an outside water source, such as leakage from a utility line or
subsurface moisture migration from off -site locations.
Potential seasonal movements were estimated assuming fill material used to raise the grade will
consist of onsite or similar material with a plasticity index of 50 or less. If the plasticity index of
material used to raise the grade is higher than 50, potential movements could be higher than our
estimates.
Potential movements estimated for slab foundations in Zones III, IV, and V (see Figures lA and
113 for delineation of Zones) are considered outside normal design tolerances. Movement of slab
foundations in Zones III, IV, and V could be reduced to not more than 41/2 inches if the upper
4 ft to 10 ft of soil below final grade, as summarized in Table A, are moisture conditioned and then
covered with an impermeable plastic barrier (polyethylene sheeting). Moisture conditioning
recommendations are provided in Section 6.2.1.
In choosing moisture conditioning as a method of slab movement reduction, the Client is accepting
some post construction movement of slabs (about 41/2 inches). Therefore, the Client understands
and acknowledges that in the geographical region covered by this report, a potential movement of
41/2 inches is considered a reasonable compromise between foundation design and construction
ALPHA Report No. W212453
cost and the amount of allowable movement of the foundation.
Please note, improvement of the existing soils using moisture conditioning with plastic sheeting is
intended only for the designated building pad areas plus S ft beyond the building pad limits, and
not the entire residential lot. Accordingly, planned residences must be exclusively constructed
within I ft of the placed plastic barrier and within the building pad designated on the reference
project grading plans. The purpose of the plastic sheeting is to maintain the moisture of the
underlying soils relatively the same from the time the plastic sheeting is placed through the time
the foundation is placed. This plastic sheeting is not intended as a moisture barrier component
for the actual foundation. Any such requirements should be addressed by the designer of the
foundation, and should be followed by the builder. Prior to building on the improved designated
building pad area, a surveyor should verify the lateral extent of the plastic sheeting and to confirm
that no portion of the new residences will extend beyond the limits of the designated building pad.
If any part of the slab footprint extends beyond the designated building pad, ALPHA should be
contacted for additional design recommendations.
6.2.1 Suberade Improvement Usine Moisture Conditioning in Zones III, IV, and V
Estimated potential movements of slab foundations in Zones III, IV, and V could be
reduced to about 41/2 inches by moisture -conditioning the uppermost 4 ft to 10 ft of soil
below final grade as recommended in Table A.
Limestone could be encountered within the recommended depth of moisture conditioning,
particularly near zone boundaries. In some cases, over -excavation of shallow and
relatively thin (less than 3 ft thick) limestone layers could be required. However, if
limestone is at least 3 ft thick, sufficiently strong and is present over the entire extents of
the building pad; it is not required to over -excavate limestone to install moisture
conditioned soils. Test pits should be performed to verify the nature of limestone prior to
terminating moisture conditioning at depths shallower than recommended. ALPHA should
be retained to observe the test pits.
Moisture -conditioning consists of over -excavating (where necessary) and/or filling with
on -site soil that is compacted at a "target" moisture content at least 5 percentage points
above the material's optimum moisture content as determined by the standard Proctor
method (ASTM D 698). The moisture -conditioned soil should be compacted to a dry
density between 93 and 98 percent of standard Proctor maximum dry density. Moisture -
conditioning with on -site soil should extend throughout the entire building pad area and at
least 5 ft beyond the perimeter of the designated building pad (as indicated on the
referenced project grading plans). Following completion of moisture -conditioning and
placement of the plastic sheeting, estimated movements in Zones III, IV, and V should
not exceed about 41/2 inches.
The purpose of moisture -conditioning is to reduce the free swell of the moisture -
conditioned soils to 1 percent or less. Additional laboratory tests (i.e., standard Proctors,
absorption swell tests, etc.) should be conducted during construction to verify that the
"target" moisture content for moisture -conditioning (estimated at 5 percentage points
above the material's optimum moisture content as defined by ASTM D 698) is sufficient
to reduce the free swell potential of the processed soil to 1 percent or less.
G7
ALPHA Report No. W212453
Moisture conditioning should be observed and tested on a full time basis by a representative
of ALPHA to verify the moisture conditioned clays are placed with the proper lift
thickness, moisture content, and density.
6.3 Post -Tensioning Institute, Design of Post -Tensioned Slab -on -Grade
Table B contains information for design of the post -tensioned, slab -on -grade foundations. Design
parameters were evaluated based on the conditions encountered in the borings and using
information and correlations published by PTI Third Edition and VOLFLO 1.5 computer program
provided by Geostructural Tool Kit, Inc. (GTI).
TABLE B
PTI Design Parameters Potential Seasonal Movement = 4% inches
In Zone I and after subgrade improvement in Zones II through V as recommended in Section 6.2
Edge Moisture Distance (em), ft
Differential Soil Movement (ym), inches
Edge Lift Center Lift
4.3 8.5
2.2 (swell) 1.6 (Shrink)
6.4 Independent Drilled Piers Associated with Slab Foundations in Deep Fill Areas
Significant thicknesses of fill (18 ft) are planned for slab foundations in Lot 40 of Block P in the
vicinity of Boring 102. For the building pad with planned fills of 17 ft or greater, a system of
independent drilled piers should be constructed below the slab -on -grade foundations to reduce the
potential for long-term settlements. The referenced lot is delineated on the Boring Location Plan,
Figures I and 1B, with heavy black outline.
Please Note: Due to the difference in potential movement between the piers and the slab -on -grade
foundation, piers should be independent and not structurally connected to the slab -on -grade
foundation. In addition, the structural engineer should appropriately design the slab -on -grade to
consider the possibility portions of the slab are supported only by the piers in the event the on -site
soils shrink/settle and pull away from the slab. Post Tension Institute (PTI) design parameters
provided in Section 6.3 of this report are valid only for slab -on -grade systems fully supported on
soil and do not take into consideration any portion of the slab or grade beams being fully or
partially suspended on piers due to shrinkage or swelling of on -site soils. Differential movements
can also occur between the pier supported foundations and connecting flatwork and utilities. This
should be considered when designing foundations and connections.
Alternating layers of clay, shaly clay, limestone, and/or shale extended to the 15 ft termination
depth of Borings 101 and 102. Due to the extreme variation in subsurface conditions and to the
depth to rock over relatively short distances, we recommend test piers be performed in front and
behind the building pad prior to construction to verify subsurface conditions at the lot and
constructability of drilled straight -shaft piers.
Recommendations for straight shaft piers and helical piers are provided in Sections 6.4.1 and 6.4.2.
7
ALPHA Report No. W212453
6.4.1 Straight -Shaft Piers
Limestone encountered in the borings was hard to very hard. Drilled pier contractors
planning to install straight shaft piers should make provisions for core barrels and/or rock
teeth to penetrate hard limestone.
Drilled piers bearing at least 2 ft into limestone can be dimensioned using a net allowable
bearing pressure of 5 ksf and skin friction (in compression) of 2 ksf. Uplift resistance can
be computed using a net allowable skin friction value of 1.6 ksf. The upper 2 ft limestone
should be neglected in computing skin friction. The allowable bearing pressure value has
a factor of safety of 3 considering general bearing capacity failure and the skin friction
values have a factor of safety of at least 2. Normal elastic settlement of piers under loading
is estimated at less than about 1 inch. Theses recommended parameters for end bearing
and skin friction are based on our expectation that drilled piers could extend through
limestone and bear in underlying clay layers based on conditions encountered in Boring
102.
Straight shaft piers should be sufficiently embedded into the limestone (and the underlying
clay layers) and should be designed with full length reinforcing steel to resist the uplift
pressure (soil -to -pier adhesion) due to potential soil swell along the shaft from post
construction heave and other uplift forces applied by structural loadings. The magnitude
of uplift adhesion due to soil swell along the pier shaft cannot be defined accurately and
can vary according to the actual in -place moisture content of the soils during construction.
Soil uplift adhesion is approximated to act uniformly over the portion of the pier shaft in
contact with clayey soils to a maximum depth of 12 ft below the ground surface. An uplift
adhesion of 1.0 kip per sq ft can be used for the portion of the pier shaft bearing against
moisture conditioned soils and an uplift adhesion of 1.4 kips per sq ft can be used for the
pier shaft bearing against general fill below the Moisture conditioned soils. An uplift
adhesion of 2.2 kip per sq ft can be used for the portion of the pier shaft bearing against
native, undisturbed soils.
6.4.2 Helical Piers
It could be desirable to use helical piers in lieu of drilled piers. Helical piers are a
manufactured foundation element consisting of a centralized steel shaft and one or more
helical bearing plates. The helical plates are formed with a uniform -pitch screw thread,
and the pier is installed by rotating it into the ground to the desired depth or refusal. The
helical plate(s) provides end bearing resistance due to gravity loads and uplift resistance
due to swelling of high shrink -swell active clays such as encountered at the boring
locations.
Helical piers should bear at a minimum depth of 20 ft below the ground surface in native
clay or on limestone. Helical piers should not bear in fill material. All helixes should be
situated at a depth of at least 20 ft below final grade. Vertical spacing between helixes
along the shaft should be least three (3) helix diameters, based on the largest adjacent helix.
The minimum helix diameter must be sized to prevent the bearing soils from being over-
stressed and to develop sufficient uplift capacity to overcome the potential uplift forces
acting on the pier. The helix portion should be at least three (3) times the width of the
shaft. The minimum clear spacing between edges of adjacent piers should be at least two
8
ALPHA Report No. W212453
(2) helix diameters (based on the larger helix). Normal elastic settlement of helical piers
under loading is estimated at less than about 1 inch.
Load capacity of helical piers bearing in native clays or on limestone at a depth of at least
20 ft below the ground surface can be calculated by summing the allowable end bearing
pressure of 6 kips per sq ft applied to the lowermost helix. Based on conditions
encountered in Boring 102, we expect a pier with a single helix will be required as the
limestone situated at a depth of 2 ft below existing grade will not permit penetrations
required for the minimum embedment of overlying helixes.
Each helical pier should be designed to resist the uplift pressure (soil -to -pier adhesion) due
to potential soil swell along the shaft from post construction heave and other uplift forces
applied by structural loadings. The magnitude of uplift adhesion due to soil swell along
the helical pier shaft cannot be defined accurately and can vary according to the actual in -
place moisture content of the soils during construction. Soil uplift adhesion is approximated
to act uniformly over the portion of the pier shaft in contact with clayey soils to a maximum
depth of 12 ft below the ground surface. An uplift adhesion of 1.0 kip per sq ft can be used
for the portion of the pier shaft bearing against moisture conditioned soils and an uplift
adhesion of 1.4 kips per sq ft can be used for the pier shaft bearing against general fill
below the Moisture conditioned soils.
From our experience, helical piers are frequently designed and installed by specialty
contractors. Helical piers should be designed by a professional engineer and should be
installed per the manufacturer's requirements. Helical piers should be load tested to verify
the pier is capable of supporting the design load. Load tests can also be utilized to
maximize the foundation load, thereby reducing the number of piers. We recommend
performing at least one helical pier load test. ALPHA would be pleased to assist in design,
implementation, and evaluation of a pier load test if desired.
6.5 Drainage and Other Considerations
Adequate drainage should be provided to reduce seasonal variations in the moisture content of
foundation soils. All pavement and sidewalks within 5 ft of the residences should be sloped away
from the structures to prevent ponding of water around the foundations. Final grades within 5 ft
of the structures should be adjusted to slope away from the structures at a minimum slope of 2
percent. Maintaining positive surface drainage throughout the life of the structures is
essential.
In areas with pavement or sidewalks adjacent to the new residences, a positive seal must be
maintained between the structure and the pavement or sidewalk to minimize seepage of water into
the underlying supporting soils. Post -construction movement of pavement and flatwork is
common. Normal maintenance should include inspection of all joints in paving and sidewalks,
etc. as well as resealing where necessary.
Several factors relate to civil and architectural design and/or maintenance, which can significantly
affect future movements of the foundation and floor slab systems:
9
ALPHA Report No. W212453
• Preferably, a complete system of gutters and downspouts should carry runoff water a
minimum of 5 ft from the completed structures.
• Large trees and shrubs should not be allowed closer to the foundation than a horizontal
distance equal to roughly one-half of their mature height due to their significant moisture
demand upon maturing.
• Moisture conditions should be maintained "constant" around the edge of the slab. Ponding
of water in planters, in unpaved areas, and around joints in paving and sidewalks can cause
slab movements beyond those predicted in this report.
• Planter box structures placed adjacent to building should be provided with a means to
assure concentrations of water are not available to the subsoil stratigraphy.
• Architectural design of the floor slabs should avoid additional features such as wing walls
as extensions of the slab.
• The root systems from existing trees at this site will have dried and desiccated the
surrounding clay soils, resulting in soil with near -maximum swell potential. Clay soils
surrounding tree root mats in areas to be covered with grade slabs (including but not limited
to foundations, driveways, patios and sidewalks) should be removed to a minimum depth
of 1 ft below the root ball and compacted in -place with moisture and density control as
described in Section 7.3.
Trench backfill for utilities should be properly placed and compacted as outlined in Section 7.4
and in accordance with requirements of local City standards. Since granular bedding backfill is
used for most utility lines, the backfilled trench should not become a conduit and allow access for
surface or subsurface water to travel toward the new structures. Concrete cut-off collars or clay
plugs should be provided where utility lines cross building lines to prevent water from traveling in
the trench backfill and entering beneath the structure.
7.0 GENERAL CONSTRUCTION PROCEDURES AND GUIDELINES
Variations in subsurface conditions could be encountered during construction. To permit
correlation between test boring data and actual subsurface conditions encountered during
construction, it is recommended a registered Professional Engineering firm be retained to observe
construction procedures and materials.
Some construction problems, particularly degree or magnitude, cannot be reasonably anticipated
until the course of construction. The recommendations offered in the following paragraphs are
intended not to limit or preclude other conceivable solutions, but rather to provide our observations
based on our experience and understanding of the project characteristics and subsurface conditions
encountered in the borings.
10
ALPHA Report No. W212453
7.1 Site Preparation and Grading
Limestone was encountered within 4 ft of the ground surface in several of the borings and will
likely be encountered during general excavation and grading at this site. From our experience, this
limestone can be hard and difficult to excavate. Rock excavation methods (including, but not
limited to rock teeth, rippers, jack hammers, or sawcutting) may be required to remove the
limestone. Crushing equipment may be required to process this limestone if it is desired to use
this material as compacted fill on the site. The contractor selected should have experience with
excavation in hard limestone.
Existing fill was encountered to depths of about 1 ft and 6 ft below the existing ground surface in
Borings 19 and 28, respectively. Although not encountered in the borings, existing fill materials
can also contain organics, boulders, rubble, and other debris which could be encountered during
site grading and general excavation. The earthwork and excavation contracts should contain
provision for removal of unsuitable materials in the existing fill. Test pit excavations performed
prior to construction can be used to evaluate the depth, extent and composition of existing fill at
this site. ALPHA would be pleased to provide this service if desired.
All areas supporting slab foundations, flatwork or areas to receive new fill should be properly
prepared.
• After completion of the necessary stripping, clearing, and excavating and prior to placing
any required fill, the exposed subgrade should be carefully evaluated by probing and
testing. Any undesirable material (organic material, wet, soft, or loose soil) still in place
should be removed.
• The exposed subgrade should be further evaluated by proof -rolling with a heavy pneumatic
tired roller, loaded dump truck or similar equipment weighing approximately 10 tons to
check for pockets of soft or loose material hidden beneath a thin crust of possibly better
soil.
• Proof -rolling procedures should be observed routinely by a Professional Engineer or his
designated representative. Any undesirable material (organic material, wet, soft, or loose
soil) exposed from the proof roll should be removed and replaced with well -compacted
material as outlined in Section 7.3.
• Prior to placement of any fill, the exposed subgrade should then be scarified to a minimum
depth of 6 inches and recompacted as outlined in Section 7.3.
If fill is to be placed on existing slopes (natural or constructed) steeper than six horizontal to one
vertical (6:1), the fill materials should be benched into the existing slopes in such a manner as to
provide a minimum bench width of five (5) ft. This should provide a good contact between the
existing soils and new fill materials, reduce potential sliding planes, and allow relatively horizontal
lift placements.
Even if fill is properly compacted as recommended in Section 7.3, fills in excess of about 10 ft are
still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This
should be considered when planning or placing deep fills.
11
ALPHA Report No. W212453
Slope stability analysis of embankments (natural or constructed) and global stability analysis for
retaining walls was not within the scope of this study.
The contractor is responsible for designing any excavation slopes, temporary sheeting or shoring.
Design of these structures should include any imposed surface surcharges. Construction site safety
is the sole responsibility of the contractor, who shall also be solely responsible for the means,
methods and sequencing of construction operations. The contractor should also be aware that
slope height, slope inclination or excavation depths (including utility trench excavations) should
in no case exceed those specified in local, state and/or federal safety regulations, such as OSHA
Health and Safety Standard for Excavations, 29 CFR Part 1926, or successor regulations.
Stockpiles should be place well away from the edge of the excavation and their heights should be
controlled so they do not surcharge the sides of the excavation. Surface drainage should be
carefully controlled to prevent flow of water over the slopes and/or into the excavations.
Construction slopes should be closely observed for signs of mass movement, including tension
cracks near the crest or bulging at the toe. If potential stability problems are observed, a
geotechnical engineer should be contacted immediately. Shoring, bracing or underpinning
required for the project (if any) should be designed by a professional engineer registered in the
State of Texas.
Due to the nature of the clay soils found near the surface at the borings, traffic of heavy equipment
(including heavy compaction equipment) may create pumping and general deterioration of shallow
soils. Therefore, some construction difficulties should be anticipated during periods when these
soils are saturated.
7.2 Foundation Excavations
All foundation excavations should be monitored to verify foundations bear on suitable material.
The bearing stratum exposed in the base of all foundation excavations should be protected against
any detrimental change in conditions. Surface runoff water should be drained away from
excavations and not allowed to collect. All concrete for foundations should be placed as soon as
practical after the excavation is made. Piers should be excavated and concrete placed the same
day.
Prolonged exposure of the bearing surface to air or water will result in changes in strength and
compressibility of the bearing stratum. Therefore, if delays occur, straight -shaft piers should be
slightly enlarged and deepened or a new (deeper) design penetration made to provide a fresh
bearing surface. Grade beams excavations should be cleaned and slightly deepened.
