HomeMy WebLinkAboutContract 57314-CO1CSC No. 57314-COI
I'OI:T WORTH City of Fort Worth
Change Order Request
Project Name: Westside Water Treatment Plant Backup Generators City Sec Na: 1 57314
Project No.(s):j 56002IM00430157400101605480 I DOE No, I N/A CiIyPfoj.No-:j 103410
Proect Description; Backup power generation and appurtenant swilchgear for the operations of Westside WTP in a power -cut situation.
Contractor; Crescent Constructors, Inc. Change Order# Date; 1 12/8/2022
City Project Mgr.1 David Townsend, P.E. City Inspector. I Nathan Gray
Phone Number: 817-392-8430 Phone Number; 817-991-0829
Dept Backup Totals Contract Time
Generators (Calender days)
Original Contract Amount 12 297,000.00 $12,297,000.00 600
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $12,297,000,00 $12,297 00(1.00 1 600
.00
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
CHANGE; ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.81%
MAXAf1OWADLECOMRACTAMOUNT(ORIGINALCONTRACT COST +25%) $15,371,250.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 1 provides waterproof membrane roof coating system for the electrical building to provide
protection for the electrical equipment inside.
Staff concurs with the contractor's request for 9 additional calendar days for the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arisinil out of, or incidental to, the above Change Order.
Contractor's Company Name
Contractor Name
jDat3
Crescent Constructors Inc.
David Caldviell
( !M
M21I
Ins ector
Date
Project Manager
Date
VWal ,
12/14/2022
David .TOWnsend,PE wr,
Director (Wate(&ply
Date
Cor slruction Supervisor
Date
Dec 29, 2022
Senior Assistant City Attorney
Date
Assistant City'Manager er
Date
Dec 30, 2022
Dec 30, 2022
Council Action If Required)
M&C Number N/A
M&C Date Approved
WA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FO R-r Wa R-rH City of Fort Worth
Change Order Additions
Project Name
Project No.(s):
Project
Description
Westside Water Treatment Plant Backup Generators I City Sec No.: 57314
5600210600430157400101005480 DOE No. N/A City Proj. No.: 103410
FBackup power generation and appurtenant switchgear for the operations of Westside WTP in a power -out situation.
Contractor Crescent Constructors, Inc. I Change Order. L__L_j Date:1 121812022
City Protect Mgr. ~ David Townsend, RE, City Inspector ENathan Gray
ADDITIONS
FORT Wowrm City of Fora~ Worth
Change Order Deletions
Project Name Westside Water Treatment Plant Backup Generators City Sec No.: 57314
Project No,(s): 56000600430157400101005480 DOE No. = City Pro]. No,: 103410
Project Description
Backup power generation and appurtenant switchgear for the operations of Westside Wf'P in a power -out
situation.
Contractor Crescent Constructors, Inc. Change Order: U Date I 1218/20?
City Project Mgr, David Townsend, P.E. City Inspector. Nathan Gray
DELETIONS
MMBE
Breakdown for this Change Order
MWBE Sub
Type of Service
Amount for this CO
Same as original Contract
Time Extension
$0.00
Total
$0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
David Townsend
Name of Employee
Engineering Manager
Title
ATTEST:
dda�ald
J,ioette S. Goodall (Dec 30, 202218 CST)
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
From: Charlie Erwin
To: Townsend, David
Subject: RE: CPN103410 - CMR for electrical building roofing on Westside WTP electrical building
Date: Monday, November 14, 2022 4.25:22 PM
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open
attachments unless you recognize the sender and know the content is safe.
David,
I'll get the Change Order documentation pulled together.
Regards,
Charlie
From: Townsend, David <David.Townsend@fortworthtexas.gov>
Sent: Monday, November 14, 2022 1:32 PM
To: Charlie Erwin <Charlie.Erwin@freese.com>
Subject: FW: CPN103410 - CMR for electrical building roofing on Westside WTP electrical building
this is an email from an EXTERNAL source. DO NOT click links or open attachments without positive
sender verification of purpose. Never enter USERNAME, PASSWORD or sensitive Information on
linked pages from this email. Please report all suspicious messages using the Report Message
button In Outlook.
