Loading...
HomeMy WebLinkAboutContract 58734 CSCO NO. 58734 TRANSPORTATION IMPACT FEE CREDIT AGREEMENT THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the "Agreement") is made and entered into effective as of the Effective Date (as defined below), by and among T H E C I T Y O F F 0 R T W 0 R T H, T E X A S (the "City"), a Texas home rule municipal corporation, and Carter Park East Land, LLC, a Delaware limited liability company authorized to do business in Texas (the "Owner") (the City and the Owner a "Party", and collectively, the "Parties"). RECITALS W H E R E A S, the Owner is the owner o f approximately 556 acres in Tarrant County, Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the corporate boundaries of the City. A map of the Property showing its location is attached hereto as Exhibit "B"; and WHEREAS, the Owner desires to proceed with development of the Property as described or illustrated on the Development Plan, attached hereto as Exhibit "C", which identifies the on-site and/or off-site transportation facilities necessary for serving full development of the Property; and WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, et seq., as amended, under which impact fees are imposed on new development for impacts to the City's transportation facilities as a result o f said development; and W H E R E A S, transportation impact fees are collected and must be spent by the City on impact fee eligible transportation facilities identified within the City's adopted Transportation Improvements Plan ("TIP"), as amended, within the service area(s) in which the new development is located; and W H E R E A S, the Impact Fee Prog r am provides for credits against impact fees for dedication o f right-of-way and/or construction o f transportation improvements identified as impact fee eligible on the adopted TIP; and W H E R E A S, the Property is located within service area X; and W H E R E A S, the City has determined the maximum transportation impact fees to be assessed against new development within service area X to be $3,806 per service unit (vehicle-miles o f demand); and WHEREAS, certain transportation facilities depicted on Exhibit "D are identified as impact fee eligible within the City's adopted TIP and therefore eligible for impact fee credit; and WHEREAS, Owner has agreed to dedicate the right-of-way and/or constructed the transportation improvements shown on Exhibit "D" for which credits against transportation impact fees shall be g ranted; and W H E R E A S, the Owner has dedicated 115,458 square feet o fright-of-way for Joel East Road, an eligible arterial, recorded byinstrumentD219130408,June 14, 2019; and OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Transportation Impact Fee Credit Agreement- CA-21-009 Page 1 of 20 Carter Park East Updated 2/23/2021 WHEREAS, the Owner has received approval of infrastructure plans for Joel East Road JPRC18-0102), an executed Community Facilities Agreement (CFA18-0186), recorded by City Secretary Number 52710, and accepted by the city October 1, 2020; and WHEREAS, the Owner has received approval of infrastructure plans for Oak Grove Road JPRC18-0096), an executed Community Facilities Agreement (CFA18-0187), recorded by City Secretary-Number 56080, currently under construction; and WHEREAS, the Owner has received approval for the Carter Park East preliminary plat (PP- 20-037); and WHEREAS, the