All pier shafts should be at least 1-ft in diameter to facilitate clean -out of the base and proper
monitoring. Concrete placed in pier holes should be directed through a tremie, hopper, or
equivalent. Placement of concrete should be vertical through the center of the shaft without hitting
the sides of the pier or reinforcement to reduce the possibility of segregation of aggregates.
Concrete placed in piers should have a minimum slump of 5 inches (but not greater than 7 inches)
to avoid potential honey -combing.
Observations during pier drilling should include, but not necessarily be limited to, the following
items:
12
ALPHA Report No. W212453
• Verification of proper bearing strata and consistency of subsurface stratification with
regard to boring logs,
• Confirmation the minimum required penetration into the bearing strata is achieved,
• Complete removal of cuttings from bottom of pier holes,
• Proper handling of any observed water seepage and sloughing of subsurface materials,
• No more than 2 inches of standing water should be permitted in the bottom of pier holes
prior to placing concrete, and
• Verification of pier diameter and steel reinforcement.
Groundwater was not encountered in the borings. However, groundwater seepage could be
encountered during pier installation. The risk of encountering this seepage is increased during or
after periods of precipitation. Temporary casing may be useful for controlling groundwater
seepage that could occur in the clayey soils in straight shaft pier excavations. As casing is
extracted, care should be taken to maintain a positive head of plastic concrete and minimize the
potential for intrusion of water seepage. It is recommended a separate bid item be provided for
casing on the contractors' bid schedule.
ALPHA should be contacted for further review and evaluation if groundwater seepage and/or
underream collapse occurs during pier installation.
Limestone encountered in the borings was hard to very hard. Drilled pier contractors planning to
install straight shaft piers should make provisions for core barrels and/or rock teeth to penetrate
hard limestone.
7.3 Fill Compaction
The following are recommendations pertaining to general fill compaction. Moisture conditioned
soil should conform to the recommendations provided in Section 6.2.
Clay soils with a plasticity index equal to or greater than 25 should be compacted to a dry density
between 93 and 98 percent of standard Proctor maximum dry density (ASTM D 698). The
compacted moisture content of the clays during placement should be within the range of 2 to 6
percentage points above optimum.
Clay soils with a plasticity index less than 25 should be compacted to a dry density of at least 95
percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1
percentage point below to 3 percentage points above the material's optimum moisture content.
Clayey materials used as fill should be processed and the largest particle or clod should be less
than 6 inches prior to compaction.
13
ALPHA Report No. W212453
Processed limestone used as fill should be compacted to at least 95 percent of standard Proctor
maximum dry density. The compacted moisture content of the processed limestone is not
considered crucial to proper performance. However, if the material's moisture content during
placement is within 3 percentage points of optimum, the compactive effort required to achieve the
minimum compaction criteria may be minimized. Individual rock pieces larger than 6 inches in
dimension should not be used as fill. However, if rock fill is utilized within 3 ft below the bottom
of floor slabs, the maximum allowable size of individual rock pieces should be reduced to 3 inches.
Processed limestone used as fill should incorporate sufficient fines to prevent the presence of voids
around larger diameter rock pieces. A gradation of at least 40 percent passing a standard No. 4
sieve is recommended.
Where mass fills are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least
100 percent of standard Proctor maximum dry density (ASTM D-698) and within 2 percentage
points of the material's optimum moisture content. The portion of the fill/backfill shallower than
10 ft should be compacted as outlined herein.
Compaction should be accomplished by placing fill in about 8-inch thick loose lifts and
compacting each lift to at least the specified minimum dry density. Field density and moisture
content tests should be performed on each lift.
7.4 Utilities
Where utility lines are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at
least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within —2 to +2
percentage points of the material's optimum moisture content. The portion of the fill/backfill
shallower than 10 ft should be compacted as previously outlined. Density tests should be
performed on each lift (maximum 12-inch thick) and should be performed as the trench is being
backfilled.
Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over
time of up to about I to 2 percent of the total fill thickness. This should be considered when
designing pavement over utility lines and/or other areas with deep fill.
If utility trenches or other excavations extend to or beyond a depth of 5 ft below construction grade,
the contractor or others shall be required to develop an excavation safety plan to protect personnel
entering the excavation or excavation vicinity. The collection of specific geotechnical data and
the development of such a plan, which could include designs for sloping and benching or various
types of temporary shoring, is beyond the scope of this study. Any such designs and safety plans
shall be developed in accordance with current OSHA guidelines and other applicable industry
standards.
7.5 Groundwater
Groundwater was not encountered in the borings. However, from our experience, shallow
groundwater seepage could be encountered from the subsurface stratigraphy in excavations for
pavement, utilities and other general excavations at this site. The risk of seepage increases with
depth of excavation and during or after periods of precipitation. Standard sump pits and pumping
may be adequate to control seepage on a local basis.
14
ALPHA Report No. W212453
In any areas where cuts are made, attention should be given to possible seasonal water seepage
that could occur through natural cracks and fissures in the newly exposed stratigraphy. Also, the
risk of seepage is increased where limestone is exposed in excavations and slopes or is near final
grade. In these areas subsurface drains may be required to intercept seasonal groundwater seepage.
The need for these or other dewatering devices should be carefully addressed during construction.
Our office could be contacted to visually observe final grades to evaluate the need for such drains.
8.0 LIMITATIONS
Professional services provided in this geotechnical exploration were performed, findings obtained,
and recommendations prepared in accordance with generally accepted geotechnical engineering
principles and practices. The scope of services provided herein does not include an environmental
assessment of the site or investigation for the presence or absence of hazardous materials in the
soil, surface water or groundwater. ALPHA, upon written request, can be retained to provide these
services.
ALPHA is not responsible for conclusions, opinions or recommendations made by others based
on this data. Information contained in this report is intended for the exclusive use of the Client
(and their designated design representatives), and is related solely to design of the specific
structures outlined in Section 2.0. No party other than the Client (and their designated design
representatives) shall use or rely upon this report in any manner whatsoever unless such party shall
have obtained ALPHA's written acceptance of such intended use. Any such third party using this
report after obtaining ALPHA's written acceptance shall be bound by the limitations and
limitations of liability contained herein, including ALPHA's liability being limited to the fee paid
to it for this report. Recommendations presented in this report should not be used for design of
any other structures except those specifically described in this report. In all areas of this report in
which ALPHA may provide additional services if requested to do so in writing, it is presumed that
such requests have not been made if not evidenced by a written document accepted by ALPHA.
Further, subsurface conditions can change with passage of time. Recommendations contained
herein are not considered applicable for an extended period of time after the completion date of
this report. It is recommended our office be contacted for a review of the contents of this report
for construction commencing more than one (1) year after completion of this report. Non-
compliance with any of these requirements by the Client or anyone else shall release ALPHA from
any liability resulting from the use of, or reliance upon, this report.
Recommendations provided in this report are based on our understanding of information provided
by the Client about characteristics of the project. If the Client notes any deviation from the facts
about project characteristics, our office should be contacted immediately since this may materially
alter the recommendations. Further, ALPHA is not responsible for damages resulting from
workmanship of designers or contractors. It is recommended the Owner retain qualified personnel,
such as a Geotechnical Engineering firm, to verify construction is performed in accordance with
plans and specifications.
15
#t\
APPENDIX
ALPHA Report No. W212453
A-1 METHODS OF FIELD EXPLORATION
Using standard rotary drilling equipment, a total of 116 test borings were performed for this
geotechnical exploration. The approximate locations of the borings are shown on the Boring
Location Plan, Figures IA and 1B. The test boring locations were staked using a handheld GPS
unit or by pacing/taping and estimating right angles from landmarks which could be identified in
the field and as shown on the site plan provided during this study. The locations of test borings
shown on the Boring Location Plan are considered accurate only to the degree implied by the
methods used to define them.
Relatively undisturbed samples of the cohesive subsurface materials were obtained by
hydraulically pressing 3-inch O.D. thin -wall sampling tubes into the underlying soils at selected
depths (ASTM D 1587). These samples were removed from the sampling tubes in the field and
evaluated visually. One representative portion of each sample was sealed in a plastic bag for use
in future visual evaluation and possible testing in the laboratory.
The Texas Cone Penetration (TCP) test was completed in the field to determine the apparent in -
place strength characteristics of the rock type materials. A 3-inch diameter steel cone driven by a
170-pound hammer dropped 24 inches is the basis for TxDOT strength correlations. Depending
on the resistance (strength) of the materials, either the number of blows of the hammer required to
provide 12 inches of penetration, or the inches of penetration of the cone due to 100 blows of the
hammer are recorded on the field log and are shown on the Log of Boring sheets as "TX Cone"
(reference TxDOT Test Method TEX 132-E, as modified).
Logs of the borings are included in the Appendix. The logs show visual descriptions of subsurface
strata encountered using the Unified Soil Classification System. Sampling information, pertinent
field data, and field observations are also included. Samples not consumed by testing will be
retained in our laboratory for at least 14 days and then discarded unless the Client requests
otherwise.
B-1 I ' +�. � —�
' rN
P-1 II B-3 B-4 1 —+� rater..
B-s
I
B-8 B-9 B-10 0
IVY �����. �'� p ,
B-11 B-13 j•r B-14 �B-1 �3-17��� {` '
12 i� IV IT �.
P-2 / P-3 /� rr fi
B-1 R IVB-19 B-2o � . � % .� r �
'Ti
P4��
B-23`'�--
B-30 r
B-27B-28 B-29 /
/ B-2 , III � % C. `` -
/^ B-35 ;B-36f i B-37
w B-31� IV
'" B-32
III III _
B-38 P-5 B-40-41' ;� B-42� B-43B-44
P-6 /
B-47 B-48 B-49 B-51 .' B-52
�%
B—Sc B-5 b.
T B-59 ° B-60� s p�
B-57
B-65
r
APPROXIMATE PRELIMINARY •
GEOTECHNICAL EXPLORATION A L R H A T E T I �l BORING LOCATION (W192432)
CHISHOLM TRAIL RANCH SECTION 3 APPROXIMATE BORING LOCATION
PHASES IA, 1B AND 2 F= ZONE
NWC OF BREWER BOULEVARD AND WHERE 17 ALL BESINS ZONE IV
STEWART FELTZ ROAD m ZONE II
FORT WORTH, TEXAS FIGURE 1A ZONE III ZONE Y
ALPHA PROJECT NO. W212453
BORING LOCATION PLAN L..jLOT REQUIRES DRILLED PIERS
AREAS EXCLUDEDFROM CURRENT B ,
STUDY UNTIL DEEPER BORINGS ARE DRILLED
III B-39�
II ��
L-T✓ I-
� � I
B-461
B-53 I B-55
P-7 B-54
Y_ I
_ _ I B-62LN, B-63
IV
Y B-6 1
B-66 I B-68
B-67
B-110;—I I
I ^
B-78 I I
w
I
B-85 Q
J_9
-8S
t .
J. -97 D-yo I
3
B-103 B-104
I
I
w - B-114F B-115 B-116-
B-113 V
STEWART FELTZ ROAD
GEOTECHNICAL EXPLORATION A L R H A'kT E ST I N G
CHISHOLM TRAIL RANCH SECTION 3 #
PHASES 1A, 113 AND 2
NWC OF BREWER BOULEVARD AND WHERE I T 1L L L B E f3 I M S
STEWART FELTZ ROAD
FORT WORTH, TEXAS FIGURE 1B
ALPHA PROJECT NO. W212453 BORING LOCATION PLAN
APPROXIMATE PRELIMINARY
BORING LOCATION (W192432)
APPROXIMATE BORING LOCATION
ZONEI ZONEIV
ZONE II ZONE V
ZONE III
LOT REQUIRES DRILLED PIERS
. AREAS EXCLUDED FROM CURRENT
STUDY UNTIL DEEPER BORINGS ARE DRILLED
ALPHA Report No. W212453
B-1 METHODS OF LABORATORY TESTING
Representative samples were evaluated and classified by a qualified member of the Geotechnical
Division and the boring logs were edited as necessary. To aid in classifying the subsurface
materials and to determine the general engineering characteristics, natural moisture content tests
(ASTM D 2216) and Atterberg-limit tests (ASTM D 4318) were performed on selected samples.
In addition, unconfined compressive strength tests (ASTM D 2166) and pocket -penetrometer tests
were conducted on selected soil samples to evaluate the soil shear strength. Results of these
laboratory tests are provided on the Log of Boring sheets.
In addition to the Atterberg-limit tests, the expansive properties of the clayey soils were further
analyzed by absorption swell tests in general accordance with ASTM D 4546. The swell test is
performed by placing a selected sample in a consolidation machine and applying either the
approximate current or expected overburden pressure and then allowing the sample to absorb
water. When the sample exhibits very little tendency for further expansion, the height increase is
recorded and the percent free swell and total moisture gain calculated. Results of these laboratory
tests are provided on the Log of Boring sheets.
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 1
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/19/2020 End Date: 6/19/2020 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Dark Brown CLAY
_10-
15
20
Tan LIMESTONE with clay seams and layers
Tan and Gray SHALY CLAY
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
r
>>
E
JC,
oa?i)o
f
"aL
In
O
O-�
aO
C
E a)-
dN
U)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
20
4.5+
23
83
26
57
2.0
4.0
13
13.0
20.0
175 7
4.75"
4.5 27 61 21 40
4.5+ 24
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
0 0
5058 Brush Creek Rd. BORING NO.: 2
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/19/2020 End Date: 6/19/2020 West:
CONTINUOUS FLIGHT AUGER North:
GROUND WATER OBSERVATIONS
QOn Rods (ft): NONE
ZAfter Drilling (ft): DRY
NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY
Tan CLAY
T Gray LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
`-
a O
C
E E
dN
U)
aoi
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
8
35
17
18
1.0
54
4.5+
8
35
19
16
53
8
9.0
100/
1"
3.5" 17
.5
100/ 11
20.0 , 1.25"
5058 Brush Creek Rd.
BORING NO.:
3
ALPHA
Phone»4 ��'�
sheet 1 1
^TESTING
656
of
Fax: 817-496-5608
PROJECT NO.:
W192432
WHERE IT ALL BEGINS
www.alphatesting.com
Client: Meritaqe Homes of Texas, LLC - DFW
Location: Fort Worth, Texas
Project: Chisholm Trail Ranch - Section 3
Surface Elevation:
Start Date: 6/19/2020 End Date:
6/19/2020
West:
Drilling Method: CONTINUOUS FLIGHT AUGER
North:
Hammer Drop (Ibs / in): 170 / 24
GROUND WATER OBSERVATIONS
�•�
E
0)
w NONE
V On Rods (ft):
o
T
;�
U� C.N a)
'�
_
E a o
ZAfter Drilling (ft): DRY
n 'oW o
a v
a, aN
.5
After_ Hours (ft):
o—�° a
m a) U`
p
�
3
o 0
a�
cn of X ci =
o o o
Q U)
HL a ZCU o
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments .
4.5+ 12
Light Brown CLAY
Tan and Gray SHALY CLAY
Tan LIMESTONE with clay seams and layers
Gray LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
2.0
8.0
3.5 10 56 18 38 0.8
4.5+ 2.9 115 17
4.5+ 14
4.5+ 22 58 20 38 2.7
14.0 4.5+ 18
100/ 42
1.25"
16.0
100/
20.0 , 0.75"
11
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 4
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/22/2020 End Date: 6/22/2020 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
10
_15
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
>
.>a>
E
J
aYU
C,oN
f
c
Oo
J_
aO
E
N
7O—�
a
i
U)
i
U
x ci
OU)
o O
Z
•�
CU
J
co
a
n cn
(0
Ha
c
D
a_.
4.5+
11
57
20
37
1.0
100/
8.25"
100/
1.50"
6 100/
1"
100/
0.75"
17.0
100/
20.0 L 1.50"
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
5J
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W192432
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC - DFW
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch - Section 3
Surface Elevation:
Start Date:
6/19/2020 End Date:
6/19/2020
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Dark Brown CLAY
5
Tan LIMESTONE with clay seams and layers
Tan CLAY
10
Tan Weathered LIMESTONE with clay seams
and layers
Tan and Gray SHALY CLAY
15
20
TEST BORING TERMINATED AT 20 FT
6.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
rno>
7
�
.>a>
E
J
�oNa)U�
f
"aL
cC
Oo
J_
YcU
Ea)
dN
7OoO
a
i
U)
ai
ofx
0
ci
OU)
o O
Z
•�
CU
J
mo
a
n cn
(0
Ha
d
c
D
a_4.5+
22
4.5+ 19 75 23 52 1.7
4.5+ 16
12
8.0
3.0 15 41 16 25
10.0
12.0
4.25 28 67 22 45 0.1
20.0
4.5+ 23
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 6
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/19/2020 End Date: 6/19/2020 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with calcareous deposits
Tan LIMESTONE with clay seams and layers
5
10
_15
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
>
.>a>
E
J
aYU
C,oN
f
c
Oo
J_
aO
E
N
7O—�
a
i
U)
i
U
x ci
OU)
o O
Z
•�
CU
J
co
a
n cn
(0
Ha
c
D
a_.
4.5+
6
45
19
26
1.0
5.25"
125
5
100/ 7
4.50"
100/
1.25"
17.0
11.1 00/ 10
20.0 L
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: %
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/19/2020 End Date: 6/19/2020 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Dark Brown CLAY
Light Brown CLAY
Tan LIMESTONE with clay seams and layers
Gray LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
r
>>
E
JC,
oa?i)o
f
"aL
In
O
O-�
aO
C
E a)-
dN
U)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5
20
4.5
22
74
22
52
4.0
3.0
23
47
18
29
0.3
5.0
100/
4.50"
11
100/
4.50"
14.0
100/
2.7575"
100/ 10
20.0 , 1.25"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 8
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/19/2020 End Date: 6/19/2020 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Tan LIMESTONE with clay seams and layers
_10—
15
20
Brown SHALY CLAY
TEST BORING TERMINATED AT 20 FT
20.0
Hammer Drop (lbs / in): 170 / 24
a
o -6•9 Et X
Q o U)C�:F o u, rn> .°'
oN �� U� r� >a> u�i E_ J a
�� ?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
E a) U- 0 E N
U) ofxci oU) o o E a m
�a a c Z D a
9
125 17
5.25"
71
100/
9.50"
4.5+ 22 68 25 43 2.7
4.5+ 23
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 9
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/19/2020 End Date: 6/19/2020 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
Tan LIMESTONE with clay seams and layers
5
10
_15
/ Gray SHALY CLAY
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
r
>>
E
JC,
oa?i)o
f
"aL
In
O
O-�
aO
C
E�-
dN
�v
U)
ofx
U
ci
OU)
o
o O
Z
•�
J
m
a
n cn
(0
Ha
d
c
D
a_.