Charles H. Erwin, P.E., CCM (Freese & Nichols)
The Water Department has received your e-mail dated November 14, 2022, for Contractor's
Modification Request (CMR-003) for Electrical Building Roofing System.
The precast concrete building specification does not provide adequate detail to get the roofing
system that is necessary. Additional architectural details were provided to the Contractor who
received three bids for the additional work. The lowest bid was reviewed bythe Engineer and should
provide the necessary roofing system. The Water Department agrees with your recommendation
that the contractor's proposed cost of $99.931.00 for this work should be accepted as the cost
is fair and reasonable. No additional time has been requested.
This office will recommend to the City Council (and/or the City Manager's Office), the approval
and acceptance of this additional cost as part of a change order to be prepared and submitted
by you to this office.
Sincerely:
David R Townsend, PE
Facilities Engineer Manager
Fort Worth Water Department
From: Charlie Erwin <Charlie.Erwin(ufreese.com>
Sent: Monday, November 14, 202212:08 PM
To: Townsend, David <David.Townsend(a@fortworthtexas.gov>
Subject: CPN103410 - CMR for electrical building roofing on Westside WTP electrical building
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open
attachments unless you recognize the sender and know the content is safe.
David,
On the Westside WTP Generator project, we did not include a specification in the bid for the roofing
system that should go on top of the building. The precast concrete building specification does not
provide adequate detail to get the roofing system that we needed.
I talked with our architectural to see what we need. I provided the requirements to the Contractor
and they received three bids (attached). The proposed bid is the lowest. I reviewed this with
architectural and it should provide what is needed.
The total change order amount would be $99,931(this includes contractor markup). The markup is
in compliance with the contract documents.
The specifications for the four pump stations and Holly will account forthis roofing requirements.
I will call to discuss.
Regards,
Charlie
Charles H. Erwin, P.E., CCM I Freese and Nichols, Inc. 1817.735.7212 (d) 1817.929.8037 (m)
charlie.erwin(freese.com I www.freese.com
This electronic mail message is intended exclusively for the individual or entity to which it is
addressed. This message, together with any attachment, may contain the sender's
organization's confidential and privileged information. The recipient is hereby notified to treat
the information as confidential and privileged and to not disclose or use the information except
as authorized by sender's organization. Any unauthorized review, printing, retention, copying,
disclosure, distribution, retransmission, dissemination or other use of, or taking of any action
in reliance upon, this information by persons or entities other than the intended recipient is
prohibited. If you received this message in error, please immediately contact the sender by
reply email and delete all copies of the material from any computer. Thank you for your
cooperation.
CONTRACT MODIFICATION REQUEST: 3
PROJECT: Westside Water Treatment Backup Generators
CS#57314
ATTENTION: David Townsend, P.E.
City of Fort Worth
Attention:
The following ohange in contract on this project is proposed:
A breakdown of cost SHALL be attached,
Work shall not commence until aidlim•ized by the OWNER,
DATE: 11/8/2022
Description or the Proposed Change & Clarifications
Add a TPO roof to the electrical building
Acurva Roofing plans to have the high point in the center of the roof and taper to the outside edges, reducing the
amount of wood blocking required at the edge of the roof,
TOTAL AMOUNT 1 $ 99,931
All work shall be in accordance with the terms, stipulations, and conditions of the
original Contract Documents. if the work herein provided for is Approved by
Change Order, the time of completion vrill he:
Increased By 0 Calendar Days
Decreased
Unchanged
a
Todd C. Hoff
ACCEPTED
City of Fort Worth Date
REJECTED
CHANGE ORDER SUMMARY
Front Shoat
Westside WTP plate Settler Expansion
CHANGE DESCRIPTION: Add a TPO roof to the electrical building
CONTRACTORS MODIFICATION REQUEST #003 Job #: 2021.08
Description
Labor
Material
Equipment
Subcontract
Other
Total
_ DIRECT COSTS
800
83,700
_
841300
LABOR BURDEN 8 FRINGES 56°�,
330
330
--
_48
18
SMALL TOOLS 6% OF LABOR
48
^ SAFETY SUPPLIES 3% OF LABOR
_
18
SUBTOTALS
9m
MAO
66
84696
CONTRACTOR MARKUP
140
12,555
12,695
BONDS & INSURANCE $%1
2,541
TOTAL
CLARIFICATIONS:
1
2
3
4