Owner has dedicated 25,867 square feet of right-of-way for Oak Grove Road, an eligible arterial, recorded by Instrument D221089352,April 1, 2021; and WHEREAS, the Owner has received approval of infrastructure plans for Oak Grove Road JPRC20-0127), an executed Community Facilities Agreement (CFA21-0004), recorded by City Secretary Number 55443, currently under construction. NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and conditions contained herein, and other good and valuable consideration, the City and the Owner hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Transportation Improvements. Owner has dedicated the rights-of-way, constructed and/or constructing the system improvements identified in Exhibit "D". 3. Credits. The Parties agree that the estimated value of the credits for each transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee associated with any lot for which a building permit has previously been issued, and the net value of credits shown on Exhibit "E" shall be considered as exact. 4. Phasing. The Parties acknowledge that,where it is anticipated that the project will be developed in phases, the anticipated construction of improvements by phase shall be as depicted in Exhibit "D",which is attached hereto and incorporated herein by reference. 5. Allocation of Credits by Phase. The general allocation of credits to each phase of the development shall be as shown on Exhibit "F",which is attached hereto and incorporated herein by reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have been created until the system facility for which credit is to be granted has been dedicated and accepted (in the case of right-of-way) or constructed through an executed Community Facilities Agreement and final acceptance by the City has been obtained. The Parties further agree that,prior to the application of a credit against transportation impact fees otherwise due for any unit of development; the following events shall take place: (a) The number of credits resulting from such improvement has been valued; and Transportation Impact Fee Credit Agreement—CA-21-009 Page 2 of 20 Carter Park East Updated 2/23/2021 (b) Concurrent with final plat approval,a credit allocation shall be provided by the developer for the phase of development to which the credit is to be applied, which allocation may either assign the credit, expressed in dollars, to each finally platted lot or may create a credit-pool to be utilized by that phase of development. (c) Provide final acceptance by the City for the construction in process and amend the transportation impact fee credit agreement to allocate the additional construction credit. 6. Term and Effective Date. The term of this Agreement shall be ten (10) years from its Effective Date. 7. Assignment. Owner shall have the right to assign this Agreement to any person or entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is in writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement by reference and binds the Owner's Assignee to perform (to the extent of the obligations assigned) in accordance with this Agreement. Each Owner's Assignee shall become a Party to this Agreement upon the execution of such assignment. In no event may this Agreement be construed to authorize assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for use outside the boundaries of the Property. 