4.5+
14
62
21
41
1.0
100/
4.75"
100/
2.50"
100/
2.25"
100/
5"
17.0
100/ 4.5+ 11 62 21 41
20.0 , 8.25'
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 10
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/19/2020 End Date: 6/19/2020 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
/ Dark Brown CLAY
Tan LIMESTONE with clay seams and layers
_5
Tan CLAY
j
j
Tan LIMESTONE with clay seams and layers
_10_
Tan and Gray SHALY CLAY
15
Tan LIMESTONE with clay seams and layers
Gray SHALY CLAY
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
r
>>
E
JC,
oa?i)o
f
"aL
In
O
O-�
aO
C
E�-
dN
�v
U)
ofx
U
ci
OU)
o
o O
Z
•�
J
m
a
n cn
(0
Ha
d
c
D
a_.
4.5+
26
80
28
52
1.0
100/
4.25"
100/
66 4.50"
6.0
. 4.5 18 48 19 29 0.5
9.0
46
11.0
4.5+ 27
15.0
17.0
4.5+ 24 67 23 44
20.0
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 11
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W192432
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas
Chisholm Trail Ranch - Section 3 Surface Elevation:
6/19/2020 End Date: 6/19/2020 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Brown CLAY
Tan LIMESTONE with clay seams and layers
Tan and Gray SHALY CLAY
Hammer Drop (lbs / in): 170 / 24
a
Q o U)C�:F o u,
rno >
In
J_ J E E
�oNaa)U "aL
f �op-� do cc dR r
VE a) a m Ycv
o3
n (n
U) ofxci oU) o o E a m
� a a c Z D o-
3.75 8.7 110 21 75 25 50
2.0
17" 12
56 17
12.0
71
3.5 27 67 23 44 0.4
18.0
Gray SHALY CLAY
4.5+ 22 59 21 38 0.0
20.0
TEST BORING TERMINATED AT 20 FT
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
12
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W192432
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC - DFW
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch - Section 3
Surface Elevation:
Start Date:
6/29/2020 End Date:
6/29/2020
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Light Brown CLAY
- with limestone fragments below 4 ft
Tan LIMESTONE with clay seams and layers
Gray LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y a)
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
`-
o O
C
E E
dN
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
21
4.5+ 2.5 115 16
4.5
6.0
100/
1.25"
12.0
100/
100/
20.0 , 0.75"
19 42 20 22 0.3
10
12
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
13
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W192432
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC - DFW
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch - Section 3
Surface Elevation:
Start Date:
6/29/2020 End Date:
6/29/2020
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
g
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
2.0
Light Brown CLAY
- with limestone fragments from 2 ft to 4 ft
11.0
Tan LIMESTONE with clay seams and layers
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
22
77
28
49
1 5"
1.
100/
20.0 , 1.25"
TEST BORING TERMINATED AT 20 FT
3.5 20
4.25 23
4.5+ 16 49 18 31 1.9
4.5+ 21
8
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 1
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
10
_15—
_20
Tan LIMESTONE with clay seams and layers
Gray LIMESTONE with shale seams
TEST BORING TERMINATION AT 20 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 2 c aN U 3 rn U
E V- 0 c 0
U) i xci o� o o E a m
� a a Z D o-
4.0 24 68 23 45
2.0
100/
1.25"
100/
2.25"
16.0
100/
20.0 , 0.25"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 2
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
5
10
_15
20
Tan LIMESTONE with clay seams and layers
Tan CLAY with calcareous deposits and limestone
fragments
Tan and Gray SHALY CLAY
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)
oN
��
o u,
U�
rn>
7�
.°'
E_
J
a o
n
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�—
o O
C
E E
aN
v
U
7
in
U ?i
U)
i
U
x ci
O�
o O
Z
•�
J
m
a
n
(0
Ha
d
D
a_4.5+
26
2.0
4.0
8.0
12.0
100/
15.0 , 1.5"
4.5+ 9 40 17 23
4.5+ 9
4.5+ 11.4 100 25 60 23 37 2.0
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
3
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Brown CLAY
5
Tan LIMESTONE with clay seams and layers
_10
_15_
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATION AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
o
Q
o
U
o
E>
.>a�
a)
E
_7
J
o
f
cC
In
Oo
YU
O—oO
E a)
dN
U
in
?i-
U)
a)
ofx
U
ci
OU)
o O
Z
•�
CU
J
a
(0
Ha
d
c
D
a_4.5+
24
6.0
1 5"
1.
6 100/1.1
18.0
100/
20.0 66 1.25"
4.5+ 14 62 19 43
4.5+ 17 1.3
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 4
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with rock fragments
5
10
J
15
20
Brown CLAY with limestone fragments
Reddish Brown SHALY CLAY
TEST BORING TERMINATED AT 15 FT
4.0
8.0
15.0
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
31
11
4.5+ 9 47 16 31 4.5
4.5+ 8
4.5+ 19 70 23 47 4.9
4.5+ 17
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
5
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
g
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5
10
_15_
_20
Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 20 FT
4.0
12.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
CU
J
a
(0
Ha
d
c
D
a_4.5+
19
100/
0.75"
100/
20.0 , 2.75"
4.5+ 23 63 24 39
4.5+ 15
4.5+ 17.5 120 14 37 18 19 0.0
4.5+
12
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 6
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
5.0
Tan LIMESTONE with clay seams and layers
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
8
6 100/
1"
100/
15.0 , 0.5"
TEST BORING TERMINATED AT 15 FT
4.5+ 11
4.5+ 13 68 21 47
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
%
Sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5
10
15
_20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o N
a)
o u,
U�
rn>
7�
.°'
>a>
E_
J
c o
n
��
o0
?�
c°
Y a)
of
"aL
c�
@o
>
�a
C
O
J
Y -
E
O�
`-
o O
C
E E
dN
0-
U
7
a
in
U ?i
U)
aoi
ofx
U
ci
OU)
o
o O
Z
•�
J
m
a
n cn
(0
Ha
d
c
D
a_4.5+
22
4.0
Tan LIMESTONE with clay seams and layers , 100/
0.75"
Tan and Gray CLAY with calcareous deposits
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 20 FT
8.0
14.0
100/
20.0 , 0.75"
4.5+ 18 73 26 47
4.5+ 18 43 21 22 0.5
4.5+ 26
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 8
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Brown CLAY
5.0
Tan LIMESTONE with clay seams and layers
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
22
6 100/
1"
100/
15.0 , 0.75"
TEST BORING TERMINATED AT 15 FT
4.5+ 12 54 21 33
4.5+ 16
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
9
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
4.0
Reddish Brown SHALY CLAY
20.0
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
11
4.5+ 12 61 20 41
4.5+ 17
4.5+ 19 68 23 45 4.7
4.5+ 21
4.5+ 19
4.5+ 20
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 10
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan CALCAREOUS CLAY
5
Tan LIMESTONE with clay seams and layers
10
Brown and Gray SHALY CLAY
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
o u,
rn>
.°'
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
E_
J
J
a o
-
n
o0
c°
of
O
c�
C
@o
dN
�a
v
O
Y a)
E
aa)
O�
U �-
o
E E
OU)
o O
•�
m
n
U)
ofx
ci
Ha
c
Z
D
J
a
(0
a_13
d
11
4.0
4.5+ 9 46 18 28
6.0
100/
5.25"
12.0
4.5+ 16
15.0
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
0 0
10
15
_20
5058 Brush Creek Rd.
BORING NO.: 11
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
GROUND WATER OBSERVATIONS
QOn Rods (ft): NONE
ZAfter Drilling (ft): DRY
NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
Brown and Gray SHALY CLAY
Gray LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
r
>>
E
JC,
oa?i)o
f
"aL
In
O
O-�
oO
C
E a)-
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_1.0
t
BE
16.0
20.0 ,
100/
1.5"
100/
0.5"
4.5+ 23 67 25 42 1.2
4.5+ 24
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 12
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
10
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
c
D
a_.
4.5+
26
1.0
100/
1"
100/
15.0 , 3'
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 13
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_5_
_10
_15
Gray SHALE
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o�
O�
`-
o O
C
E E
dN
U)
a�i
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
26
4.5+
15
60
21
39
4.0
100/
66
1"
100/
1"
100/
0.75"
16.0
1400/
20.0 ,
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 14
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Brown CLAY
10
J
15
20
Brown and Gray SHALY CLAY
TEST BORING TERMINATED AT 15 FT
6.0
15.0
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
29
4.5+ 19
4.5+ 18 65 21 44 4.8
4.5+ 16
4.5+ 18 68 23 45 4.5
4.5+ 19
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 15
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
Brown and Gray SHALY CLAY
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 o c dcv U n v 3
E V- 0 c 0
U) i xci o� o o E a m
� a a Z D a_
4.5+ 31
2.0
12.0
20.0
100/
3.75"
100/
1.75"
4.5+ 26 78 27 51
4.5+ 22
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 16
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with gravel
Tan LIMESTONE with clay seams and layers
5
_10_
Reddish Brown SHALY CLAY
15/
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o�
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_1.0
t
10
100/
1"
100/
3.5"
12.0
4.5+ 22
15.0
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 17
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Tan LIMESTONE with clay seams and layers
16.0
Reddish Brown CLAY
20.0
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
.°'
E_
a
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
J
J
o
-
n
o0
c°
O�
of
O
c�
C
@o
dN
�a
v
O
Y a)
E
aa)
ofx
U �-
ci
o
E E
OU)
o O
•�
J
m
a
n
(0
U)
Ha
c
Z
D
a_I
d
u
I I
100/
1.5"
4.5+
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 18
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Dark Brown CLAY
10
15
20
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o�
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
26
6.0
Tan LIMESTONE with clay seams and layers
100/
6.25"
100/
15.0 ).625'
TEST BORING TERMINATED AT 15 FT
4.5+ 22
3.75 4.3 108 24 82 27 55 0.9
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 19
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Dark Brown CLAY with gravel - FILL
_
Tan LIMESTONE with clay seams and layers
_5
Tan and Gray CLAY with calcareous deposits
and limestone fragments
Reddish Brown and Gray SHALY CLAY
10
15
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o�
O�
o O
C
E�
dN
�v
U)
a�i
ofx
U`-
ci
OU)
o
o O
Z
•�
CU
J
m
a
n cn
(0
Ha
c
D
a_4.5+
0
29
1.0
1
"
4
6.0
8.0
20.0
4.5+ 11 52 19 33
4.5+ 22
4.5+ 16
4.5+ 14
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 20
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
_10—
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 o c dcv U n v 3
E V- 0 c c
U) i xci o� o o E a m
� a a Z D o-
4.5+ 18
2.0
100/
).875875'
u
100/
15.0 , 1.25"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 21
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
_10—
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 o c dcv U n v 3
E V- 0 c c
U) i xci o� o o E a m
� a a Z D o-
4.5+ 9
2.0
100/
0.5"
u
100/
15.0 , 1.25"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 22
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
_10—
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 o c dcv U n v 3
E V- 0 c c
U) i xci o� o o E a m
� a a Z D o-
4.5+ 20
2.0
u
100/
0.75"
100/
15.0 ,
ALPHA
^TESTING
5058 Brush Creek Rd.
Phon »_Texas 56 ��'�
BORING NO.:
23
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
3.0
Tan LIMESTONE with clay seams and layers
12.0
Brown and Gray SHALY CLAY
16.0
Gray LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
24
79
27
52
4.5+
22
u
47
100/
20.0 ,
4.5+ 24
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 24
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
Tan and Gray CLAY with calcareous deposits
10
Tan LIMESTONE with clay seams and layers
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a
o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y
-
a)
E
O�
�—
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_.
4.5+
18
1.0
100/
2.5"
6.0
4.5+
16
57
19
38
2.5
4.5+
21
12.0
100/
15.0 ,
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
25
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Dark Brown CLAY
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y a)
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
`-
o O
C
E E
dN
0-
U
7
a
in
U ?i
U)
aoi
i
U
x ci
OU)
o
o O
Z
•�
CU
J
m
a
n cn
(0
Ha
d
c
D
a_4.5+
33
5
_ 6.0
Brown CLAY with limestone fragments and calcareous
deposits
_10�
Tan LIMESTONE with clay seams and layers
_15_
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATION AT 20 FT
12.0
100/
1.25"
16.0
20.0 L 1.2 100/
4.5+ 21
4.5+ 22 76 27 49 5.2
4.5+ 6.4 118 10
4.5+
9 37 15 22
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 26
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Brown CLAY with calcareous deposits and limestone
5 fragments
Tan LIMESTONE with clay seams and layers
_10
Tan CLAY
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o�
O�
�—
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
32
4.5+ 22 67 23 44
4.0
4.5+ 20 65 22 43
6.0
1 5"
1.
12.0
4.5+ 16
15.0
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
27
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Brown CLAY with calcareous deposits and limestone
fragments
_10_
_15—
_20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y a)
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
`-
o O
C
E E
dN
0-
U
7
a
in
U ?i
U)
aa)
ofx
U
ci
OU)
o
o O
Z
•�
CU
J
m
a
n cn
(0
Ha
d
c
D
a_4.25
24
6.0
Tan and Gray CLAY with calcareous deposits
7.0
Tan LIMESTONE with clay seams and layers
Gray LIMESTONE with shale seams
TEST BORING TERMINATION AT 20 FT
1 5"
1.
16.0
100/
20.0 , 1.25"
4.5+ 14
4.5+
14
50
21 29
4.5+
18
45
22 23
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 28
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Dark Brown, Brown, and Light Brown CLAY with
gravel - FILL
5
10
J
15
20
Tan and Gray SHALY CLAY
TEST BORING TERMINATED AT 15 FT
6.0
15.0
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
19
4.5+ 8 35 14 21
4.5+ 9
4.25 23
4.5+ 3.2 107 21 66 26 40
4.5+
21
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 29
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY
Tan LIMESTONE with clay seams and layers
5
_10_
Tan and Gray SHALY CLAY
15
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
c
D
a_.
4.5+
30
1.0
12.0
20.0
u
12"
4.5+ 16 53 18 35
4.5+ 22
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 30
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
_10—
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 o c dcv U n v 3
E V- 0 c c
U) i xci o� o o E a m
� a a Z D o-
4.5+ 16
2.0
100/
1.25"
u
100/
15.0 k $
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 31
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
Tan and Gray CLAY with calcareous deposits
Gray LIMESTONE with shale seams
TEST BORING TERMINATION AT 20 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 o c dcv U n v 3
E V- 0 c c
U) i xci o� o o E a m
� a a Z D o_
4.5+ 21 70 23 47
2.0
1"
4
6.0
4.25 25
4.0 1.3 103 22 73 24 49
12.0
u
100/
20.0 k
5058 Brush Creek Rd.
BORING NO.:
32
ALPHA
Phon »_Texas ��'�
sheet 1 1
^TESTING
56
of
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location:
Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases
1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drilling Method: CONTINUOUS FLIGHT AUGER
North:
Hammer Drop
(Ibs / in):
170 / 24
GROUND WATER OBSERVATIONS
�•�
E
0)
w
QOn Rods (ft): NONE
o
T �5
a`)
U� r'.m
_
E E a o
-
�
ZAfter Drilling (ft): DRY
n 'ow
o
a
a, aN
v
NFAfter Hours (ft):
o-�°
a� V -
a
p
�
3
as cn
o
Ha
d
o
j� Z D
j
a a_MATERIAL
DESCRIPTION
Dark Brown CLAY
—
/
4.0
31
—
4.5+
21
— 5
4.5+
21
82 27 55
_
6.0
Tan CLAY with calcareous deposits and limestone
—
�
fragments
4.5+
14
43 17 26
8.0
Tan LIMESTONE with clay seams and layers
100/
— 10
5.5"
,
100/
_15
15.0
, 0.5"
TEST BORING TERMINATED AT 15 FT
20
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 33
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
_10
Tan and Gray CLAY
15
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
`-
o O
C
E E
dN
U)
a�i
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
29
4.5+
19
67
23
44
4.0
12.0
20.0
100/
1.5"
4.5+ 22 68 24 44
4.5+ 24
5058 Brush Creek Rd. BORING NO.: 34
ALPHA ^TESTING Phon s»_Texas
6 56 ��'� sheet 1 of 1
Fax: 817-496-5608 PROJECT NO.: W212453
WHERE IT ALL BEGINS www.alphatesting.com
Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
Start Date: 10/11/2021 End Date: 10/11/2021 West:
Drilling Method: CONTINUOUS FLIGHT AUGER North:
Hammer Drop (Ibs / in): 170 / 24
GROUND WATER OBSERVATIONS o �•� E _ 0)
> L �5 `) U� r'.m E E
QNONE a
a o
� On Rods (ft): -
ZAfter Drilling (ft): DRY n 'ow o-�° a o a, aN p a v 3
o NFAfter Hours (ft): a� V - o � as cn
Ha d j� Z D j a a_MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
4.5+ 32
4.5+ 18 66 23 43
4.0
— � Light Brown CLAY with calcareous deposits and
5 limestone fragments
— � 4.5+ 17
4.5+ 14 35 16 19
j
4.5+ 34
10 10.0
Tan LIMESTONE with clay seams and layers
100/
_15 15.0 , 2.25"
TEST BORING TERMINATED AT 15 FT
20
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 35
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
10
J
15
_20
Light Brown CLAY with calcareous deposits
Gray LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
rno>
7
�
.>u>
E
J
aYU
�oNa)U�
f
"aL
cC
Oo
J_
oO
E a)
dN
7O—�
a
i
U)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n cn
(0
Ha
d
c
D
a_4.5+
19
4.0
20
4.5+
18
79
27
52
6.0
18.0
100/
20.0 66 0.75"
4.5+ 16
4.5+ 20 59 22 37
4.5+ 26
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 36
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
10
- J
15
20
Tan LIMESTONE with clay seams and layers
Light Brown CLAY with calcareous deposits
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 2 c aN U 3 rn U
E V- 0 c c
U) i xci o� o o E a m
� a a Z D o_
4.0 27 84 28 56
2.0
6.0
15.0
100/
7.5"
4.0 15
4.5+ 20 65 22 43
4.0 26
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 37
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_5
_10_
_15
Reddish Brown and Gray SHALY CLAY
_20
TEST BORING TERMINATED AT 20 FT
3.0
16.0
20.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
32
4.5+
15
69
23
46
u
100/
1.5"
63
4.5+ 22
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 38
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�—
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
33
4.5+ 22 69 26 43
4.0
Tan and Gray CLAY with calcareous deposits
and limestone fragments
4.5+ 14 28 18 10
6.0
Tan LIMESTONE with clay seams and layers
6 100/
1"
100/
15.0 , 0.5"
TEST BORING TERMINATED AT 15 FT
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
39
Sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5.0
Tan LIMESTONE with clay seams and layers
8.0
Tan and Gray CLAY with calcareous deposits
12.0
Tan LIMESTONE with clay seams and layers
18.0
Gray LIMESTONE with shale seams
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
UZ=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
CU
J
a
(0
Ha
d
c
D
a_4.5+
24
6 100/1.1
100/
20.0 66 1.5"
