HomeMy WebLinkAboutOrdinance 7300 ORDINANCE NO.
ORDINANCE ACCEPTrNG IMPROVEMENIS ON A PORTION OT WEST PETER SMITE! STREET
AND PORTIONS OF SUNDRY OTHER STREETS , AVEN"JES AND F1 BLIC PLACES
IN THE C11Y OF FORT WORTH:, TEXAS, DECLARING' TIME CONTRACT WITH
TEXAS B11MITHIC COMPANY FOR Ta C014STRUCTION OF
SAID IMPROVE ANTS FULLY COMPLETED AND MRFORMED; DIRECTING THE
ISSUANCE,, EXECUTION AND DELI'VERY OF CERTIFICATE'S IN EVIDENCE OF
SPECIAL, ASSESS14EIM LEVI-ED AFTER GIVING EFFECT TO 31MDRY CREDITS
M.REIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRE(I"TING THE Cll',rf SECREJ,'ARY '1`0 ENGROSS AND ENROLL THIS ORDINANCE
BY CO'FfING THE CAP'TF.ON OF SAM, IN 7IC MIMITE BOOK OF THE'" CITY
COIJNCIL OF FORT WOR147H,, TEXAS, AND BY F11LING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE REC;ORDS OF' SAID CIM, AND PROVIDING AN
EFITCTIVE DATE,
WHEREAS., the City of Fort Worth, Texas, has heretofore entered into a contract
with for the making and construction of
certain street improvemenLn oK� the hereinafter describad portions of streets, avenues and
public places in said City, to-wit°
WEST PETER SMITH S7,11FET From Forest Park Boulevard Lo Fifteenth
Avenue, known and designgted as Project
No. 104-35000-361.
1vREREAS, 'by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 7141 ., a portion of the cost of
said improvements was levied .and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort �,orth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 7 141, ,, and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAj, THAT
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be., and it is hereby, found and declared fully completed and performed.
Ii.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed andshall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment., the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day 6
APPROVED AS TO FORM AND LEGALITY:
City Attorney
PT'.t'VJECT NO, 104-35000-361, WEST PETER SMITH STREET FR(", X01 F,T PA,R �� w,�� �F ,r- �� 1��6�'[ �^Nn��
A7 NV E, to be improved by constructing a seven-inch thick r .j a a , se nt or a
six-inch thick lime stabilized subgrade with seven-inch high superimposed, concrete c,farb on,,
a forty foot roadway. Six-inch thick concrete driveways will be constructed where specifted.
BLOCK
U40R, LOT ZONING FRONTAGE VGA°:V E A,MU NT ASSESSM2N"
Beginning at the northeast corner of Forest Park Boulevard and West F nms.r SYLiith.
NORI"H SIDE CRAWFORD ADDITION
W. S. Dubose A 19 55' No benefit No Assessment
2630 W. Freeway Ind.
76102
St. Louis-San Francisco R.O.W. 108.64' No Assessrwent
R.a ilwa.y
Tarrant County Water Control 73.15' No Assessmen
District No. l
800 E. Northside Drive
'16102
Holiday Lincoln Mercury, Inc. 1-A 15 250.62' Adjusted AU V festi^nt „al,
P,O. Box 2351 Ind. 85' Pavement $35.42 1,031010.70
761 01 85' Curb 1.3",1 113.615
$3,123.75
Fifteenth Avenue intersects
��VS�S DI _E_D_.W_A-�RDS 11EI7.R S 3'V�� 'I0'N
.