8. Amendment. This Agreement shall not be modified or amended except as follows: (a) Any amendment or modification to this Agreement or any Exhibit or schedule hereto shall be in writing and signed by the Parties. (b) Any revision, amendment, or modification to this Agreement, the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date executed by the Parties or, as applicable, upon the date of approval by the City Council or designated city official. 9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this Agreement for all purposes as if set forth in full in the body of this Agreement. (Remainder of Page Intentionally Left Blank) Transportation Impact Fee Credit Agreement—CA-21-009 Page 3 of 20 Carter Park East Updated 2/23/2021 IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City's Assistant City Manager. CITY OF FORT WORTH,TEXAS OWNER Carter Park East Land,LLC a Delaware limited liability company Dana Burghdoff(Jan 13,20 06:45 CST by: Carter East Investor, LLC Dana Burghdoff it's managing member Assistant City Manager Date: 1/13/23 Matthew E. Colter Vice President Recommended By: DJ Harrell(Jan 12,2023 08:55 CST) City Contract Compliance Manager: DJ Harrell Director,Development Services By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, Approved as to Form and Legality: including ensuring all performance and reporting requirements. D$lack(Jan 12,2023 10:37 CST) Douglas Black Mirian Sepncer Assistant Cite Attorney Transportation Impact Fee Coordinator M&C:None required Development Services Department Form 1295: None required godvonn4� ATTEST: FORr�o��� Pvoo o o �o S� aaa�nEXASo�p Jannette Goddall City Secretary OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Transportation Impact Fee Credit Agreement—CA-21-009 Page 4 of 20 Carter Park East Updated 2/23/2021 EXHIBIT LIST "A" Description of the Property "B" Map of Property- "C" Development Plan "D" Eligible Transportation Improvements "E" Credits Against Transportation Impact Fees "F" Allocation of Credits Transportation Impact Fee Credit Agreement—CA-21-009 Page 5 of 20 Carter Park East Updated 2/23/2021 Exhibit "A" DESCRIPTION OF PROPERTY PP-20-037 BEING a 539.0405 acre tract of land situated in the Shelby County School Land Survey, Tracts 3,4,11 and 12 - Abstract No. 1375, City of Fort Worth, Tarrant County, Texas, and being all of Lot 1, Block 8R, Forbess Addition, and addition to the City of Fort Worth, Texas according to the plat recorded in Instrument No. D212299693 of the Official Public Records of Tarrant County, Texas, and being part of a tract of land described as "1st TRACT" in Deed to Ruth Carter Johnson recorded in Volume 3587, Page 317 of the Deed Records of Tarrant County, Texas, and being part of that tract of land described as "SECOND TRACT" in Special Warranty Deed to Amon G. Carter Foundation recorded in Volume 8793, Page 1057 of said Deed Records, as corrected by Second Correction Special Warranty Deed recorded in Instrument No. D205244839 of the Official Public Records of Tarrant County, Texas, said tract being all of a called 300.3879 acre tract of land described in Special Warranty Deed to Carter Park East Land, LLC recorded in Instrument No. D220095202 of the Official Public Records of Tarrant County, Texas, and being part of a called 255.5957 acre tract of land described in Special Warranty Deed to Carter Park East Land, LLC recorded in Instrument No. D220095204 of the Official Public Records, and