TEST BORING TERMINATED AT 20 FT
4.5+ 18 64 23 41
4.5+ 18
4.0 0.9 105 20 67 22 45
ALPHA
^TESTING
5058 Brush Creek Rd.
Phon »_Texas 56 ��'�
BORING NO.:
40
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
10
_15
20
Tan and Gray SHALY CLAY
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
24
6.0
12.0
15.0 ,
100/
0.75"
4.5+ 15
4.5+ 16 64 22 42 4.4
4.5+ 23
4.5+ 3.5 116 12 49 19 30 0.5
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client: Meritaqe Homes of Texas, LLC
Project: Chisholm Trail Ranch Section 3, Phase
Start Date: 10/11/2021 End Date:
Drilling Method: CONTINUOUS FLIGHT AU
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
0CL
After Hours (ft):
MATERIAL DESCRIPTION
Dark Brown and Light Brown CLAY with limestone
fragments
jj
i'
Tan CLAY with calcareous deposits
5
Reddish Brown CLAY
10
15
20
TEST BORING TERMINATED AT 20 FT
5058 Brush Creek Rd.
BORING NO.:
41
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.:
W212453
www. alphatesting. com
Location: Fort Worth, Texas
s 1A, 1B, and 2
Surface Elevation:
10/11 /2021
West:
GER
North:
Hammer Drop (Ibs / in):
170 / 24
Q o U)C�:F
E'—
o u, rn>
E_ E a
>�•
o
occ
Q E
o v UO
@NE
ac?in)n
aiU-oO
E a) O
oNo
Oof
Ho
'n cix
a
�ZC CU
D
a_d
4.5+-
12
49 18 31
4.0
4.5+
11
50 18 32
6.0
20.0
4.5+ 19 70 24 46 6.0
4.5+ 20
4.5+ 22
4.5+ 19
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 42
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Tan LIMESTONE with clay seams and layers
5
10
Reddish Brown CLAY
15/
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (Ibs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
.°'
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
E_
J
J
a o
-
n
o0
c°
of
O
c�
C
@o
dN
�a
O
U
7
in
Y a)
U ?i
O�
U—
o
E E
OU)
o O
�v
•�
a
co
n v)
U)
ofx
ci
Ha
d
c
Z
D
CU
J
a
(0
a_I
6 100/
1"
47
12.0
4.0 23
15.0
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 43
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
10
_15
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U)C�:F o u, rn> .°'
o N a� a) U E u>a> E_ J c o
�� ?� Y N In
"aL > C J Y
n o� c° of c� @o �a
p� o c dR U rn v 3
E V- 0 E N o 0� a m n (n
U) of xci oU) o o E a m
� a a c Z D o-
4.5+ 9
2.0
100/
66 1"
100/
5"
16.0
100/
20.0 L 1.5"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 44
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
10
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
c
D
a_.
4.5+
27
1.0
u
6 100/
1"
100/
15.0 , 1.75"
ALPHA
^TESTING
5058 Brush Creek Rd.
Phon »_Texas 56 ��'�
BORING NO.:
45
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
6.0
/ Tan CALCAREOUS CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_10
Tan and Gray CLAY with limestone fragments
15
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
18
8.0
13"
12.0
20.0
4.5+ 18
4.5+ 20 80 25 55 3.1
4.5+ 6 47 17 30
4.5+ 22 72 24 48
4.5+ 19
ALPHA
^TESTING
5058 Brush Creek Rd.
Phon »_Texas 56 ��'�
BORING NO.:
46
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Dark Brown CLAY
5
10
15
20
Tan CLAY with calcareous deposits and limestone
fragments
Tan and Gray SHALY CLAY with calcareous
deposits
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
19
65
22
43
2.0
8.0
12.0
15.0 ,
100/
1.5"
4.5+ 8
4.5+ 10 48 17 31 2.1
4.5+ 16
4.0 24 73 25 48 1.6
5058 Brush Creek Rd. BORING NO.: 47
Pha6ALPHA 5
Sheet 1 of 1
Fax: 817-496-5608 PROJECT NO.: W212453
WHERE IT ALL BEGINS www.alphatesting.com
Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
Start Date: 10/11/2021 End Date: 10/11/2021 West:
Drilling Method: CONTINUOUS FLIGHT AUGER North:
Hammer Drop (Ibs / in): 170 / 24
GROUND WATER OBSERVATIONS o �•� E _ 0)
> L �5 `) U� r'.g .� E E
Q18 a
a o
� On Rods (ft): -
ZAfter Drilling (ft): DRY n 'ow o-�° a o a, aN p a v 3
o NFAfter Hours (ft): a� V - o � as cn
Ha d j� Z D j a a_MATERIAL DESCRIPTION
Brown CLAY with calcareous deposits and limestone
fragments
— 4.5+ 19
4.5+ 11 52 24 28
_ 3.0
Tan LIMESTONE with clay seams and layers
—5
— , 100/
10 2.25"
— , 100/
15 6"
S_Z 18.0
Gray SHALY CLAY
— 4.5+ 22
20 20.0
TEST BORING TERMINATED AT 20 FT
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 48
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
_10—
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 o c dcv U n v 3
E V- 0 c c
U) i xci o� o o E a m
� a a Z D o-
4.5+ 30
2.0
100/
1.25"
10
10"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 49
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Tan LIMESTONE with clay seams and layers
18.0
Reddish Brown and Gray SHALY CLAY
20.0
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
.°'
E_
a
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
J
J
o
-
n
o0
c°
of
O
c�
C
@o
dN
�a
v
O
Y a)
E
aa)
O�
U �-
o
E E
OU)
o O
•�
m
n
U)
ofx
ci
Ha
d
c
Z
D
J
a
(0
a_I
u
100/
0.5"
53
4.5+
23
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 50
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
10
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
.°'
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
E_
J
J
a o
-
n
o�
c°
of
O
c�
C
@o
dN
�a
v
O
Y a)
E
O�
U �-
o
E E
OU)
o O
•�
m
n
U)
ofx
ci
Ha
c
Z
D
CU
J
a
(0
a_1.0
d
E
12
100/
1.125125'
u
100/
15.0 , 2.75"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 51
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_5
_10_
_15
Reddish Brown and Gray SHALY CLAY
_20
TEST BORING TERMINATED AT 20 FT
3.0
16.0
20.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
19
4.5+
11
51
20
31
u
100/
0.5"
100/
2.25"
4.5+ 22
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 52
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
_10_
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
25
4.5+
18
69
25
44
4.0
100/
0.5"
u
100/
15.0 , 2.25"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 53
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
_10
_15
Gray SHALE
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
`-
o O
C
E E
dN
U)
a�i
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
22
4.5+
16
68
22
46
4.0
100/
2.0"
53
16.0
100/
20.0 , 1.5"
ALPHA
^TESTING
5058 Brush Creek Rd.
Phon »_Texas 56 ��'�
BORING NO.:
54
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Light Brown GRAVELLY CLAY
Brown and Gray CLAY with calcareous deposits
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
19
4.0
6.0
8.0
100/
0.5"
100/
15.0 , 4.25"
4.5+ 15 68 24 44
4.5+ 7
4.5+ 14 36 17 19 0.0
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 55
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_5
10
15
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o N
a� a)
o u,
U
rn>
E
.°'
u>a>
E_
J
c o
n
��
o�
?�
c°
Y O
of
"aL
c�
In
@o
>
�a
C
O
J
Y -
E
O�
`-
o O
C
E E
dN
0-
U
7
a
in
U ?i
U)
aoi
ofx
U
ci
OU)
o
o O
Z
•�
J
m
a
n cn
(0
Ha
d
c
D
a_4.5+
23
62
24
38
2.0
1 5"
1.
20.0 L 58
5058 Brush Creek Rd.
BORING NO.:
56
ALPHA
Phon »_Texas ��'�
sheet 1 1
^TESTING
56
of
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location:
Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases
1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drilling Method: CONTINUOUS FLIGHT AUGER
North:
Hammer Drop
(Ibs / in):
170 / 24
GROUND WATER OBSERVATIONS
�•�
E
0)
w
QOn Rods (ft): NONE
o
T �5
a`)
U� r'.m
_
E E a
-
o
�
ZAfter Drilling (ft): DRY
n 'ow
o
a
a, aN
v
NFAfter Hours (ft):
o-�°
a� V -
a
p
�
as
3
cn
o
Ha
d
o
j� Z D
j
a a_MATERIAL
DESCRIPTION
/
Brown CLAY with limestone fragments
-
4.5+
23
_
2.0
Brown CLAY with calcareous deposits and limestone
fragments
-
4.5+
13
- 5
4.5+
18
68 21 47
3.3
-
4.5+
21
-
-
4.5+
20
10
_
12.0
Brown and Gray SHALY CLAY
-
-
4.5+
18
15
15.0
TEST BORING TERMINATED AT 15 FT
20
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 57
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Tan LIMESTONE with clay seams and layers
10
15
J
20
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
E
Z=
"aL
r
In
>>
JC,
-
oa?i)o
f
C
dN
O
a)
O—oO
U
E a)
OU)
o O
•�
U)
ofx
ci
Ha
d
c
Z
D
J
a
(0
a_I
1 5"
1.
8.0
Reddish Brown and Gray CLAY with limestone .
fragments
4.5+ 1.5 104 22 67 23 44
TEST BORING TERMINATED AT 20 FT
20.0
4.5+ 21
4.5+ 22
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 58
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Tan LIMESTONE with clay seams and layers
10
15
20
8.0
Light Brown and Gray CLAY with limestone fragments
12.0
Reddish Brown and Gray SHALY CLAY
15.0
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
.°'
E_
a
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
J
J
o
-
n
o0
c°
O�
of
O
c�
C
@o
dN
�a
v
O
Y a)
E
aa)
ofx
U �-
ci
o
E E
OU)
o O
•�
J
m
a
n
(0
U)
Ha
d
c
Z
D
a_I
100/
0.75"
4.5+ 22 64 23 41 2.0
4.5+ 19 61 20 41
5058 Brush Creek Rd.
BORING NO.:
59
ALPHA
Phone»4 ��'�
Sheet
1 1
^TESTING
656
of
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location:
Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases
1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drilling Method: CONTINUOUS FLIGHT AUGER
North:
Hammer Drop
(Ibs / in):
170 / 24
GROUND WATER OBSERVATIONS
�•�
E
0)
w
QOn Rods (ft): NONE
o
T �5
a`)
U� r'.m
_
E
E a o
-
�
ZAfter Drilling (ft): DRY
n 'ow
o
a
a, aN
v
NFAfter Hours (ft):
o-�°
a� V -
a
p
�
3
as cn
o
Ha
d
o
j� Z D
j
a a_MATERIAL
DESCRIPTION
/
Dark Brown CLAY with limestone fragments
—
3.75
29
78
27 51
_
2.0
Tan CALCAREOUS CLAY with limestone fragments
—
4.5+
10
—5
4.5+
8
42
17 25
_
6.0
Tan LIMESTONE with clay seams and layers
100/
— 10
3.5"
,
12.0
_
Reddish Brown CLAY
— —
4.5+
22
71
25 46
15
— —
4.5+
23
20
20.0
TEST BORING TERMINATED AT 20 FT
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 60
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
10
15
20
Tan LIMESTONE with clay seams and layers
Tan CLAY with calcareous deposits and limestone
fragments
Reddish Brown SHALY CLAY
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U) o u, rn> .°'
oN �� U� 7� E_ J a
?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
0 o c dcv U n v 3
E V- 0 c c
U) i xci o� o o E a m
� a a Z D a_
4.5+ 21 60 21 39
2.0
100/
2.5"
8.0
4.0 18 53 19 34 1.6
12.0
4.5+ 25
15.0
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
61
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
10
15
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
30
4.5+ 20
4.5+ 16 65 22 43 0.4
6.0
Tan CALCAREOUS CLAY
4.5+ 16 57 19 38
9.0 4.5+ 22
Gray LIMESTONE with shale seams , 100/
1.5"
TEST BORING TERMINATED AT 20 FT
100/
20.0 hL 3"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 62
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Tan CALCAREOUS CLAY
_5�
Tan LIMESTONE with clay seams and layers
10
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.0
27
74
25
49
1.00
4.5+
9
4.5+
12
40
17
23
6.0
100/
2.75"
100/
15.0 66 5„
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 63
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
GROUND WATER OBSERVATIONS
0)
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Brown CLAY
Tan LIMESTONE with clay seams and layers
Reddish Brown and Gray SHALY CLAY
5
10
15
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
.°'
E_
a
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
J
J
o
-
n
o�
c°
O�
of
O
c�
C
@o
dN
�a
O
Y a)
E
a�i
ofx
U`-
ci
o
E�
OU)
o
o O
�v
•�
J
m
a
n cn
(0
U)
Ha
c
Z
D
CU
a_.
4.5+
24
1.0
4.0
20.0
4.5+ 18
4.5+ 1.3 103 23 74 25 49 4.4
4.5+ 22
4.5+ 25
4.5+ 25
ALPHA
^TESTING
5058 Brush Creek Rd.
Phon »_Texas 56 ��'�
BORING NO.:
64
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5
10
J
15
20
Tan CALCAREOUS CLAY
Reddish Brown and Gray SHALY CLAY
TEST BORING TERMINATED AT 15 FT
2.0
8.0
15.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
18
69
22
47
4.5+ 8
4.5+ 9
4.5+ 11 33 14 19 0.0
4.5+ 23 71 25 46
4.5+ 22
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
0 0
5058 Brush Creek Rd.
BORING NO.: 65
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
GROUND WATER OBSERVATIONS
QOn Rods (ft): NONE
ZAfter Drilling (ft): DRY
NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY
Tan LIMESTONE with clay seams and layers
Brown CLAY with calcareous deposits
Tan and Gray SHALY CLAY
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
o u,
rn>
Z=
"aL
r
In
>>
E
JC,
oa?i)o
O—�
f
C
dN
O
ofx
U
ci
oO
E a)-
OU)
o O
•�
J
a
(0
U)
Ha
c
Z
D
CU
a_.
2.0
31
1.0
3.0
4.0
20.0
4.5+
4.5+
4.5+
4.5+
4.5+
4.5+
17 60 18 42
22
24
21 67 23 44
26
24
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 66
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
GROUND WATER OBSERVATIONS
0)
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Dark Brown and Brown CLAY with limestone
fragments
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
29
4.5+
22
72
24
48
4.5+
21
5.0
100/
3.0"
46
15.0 ,
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Meritaqe Homes of Texas, LLC
Project:
Chisholm Trail Ranch Section 3, Phase
Start Date:
10/11/2021 End Date:
Drilling Method: CONTINUOUS FLIGHT AU
GROUND WATER OBSERVATIONS
0)
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
After Hours (ft):
0CL
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
Tan CLAY with calcareous deposits
5
Tan and Gray SHALY CLAY
—
Tan LIMESTONE with clay seams and layers
10
_15
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
5058 Brush Creek Rd.
BORING NO.:
67
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.:
W212453
www. alphatesting. com
Location: Fort Worth, Texas
s 1A, 1B, and 2
Surface Elevation:
10/11 /2021
West:
GER
North:
Hammer Drop (Ibs / in):
170 / 24
Q o U)C�:F
E'—
o u, rn>
"a-5 N > C
E_ E a o
J -
o
n o� c°
Q E
of
O
c� @o �a O
C aN
Y a)
O�
E aoi U`-
o
E a)
O� o O •C
'n o x ci
Ha
d
Z D CU
J a (0
d
23
67 23 44
2.0
4.0
4.5+ 12
4.5+ 15 60 23 37
8.0
4.0 1.4 98 27 73 25 48
9.0
100
1.0"
16.0
100/
20.0 L 0.5"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 68
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan CALCAREOUS CLAY
Tan LIMESTONE with clay seams and layers
5
_10
Tan and Gray SHALY CLAY
15/
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in): 170 / 24
a
o -6•9 Et X
Q o U)C�:F o u, rn> .°'
oN �� U� r� >a> u�i E_ J a
�� ?� Y N "aL > C J Y
n o0 c° of c� @o �a ° a)
E U- 0 E N
U) of xci oU) o o E a m
� a a c Z D a_
4.5+ 23 65 25 40
2.0
4.5+ 10 45 21 24
4.0
100/
4.25"
50
12.0
4.5+ 27
15.0
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
69
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2
Surface Elevation:
Start Date:
10/11/2021 End Date:
10/11/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
5
10
15
20
4.0
Brown and Gray SHALY CLAY
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
12
4.5+ 14 64 22 42
4.5+ 18
4.5+ 21 60 24 36 3.6
8.0
Brown CLAY with limestone fragments 4.5+ 18 57 21 36
9.0
Tan LIMESTONE with clay seams and layers , 100/
0.25"
TEST BORING TERMINATED AT 20 FT
100/
20.0 hL 1.25"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 70
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation:
10/11/2021 End Date: 10/11/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
2.0
Light Brown CALCAREOUS CLAY
4.0
Reddish Brown and Gray SHALY CLAY
15.(
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•C
J
m
a
n
(0
Ha
a-c
D
a_
4.5+ 12 40 20 20
4.5+ 14
4.5+ 19
4.25 24 70 23 47 2.1
4.5+ 23
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
71
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
10/1/2021 End Date:
10/1/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
6.0
Reddish Brown CLAY
Light Brown SHALY CLAY
Gray LIMESTONE with shale seams
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•C
J
a
(0
H a
a-c
D
a_
100/
20.0 k
TEST BORING TERMINATED AT 20 FT
4.5+
4.5+
4.5+
4.5+
4.5+
13 61 20 41
23
23 65 24 41 1.9
19 55 20 35
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 72
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/30/2021 End Date: 9/30/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5
_10_
_15
20
Light Brown CALCAREOUS CLAY
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
4.0
6.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
20
100/
2.25"