Albert J. Hopkins Co. B 30 233.59' AdJusted to (3'raa6aa
P.O. Box 503 Ind. 85' Pavement 35.42 $3,010.75
76101 85' Curb 1,..33 113.05
"3,12;x.7
"V,aarrant County Water Control 70.61'
District No. 1
800 E. Northside Drive
7 6102
PRQ,71--,CT NO. 104-35000-361 WEST PETER STIF."M STPEET F'R,Ql FOREST PARK BOULEVARD TO FUTILENTH
Continued
BLOCK,
(NMR LQT Z011ING �'R(IN 7A G E RA M AMOUNT ASSESSMENT
SOUTH S ME ETAMRDS' HEIRtS ADDITIODI
St. Loui.s.-San Francisco R.0.11'. 1,OR.611 No Assessimilt
Railurawar
Foni Leasing Developing Co. 1, 3 I-P 86,".3'21 Pavcmwnt $35.42 $,3,064.54
11.0. Bcyx 1940 ic, 8 6.5 2 1 rb 1.33 115.07
Dearborn, michigan 233 sq. 'E't. Dr',Lveway 1.70, 396.10
48121 $3,575.71
Attn- Mr. F.J. Thibodeau
TOTMI COST TO PROPERTY .. ... . . . .. . . .. ..$ 9P823.21.
D.)IM, Uki'r TO CI'17� OF I'()RT WORTU.. .. . ... . .. . .. .. ..$ 98,641.19
TOTAL ESTBV�TED CONSTRUCTION CuS'j,. . .. . . .... . .. . ...$1,0 8,4 64.40
LINE City of Fort Worth, Texas
Mayor and Council Communication
DATE REFER EONCE SUBJECT: Final Payment - West Peter Smith PAGE
N UMB
2/9/76 FP-1127 Street From Forest Park Blvd. to 15th I of 2
Axe P-xe--
Final Council action on the Project described below is requested.
Project Description
Name: West Peter Smith Street from Forest Park Blvd. to 15th Avenue
Project No. 104�-35000-361
Contractor: Texas Bitulithic Company
Contract Awarded: January 20, 1975 (M&C C-3007)
Work Order Issued: Match 20, 1975
Work Order Effective: April 7, 1975
Work Began: April 7, 1975
Date of Final Inspection and Approval: November 24, 1975
Working Time Bid: 52 Working Days
Working Time Used: 63 V.1orkin.-, "Days
Project Cost and Financing
Original Bid Price: $91,372.85
Final Contract Cost: $98,604.00
Partial Payments Previously Made: 7 ($87,737w63)
Final Payment Due: $10,866.37
Sufficient funds are available for the final payment to be made from
Project Number 104-35000-361.
Contract 'Time
Monthly statement of contract rime charged shows the contractor used
11 working days in addition to the time allotted in the contract docu-
ments. However, the project required more work and material than
anticipated in the contract. Subsequently, in accordance with the
contract specificatiops, the contractor is due additional time for
the additional work; also, the contractor was delayed and could not
properly schedule his work due to the railroad crossing adjustment
DATE REFERENCE SUBJECT: Final Payment - West Peter Smith PAGE
NUMBER Street From Forest Park Blvd. to 15th 2 2
2/9/76 FP-1127 Avenue of
work performed by the railroad. In cooperation with the City, the con-
tractor has maintained barricades on the project for the past two months
after their work was complete in order that the street could be opened
to local traffic until such time as the railroad finishes signalization
of the crossing. Consequently, the contractor is due the additional
working time required to complete the project.
Deviation from Bid Price
The final contract cost of the project is $7,231.15 over the Bid Price.
The major portion of the increase, $8,178, resulted because during
preparation of the quantities shown in the proposal of the contract
documents, the quantity of r,iprap required to construct the work for
the limits shown on the plans was miscalculated. A savings of $500.00
resulted because it was not necessary to adjust utilities as anticipated
and a savings of $446-85 resulted due to minor variations between quan-
tities estimated in the contract specifications and quantities measured
and used at the job site.
Compliance with Specifications
Tests made during construction show materials used and the thickness
of pavement is in compliance with contract, specifications.
Recommendation
It is recommended that the project described be accepted by adoption of
an ordinance and final payment of $10,866.37 be made to Texas Bitulithic,
Company.
RNL:cc
SUBMITTED BY: DISPOSITIOWZY COUNCIL: PROCES,45D BY
P_XPPROVED OTHER (DCSCRISE)
ECR RY
............. —6X fE......
CITY MANAGER