being more particularly described as follows and being more particularly described as follows: BEGINNING at a 5/8-inch iron rod with plastic cap stamped "KHA" set in the south line of a tract of land described in Deed to Texas Electric Service Company recorded in Volume 2911, Page 367 of said Deed Records, and being in the east right-of-way line of Oak Grove Road - County Road No. 1023 (a variable width right-of-way); THENCE departing the said east right-of-way line of Oak Grove Road - County Road No. 1023 and with said south line of the Texas Electric Service Company tract, North 89029'17" East, a distance of 4697.27 feet to a 1/2-inch iron rod found for the northwest corner of Lot 1, Block 1, Wichita Springs Addition, an addition to the City of Fort Worth, Texas according to the plat recorded in Volume 388-175, Page 57 of said Plat Records; THENCE departing the said south line of the Texas Electric Service Company tract, South 0029'43" East, a distance of 2527.00 feet to a 5/8-inch iron rod with plastic cap stamped "KHA" set in the north line of said 1st TRACT, for the southwest corner of said Wichita Springs Addition; THENCE with the said north line of 1st TRACT, North 89'24'17" East, a distance of 412.55 feet to a 5/8-inch iron rod with plastic cap stamped "KHA" set in the northwest right-of-way line of Wichita Street (50-foot wide right-of-way), for the northeast corner of said 1st TRACT; THENCE with the said northwest right-of-way line of Wichita Street, South 11 o53'49" West, a distance of 1682.52 feet to a 5/8-inch iron rod with plastic cap stamped "KHA" set for corner; THENCE departing the said northwest right-of-way line of Wichita Street, South 89019'50" West, a distance of 1245.42 feet to a point for corner; THENCE South 0038'27" East, a distance of 995.65 feet to a point for corner in the north right- of-way line of Enon Road - County Road No. 1051 (a variable width right-of-way); THENCE with Enon Road - County Road No. 1051, South 89°24'14" West, a distance of 3506.32 feet to a 5/8-inch iron rod with plastic cap stamped "KHA" set at the intersection of Enon Road - County Road No. 1051 and said east right-of-way line of Oak Grove Road - County Road No. 1023; THENCE with the said east right-of-way line of Oak Grove Road - County Road No. 1023, North 0'29'25" West, a distance of 5173.84 feet to the POINT OF BEGINNING and containing 539.0405 acres or 23,480,605 square feet of land, more or less. FP-18-125 BEING a 29.9851 acre tract of land situated in the Elizabeth Teague Survey, Abstract No. 1544 and the J Jennings Survey, Abstract No. 875, City of Fort Worth, Tarrant County, Texas; said tract being part of Block 7, Carter Industrial Park, an addition to the City of Fort Worth according to the plat recorded in Volume 388-31, Page 52 of the Plat Records of Tarrant County, Texas; said tract being more particularly described as follows: BEGINNING at a 1/2-inch iron rod with "BRITTAIN & CRAWFORD" cap found in the east right- of-way line of Oak Grove Road (an 80-foot wide right-of-way); said point being the northeast corner of said Block 7; THENCE South 0'29'25" East, along the said west line of Oak Grove Road, a distance of 2081.74 feet to a "+" cut found for corner; THENCE South 89'27'10" West, departing the said west line of Oak Grove Road, a distance of 626.78 feet to a 5/8-inch iron rod with "CARTER & BURGESS" cap found for corner; THENCE North 