100/
15.0 ,
4.5+ 17 62 21 41
4.5+ 10 43 23 20
5058 Brush Creek Rd.
BORING NO.:
73
ALPHA
Phone»4 ��'�
sheet 1 1
^TESTING
656
of
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2
Surface Elevation:
Start Date:
10/5/2021 End Date:
10/5/2021
West:
Drilling Method: CONTINUOUS FLIGHT AUGER
North:
Hammer Drop (Ibs / in):
170 / 24
GROUND WATER OBSERVATIONS
�•�
E
0)
w
QOn Rods (ft): NONE
o
T
�5
a`)
U� r'.m
_
E E a o
—
�
ZAfter Drilling (ft): DRY
n 'ow
o
a v
a, aN
NFAfter Hours (ft):
a�
o—�°
V -
a
p
�
3
as cn
o
Ha
o
j� Z D j
a a_MATERIAL
d
DESCRIPTION
Brown CLAY
—
/
4.5+
22
70 25 45
_
2.0
Tan LIMESTONE with clay seams and layers
13
— 5
—
,
��
"
10
12.0
_
Tan and Gray CLAY with calcareous deposits
—
—
4.5+
21
62 24 38
15
_
16.0
Gray LIMESTONE with shale seams
100/
_20
20.0
,
2.25"
TEST BORING TERMINATED AT 20 FT
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 74
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/5/2021 End Date: 10/5/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)
oN
��
o u,
U�
rn>
7�
.°'
E_
J
a o
n
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
aN
v
U
7
in
U ?i
U)
i
U
x ci
O�
o O
Z
•�
J
m
a
n
(0
Ha
d
D
a_4.5+
21
2.0
4.0
Brown CLAY
4.5+ 10 53 17 36 4.3
6.0
Tan LIMESTONE with clay seams and layers
100/
1.25"
100/
15.0 , 0.5"
TEST BORING TERMINATED AT 15 FT
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
75
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
10/6/2021 End Date:
10/6/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0 0
GROUND WATER OBSERVATIONS
QOn Rods (ft): NONE
ZAfter Drilling (ft): DRY
NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
Tan CALCAREOUS CLAY
Tan LIMESTONE with clay seams and layers
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
o u,
rn>
.°'
��
oN
?�
��
Y O
U�
"aL
E�
>a>
>
u�i
C
E_
J
J
a o
-
n
o0
c°
of
O
c�
C
@o
dN
�a
O
Y a)
E
a�i
O�
U `-
o
E E
OU)
o O
•�
U)
ofx
ci
Ha
c
Z
D
CU
J
a
(0
a_.
4.5+
26
1.0
4.0
4.5+
11
39
18
21
8.0
100/
2.5"
12/
4.5+ 13
18.0
Brown and Gray CLAY
4.5+ 20
20.0
TEST BORING TERMINATED AT 20 FT
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 76
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/1/2021 End Date: 10/1/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
5
_10_
_15
20
Tan CALCAREOUS CLAY
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
2.0
6.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
17
58
24
34
100/
1125 .125'
100/
15.0 , 0.75"
4.5+ 9
4.5+ 13
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client: Meritaqe Homes of Texas, LLC
Project: Chisholm Trail Ranch Section 3 - Phas
Start Date: 10/1/2021 End Date:
Drilling Method: CONTINUOUS FLIGHT AU
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Dark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
5
Tan CALCAREOUS CLAY
_10
_20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 20 FT
5058 Brush Creek Rd. BORING NO.: 77
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Location: Fort Worth, Texas
es 1A, 1B, and 2 Surface Elevation:
10/1 /2021 West:
GER North:
Hammer Drop (Ibs / in): 170 / 24
E'—
Q o U)C�:F o u, rn>
E_ E a
o Q E "aL N > C J Y
n o0 c° of c� @o �a ° a)
co o c dcv U n v 3
E a) U- 0 E N
'n of xci o� o o E a m
� a a Z D o-
4.5+ 13
4.5+ 11 60 23 37
4.0
100/
3"
6.0
4.0 17
4.5+ 13 29 16 13
12.0
u
20.0 62,
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 78
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/30/2021 End Date: 9/30/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
5
_10_
_15
20
Tan CLAY with calcareous deposits
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
4.0
6.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
15
13"
60
15.0 ,
4.5+ 13 72 23 49
4.5+ 13 39 20 19 1.2
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 79
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/5/2021 End Date: 10/5/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
_5_
10
15
20
Tan LIMESTONE with clay seams and layers
Tan and Gray CLAY with limestone fragments
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)
oN
��
o u,
U�
rn>
7�
.°'
E_
J
a o
n
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
`-
o O
C
E
aN
U
7
in
U ?i
U)
aoi
i
U
x ci
O�
o O
Z
•�
J
a
(0
Ha
d
D
a_4.5+
17
2.0
100/
2.5"
8.0
3.5
19
50
18
32
0.5
4.5+ 0.9 104 21
18.0
Reddish Brown CLAY
4.5+ 20
20.0
TEST BORING TERMINATED AT 20 FT
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 80
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/4/2021 End Date: 10/4/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
_10-
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)
oN
��
o u,
U�
rn>
7�
.°'
E_
J
a o
n
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
aN
v
U
7
in
U ?i
U)
i
U
x ci
O�
o O
Z
•�
J
m
a
n
(0
Ha
d
D
a_4.5+
18
2.0
1 5"
1.
100/
15.0 , 1.25"
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
81
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
10/5/2021 End Date:
10/5/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Tan and Gray CALCAREOUS CLAY
j
_5�
j
Tan and Gray SHALY CLAY with calcareous
deposits
10
Tan LIMESTONE with clay seams and layers
_15_
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
rno>
7
�
.>a>
E
J
�oNa)U�
f
"aL
cC
Oo
J_
YcU
E a)
dN
7O—oO
a
i
U)
ai
ofx
U
ci
OU)
o O
Z
•�
CU
J
mo
a
n cn
(0
Ha
d
c
D
a_4.0
24
73
24
49
2.0
6.0
12.0
16.0
100/
20.0 L 0.75"
4.5+ 7 31 19 12
4.5+ 10
4.5+ 19
4.5+ 21 53 23 30 3.6
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 82
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/5/2021 End Date: 10/5/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_5
Light Brown CLAY with calcareous deposits and
limestone fragments
10�
j/
Tan and Gray SHALY CLAY
15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�—
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
21
2.0
1
1.5"
8.0
7 4.5+ 16 37 18 19
12.0
4.5+ 23 72 23 49
15.0
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
83
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
10/1/2021 End Date:
10/1/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5
Tan CLAY with calcareous deposits and limestone
fragments
_10�
-1
` Reddish Brown and Gray SHALY CLAY
15
Tan LIMESTONE with clay seams and layers
Gray LIMESTONE with shale seams
20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O-oO
Eo
U)
ai
i
U
x ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
23
12.0 1
15.0
18.0
20.0 ,
100/
0.5"
4.5+ 15
4.5+ 19 82 25 57 3.3
4.5+ 15
4.5+ 12 35 17 18
4.5+ 25
ALPHA
^TESTING
5058 Brush Creek Rd.
Phon »_Texas 56 ��'�
BORING NO.:
84
Sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
9/30/2021 End Date:
9/30/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5
10
_15
20
Tan CLAY with calcareous deposits and limestone
fragments
Tan and Gray CALCAREOUS CLAY
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
17
4.0
8.0
12.0
15.0 ,
100/
7"
4.5+ 13 63 23 40
4.5+ 9
4.0 15 42 16 26
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 85
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/30/2021 End Date: 9/30/2021 West:
CONTINUOUS FLIGHT AUGER North:
0)
GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w
VAfter Drilling (ft): DRY
CL
Hours (ft):
0NFAfter
MATERIAL DESCRIPTION
Brown CLAY with calcareous deposits and limestone
fragments
10
15
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o�
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
13
6.0
Tan LIMESTONE with clay seams and layers
100/
0.75"
100/
15.0 L 1.5"
TEST BORING TERMINATED AT 15 FT
4.5+ 8
4.5+ 11 57 18 39 6.1
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 86
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/4/2021 End Date: 10/4/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_5_
10
Gray LIMESTONE with shale seams
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
18
4.5+
12
62
20
42
4.0
100/
0.5"
12.0
100/
15.0 , 2.25"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 87
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/4/2021 End Date: 10/4/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
10
15
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
19
6.0
Tan LIMESTONE with clay seams and layers
100/
0.75"
100/
15.0 L 1.25"
TEST BORING TERMINATED AT 15 FT
4.5+ 17
4.5+ 20 79 24 55 2.9
ALPHA
^TESTING
5058 Brush Creek Rd.
Phon »_Texas 56 ��'�
BORING NO.:
88
Sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
10/4/2021 End Date:
10/4/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
g
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown with limestone fragments
5
_10_
_15
20
Brown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
4.0
8.0
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
E�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
22
100/
0.75"
100/
15.0 , 1.25"
4.5+ 19 71 23 48
4.5+ 17
4.5+ 16 47 19 28 0.0
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 89
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/30/2021 End Date: 9/30/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Brown CLAY with calcareous deposits
_5
Tan LIMESTONE with clay seams and layers
10
_15
Gray SHALE
i
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
13
5.0
u
18.0
1"
4
100/
20.0 66 0.5"
4.5+ 10
4.5+ 8 45 17 28
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 90
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/4/2021 End Date: 10/4/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Tan CLAY with calcareous deposits and limestone
fragments
Tan LIMESTONE with clay seams and layers
5
10
Gray SHALE
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
o u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
22
2.0
4.5+
8
34
15
19
4.0
100/
66
1"
Q
u
12.0
100/
15.0 , 2.25"
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
91
Sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
10/4/2021 End Date:
10/4/2021
West:
Drilling Method:
CONTINUOUS FLIGHT AUGER
North:
0 0
Hammer Drop (Ibs / in):
170 / 24
GROUND WATER OBSERVATIONS
o
�•�
E
a�
0)
QOn Rods (ft): NONE
Lp
o 3
Y
Uoas
>
rn
E
a o
ZAfter Drilling (ft): DRY
n_
'ow
o
a,
aN
a
v
After_ Hours (ft):
o—�°
V
a
�
p
3
-
(f)
Ha
d
o
C�
O
Z
D
j
a
MATERIAL DESCRIPTION
Dark Brown CLAY
4.5+
24
81
26
55
2.0
Brown CLAY with calcareous deposits and limestone
fragments
4.5+
11
53
20
33
4.0
Tan LIMESTONE with clay seams and layers
18.0
Brown CLAY
20.0
TEST BORING TERMINATED AT 20 FT
100/
2.25"
12/
4.5+
18
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 92
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/4/2021 End Date: 10/4/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
10
J
15
20
Hammer Drop (lbs / in):
EE' —
°'
t
�
axi
Q
o
U)�
O u,
rn>
�)
.°'
E_
J
a o
n
?�
c°
of
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•C
J
m
a
n
(0
H a
(i
D
a_4.5+
25
4.5+ 16
4.5+ 21 74 24 50 5.3
6.0
Tan and Gray CLAY with calcareous deposits
and limestone fragments
4.5+ 13
TEST BORING TERMINATED AT 15 FT
15.0
4.5+ 16 50 18 32
4.5+ 23
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 93
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
10/4/2021 End Date: 10/4/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
_10_
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
23
4.5+
15
62
23
39
4.0
100/
0.5"
100/
15.0 , 2.25"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 94
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/30/2021 End Date: 9/30/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
_5_—
X0
10 X
X
1
15
20
Tan LIMESTONE with clay seams and layers
Tan CLAY
Tan and Gray CLAY
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
rn>
E
E
J
�oNaa)U
f
"aL
cC
In
Oo
J_
YcU
oO
E a)
dN
7O-�
a
i
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
15
63
24
39
2.0
100/
2.75"
6.0
4.5+
11
38
19
19
1.6
8.0
4.5+
23
71
24
47
12.0
100/
15.0 , 0.75"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 95
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/30/2021 End Date: 9/30/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5 ,
10
Tan LIMESTONE with clay seams and layers
Tan and Gray SHALY CLAY
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
>
)
.>a>
E
J
aYU
C,oN
f
"aL
cC
Oo
J_
oO
E a)
dN
7O—�
a
i
U)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
cn
Ha
d
c
D
a_4.5+
18
4.5+
15
4.5+
8.1
111
17
72
25
47
5.5
6.0
100/
5.5"
12.0
20.0
4.5+ 20 72 25 47
4.5+ 17
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 96
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/29/2021 End Date: 9/29/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
_10_
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o0
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
17
4.5+
10
53
20
33
4.0
100/
1.25"
100/
15.0 ,
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
97
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
9/29/2021 End Date:
9/29/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
Brown CALCAREOUS CLAY
5
Tan and Gray CLAY with limestone fragments
_10�
Tan LIMESTONE with clay seams and layers
_15_
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
22
4.0
6.0
12.0
16.0
20.0 L
100/
0.5"
4.5+ 14 61 21 40
4.5+ 12 47 18 29 1.3
4.5+ 15
4.5+ 4.1 113 16 42 20 22 0.7
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd.
BORING NO.: 98
Fort Worth, Texas 76119
Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608
PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/29/2021 End Date: 9/29/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
10
15
20
Brown and Gray CLAY with limestone fragments
TEST BORING TERMINATED AT 15 FT
6.0
15.0
Hammer Drop (lbs / in):
EE' —
°'
t
�
axi
Q
o
U)�
O u,
rn>
�)
.°'
E_
J
a o
n
o0
?�
c°
of
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•C
J
m
a
n
(0
H a
(i
D
a_4.5+
14
4.5+ 17
4.5+ 11.2 116 16 62 20 42
4.5+ 15
4.5+ 19 47 21 26 0.1
4.5+ 26
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone» 4 6 56 0119
BORING NO.:
99
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
9/29/2021 End Date:
9/29/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VADark Brown CLAY with limestone fragments
5
10
15
20
Brown CLAY with calcareous deposits
Brown and Gray SHALY CLAY
TEST BORING TERMINATED AT 20 FT
4.0
8.0
20.0
Hammer Drop (lbs / in):
EE' —
°'
t
�
axi
Q
o
U)�
o u,
rn>
E)
.°'
E_
J
a o
n
o0
?�
c°
of
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
`-
o O
C
E E
dN
U)
a�i
ofx
U
ci
OU)
o O
Z
•C
CU
J
a
(0
H a
(i
D
a_4.5+
14
4.5+
14 56 18 38
4.5+ 15
4.5+ 7.8 103 19 59 22 37
4.5+ 20 69 22 47
4.0 24
4.5+ 23
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 100
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/29/2021 End Date: 9/29/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
10
Brown and Gray CLAY with calcareous deposits
and limestone fragments
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
o u,
rn>
.°'
E_
a
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
J
J
o
-
n
o�
c°
O�
of
O
c�
C
@o
dN
�a
v
O
Y a)
E
aa)
ofx
U �—
ci
o
E E
OU)
o O
•�
J
m
a
n
(0
U)
Ha
d
c
Z
D
a_I
2.0
1 5"
1.
