HomeMy WebLinkAboutContract 57889-CO1CSC No. 57889-CO1 FOR-r woyz-r" City of fort Worth ---tom--` L(` Change Order Request Project Name:1 Emergency - Pavement Repairs for Mullliple Water Main Breaks City Sec No.: 1 57889 Project No.(s): 56002-0600430-104276-CAPEXP M&C: 22-0769 Cl[yProj.No.:l 104276 Project Description: Emergency - Pavement Repairs for Multiple Water Main Breaks for Summer 2022 Heal Wave Contractor: Texas Materials Group, Inc. dba Texas Bit Change Order it Date: 1 11/13/2022 City Project Mgr. I J. Chris Underwood Cily Inspector: I Manuel Torres Phone Number: 817-392-2629 Phone Number: 817-647-2565 Dept, WaterE:7— L Totals Contract Time I (Calender days) Original Contract Amount $750,000.00 $750,000.00 Extras to Date Credits to Dale Pending Change Orders (in M&C Process) Contract Cost to Date $750,000.00 $760,000.00 Amount of Proposed Change Order $174,912.79 $174,912.79 Revised Contract Amount $924,912.79 $924,912.79 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $174,912.79 $174,912.79 23.32% CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1$937,500.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No.1 provides additional funding in the amount of $174,912,79 via approved, attached supplement dated December 6, 2022 to the July 20, 2022 memorandurn which authorized City Secretary Contract No. 57889 with Texas Materials Group, Inc. dba Texas Bit in the amount of $750,000.00 for emergency pavement repairs for multiple water main breaks for the Summer 2022 heat wave. Based upon pavement repairs conducted, funding in the amount of $171,637.21 is necessary to compensate Texas Bit for additional work performed. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name I Contractor Name Contractor Signature Dale Texas Materials Group, Inc. dba Texas Bil Sam Davis �zi�srzo22 Inspector Date Project Ma aggr Date AA [/ J!i GS -/f-Z 1 I Director Water Dept Date Cons fucti n Supervisor TPW l Data ky p u H`u-de, Dec 16, 2022 - IfV /01 ^ / ' Assistant City Attorney Date Assistant City Manager Date i Dec 19, 2022 Dec 20, 2022 Council Action If Required M&C Number NIA M&C Date Approved City of Fort Worth Change Order Additions Project Name Emergency - Pavement Repairs for Mutltiple Water Main Breaks City Sec No.: 57889 Project No,(s): 56002-0600430-104276-CAPEXP DOE No. 22-076 City Proj. No.: 104276 Project Description Emergency - Pavement Repairs for Multiple Water Main Breaks for Summer 2022 Heat Wave Contractor Texas Materials Group, Inc. dba Texas Bit Change Order:=1 Date: 11/13/2022 City Project Mgr. J. Chris Underwood City Inspector F Manuel Torres ADDITIONS —ITEIV DESCRIPTION DEPT City Unit Unit Cost Total 2 Additional work performed at 33 Locations Water 1.00 LS $174,912.79 $174,912.79 Water $174,912.79 Page 2 of 4 Additions Sub Total $174,912.79 FORT WORTH City of Fort Worth Change Order Deletions Project Name Emergency - Pavement Repairs for Mutltiple Water Main Breaks City Sec No.: 57889 Project No.(s): I 56002-0600430-104276-CAPEXP DOE No. 22-07 City Proj. No.: 104276 Project Description Emergency - Pavement Repairs for Multiple Water Main Breaks for Summer 2022 Heat Wave Contractor Texas Materials Group, Inc. dba Texas Bit Change Order: DJ Date 11/13/2022 City Project Mgr. J. Chris Underwood City Inspector: Manuel Torres DELETIONS ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost JTotal Water Page 3 of 4 (Deletions Sub Total MIWBE Breakdown for this Change Order Previous Change Orders Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Sit/nature 0M 'Won M0,10 C Name of Employee ATTEST: 9a�usette-S �aor7a,CG Jannette S. Goodall (Dec 20, 202212:22 CST) Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX INTEROFFICE MEMO Date: December 6, 2022 To: Dana Burghdoff, Assistant City Manager From: Chris Harder, P.E., Water Director Subject: Supplement to July 20, 2022 Memorandum, City Secretary Contract No. 57889 for EMERGENCY REPAIR— SUMMER 2022 HEAT WAVE — PAVEMENT REPAIR FOR MULTIPLE WATER MAIN BREAKS In June, 2022, unseasonably high temperatures, exceeding 100°F on many days, were recorded in North Texas. The month of July saw temperatures exceeding 100°F nearly every day. The sustained heat caused at least 200 water main breaks over the summer months, including into August. On July 14, 2022, an emergency memo was circulated recommending that the City engage additional available contractors for emergency water main repairs. Due to the anticipated amount of repairs to be completed by these contractors, there was a need to retain paving contractors to augment our on -call paving contracts in order to keep up with associated pavement repairs. The Water Department instituted emergency procurement of Jackson Construction, Ltd. and Texas Materials Group, Inc. dba Texas Bit to perform the pavement repairs each with a contract in the amount of $750,000.00. As with any emergency, the dollar amounts are estimated as it is unknown at the time of contracting exactly how long the contractor's services will be needed. This memo is submitted to request authorization for additional funding in the amount of $174,912.79 to fully compensate Texas Bit for all of the pavement repairs that the company conducted during the emergency. A change order will be processed to the existing contract with Texas Bit and an M&C will ratify the contract. APPROVED FOR EMERGENCY PROCUREMENT: Recommended: Approved as to form and Legality: Approve: Approve: chris-pmher i�arder Christopher Harder (Dec 7, 202216:53 CST) Chris Harder, Director, Water Department D1Iack (Dec 8=(Dec 81, 202218:06 CST) Douglas W. Black, Sr. Assistant City Attorney .Auto& 7 .P a""e4 Cynthia Garcia, Assistant Director, Purchasing Dana surandoff Dana Burghdoff(lfec 13, 202216:29 CST) Dana Burghdoff, Assistant City Manager