0°31'24" West, a distance of 2082.07 feet to a 5/8-inch iron rod with "JACOBS" cap found for corner in the north line of said Block 7; THENCE North 89°28'58" East, along the said north line of Block 7, a distance of 627.98 feet to the POINT OF BEGINNING and containing 29.9851 acres or 1,306,152 square feet of land, more or less. EXHIBIT "B" LOCATION MAPS CL Q, I � C� z ` 0 w LLJ V) lftft I) uj 1 �- %lift 0 3AO D N30MONS Transportation Impact Fee Credit Agreement—CA-21-009 Page 7 of 20 Carter Park East Updated 2/23/2021 (! W Q 0 �— 3: w Z U Cr } z' 0 W ij 3 ' V) J L,j LL1 w M 0 W Lj- � Z W 3110 )NO Ljj NOSia]6 V NKMONS m Li w � w L S83908 -MINI '�~ T Q Transportation Impact Fee Credit Agreement—CA-21-009 Page 8 of 20 Carter Park East Updated 2/23/2021 ivounaiu[sror3[er��x�o�e Y[o�-!rw mvcv At EXHIBIT ��C�� Kz �~ ° DEVELOPMENT PLAN �am� o ggsIag s o II wg I Oz k$ Ln N aS Um r W Fl.� v a 9 _ rw � N~ s a ,Derv-,� — � --�-------- -- ~a� IIIII l a `oo�l „It gym<n �� Ng � a� d s I$�III II All "g I Rapea j 2 ZdG MS0 ff, 3 Q I III I @q I 8 e Sim �E . P e; R Al z III II III kli, ao a gV III III Fd# o.Ro I s�" III II II I I S_ I — a III II l l i a ---- ---- <�m =,�I � "6g o�< A a a nn III II I Faz w III I I 7— � v Ili II I ---- � III III I= I I R 'A19'9,Qi Aeum� I II Ill II I �5 --� — —— —_ II III III II I a� I ��l � �Yas"asvimm9 ou � � IIII III II I � I „�I I - Ili hill II I II Hill 8 III€ II II �=II I�I glffi 9 � I II III I 1. FV �� n5a5, II II I a3 i s l I 5_ e4y 19k _ -- ----- — --------- -- -- uri rou,arwwr-aswne mm — F m !a rro oe,�rwsry-,rws smwuu-vxx S g r—e o •M'9L AS p'i�O (00-0d-M-99f-»n) oss ]w ) Nava ivimsnow anavo v-9)IO019'al lei (09'Od'1f XC r•l0A) i 60 Maya lv9LLSnm a NvO v-9 MO(119'9L 101 — u � E zieu, Transportation Impact Fee Credit Agreement—CA-21-009 Page 9 of 20 Carter Park East Updated 2/23/2021 MOII//9/HaWM NV0{N"X {107-1V]d 7V ® Be $@;� ?a P�°y i$ $'j; $3 za $ �- 8 i�x V Hum r )cw s Jm €�.�^,� �p$p! � �� 0 ��Z t a "I de s V S E5 J III a;` f $ I i °5 figg'# gz$ a�aa� ))s Wg' Or � i WWa?ai jq W §$ r fill a= r j d y~z s o F H as a s � I. 6 gP 3 �. i V E j• `4Fj . F€FE "e g a`3.� ' i �p3'-p. illy;x d$l3lu�� • .s a,Ekaa$ �`R � ?a dd N MN ��3 V moon"I 1 d €m _^— --------------- —�� — —_ --- f•$ fps S Cb _ tl I �b HA � 1 flop 11� I"�I��A�'s i'tl �'e I ass fy j ff 'r�lAB M g' 0[ 1 1 jt �z I III ,x°��+ €i a«�xa,btcvd. I ( Ada a � H t �� 1� $g uss��a� 1 11 II�4 ;�I M 11 k II III it l�w I� I j� §fib Sh oil %g II 11111I R= Im � Aga a C—�— I .LB'ZLB -2S,OG.005 $ �6 E8�tl NJ T��� §s a.s gaka ;b§ssE � app sit �i s f gg�H t I Zs•E H{:,gRe �3� s�s�k ;Y€ Ff Vgk �6 Y�Y Y9 hi $$a.� � �CFa I•e E'�s5 Eme &azH�"b @i(L8$y Fs e2 d�a of e W � g GIs 0911 ss$ sly; -Hi is HgP •E ? i i is`{{Y' € E� 3 8 s� FR2 A LLs S ps` g6 OF Hs g�� � �. ���sa :���•fI erg (��a;j I�$� c IN MRS gg �gs h a$ OAR vu $ l = �Hsg w,nis Transportation Impact Fee Credit Agreement—CA-21-009 Page 10 of 20 Carter Park East Updated 2/23/2021 R Y war ^^ § F - O - U) OF < Ja 10< �0 - 2 a m a. a�W�3Nr ce zzd w �p�i �Q Lu< K a - F O w � J a Oyu_ � r U 1� ow II I ' ilawserv�uesvilu� _ e i d I m II I oPLZSZ 3'eD.6Lea9 Sim / W G / A I y'_ ac3°uo 'I' \�zwa=Qa II 11 I k 1� I w w l �I I ___---_—__------------------------ L1-- ---- --- I YI — —_—a a %�W N f/1 III�' �_—___— %�'�/♦� 1 ��� �'� .' I I c , I 1� /; ` ' `�i `/ y 1 15 ------------ �_ III ) H; III YA� 'ICI I - II ------ ----- I w I I II z 'I II , `„ s�♦♦I I w �a - I I _ I � o� I� li t f♦I /__ �i.