15"
12.0
3.0 25
15.0
5058 Brush Creek Rd.
BORING NO.:
101
ALPHA
Phon »_Texas ��'�
sheet 1 1
^TESTING
56
of
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location:
Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2
Surface Elevation:
Start Date:
9/29/2021 End Date:
9/29/2021
West:
Drilling Method: CONTINUOUS FLIGHT AUGER
North:
Hammer Drop
(Ibs / in):
170 / 24
GROUND WATER OBSERVATIONS
�•�
E
0)
w
QOn Rods (ft): NONE
o
T
�5
U� r- 'O
_
E a o
—
�
ZAfter Drilling (ft): DRY
,ao
vow
NFAfter Hours (ft):
o°
--
V
ao
N p
a)no
3
o
Ha
j� Z D
j
a a_MATERIAL
d
DESCRIPTION
Brown CLAY with calcareous deposits and limestone
fragments
—
4.5+
11
—
4.5+
13
63 19 44
4.5+
13
_ 5
5.0
Tan LIMESTONE with clay seams and layers
100/
— 10
—
,
1
14.0
_
Gray SHALE
100/
— 15
15.0 L
3"
TEST BORING TERMINATED AT 15 FT
20
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 102
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/29/2021 End Date: 9/29/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
10 X
X
21
X0
1
X
_X
15
20
Tan LIMESTONE with clay seams and layers
Tan and Gray CLAY with calcareous deposits
Tan and Gray CLAY with calcareous deposits
Tan and Gray SHALY CLAY
TEST BORING TERMINATED AT 15 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
rn>
E
E
J
�oNaa)U
f
"aL
cC
In
Oo
J_
YcU
oO
E a)
dN
7O-�
a
i
U)
ofx
U
ci
OU)
o O
Z
•�
CU
J
m
a
n
(0
Ha
d
c
D
a_4.5+
16
71
23
48
2.0
100/
3.25"
6.0
4.5+
2.5
106
17
43
19
24
1.5
8.0
4.5+
2.5
105
20
64
22
42
12.0
3.0
2.4
101
25
15.0
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 103
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/27/2021 End Date: 9/27/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_5
Brown and Gray CLAY
10
15
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
.°'
E_
a
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
J
J
o
-
n
o�
c°
of
O
c�
C
@o
dN
�a
O
Y a)
E
a�i
O�
U `-
o
E E
OU)
o O
•�
U)
ofx
ci
Ha
c
Z
D
J
a
(0
a_13
d
58
21
37
2.0
1
1.5"
BE
16.0
100/
20.0 , 0.5"
4.5+ 22 63 23 40 2.1
4.5+ 19
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 104
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/27/2021 End Date: 9/27/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Dark Brown and Brown CLAY with calcareous
deposits and limestone fragments
_5
10
Tan LIMESTONE with clay seams and layers
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (Ibs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o�
O�
�—
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
20
12.0
100/
15.0 , 2.25"
4.5+ 9
4.5+ 13
4.5+ 11 41 17 24 0.4
4.5+ 11
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 105
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/27/2021 End Date: 9/27/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
_5
Tan LIMESTONE with clay seams and layers
10
Brown CLAY with limestone fragments
KOO
15
Gray SHALE
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
r
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
18
5.0
13"
12.0
16.0
100/
20.0 , 1.75"
4.5+ 16
4.5+ 6 68 22 46
4.5+ 17 54 19 35
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 106
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/27/2021 End Date: 9/27/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
_5
10
Gray SHALE
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
o�
O�
�-
o O
C
E E
dN
v
U)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
11
53
22
31
2.0
100/
1.25"
u
12.0
100/
15.0 , 1.75"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 107
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/27/2021 End Date: 9/27/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Brown CALCAREOUS CLAY
- 5
Tan LIMESTONE with clay seams and layers
Tan and Gray CLAY with calcareous deposits
10
Tan LIMESTONE with clay seams and layers
_15_
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
o u,
rn>
E
Z=
"aL
r
In
>>
JC,
-
oa?i)o
f
C
dN
O
a)
O-oO
U
E a)
OU)
o O
•�
U)
ofx
ci
Ha
d
c
Z
D
J
a
(0
a_
4.0
4.5+ 14 45 17 28
6.0
8.0
4.5+ 14 51 20 31 1.5
12.0
100/
1.25"
16.0
100/
20.0 L 0.5"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 108
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/27/2021 End Date: 9/27/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
_10_
_15
20
Tan LIMESTONE with clay seams and layers
TEST BORING TERMINATED AT 15 FT
3.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
11
4.5+
10
51
18
33
100/
1.25"
100/
1.25"
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
109
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
9/27/2021 End Date:
9/27/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O—oO
C
E a)
dN
U)
a)
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
15
5
_ 6.0
Brown CLAY with calcareous deposits and limestone
fragments
_10�
Tan LIMESTONE with clay seams and layers
15
Gray LIMESTONE with shale seams
_20
TEST BORING TERMINATED AT 20 FT
12.0 1
16.0
20.0 L
100/
0.25"
4.5+ 12
4.5+ 12 60 19 41 5.7
4.5+ 14
4.5+ 14 46 17 29
4.5+ 6
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 110
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/27/2021 End Date: 9/27/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
%/A Dark Brown CLAY
5
10
15
20
Tan LIMESTONE with clay seams and layers
Tan CALCAREOUS CLAY
Brown CLAY with calcareous deposits
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)
oN
��
o u,
U�
rn>
7�
.°'
E_
J
a o
n
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o 2
C
E E
aN
v
U
7
in
U ?i
U)
i
U
x ci
O�
o O
Z
•�
J
m
a
n
(0
Ha
d
D
a_4.5+
21
76
27
49
2.0
4.0
8.0
4.5+ 13 30 15 15 0.5
4.5+ 2.7 114 14 42 18 24
4.5+ 20
12.0 1
Brown SHALY CLAY
4.5+ 24
15.0
TEST BORING TERMINATED AT 15 FT
ALPHA
^TESTING
5058 Brush Creek Rd.
Phone»4 656 ��'�
BORING NO.:
111
sheet 1 of 1
Fax: 817-496-5608
PROJECT NO.:
W212453
WHERE
IT ALL BEGINS
www.alphatesting.com
Client:
Meritaqe Homes of Texas, LLC
Location: Fort Worth, Texas
Project:
Chisholm Trail Ranch Section 3 - Phases
1A, 1 B, and 2
Surface Elevation:
Start Date:
9/24/2021 End Date:
9/24/2021
West:
Drillin Method:
CONTINUOUS FLIGHT AUGER
North:
9
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
5 ,
10
Tan CALCAREOUS CLAY
Tan and Gray SHALY CLAY
TEST BORING TERMINATED AT 20 FT
6.0
12.0
20.0
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
o u,
Z=
rn>
E
>>
E
JC,
oa?i)o
f
"aL
In
O
-
O-oO
C
E a)o
dN
U)
ai
ofx
U
ci
OU)
o O
Z
•�
J
a
(0
Ha
d
c
D
a_4.5+
17
4.5+ 18
4.5+ 17 62 19 43
4.5+ 12
4.5+ 15 36 16 20 0.4
4.5+ 2.0 102 22 71 23 48
4.5+
21
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 112
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/24/2021 End Date: 9/24/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
Tan CALCAREOUS CLAY
5
Tan LIMESTONE with clay seams and layers
10
Gray LIMESTONE with shale seams
_15
TEST BORING TERMINATED AT 15 FT
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o0
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
17
4.0
5.0
100/
0.75"
12.0
100/
15.0 rk 1.25"
4.5+ 14 64 21 43
4.5+ 13
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 113
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/24/2021 End Date: 9/24/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
5
10
_15_
_20
Tan CALCAREOUS CLAY
Tan LIMESTONE with clay seams and layers
Tan CLAY with limestone fragments
Tan LIMESTONE with clay seams and layers
Gray LIMESTONE with shale seams
TEST BORING TERMINATED AT 20 FT
Hammer Drop (lbs / in): 170 / 24
a
Q o U)C�:F o u, rn> .°'
o N a) U� 7� E_ J a
�� ?� Y N "aL > C J Y
n o0 c° of c� @o �a
p� o c dR U rn v 3
E V- 0 E N o 0� a m n (n
U) of xci oU) o o E a m
� a a c Z D o-
4.5+ 12 54 21 33
4.0
4.5+ 17 48 19 29
6.0
8.0
2.0 13 41 17 24
12.0
100/
1.25"
18.0
100/
20.0 66 1.5"
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 114
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/24/2021 End Date: 9/24/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
10
15
20
Hammer Drop (lbs / in):
170 / 24
a
Q
o
U)C�:F
oN
��
O u,
U�
rn>
r�
.°'
>a>
u�i
E_
J
a o
n
��
o�
?�
c°
Y O
of
"aL
c�
@o
>
�a
C
O
J
Y -
a)
E
O�
�-
o O
C
E E
dN
v
U)
aa)
ofx
U
ci
OU)
o O
Z
•�
J
m
a
n
(0
Ha
d
c
D
a_4.5+
19
6.0
Tan LIMESTONE with clay seams and layers
100/
2.25"
100/
15.0 L 1.5"
TEST BORING TERMINATED AT 15 FT
4.5+ 12
4.5+ 15 62 22 40 6.4
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 115
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/24/2021 End Date: 9/24/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
VABrown CLAY with limestone fragments
5
10
_ J
15
20
Brown CALCAREOUS CLAY
Reddish Brown and Gray SHALY CLAY
TEST BORING TERMINATED AT 20 FT
3.0
6.0
20.0
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
Z=
"aL
r
In
>>
E
JC,
-
oa?i)o
O—oO
f
C
dN
O
a)
ofx
U
ci
E a)
OU)
o O
•�
J
a
(0
U)
Ha
d
c
Z
D
a_I
4.5+ 17
4.5+ 17
4.5+ 1.7 102 20 65 22 43 4.1
4.5+ 21
4.5+ 16
ALPHA N
rTESTING
WHERE IT ALL BEGINS
Client:
Project:
Start Date:
Drilling Method:
5058 Brush Creek Rd. BORING NO.: 116
Fort Worth, Texas 76119 Sheet 1 of 1
Phone: 817-496-5600
Fax: 817-496-5608 PROJECT NO.: W212453
www.alphatestiiig.com
Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas
Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation:
9/24/2021 End Date: 9/24/2021 West:
CONTINUOUS FLIGHT AUGER North:
0) GROUND WATER OBSERVATIONS
V On Rods (ft): NONE
w VAfter Drilling (ft): DRY
CL
0NFAfter Hours (ft):
MATERIAL DESCRIPTION
Tan LIMESTONE with clay seams and layers
_5_
10
J
15
20
Reddish Brown and Gray SHALY CLAY
TEST BORING TERMINATED AT 15 FT
6.0
15.0
Hammer Drop (lbs / in):
170 / 24
Q
o
U)C�:F
a
O u,
rn>
.°'
E_
a
��
oN
?�
��
Y O
U�
"aL
r�
>a>
>
u�i
C
J
J
o
-
n
o0
c°
O�
of
O
c�
C
@o
dN
�a
O
Y a)
E
aa)
ofx
U �-
ci
o
E E
OU)
o O
•�
J
a
(0
U)
Ha
c
Z
D
a_1
d
1.5"
4.0 23
3.5 26 73 23 50 1.1
4.0 24
A L P H A #NtTESTING KEY TO SOIL SYMBOLS
WHERE IT ALL BEGINS AND CLASSIFICATIONS
SOIL & ROCK SYMBOLS
RELATIVE DENSITY OF COHESIONLESS SOILS (blows/ft)
®
(CH), High Plasticity CLAY
VERY LOOSE 0 TO 4
®
(CL), Low Plasticity CLAY
LOOSE 5 TO 10
MEDIUM 11 TO 30
(SC), CLAYEY SAND
DENSE 31 TO 50
VERY DENSE OVER 50
(SP), Poorly Graded SAND
(SW), Well Graded SAND
SHEAR STRENGTH OF COHESIVE SOILS (tsf)
(SM), SILTY SAND
VERY SOFT LESS THAN 0.25
SOFT 0.25 TO 0.50
IN(ML),
SILT
FIRM 0.50 TO 1.00
STIFF 1.00 TO 2.00
®
(MH), Elastic SILT
VERY STIFF 2.00 TO 4.00
HARD OVER 4.00
19
LIMESTONE
RELATIVE DEGREE OF PLASTICITY (PI)
SHALE / MARL
LOW 4 TO 15
SANDSTONE
MEDIUM 16 TO 25
HIGH 26 TO 35
o
(GP), Poorly Graded GRAVEL
VERY HIGH OVER 35
(GW), Well Graded GRAVEL
(GC), CLAYEY GRAVEL
RELATIVE PROPORTIONS (%)
W
(GM), SILTY GRAVEL
4
m(OL),
ORGANIC SILT
TRACE 1 TO 10
LITTLE 11 TO 20
SOME 21 TO 35
(OH), ORGANIC CLAY
AND 36 TO 50
15mm
1♦
N
SAMPLING SYMBOLS
PARTICLE SIZE IDENTIFICATION (DIAMETER)
■SHELBY
TUBE (3" OD except where
BOULDERS
8.0" OR LARGER
noted otherwise)
COBBLES
3.0" TO 8.0"
SPLIT SPOON (2" OD except where
COARSE GRAVEL
0.75" TO 3.0"
noted otherwise)
AUGER SAMPLE
FINE GRAVEL
COURSE SAND
5.0 mm TO 3.0"
2.0 mm TO 5.0 mm
❑
TEXAS CONE PENETRATION
MEDIUM SAND
FINE SAND
0.4 mm TO 5.0 mm
0.07 mm TO 0.4 mm
ROCK CORE (2" ID except where
SILT
CLAY
0.002 mm TO 0.07 mm
LESS THAN 0.002 mm
noted otherwise)
GR-01 60 00 Product Requirements
Page 1 of 1
GR-01 60 00 PRODUCT REQUIREMENTS
Chisholm Trail Ranch Section 3 Phase 1A
CPN 103826
CITY OF FORT WORTH
FORT WORM, WATER DEPARTMENT
STANDARD PRODUCT LIST
Note: All water or sewer pipe larder than 15 inch diameter shall be approved for use by the Water Department on a project specific basis.
Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16)
J
I 07/23/97
33 05 13
Urethane Hydrophilic Watcrstop
Asahi Keay. K.K.
Adeka Ultra -Seal P-201
I 04/26/00
33 05 13
Offset Joint for 4' Dim. MH
Hanson Concrete Products
Drawing No. 35-0048-001
I 04/26/00
33 05 13
Profile Gasket for 4' Diam. MH.
Press -Seal Gasket Corp.
2504G Gasket
I 1126199
33 05 13
HOPE Manhole Adjustment Rings
Ladiech, Inc
HDPE Adjustment Ring
I 5/13/05
33 05 13
Manhole External Wrap
Canusa - CPS
WrapidSeal Manhole Encapsulation System
I
er - aNTn- ior& Bases/Fiberglass 33-39-13 (1/8/13
1/26/99
33 39 13
Fiberglass Manhole
Fl77MZtrrin�g
taie08/30/0633
39 13
Fibe glass Manhole
I
EI
Water & Sewer - Manholes & Bases/Frames & Covers/Rectanaular 33-05-13 (Rev 2/3/1(l)
33 05 13
IManho1e Fmmes and Covers
Western Iron Works, Bass & Hays Foundry
I
Water & Sewer - anholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16)
3305 13
Manhole Frames and Covers
West= Iron Works, Bass & Hays Foundry
I*
3305 13
Manhole Frames and Covers
McKinley Iron Works Inc.
I08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
I08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
I33
05 13
Manhole Frames and Covers
Sigma Corporation
I33
05 13
Manhole Frames and Cove s
Sigma Corporation
I33
05 13
Manhole Frames and Covers
Pont-A-Mousson
I33
05 13
Manhole Frames and Covers
Neenah Casting
Flowtite
Updated:03/29/2022
be required for some
ASTM D2240/D412/D792
I
ASTM C-443/C-361 SS MH I
Traffic and Non -traffic area I
I
ASTM 3753 Non -traffic area
Non -traffic area
1001
I
24"x40" WD
I
30024
24" Dia. I
A 24 AM
24" Dia.
R-1272
ASTM A48 & AASHTO M306
24" Dia.
R- 165-LM (Hinged)
ASTM A48 & AASHTO M306
24" Dia.
NF 1274
ASTM A48 & AASHTO M306
30" Dia.
R-1743-LM (Hinged)
ASTM A48 & AASHTO M306
30" dia.
MH-144N
MH-143N
GTS-STD
24" dia.
I 10/31/06
33 05 13
Manhole Frames and Covers (Hinged)
Powerseal
Hinged Ductile Iron Manhole
ASTM A536
I 7/25/03
33 05 13
Manhole Frames and Covers
Saint-Gobain Pipelines (Pamrex/rexus)
RE32-R8FS
I 01/31/06
3305 13
30" Dia. MH Ring and Cover
East Jordan Iron Works
V1432-2 and V1483 Designs
AASHTO M306-04
I 11/02/10
3305 13
30" Dia. MH Ring and Cover
Sigma Corporation
MH1651FWN & MH16502
I 07/19/11
3305 13
30" Dia. MH Ring and Cover
Star Pipe Products
MR32FTWSS-DC
I 08/10/11
3305 13
30" Dia. MH Ring and Cover
Accucast
220700 Heavy Duty with Gasket Ring
30" ERGO XL Assembly
10/14/13
3305 13
30" Dia. MH Ring and Cover (Hinged & Lockable)
East Jordan Iron Works
with Cam Lock/MPIC/T-Gasket
ASSHTO MI 05 & ASTM A536
I 06/01/17
3405 13
30" Dia. MH Ring and Cover (Hinged & Lockable) CI
SIP Industries
2280 (32")
ASTM A 48
CAP-ONE-30-FTW, Composite, w/ Luck
.111111
33 OS 13
30" Dia. MH Ring and Cover
Composite Access Products, L.P.
w/o Hmg
I 10/07/21
3405 13
30" Dia. MH Ring and Cover
Trumbull Manufacturing
32"(30") Frame and Cover
I
Water & Sewer - Manholes & Bases/Frames & Covers/Water
Tight & Pressure Tight 33-05-1��v 2/3/1�
33 05 13
Manhole Frames and Covers
Pont-A-Mousson
Pamtight
I33
05 13
Manhole Frames and Cove s
Neenah Casting
I33
0513
Manhole Frames and Cove s
Western Iron Works,Bass & Hays Foundry
300-24P
I
33 05 13
Manhole Frames and Cove s
McKinley Iron Works Inc.
WPA24AM
I 03/08/00
33 05 13
Manhole Frames and Covers
Accucast
RC-2100
ASTM A 48
I 04/20/01
33 05 13
Manhole Frames and Covers
(SIP)Semmpore Industries Private Ltd.
300-24-23.75 Ring and Cover
ASTM A 48
I
Water & Sewer - Manholes & Bases/Precast Concrete (2ev
1/8/13
33 39 10
Manhole, Precast Concrete
Hydro Conduit Com
SPL Item #49
ASTM C 478
I *
33 39 10
Manhole, Precast Concrete
Wall Concrete Pipe Co. Inc.
ASTM C443
I 09/23/96
33 39 10
Manhole, Precast Concrete
Concrete Product Inc.
48" I.D. Manhole w/ 32" Cone
ASTM C 478
I 05/08/18
33 39 10
Manhole, Precast Concrete
The Turner Company
48", 60" I.D. Manhole w/ 32" Cone
ASTM C 478
I 10/27/06
33 39 10
Manhole, Precast Concrete
Oldcastle Precast Inc.
48" I.D. Manhole w/ 24" Cone
ASTM C 478
I 06/09/10
33 39 10
Manhole, Precast (Reinforced Polymer)Concrete
US Composite Pipe
Reinforced Polymer Concrete
ASTM C-76
I 09/06/19
33 3920
Manhole, Precast Concrete
Forterra Pipe and Precast
60" & 72" I.D. Manhole w/32" Cone
ASTM C-76
I 10/07/21
32 39 20
Manhole, Precast Concrete
Forterra Pipe and Precast
48" I.D. Manhole w/32" Cone
ASTM C-77
I 10/07/21
33 39 20
Manhole, Precast (Reinforced Polymer) Concrete
Armorock
48" & 60" I.D. Manhole w/32" Cone
I 10/07/21
33 3920
Manhole, Precast (Hybrid) Polymer & PVC
Predl Systems
48" & 60" I.D. Manhole w/32" Cone
I
Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitiou
EI-14
Manhole Rehab Svstems
Ouadex
I 04/23/01
EI-14
Manhole Rehab Systems
Standard Cement Materials, Inc.
