Loading...
HomeMy WebLinkAboutContract 57011-AR8CSC No. 57011-AR8 FOx-r WOm-r City of Fort Worth Construction Allowance Request Project Namel Trinity Boulevard Phase 1 - IH 820 to Salado Trail City Sec No. 1 57011 Project No.(s) 102101-1 M&C: 21 0878 CityProj.No.1 102101 Project Description: Trinity Boulevard Phase 1 - Roadway, Drainage, Water, Illumination, Landscape and Traffic Improvements Contractor: SJ Louis Construction of Texas LTD Allowance No: ® Date: 1 12/13/2022 City Project Mgr.1 Mitch Aiton / Preeti KC City Inspector: I Steve Johnson Phone Number: 817-392-8092 Phone Number: 817-770-3664 Unit/Dept. I Unit 1, IV & 5 1 Unit II 1 Unit III I Totals Original Contract Amount Previous Allowances Allocated $16,716,606.80 $5,063,103.22 $230,906.00 $22,010,616.02 $180,370.92 $9,171.52 $0.00 $189,542.44 Amount of Proposed Allocation $0.00 $71,921.38 $0.00 1 $71,921.38 Original Allowance Available for Allocation Remaining Funds Available for this Allocation $500,000.00 $100,000.00 $20,000.00 $620,000.00 $319,629.08 $90,828.48 $20,000.00 $430,457.56 JUSTIFICATION (REASONS) FOR ALLOWANCE Allowance No. 8 will provide for the following items that are necessary for this project due to previously unknown ONCOR and storm drain conflict that were encountered during construction. • Removal for 1 CSS encased joint of 36" DIP water main to change the degree of deflection to cross over the ONCOR conflict. • Connection to a 36" water main. • Additional 37 LF of 8-inch DR-14 Water Main with CSS Backfill. • Concrete Encasement for utility pipe. • 1 additional 8-inch cut in valve. • 1 additional 10" X8" Reducer It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of, or incidental to, the above Construction Allowance Request. Contractor's Company Name Contractor Name Contractor Signature Date SJ Louis Construction of Texas LTD Adam Lunsford dam Lunsford (Dec 15, 202211:36 CST) DeC 15, 2022 Inspector Date Project Manager Date Dec 14, 2022 —'KG Dec 15, 2022 t°��nJ°hn�on(D°c14,202209° Director Water Dept Date Construction Supervisor (TPW Dept) Date 20, 2022 Dec 15, 2022 lh,i-pl-41de3Dec20,2022063 CST)Dec 21 q7 CS 1, Assistant City Attorney Date Assistant City Manager Date .r n m n o-M ns h Jan 5 2023 Jan 6 2023 eremy Anato-Mensah (Jan 5, 202316:16 CST) ana Burghdo(f (Jan 6, 2C2 136 CS I'; IF ATTEST: 4p44pn �pF FART dad 9a�uiefte S. Crdn�itCG � oo°°°°°°°°°�oddd v0--4d �i,i0 OFFICIAL RECORD CITY SECRETARY Jannette S. Goodall (Jan 6, 202312:05 CST)) ��d.'� FT. WORTH, TX Jannette Gnndall_ Citv Serretary °°o o°� ,4" nRRO 4ppp FOKT WORTH City of Fort Worth Construction Allowance Request Project Name Trinity Boulevard Phase 1 - IH 820 to Salado Trail I City Sec No. 57011 Project No.(s) 102101-1 M&C: 21-0878 City Proj. No. 102101 Project Description Trinity Boulevard Phase 1 - Roadway, Drainage, Water, Illumination, Landscape and Traffic Improvements Contractor SJ Louis Construction of Texas LTD Allowance No: ® Date: 12/13/2022 City Project Mgr. Mitch Aiton / Preeti KC City Inspector Steve Johnson GONSTKUGTION ALLOWANCE ITEMS TO 6E ADDED ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 9 8" PVC DR-14 Water Pipe, CSS Backfill Unit II 37 LF $245.00 $9,065.00 10 Ductile Iron Water Fittings w/Restraint (24" and larger) Unit II 0.1 TN $1.00 $0.10 19 Connection to Existing 4"-12' Water Main Unit II 1 EA $500.00 $500.00 26 Salvage 30" Water Valve Unit II 1 EA $150.00 $150.00 36 Cut in 8" Gate Valve on existing Water Line Unit II 1 EA $3,835.76 $3,835.76 37 Remove, Salvage, and Replace 36" Water Main Unit II 1 LS $24,705.38 $24,705.38 38 Concrete Encasemet for Utility pipe Unit II 1.5 CY $300.00 $450.00 39 Install 10"X8" Reducer Unit II 1.00 EA $500.00 $500.00 40 36" Water Line Connection/Closure Unit II 1.00 LS $32,715.14 $32,715.14 Page 2. of 4 Unit 1, IV & 5 Unit II $71,921.38 Unit III FART co1,TH City of Fort Worth Construction Allowance Request Project Name Trinity Boulevard Phase 1 - IH 820 to Salado Trail City Sec No. 57011 Project No.(s) 102101-1 M&C: 21 0878 City Proj. No. 102101 Project Description Trinity Boulevard Phase 1 - Roadway, Drainage, Water, Illumination, Landscape and Traffic Improvements Contractor SJ Louis Construction of Texas LTD Allowance No: E8 Date 12/13/2022 City Project Mgr. Mitch Aiton I Preeti KC City Inspector Steve Johnson CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost JTotal Unit 1, IV & 5 Unit II Unit III Page 3 of 4 Deletions Sub Total M/WBE Breakdown for this Change Order Page 4 of 4 FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Trinitv Boulevard CA #8 M&C: N/A CPN: 102101 CSO: 57011 DOC#: N/A Date: 12/13/2022 To: Name Department Initials Date Out I. Mitch Aiton TPW - Approval Dec 14, 2022 2. Michelle McCullough TPW - Reviewer Dec 14, 2022 3. Adam Lunsford SJ Louis - Signature AH 4'21 Dec 15, 2022 4. Steve Johnson TPW - Signature SE1ZL Dec 14, 2022 5. Daniel Roy (Const Super) TPW - Signature -Djw Dec 15, 2022 6. Preeti KC (PM Sign) Water - Signature PK Dec 15, 2022 7. Tony Sholola Water - Approval -777 Dec 16, 2022 7. Chris Harder (Director) Water — Signature LL Dec 20, 2022 9. Doug Black Legal — Signature JAM Jan 5, 2023 10. Dana Burghdoff (ACM) Water Signature Z Jan 6, 2023 11. Jannette Goodall CSO - Signature. JSG Jan 6, 2023 12. TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: []YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ® For Your Information ® Signature/Routing and or Recording ® Comment ❑ File Return To: Please notify TPWContracts6i ,fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!