`Ili� I i¢ i �y II I - - li / r ♦ i ILL / - - yam III I / I z �I Il 1v`�1 - I Na ul I d ; I I ��— zr e I I ------;II III �Il - �2"ti I h A''II w� II w 11 --- m � u � 0 -_�I _ yam x r ; �:EI IICx I m � I; dw ,e�Qa V �' 'I��I I� I � ��� �I I I ✓ i «�E � � I II� � - - _ _ 6 r�Wa 'O rs y 1L68Zsi6LZ9 1SN11 N.-I) H 21 TIItl1Sl19NIM91YCD A dib1�1S110N1t131i1b'0 I ' Transportation Impact Fee Credit Agreement—CA-21-009 Page 11 of 20 Carter Park East Updated 2/23/2021 � Transportation Impact Fee Credit Agreement—[A-21-OO9 Page 12 of3O ALTAMESA f ____� _ EXHIBIT IID11_ _ Carter Park East . - �n�� n E �y *Eligible for Credit Against Transportation Impact Fees Right-of-Way Dedication - T -__ - - & Construction • FORTIVORrn s > o 1 c� JOE L EAST 95 4 t.1 ? - - z r _ - Eligible Improvements Limits Oak Grove Road ROW Dedication (FP-21-010) ° Oak Grove Road ROW Construction (City Project 101902) ■-` EVERMAN Oak Grove Road ROW Construction (City Project 102802) Joel East Road ROW Dedication (FP-18-098) _ Joel East Road ROW Construction (City Project 101903) Transportation Impact Fee Credit Agreement-CA-21-009 Page 13 of 20 Carter Park East Updated 2/23/2021 EXHIBIT "E" Carter Park East Transportation Impact Fee Credit Overview Value of ROW Dedication Instrument# Plat Case# Eligible Arterial Value D219130408 FP-18-098 Joel East Rd $ 226,298.00 D221089352 FP-21-010 Oak Grove Rd $ 54,579.00 Value of Capacity Completed City Project# Plat Case# Eligible Arterial Value 101903 FP-18-098 Joel East Rd $ 2,671,568.40 Current Available Transportation Impact Fee Credit $ 2,952,445.40 Value of Capacity in Process City Project# Plat Case# Eligible Arterial Value 101902 FP-18-125 Oak Grove Road $ 3,747,622.00 101902 City Participation Oak Grove Road $ (2,100,000.00) 102802 FP-20-021 Oak Grove Road $ 6,136,774.00 102802 City Participation Oak Grove Road $ (1,200,000.00) * Credit for projects in process unavailable until projects complete Total Anticipated Transportation Impact Fee Credit $ 9,536,841.40 Value of Existing Demand Number of Permits Collection Rate FP-20-021 Building Permits 7 $ 557,018.90 Net Credit Available $ 2,395,426.50 Transportation Impact Fee Credit Agreement—CA-21-009 Page 14 of 20 Carter Park East Updated 2/23/2021 Joel East Road Right-of-way Calculation Right-of-Way Valuation for Carter Park East Valuation Method 1-Precentage of TIP Project Cost Eligible Arterial Joel East Rd 2017 Transportation Improvements Plan Project X-5 Number Estimated Construction Costs from 2017 $4,533,000 Transportation Improvements Plan Value of Total Project Right-of-Way(20%of $906,600 Construction Cost) Total Project Length(LF) 5,805 Arterial Cross-Section Width(LF) 80 Additional ROW needed for Roundabout(SF) 0 Total Project Right-of-Way(SF) 464,400 Right-of-Way Value Per Square Foot $1.96 Valuation Method 2-Precentage of Construction Cost Eligible Arterial Joel East Rd Construction Costs for CPN 101903 $2,671,568 Value of Total Project Right-of-Way(20%of $534,314 Total Project Length(LF) 5,295 Arterial Cross-Section Width(LF) 80 Additional ROW needed for Roundabout(SF) 0 Total Project Right-of-Way(SF) 423,600 Right-of-Way Value Per Square Foot $1.27 Valuation Method 3-TAD appraised value TAD Value as of 1/15/2021 Joel East Rd TAD Account 4700430 4700465 Total Area(SF) 6,660,746 1,167,844 Appraised Value $381,178.00 $124,024.00 Value per Square Foot $0.06 $0.11 Right-of-Way Dedication Joel East Rd Recording Instrument Number D219130408 Recording Date 6/18/2019 Total area of ROW dedicated 115,458 sq ft Value per SF $1.96 Credit $226,297.68 Joel East Road ROW Credit Available $226,298.00 Transportation Impact Fee Credit Agreement—CA-21-009 Page 15 of 20 Carter Park East Updated 2/23/2021 Oak Grove Road Right-of-way Calculations Right-of-Way Valuation for Carter Park East Valuation Method 1-Precentage of TIP Project Cost Eligible Arterial Oak Grove Rd 2017 Transportation Improvements Plan Project X-18 Number Estimated Construction Costs from 2017 $7,361,000 Transportation Improvements Plan Value of Total Project Right-of-Way(20%of $1,472,200 Construction Cost) Total Project Length(LF) 6,600 Arterial Cross-Section Width(LF) 110 Additional ROW needed for Roundabout(SF) 0 Total Project Right-of-Way(SF) 726,000 Right-of-Way Value Per Square Foot $2.03 Valuation Method 2-Precentage of Construction Cost Eligible Arterial Oak Grove Rd Construction Costs for CPN 102802 $6,136,774 Value of Total Project Right-of-Way(20%of $1,227,355 Total Project Length(LF) 5,295 Arterial Cross-Section Width(LF) 110 Additional ROW needed for Roundabout(SF) 0 Total Project Right-of-Way(SF) 582,450 Right-of-Way Value Per Square Foot $2.11 Valuation Method 3-TAD appraised value TAD Value as of 1/15/2021 Oak Grove Rd TAD Account 4700430 4700465 Total Area(SF) 6,660,746 1,167,844 Appraised Value $381,178.00 $124,024.00 Value per Square Foot $0.06 $0.11 Right-of-Way Dedication Oak Grove Rd Recording Instrument Number D221089352 Recording Date 12/8/2020 Total area of ROW dedicated 25,867 sq ft Value per SF $2.11 Credit $54,579.37 Oak Grove Road ROW Credit Available $54,579.00 Transportation Impact Fee Credit Agreement—CA-21-009 Page 16 of 20 Carter Park East Updated 2/23/2021 Joel East Road Construction Improvements Capacity Provided by Joel East Road Improvements CPN 101903 Paving Item Eligible Completed Description Unit Unit Price No. Quantity Quantity Credit Available 1 REMOVE ASPHALT PVMT SY 10,288 10,288 $ 8.00 $ 82,304.00 2 REMOVE FENCE LF 2,475 2,475 $ 3.00 $ 7,425.00 3 REMOVE 24"STORM LINE LF 66 66 $ 20.00 $ 1,320.00 4 VALVE BOX ADJUSTMENT EA 2 2 $ 500.00 $ 1,000.00 5 TRAFFIC CONTROL MO 5 5 $ 1,500.00 $ 7,500.00 6 8"CONC PVMT SY 15,732 15,732 $ 46.00 $ 723,672.00 7 7"CONC PVMT SY 1,509 1,509 $ 42.00 $ 63,378.00 8 2"ASPHALT PVMT TYPE D COB2 SY 929 929 $ 14.00 $ 13,006.00 9 4"ASPHALT BASE TYPE B COB2 SY 929 929 $ 24.00 $ 22,296.00 10 4"CONC SIDEWALK SF 58,022 58,022 $ 3.50 $ 203,077.00 11 8" LIME TREATMENT SY 17,430 17,430 $ 3.50 $ 61,005.00 12 COMMERCIAL LIME SLURRY TN 424 424 $ 190.00 $ 80,560.00 13 TOPSOIL CY 1,958 1,958 $ 20.00 $ 39,160.00 14 4"SLD PVMT MARKING HAS LF 10,799 10,799 $ 2.00 $ 21,598.00 15 8"SLD PVMT MARKING TAPE LF 261 261 $ 3.00 $ 783.00 16 8"SLID PVMT MARKING TAPE LF 140 140 $ 3.00 $ 420.00 17 LANE LEGEND ARROW EA 21 21 $ 450.00 $ 9,450.00 18 LANE LEGEND ONLY EA 3 3 $ 450.00 $ 1,350.00 19 REFL RAISED MARKER EA 174 174 $ 5.25 $ 913.50 20 UNCLASSIFIED EXCAVATION BY PLAN CY 4,126 4,126 $ 6.00 $ 24,756.00 21 SITE CLEARING LS 1 1 $ 15,000.00 $ 15,000.00 22 MOBILIZATION LS 1 1 $ 5,000.00 $ 5,000.00 Paving Subtotal $ 1,384,973.50 Storm Drain Item Eligible Completed No. Description Unit Quantity Quantity Unit Price Credit Available 1 4X3 BOX CULVERT LF 799 799 $185.00 $ 147,815.00 2 6'STORM JUNCTION BOX EA 2 2 $7,500.00 $ 15,000.00 3 10' RECESSED INLET EA 11 11 $3,600.00 $ 39,600.00 4 15' RECESSED INLET EA 2 2 $4,600.00 $ 9,200.00 5 20' RECESSED INLET EA 2 2 $5,600.00 $ 11,200.00 6 SET TYPE I FOR BOX CULVERTS CY 4 4 $2,750.00 $ 11,000.00 7 CONCRETE RIPRAP(6"THICK) SY 187 187 $75.00 $ 14,025.00 8 21" RCP CLASS III LF 449 449 $50.00 $ 22,450.00 9 MEDIUM STONE RIPRAP COB1 SY 122.7 122.7 $10S.00 $ 12,883.S0 10 CONCRETE ENCASEMENT FOR UTILITY PIPES CY 3 3 $200.00 $ 600.00 11 SWPPP>1 ACRE LS 1 1 $13,500.00 $ 13,500.00 12 42" RCP CLASS III LF 795 795 $120.00 $ 95,400.00 13 36" RCP CLASS III LF 1,741 1,741 $100.00 $ 174,100.00 14 4'STACKED MANHOLE LF 2 2 $2,500.00 $ 5,000.00 15 3X2 BOX CULVERT LF 464 464 $155.00 $ 71,920.00 16 4'STORM JUNCTION BOX LF 4 4 $4,500.00 $ 18,000.00 17 30" RCP CLASS III COB1 LF 108 108 $80.00 $ 8,640.00 18 30" PARALLEL HEADWALL 1 PIPE EA 1 1 $3,500.00 $ 3,500.00 19 60" RCP CLASS III COB1 LF 190 190 $380.00 $ 72,200.00 20 60"SET 1 PIPE COB1 EA 1 1 $6,500.00 $ 6,500.00 Storm Drain Subtotal $ 752,533.50 Transportation Impact Fee Credit Agreement-CA-21-009 Page 17 of 20 Carter Park East Updated 2/23/2021 Street Lights Item1W Eligible Completed Description Unit Unit Pric No. Quantity Quantity Credit Available 1 LED LIGHTING FIXTURE EA 20 20 $1,000.00 $ 20,000.00 2 FURNISH/INSTALL 8'WOOD LIGHT POLE ARM EA 20 20 $1,200.00 $ 24,000.00 Street Lights Subtotal $ 44,000.00 Traffic Signal Description Unit Eligible Completed Unit Price Quantity Quantity Reclit Available 1 FURNISH/INSTALL ALUM SIGN MASE ARM EA 1 1 $800.00 $ 800.00 Traffic Signal Subtotal " 44,800.00 Paving Subtotal $ 1,384,973.50 Storm Drain Subtotal $ 752,533.50 Street Lights Subtotal $ 44,000.00 Traffic Signal Subtotal $ 44,800.00 CONSTRUCTION SUBTOTAL $ 2,226,307.00 Other Eligible Items Descripti Engineering,Surveying and Material Testing 20% of Paving&Storm Drain $ 445,261.40 Total Value of Capacity Provided $ 2,671,568.40 Transportation Impact Fee Credit Agreement—CA-21-009 Page 18 of 20 Carter Park East Updated 2/23/2021 Existing Demand (Building Permits in Review) 7 $2,395,426.S0 Street Street Permit No. Final Plat Collection Rate Credit Available No 7200 Harris Legacy PB21-03095 FP-20-021 $ 244,652.10 $2,150,774.40 7301 Harris Legacy PB21-03100 FP-20-021 $ 143,987.76 $2,006,786.64 1851 Joel East Rd P021-01759 FP-18-125 $ 168,379.04 $1,838,407.60 1851 Joel East Rd (NZ19-00124) PB19-03841 FP-18-125 $ - $1,838,407.60 1901 Joel East Rd (NZ19-00124) PB19-03842 FP-18-125 $ $1,838,407.60 1701 Joel East Rd (NZ19-00124) PB19-03843 FP-18-125 $ $1,838,407.60 1501 Joel East Rd (NZ19-00124) PB19-03844 FP-18-125 $ $1,838,407.60 FP-20-021 Available Credit $1,114,872.34 FP-18-125 Available Credit $1,280,554.16 Existing Demand $557,018.90 Transportation Impact Fee Credit Agreement—CA-21-009 Page 19 of 20 Carter Park East Updated 2/23/2021 EXHIBIT 'T' ALLOCATION OF TRANSPORTATION IMPACT FEE CREDITS FP-18-125 Shall receive 50% of the Transportation Impact Fee Credits for the Dedication and Construction of Joel East Road ($1,448,993.20) on a first-come/ first-served basis PP-20-037 Shall receive 50% of the Transportation Impact Fee Credits for the Dedication and Construction of Joel East Road ($1,448,993.20), the Dedication ($54,579) and future construction of Oak Grove Road on a first-come/first- served basis Transportation Impact Fee Credit Agreement—CA-21-009 Page 20 of 20 Carter Park East Updated 2/23/2021