Relmer MSP
E1-14
Manhole Rehab Systems
AP/M Permaform
I 4/20/01
E1-14
Manhole Rehab System
Strong Company
Strong Seal MS2A Rehab System
I 5/12/03
E1-14
Manhole Rehab System (Liner)
Poly -triplex Technologies
MH repair product to stop infiltration
ASTM D5813
I08/30/06
General Concrete Repair
FlexKrete Technologies
Vinyl Polyester Repair Product
I
F-_
aW ter & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious
I 05/20/96
EI-14
Manhole Rehab Svstems
Spravrou,
Spray Wall Polyurethane Coating
ASTM D639/D790
I*
EI-14
Manhole Rehab Systems
San Coast
12/14/01
Coating for Corrosion protection(Exterior)
ERTECH
Series 20230 and 2100 (Asphatic Emulsion)
I 01/31/06
Coatings for Corrosion Protection
Chesterton
Arc 791, S1BB, Sl, S2
Acid Resistance Test
I8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
I 08/30/06
Coatings for Corrosion Protection
Citadel
SLS-30 Solids Eppoxy
33 01 16, 33 39 10,
RR&C Dampproofing Non-]ribered Spray
.3119118
33 39 20
Coating for Corrosion protedim(Exterior)
Sherwin Williams
Grade (Asphatic Emulsion)
24" dia.
24" Dia.
30" Dia.
30" Dia.
30" Dia
30" Dia
30" Dia
30" Dia
30" Dia.
30" Dia
30" Dia
24" Dia. I
24" Dia. I
24" Dia. I
24" Dia. I
24" Dia. I
24" Dia. I
I
I
48" I
48"
48" w/32" cone
48", 60"
48" Dim w 24" Ring
48" to 72"
60" & 72"
41"
48" & 60"
48" & 60" Non Traffic Areas I
lutt'1. Irr
For Exterior Coating of Concrete
Structures Only
Sewer Applications
Sewer Applications
Sewer Applications
For Exterior Coating of Concrete
Structures Only
* From Original Standard Products List
FORT WORM,
Note: All water or sewer pipe larder than 15 inch diameter shall be
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
for use by the Water
Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16)
I *
33 - 13
Manhole Insert
Knutson Enterprises
I *
33 05 13
Manhole Insert
South Western Packaging
I *
33 05 13
Manhole Insert
Noflm-Inflow
I 09/23/96
33 05 13
Manhole Insert
Southwestern Packing & Seals, Inc.
I 09/23/96
33 05 13
Manhole Insert
Southwestern Packing & Seals, Inc.
I
Water & Sewer - Pine Casing Suacers 33-05-24 (07/01/1
11/04/02
Steel Band Casing Spacers
Advanced Products and Systems, Inc.
02/02/93
Stainless Steel Casing Spacer
Advanced Products and Systems, Inc.
04/22/87
Casing Spacers
Cascade Waterworks Manufacturing
09/14/10
Stainless Steel Casing Spacer
Pipeline Seal and Insulator
09/14/10
Coated Steel Casin Spacers
Pipeline Seal and Insulator
05/10/11
Stainless Steel Casing Spacer
Powerseal
03/19/18
Casing Spacers
BWM
03/19/18 Casing Spacers
03/29/22 1 33 05 13 ICasmg Spacers
low Water & Sewer - PiDes/Ductile Iron 33-11-10(1/8/13)
BWM
CCI Pipeline Systems
basis.
Made to Order - Plastic
Made to Order - Plastic
Made to Order - Plastic
L feSaver - Stainless Steel
TetherLok - Stainless Steel
Carbon Steel Spacers, Model SI
Stainless Steel Spacer, Model SSI
Casing Spacers
Stainless Steel Casing Spacer
Coated Steel Casin Spacers
4810 Powerchock
SS-12 Casing Spner(Stainless Steel)
FB-12 Casing Spacer (Coated Carbon Steel)
for Non_pressure Pipe and Grouted Casing
CSC12, CSS12
Updated:03/29/2022
equired for some pipes.
itional Spec Size
ASTM D 1248 For
ASTM D 1248 For 24" dig.
ASTM D 1248 For 24" dia.
For 24" dia.
For 24" this,
Up to 48"
Up to 48"
Up to 48"
*
33 11 10
Ductile Iron Pipe
Griffin Pipe Products, Co.
Super Bell-Tite Ductile Iron Pressure Pipe,
AW WA C150, C151
3" thin 24"
OS/24/18
33 11 10
Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Fastite Pipe (Bell Spigot)
AW WA C150, C151
4" than 30"
08/24/18
33 11 10
Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Flex Ring (Restrained Joint)
AW WA C150, C151
4" thou 30"
*
33 11 10
Ductile Iron Pipe
U.S. Pipe and Foundry Co.
AW WA C150, C151
*
33 11 10
Ductile Iron Pipe
McWane Cast Iron Pipe Co.
AW WA C150, C151
I
Water & Sewer - Utility Line Marker (08/24/2018)
I
Sewer - Coatin
1s/Euoxv 33-39-60 (01/08/131
02/25/02
Epoxy Lining System
Sauereisen, Inc
SewerGard 21ORS
LA County #210-1.33
I 12/14/01
Epoxy Lining System
Erieeh Technical Coatings
Ertech 2030 and 2100 Series
I
I 04/14/05
Interior Ductile Iron Pipe Coating
Inderon
Protecto 401
ASTM B-117
Ductile Iron Pipe Only I
I01/31/06
Coatings for Corrosion Protection
Chesterton
Arc 791, S1BB, SL S2
Acid Resistance Test
Sewer Applications I
I8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
Sewer Applications I
Sewer - Coatin i! s/Polvurethane
I
Sewer - Combinatio
OS/25/18 33-31-70 Air Rc
I
I
Sewer - Pioes/Concr
EI-04 Conc.
I EI-04 Cone.
I EI-04 Cone.
I EI-04 Conc.
PEI I
Sewer - Pine Enlare
PIRMS
SCCo S
Sewer - Piue/Fib c"
7/21/97 33 31 13 Ccnt.
I 03/22/10 33 31 13 Fiberg
I 04/09/21 Glass -
I 4114105 Polym
I 06/09/10 EI-9 Rem
I
Sewer - Pines/HDPE
�Hi,h-
High-
High-
High-
Sewer - Piues/PVC
12/02/11 33-11-12 DR-14
10/22/14 33-11-12 DR-1
4
I
* From Original Standard Products List
lase Valve
A.R.I. USA, Inc.
ete
Pipe, Reinforced
Wall Concrete Pipe Co. Inc.
Pipe, Reinforced
Hydro Conduit Corporation
Pipe, Reinforced
Hanson Concrete Products
Pipe, Reinforced
Concrete Pipe & Products Co. Inc.
ment Svstem (Method)33-31-23 (01/18/13)
ystem
PIM Corporation
nnell Systems
McLat Construction
ystems
Trenchless Replacement System
lass Reinforced Pine 33-31-13(1/8
Cast Fiberglass (FRP)
Hobas Pipe USA, Inc.
lass Pipe (FRP)
Ameron
Fiber Reinforced Polymer Pipe (FRP)
Thompson Pipe Group
er Modified Concrete Pipe
Amitech USA
reed Polymer Concrete Pipe
US Composite Pipe
33-31-23(1/8/131
density pOlycthylCnC pipe
Phillips Driseopipe, Inc.
density polyethylene pipe
Plexco Inc.
density polyethylene pipe
Polly Pipe, Inc.
density polyethylene pipe
CSR Hydro Conduit/Pipeline Systems
(Pressure Sewer)33-11-12 (4/t/13)
PVC Pressure Pipe
Pipelite Jetstream
PVC Pressure Pipe
Royal Building Products
D025LTP02(Composite Body)
III T&G, SPL Item #77
ASTM C 76
I
- - - e, #98 Pipe
ASTM C 76
I
ASTM C 76
I
I
Polyethylene
PIM Corp., Piscam Way, N.J.
Approved Previously
Polyethylene
Houston, Texas
Approved Previously I
Polyethylene
Calgary, Canada
Approved Previously I
I
Hobas Pipe (Non -Pressure)
ASTM D3262N3754
Bondstrand RPMP Pipe
ASTM D3262N3754
I
Thompson Pipe (Flowtite)
ASTM D3262N3754
I
Meyer Polycrete Pipe
ASTM C33, A276, F477
8" to 102", Class V I
Reinforced Polymer Concrete Pipe
ASTM C-76
I
I
Opticore Ductile Polyethylene Pipe
ASTM D 1248
8"
ASTM D 1248
8"
ASTM D 1248
8"
McConnell Pipe Enlargement
ASTM D 1248
I
I
PVC Pressure Pipe
AW WA C900
4" thou 12"
Royal Seal PVC Pressure Pipe
AW WA C900
4" thou 12"
FORT WORM,
Note: All water or
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
than 15 inch diameter shall be aooroved for use by the Water
basis. Special bedding may be required for some
Updated: 03/29/2022
'-------'-'-
------
L.'
*
33-31-20
PVC Sewer Pipe
J-M Manufacturing Co., Ina (1M Eagle)
SDR-26
ASTM D 3034
4" - 15"
12/23/97*
33-31-20
PVC Sewer Pipe
Diamond Plastics Comoration
SDR-26
ASTM D 3034
4" thin 15"
*
33-31-20
PVC Sewer Pipe
Lamson Vylon Pipe
ASTM F 789
4" thin 15"
01/18/18
33-31-20
PVC Sewer Pipe
Vinyltech PVC Pipe
Gravity Sewer
ASTM D3034
4" thin 15"
11/11/98
33-31-20
PVC Sewer Pipe
Diamond Plastics Comoration
"S" Gravity Sewer Pipe
ASTM F 679
18" to 27"
*
33-31-20
PVC Sewer Pipe
J-M Manufacturing Co, Inc. (JM Eagle)
SDR 26/35 PS 115/46
ASTM F 679
18" - 28"
09/11/12
05/06/05
33-31-20
33-31-20
PVC Sewer Pine
PVC Solid Wall Pipe
Pi q life Jet Stream
Diamond Plastics Corporation
SDR-26 and SDR-35
SDR 26/35 PS 115/46
ASTM F-679
ASTM F-679
18"
18" to 48"
04/27/06
33-31-20
PVC Sewer Fittings
Harco
SDR-26 and SDR-35 Gasket Fittings
ASTM D-3034, D-1784, etc
4" - 11"
*
33-31-20
PVC Sewer Fittings
Plastic Trends, Inc.(Westlake)
Gasketed PVC Sewer Main Finings
ASTM D 3034
1 3/19/2018
33 3120
PVC Sewer Pipe
Pipelife Jet Stream
SDR 35
ASTM F679
18"- 24"
1 3/19/2018
33 3120
PVC Sewer PTc
Pipelife Jet Stream
SDR 26
ASTM D3034
4"- 15"
3/29/2019
33 3120
Gasketed Fittings (PVC)
GPK Products, Inc.
SDR 26
ASTM D3034/F-679
4"- 15"
1 10/21/2020
33 3120
PVC Sewer Pipe
NAPCO(Westlake)
SDR 26
ASTM D3034
4" - 15"
1 10/22/2020
33 3120
PVC Sewer Pipe
Sanderson Pipe Coro.
SDR 26
ASTM D3034
4"- 15"
1 10/21/2020
33 3120
PVC Sewer Pipe
L NAPCO(Westlake)
SDR 26/35 PS 115/46
ASTM F-679
18"- 36"
I
*
Cured in Place Pipe
Insituforin Texark, Inc
ASTM F 1216
05/03/99
Cured in Place Pipe
�C.ed
National Envirotech Group
National Liner, (SPL) Item 427
ASTM F-1216/D-5813
05/29/96
in Place Pipe
Reynolds Inc/Inliner Technolgy (Inliner USA)
Inliner Technology
ASTM F 1216
Sewer - Pines/Rehab/Fold & Farm
Fold and Form Pipe
Cullum Pipe Systems, Inc.
11/03/98
Fold and Form Pipe
Insitufamn Technologies, Inc.
Insituf "NuPIpe"
ASTM F-1504
Fold and Form Pipc
American Pipe & Plastics, Inc.
Demo. Purpose Only
12/04/00
Fold and Form Pipc
Ultraliner
Ultraliner PVC Alloy Piveliner
ASTM F-1504, 1871, 1867
06/09/03
Fold and Form Pipe
Miller Pipeline Con".
EX Method
ASTM F-1504, F-1947
Up to 18" diameter
Sewer - Pioes/Ouen Profile Laree Diameter
09/26/91
E100-2
PVC Sewer Pipe, Ribbed
Lamson Vylon Pipe
Carlon Vylon H.C. Closed Profile Pipe,
ASTM F 679
18" to 48"
09/26/91
E100-2
PVC Sewer Pipe, Ribbed
Extrusion Technologies, Inc.
Ultra -Rib Open Profile Sewer Pipe
ASTM F 679
18" to 48"
E100-2
PVC Sewer Pipe, Ribbed
Up -or ETI Company
11/10/10
(E100-2)
Polwropylene (PP) Sewer Pipe, Double Wall
Advanced Drainage Systems (ADS)
SaniTite HP Double Wall (Corrugated)
ASTM F 2736
24"-30"
11/10/10
(E100-2)
Polwrovylene (PP) Sewer Pipe, Triple Wall
Advanced Drainage Systems (ADS)
SainTde HP Triple Wall Pipe
ASTM F 2764
30" to 60"
05/16/11
Steel Reinforced Polyethylene Pipe
ConTech Construction Products
Dann—
ASTM F 2562
24" to 72"
01/18/18
Water - A[mmmenlllj�-10 (07/0�
33-12-10 Double Strap Saddle
Romac
202NS Nylon Coated
AWWA C800
1"-2"SVC, up to 24" Pipe
08/28/02
Double Strap Saddle
Smith Blair
4317 Nylon Coated Double Strao Saddle
07/23/12
33-12-10
Double Strao Service Saddle
Mueller Company
DR2S Double (SS) Strap DI Saddle
AW WA C800
1"-2" SVC, up to 24" Pipe
10/27/87
Curb Stops -Ball Meter Valves
McDonald
6100M,6100MT & 61 OMT
3/4" and 1"
10/27/87
Curb Stops -Ball Meter Valves
McDonald
4603B, 4604B, 6100M, 610OTM and 6101 M
1'h" and 2"
FB600-7NL, FB1600-7-NL, FV23-777-W-NL,
1/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
L22-77NL
AW WA C800
2"
FB600-6-NL, FB1600-6-NL, FV23-666-W-
1/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
NL, L22-66NL
AW WA C800
1-1 /2"
FB6004-NL, FB16004-NL, B11-444-WR-
1/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
NL, B22444-WR-NL, L28-44NL
AW WA C800
I "
B-25000N, B-24277N-3, B-20200N-3, H-
AW WA C800, ANSF 61,
1/21/201.
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15000N, , H-1552N, H142276N
ANSI/NSF 372
_
B-25000N, B-20200N-3, B-24277N-3,H.
AW WA C800, ANSF 61,
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15000N, H-14276N, H-15525N
ANSI/NSF 372
1-1/2"
B-25000N, B-20200N-3,H-15000N, H-
AW WA C800, ANSF 61,
1/21/201.
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15530N
ANSI/NSF 372
V
01/26/00
Coated Tapping Saddle with Double SS Straps
JCM Industries, Inc.
#406 Double Band SS Saddle
1 "-2" Taps on up to 12"
0/5/21/12
33-12-25
Tapping Sleeve (Coated Steep
JCM Industries, Inc.
412 Tapping Sleeve ESS
AW WA C-223
U to 30" w/12" Out
03/29/22
I 33-12-25
ITapptng Sleeve (Coated or Stainless Steel
JCM Industries, Inc.
415 Tapping Sleeve
AW WA C-223
Concrete Pipe Only
05/10/11
Tapping Sleeve (Stainless Steel)
Powerseal
3490AS (Flange) & 3490MJ
4"-8" and 16"
02/29/12
33-12-25
Tapping Sleeve (Coated Steel)
Romac
FTS 420
AW WA C-223
U n to 42" w/24" Out
02/29/12
33-12-25
Tapping Sleeve (Stainless Steel)
Romac
SST Stainless Steel
AW WA C-223
Up to 24" w/12" Out
02/29/12
33-12-25
Tapping Sleeve (Stainless Steel
Romac
SST III Stainless Steel
AW WA C-223
Up to 30" w/12" Out
05/10/11
Joint Repair Clamp
Powerseal
3232 Bell Joint Repair Clamp
4" to 30"
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW37C-12-1EPAF FTW
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW39C-12-1EPAF FTW
08/30/06
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW65C-14-1EPAF FTW
Class "A"
Concrete Meter Box
Bass & Hays
CMB37-B12 1118 LID-9
Concrete Meter Box
Bass & Hays
CMB-18-Dual 1416 LID-9
Concrete Meter Box
Bass & Hays
CMB65-B65 1527 LID-9
Water - Bolts. Nuts. and Gaskets 33-11-05 (01/08/13),
* From Original Standard Products List
FORT WORM,
Note: All water or
than 15 inch diameter shall be
Combmation Au Release Valve
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
for use by the Water
*
E1-11
Combmation An Release Valve
*
E1-11
Combmation An Release Valve
- Dry Ba—r—reTF ire Hvdrants
10/Ol/87
E-1-12
Dry Barrel Fire Hydrant
03/31/88
E-1-12
Dry Barrel Fire Hydrant
09/30/87
E-1-12
Dry Barrel Fire Hydrant
01/12/93
E-1-12
Dry Barrel Fire Hydrant
08/24/88
E-1-12
Dry Barrel Fire Hydrant
E-1-12
Dry Barrel Fire Hydrant
09/24/87
E-1-12
Dry Barrel Fire Hydrant
10/14/87
E-1-12
Dry Barrel Fire Hydrant
01/15/88
E1-12
Dry Barrel Fire Hydrant
10/09/87
E-1-12
Dry Barrel Fire Hydrant
09/16/87
E-1-12
Dry Barrel Fire Hydrant
08/12/16
33-12-40
Dry Barrel Fire Hydrant
02/05/93
E101-5
Detector Check Meter
08/05/04
Magnetic Drive Vertical Turbine
Updated: 03/29/2022
basis. Special bedding may be required for some
GA Industries, Inc.
a
Empire Au and Vacuum Valve, Model 935
�a
ASTM A 126 Class B, ASTM A
1" 12"
240 - Rost, ASTM A 307 - Cover
Bolts
Multiplex Manufacturing Co.
Crispin Air and Vacuum Valves, Model No.
1/2", 1" & 2"
Valve and Printer Corp.
APCO 4143C, #145C and #147C
1", 2" & 3"
American -Darling Valve
Drawing Nos. 90-18608, 94-18560
AWWA C-502
American Darling Valve
Shop Drawing No. 94-18791
AWWA C-502
Clow Corporation
Shop Drawing No. D-19895
AWWA C-502
American AVK Company
Model 2700
AWWA C-502
Clow Corporation
Drawings D20435, D20436, B20506
AWWA C-502
ITT Kennedy Valve
Shop Drawing No. D-80783FW
AWWA C-502
M&H Valve Company
Shop Drawing No. 13476
AWWA C-502
Shop Drawings No. 6461
Mueller Company
A-423 Centunon
AWWA C-502
Shop Drawing FH-12
Mueller Company
A-423 Super Centurion 200
AWWA C-502
U.S. Pipe & Foundry
Shop Drawing No. 960250
AWWA C-502
Water— Company
Shop Drawing No. SK740803
AWWA C-502
EJ (East Jordan Iron Works)
WaterMaster 5CD250
Ames Company
Model 1000 Detector Check Valve
AW WA C550
4" - 10"
Hersey
Magnetic Drive Vertical
AWWA C701, Class 1
3/4" - 6"
Water - Pines/PVC (Pressure Water) 33-31-70 (01/08/13)
707.K.
AWWA C900, AWWA C605,
33-11-12
PVC Pressure Pipe
Vinyltech PVC Pipe
DR14
ASTM D1784
4"-12"
3/19/2018
33 11 12
PVC Pressure Pipe
Pipelife Jet Stream
DR14
AWWA C900
4"-12"
3/19/2018
33 11 12
PVC Pressure Pipe
Pipelife let Stream
DR18
AWWA C900
16"-24"
5/25/2018
33 11 12
PVC Pressure Pipe
Diamond Plastics Corporation
DR 14
AWWA C900
4"-12"
5/25/2018
33 11 12
PVC Pressure Pipe
Diamond Plastics Corporation
DR 18
AWWA C900
16"-24"
AWWA C900-16
UL 1285
12/6/2018
33 11 12
PVC Pressure Pipe
1-M Manufacturing Co., Inc d/b/a JM Eagle
DR 14
ANSI/NSF 61
4"-28"
FM 1612
AWWA C900-16
UL 1285
12/6/201.
33 11 12
PVC Pressure Pipe
1-M Manufacturing Co., Inc d/b/a JM Eagle
DR 18
ANSI/NSF 61
16"-24"
FM 1612
9/6/2019
33 11 12
PVC Pressure Pipe
Underground Solutions Inc.
DR14 Fusible PVC
AWWA C900
4" - 8"
9/6/2019
33 11 12
PVC Pressure Pipe
NAPCO(Westlake)
DR18
AWWA C900
16"-24"
9/6/2019
33 11 12
PVC Pressure Pipe
NAPCO(Wntlake)
DR14
AWWA C900
4"- 12"
9/6/2019
33 11 12
PVC Pressure Pipe
Sanderson Pipe Corp.
DR14
AWWA C900
4"- 12"
Water - PiDesNalves & Fittintls/Ductile Iron FittinLs 33-11-11 (01/08/13�
117/23/92
EI-07
Ductile Iron Fittings
Star Pipe Products, Inc.
Mechanical Joint Fittings
AW WA C153 & C110
*
EI-07
Ductile Iron Fittings
Griffin Pipe Products, Co.
Mechanical Joint Fittings
AWWA C 110
*
EI-07
Ductile Iron Fittings
McWane/Tyler Pipe/ Union Utilities Division
Mechanical Joint Fittings, SSB Class 350
AWWA C 153, C 110, C 111
08/11/98
EI-07
Ductile Iron Fittings
Sigma, Co.
Mechanical Joint Fittings, SSB Class 351
AWWA C 153, C 110, C 112
02/26/14
EI-07
MJ Fittings
Accucast
Class 350 C-153 MJ Fittings
AW WA C153
4"-12"
05/14/98
EI-07
Ductile Iron Joint Restraints
Ford Meter Box Co.fUni-Flange
Uni-Flange Series 1400
AW WA C111/C153
4" to 36"
05/14/98
E1-24
PVC Joint Restraints
Ford Meter Box Co.fUni-Flange
Uni-Flange Series 1500 Circle -Lock
AW WA C111/C153
4" to 24"
11/09/04
E1-07
Ductile Iron Joint Restraints
One Bolt, Inc.
One Bolt Restrained Joint Fitting
AW WA Cl1l/CI l6/C153
4" to 12"
02/29/12
33-11-11
Ductile Iron Pipe Mechanical Joint Restraint
EBAA Iron, Inc.
Megalug Series 1100 (for DI Pipe)
AW WA C111/CI l6/C153
4" to I"
02/29/12
33-11-11
PVC Pipe Mechanical Joint Restraint
EBAA Iraq Inc.
Megalug Series 2000 (for PVC Pipe)
AW WA CI11/C116/C153
4" to 24"
08/05/04
E1-07
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
Sigma One-Lok SLC4 - SLC10
AW WA C111/C153
4" to 10"
03/06/19
33-11-I1
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
Sigma One-Lok SLCS4 - SLCS12
AW WA C111/C153
4" to 12"
08/05/04
EI-07
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
Sigma One-Lok SLCE
AW WA C111/C153
12" to 24"
08/10/98
E I-07
MJ Fittings(DIP)
Sigma, Co.
Sigma One-Lok SLDE
AWWA C153
4" - 24"
10/12/10
E I-24
Interior Restrained Joint System
S & B Techncial Products
Bulldog System ( Diamond Lok 21 & JM
ASTM F-1624
4" to 12"
08/16/06
E1-07
Mechanical Joint Fittings
SIP Intimtries(Serampore)
Mechanical Joint Fittings
AWWA C153
4" to 24"
11/07/16
33-11-11
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
PVC Stargrip Series 4000
ASTM A536 AW WA CI I I
11/07/16
33-11-11
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
DIP Stargrip Series 3000
ASTM A536 AW WA CI I I
03/19/18
33-I1-I1
Mechanical Joint Retainer Glands
SIP Induaries(Serampore)
EZ Grip Joint Restraint (EZD) Black For DIP
ASTM A536 AW WA CI 11
3"-48"
EZ Grip Joint Restraint (EZD) Red for C900
03/19/18
33-1141
Mechanical Joint Retainer Glands
SIP Industries(Serampore)
DR14 PVC Pipe
ASTM A536 AW WA CI I I
4"-12"
EZ Grip Joint Restraint (EZD) Red for C900
03/19/18
334141
Mechanical Joint Retainer Glands
SIP Industries(Serampore)
DR18 PVC Pipe
ASTM A536 AW WA CI I I
16"-24"
* From Original Standard Products List
CITY OF FORT WORTH
FORT WORM, WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 03/29/2022
Note: All water or sewer pipe larder than 15 inch diameter shall be approved for use by the Water Department on a proiect specific basis. Special bedding maybe required for some pipes.
VV aLCr - IIUCD/
V aIVCJ IX lILL�CaIIICIIL JCaLI'U VAIC V
aIVC" JJ-IL-LV IVJ/1J/1J1 am �1116.
Resilient Wedged Gate Valve w/no Gears
American Flow Control
Series 2500 Drawing # 94-20247
16'
12/13/02
Resilient Wedge Gate Valve
American Flow Control
Series 2530 and Series 2536
AW WA C515
30" and 36"
08/31/99
Resilient Wedge Gate Valve
American Flow Control
Series 2520 & 2524 (SO 94-20255)
AW WA C515
20" and 24"
05/18/99
Resilient Wedge Gate Valve
American Flow Control
Series 2516 (SD 94-20247)
AW WA C515
16"
10/24/00
E1-26
Resilient Wedge Gate Valve
American Flow Control
Series 2500 (Ductile Iron)
AW WA C515
4" to 12"
08/05/04
Resilient Wedge Gate Valve
Arrencan Flow Control
42" and 48" AFC 2500
AW WA C515
42" and 48"
05/23/91
E1-26
Resilient Wedge Gate Valve
American AVK Company
American AVK Resilient goaded GV
AW WA C509
4" to 12"
01/24/02
E1-26
Resilient Wedge Gate Valve
American AVK Company
20" and smaller
*
E1-26
Resilient Seated Gate Valve
Kennedy
4" - 12"
*
E1-26
Resilient Seated Gate Valve
M&H
4" - 12"
*
E1-26
Resilient Seated Gate Valve
Mueller Co.
4" - 12"
11/08/99
Resilient Wedge Gate Valve
Mueller Co.
Series A2361 (SD 6647)
AW WA C515
16"
01/23/03
Resilient Wedge Gate Valve
Mueller Co.
Series A2360 for 18"-24" (SO 6709)
AW WA C515
24" and smaller
05/13/05
Resilient Wedge Gate Valve
Mueller Co.
Mueller 30" & 36", C-515
AW WA C515
30" and 36"
01/31/06
Resilient Wedge Gate Valve
Mueller Co.
Mueller 42" & 48", C-515
AW WA C515
42" and 48"
01/28/88
E1-26
Resilient Wedge Gate Valve
Clow Valve Co.
AW WA C509
4" - 12"
10/04/94
Resilient Wedge Gate Valve
Clow Valve Co.
16" RS GV (SO D-20995)
AW WA C515
16"
11/08/99
E1-26
Resilient Wedge Gate Valve
Clow Valve Co.
Clow RW Valve (SD D-21652)
AW WA C515
24" and smaller
11/29/04
Resilient Wedge Gate Valve
Clow Valve Co.
Clow 30" & 36" C-515
AW WA C515
30" and 36" (Note 3)
11/30/12
Resilient Wedge Gate Valve
Clow Valve Co.
Clow Valve Model 2638
AW WA C515
24" to 48" ate 3)
01/08/91
EI-26
Resilient Seat Gate Valve
Stockham Valves & Fittings
AW WA C 509, ANSI 420 - stem,
4" - 2"
ASTM A 276 Type 304 - Bolts &
.uts
*
E1-26
Resilient Seated Gate Valve
U.S. Pipe and Foundry Co.
Memesea1250, requirements SPL #74
3" to 16"
10/26/16
33-12-20
Resilient Seated Gate Valve
EJ (East Jordan Iron Works)
EJ FlowMaster Gate Valve & Boxes
08/24/18
Matco Gate Valve
Matco-Norca
225 MR
AW WA/ANSI C115/An21.15
4" to 16"
aW e�ines/Valy as/Rubber Seated Butterfly
Va1veTl-12zrMVfffMTw
EI-30
Rubber Seated Butterfly Valve
Henry Pratt Co.
AW WA C-504
24"
*
EI-30
Rubber Seated Butterfly Valve
Mueller Co.
AW WA C-504
24"and smaller
1/11/99
E1-30
Rubber Seated Butterfly Valve
D—ik Valves Co.
AW WA C-504
24" and larger
06/12/03
E1-30
Valmatic American Butterfly Valve
Valmanc Valve and Manufacturing Corp.
Valmatic American Butterfly Valve.
AW WA C-504
Up to 84" diameter
04/06/07
E1-30
Rubber Seated Butterfly Valve
M&H Valve
M&H Style 4500 & 1450
AW WA C-504
24" to 48"
03/19/18
33 1221
Rubber Seated Butterfly Valve
G. A. Industries (Golden Anderson)
AW WA C504 Butterfly Valve
AW WA C-504
30"-54"
Water - Polvettvlene Encasement 33-11-10 (01/08/13).
OS/1".
E1-13
Polyethylene Encasment
Flossol Packaging
Fulton Enterprises
AW WA C105
8 mil LLD
05/12/05
E1-13
Polyethylene Encasment
Mountain States Plastics (MSP) and AEP Ind.
Standard Hardware
AW WA C105
8 it LLD
05/12/05
E1-13
Polyethylene Encasment
AEP Industries
Bullstrong by Cowtown Bolt & Gasket
AW WA C105
8 mil LLD
09/06/19
33-11-11
Polyethylene Encasment
Northtown Products Inc.
PE Encasement for DIP
AW WA C105
8 mil LLD
Water - .S'aomtiB2 .Station
3/12/96
Water Sampling Station
Water Plus
B20 Water Sampling Station
Water - Automatic Flusher
7.
HG6-A-IN-2-BRN-LPRR(Portable)
]OY11
Flushing System
Mueller Hydroguard
HG2-A-IN--2-PVC-018-LPLG(Permanent)
04/09/21
�Autmnated
Automated Flushing System
Kupferle Foundry Company
Eclipse #9800wc
04/09/21
Automated Flushing System
Kupf le Foundry Company
Eclipse 49700 (Portable)
* From Original Standard Products List
FORT WORTH
CITY OF FORT WORTH
TRANSPORTATION & PUBLIC WORKS DEPARTMENT
STORMWATER MANAGEMENT DIVISION
STANDARD PRODUCT LIST
PAGE 1 OF 3
Storm Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 03/19/2021)
Updated: 03/19/2021
9/28/2018
3305 13
Manhole Frames and Covers
AccuCast (Govind Steel Company, LTD)
MHRC #220605
ASTM A48 AASHTO M306
**24" Dia
9/28/2018
3305 13
Manhole Cover
Neenah Foundry
NF-1274-T91
ASTM A48 AASHTO M306
32" Dia
9/28/2018
3305 13
Manhole Frames and Covers
Neenah Foundry
NF-1743-LM (Hinged)
ASTM A48 AASHTO M306
32" Dia
9/28/2018
3305 13
Manhole Frame
Neenah Foundry
NF-1930-30
ASTM A48 AASHTO M306
32.25" Dia
9/28/2018
3305 13
Manhole Frames and Covers
Neenah Foundry
R-1743-HV
ASTM A48 AASHTO M306
32" Dia
4/3/2019
3305 13
Manhole Frames and Covers
SIP Industries ++
2279ST
ASTM A48 AASHTO M306
**24" Din
4/3/2019
3305 13
Manhole Frames and Covers
SIP Industries ++
2280ST
ASTM A48 AASHTO M306
32" Dia
10/8/2020
3305 13
Manhole Frames and Covers
EJ ( Formally East Jordan Iron Works)
EJ1033 Z2/A
ASTM A536 AASHTO M306
32.25" Dia
**Note: All new development and new installation mahnole lids shall meet the minimum 304nch opening requirement as specified in City Specification 33 05 13. Any smaller opening sizes will only be allowed for existing manholes that require replacement
frames and covers.
* From Original Standard Products List
FORT WORTH,.,
CITY OF FORT WORTH
TRANSPORTATION & PUBLIC WORKS DEPARTMENT
STORMWATER MANAGEMENT DIVISION
STANDARD PRODUCT LIST
PAGE 2OF3
Updated: 10/13/21
10/08/20
33 49 20
Curb Inlets
Forterrra
FRT-lOx3-405-PRECAST**
ASTM C913
10' X 3'
10/08/20
33 49 20
Curb Inlets
Forterrra
FRT-lOx3-406-PRECAST**
ASTM C913
10' X 3'
10/08/20
33 49 20
Curb Inlets
Forterrra
FRT-lOx4.5407-PRECAST**
ASTM C913
10' X 4.5'
10/08/20
33 49 20
Curb Inlets
Forterrra
FRT-lOx4.5420-PRECAST**
ASTM C913
10' X 4.5'
10/08/20
33 39 20
Manhole
Forterrra
FRT-4X4-409-PRECAST-TOP
ASTM C913
4' X 4'
10/08/20
33 39 20
Manhole
Forterrra
FRT-4X4-409-PRECAST-BASE
ASTM C913
4' X 4'
10/08/20
33 39 20
Manhole
Forterrra
FRT-5X5-410-PRECAST-TOP
ASTM C913
5' X 5'
10/08/20
33 39 20
Manhole
Forterrra
FRT-5X5-410-PRECAST-BASE
ASTM C913
5' X 5'
10/08/20
33 39 20
Manhole
Forterrra
FRT-6X6-411-PRECAST-TOP
ASTM C913
6' X 6'
10/08/20
33 39 20
Manhole
Forterrra
FRT-6X6-411-PRECAST-BASE
ASTM C913
6' X 6'
3/19/2021
33 49 20
Curb Inlets
Thompson Pipe Group
TPG-IOX3-405-PRECAST INLET**
ASTM 615
10' X 3'
3/19/2021
33 49 20
Curb Inlets
Thompson Pipe Group
TPG-15X3405-PRECAST INLET**
ASTM 615
15' x 3'
3/19/2021
33 49 20
Curb Inlets
Thompson Pipe Group
TPG-20X3-405-PRECAST INLET**
ASTM 615
20' x 3'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-4X4-409-PRECAST TOP
ASTM 615
4' X 4'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-4X4-409-PRECAST BASE
ASTM 615
4' X 4'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-4X4-412-PRECAST 4-FT RISER
ASTM 615
4' X 4'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-5X5-410-PRECAST TOP
ASTM 615
5' X 5'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-5X5-410-PRECAST BASE
ASTM 615
5' X 5'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-5X5-412-PRECAST 5-FT RISER
ASTM 615
5' X 5'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-6X6-411-PRECAST TOP
ASTM 615
6' X 6'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-6X6-411-PRECAST BASE
ASTM 615
6' X 6'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-6X6-412-PRECAST 6-FT RISER
ASTM 615
6' X 6'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-7X7-411-PRECAST TOP
ASTM 615
TX 7'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-7X7-411-PRECAST BASE
ASTM 615
TX 7'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-7X7-412-PRECAST 4-17T RISER
ASTM 615
TX 7'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-8X8-411-PRECAST TOP
ASTM 615
8' X 8'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-8X8-411-PRECAST BASE
ASTM 615
8' X 8'
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-8X8-412-PRECAST 5-FT RISER
ASTM 615
8' X 8'
3/19/2021
33 49 20
Drop Inlet
Thompson Pipe Group
TPG-4X4-408-PRECAST INLET
ASTM 615
4' X 4'
3/19/2021
33 49 20
Drop Inlet
Thompson Pipe Group
TPG-5X5-408-PRECAST INLET
ASTM 615
5' X 5'
3/19/2021
33 49 20
Drop Inlet
Thompson Pipe Group
TPG-6X6-408-PRECAST INLET
ASTM 615
6' X 6'
**Note: Pre -cast inlets are appoved for the stage I portion of the structure (basin) only. Stage II portion of the structure are required to required to be cast in -place. No exceptions to this requirement shall be allowed.
* From Original Standard Products List