Loading...
HomeMy WebLinkAboutContract 56870-A2 AMENDMENT NO. 2 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES OLD HEMPHILL DROP-OFF STATION SCRAP METAL AREA MODIFICATIONS STATE OF TEXAS 56870-A2 CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Elements of Architecture, Inc., (Consultant) made and entered into City Secretary Contract No. 56870 (The Contract) which was admiratively authorized for $39,410.00 for design services and did not include the reimbursable expenses as noted in Consultant's proposal, the 17th day of December, 2021, for Scrap Metal Area Modifications at the Old Hemphill Drop-Off Station; and Amendment No. 1 was administratively executed in the amount of $3,200.00 for reimbursable expenses that were inadvertently omitted in the Consultant's proposal; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for modification of construction documents to include scope of work changes; NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design & construction administration services for the Old Hemphill Drop-Off Station. The cost of this additional services is $55,801.00 and no additional reimbursable expenses. The scope of services is described more fully in Elements of Architecture, Inc.'s Letter dated December 8, 2022 (Revised) subject: Proposal for A/E Services — Hemphill Scrap Metal Yard — Amendment#2, Add Sery 01 — Extended Paving and Retaining Walls. 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "B". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "B". However, the total fee paid by the City shall not exceed a total of $98,411.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX CFW-Standard Agreement for Professional Services AMENDMENT(Rev.20Mar2O2O) Page 1 of 2 EOA, Inc.-Old Hemphill DOS Scrap Metal Area Modifications,PMD2021-08 November 2022 Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth: Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and Dana&M doff administration of this contract, including By. uanaBurghdoff(Tan 20,202317:46CST) ensuring all performance and reporting Name: Dana Burghdoff, AICP requirements. Title: Assistant City Manager Date: Jan 20, 2023 Approval Recommended: Name: Brian Glass Title: City Architect fir, C-) Approved as to Form and Legality: By: Stevec.obke Nov 18,202213:53 CST) Name: Steve Cooke Title: Director, Property Management Dept. bq'dRA�n�� By �t2BH-Q- aa . Attest: �,°'o° Name: John B. Strong P.-o o=d Title: Assistant City Attorney o poi °° -$ 4 a�nIl nEXp °Saa� Contract Authorization: Not Required By: M&C: N/A Name: Jannette Goodall Title: City Secretary VENDOR: Elements of Architecture, Inc. By: �14 v Name: Debbie Fulwiler, AIA Title: President Date: N Ov 1, 2022 OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX CFW-Standard Agreement for Professional Services AMENDMENT(Rev.20Mar2O2O) Page 2 of 2 EOA, Inc.-Old Hemphill DOS Scrap Metal Area Modifications,PMD2021-08 November 2022 ELEMENTS ATTACHMENT "B" of architecture December 8, 2022 - REVISED Mr.Alfonso Meza City of Fort Worth 401 West 13th Street Fort Worth, TX 76102 Re: Proposal for A/E Services — Hemphill Scrap Metal Yard —Amendment#2 Add Sery 01 - Extended Paving and Retaining Walls Dear Alfonso; Elements is pleased to provide to you this Additional Services proposal for A/E services associated with the Scrap Metal Yard for increasing the pavement areas as discussed in site meetings on March 24, April 19,June 16 and various communications. These improvements will require an updated survey to the added areas, new retaining wall designs, guardrails, additional heavy duty equipment parking &paving design, updated Landscape/Irrigation/Urban Forestry improvements. This additional services proposal also includes current effort to date to discuss the scope and feasibility, producing preliminary site plan sketches for discussion, percent coverage and impervious area analysis, zoning update verification, floodplain research, OPCC, general compactor equipment planning and circulation study, subsequent meetings and discussions, etc. We have defined our additional scope of services beyond the original project scope as follows: SCOPE OF SERVICES Construction Documents Phase 1. Scoping meetings, produce preliminary site plan sketches for review, perform percent coverage and impervious area analysis, floodplain research, preliminary OPCC, compactor equipment and circulation study(services already completed). 2. Revise the current Scrap Metal drawings&specifications to reflect the new expanded paving areas and retaining walls as shown in attached exhibit dated 9-13-2022 and Revised 10-24-2022. 3. Attend 4 additional design phase meetings with Owner. A. Submit Substantially Complete documents for Owner's Review. 5. Address Owner Review comments and submit final sealed construction documents. Exclusions and Qualifications to This Proposal: 1. Proposals for civil, structural and cost estimating consultants are attached with the information included as if provided within this proposal. Page 1 of 2 Elements of Architecture, Inc. 11201 6'h Avenue, Suite 100, Fort Worth,Texas 76104 1 817.333.2880 2. We have not included MEP Engineering, nor do we believe these are required for these additional services. If we see that these are needed, we will provide a proposal for these services. 3. This proposal is based on the remaining design phase efforts being complete within two months of NTP. If this phase extend beyond these anticipated schedules, we will provide a proposal for these extended services. A. This proposal excludes a pre-engineered shade canopy structure at the recycling center. 5. This proposal is based on 1 new APC 526 pre-crusher compactor with a 40YD receiver box. The final compactor equipment to be purchased by the COFW will need to be tested for operational circulation against the final engineered site plan prior to procurement. 6. We have not included cost estimating within this proposal or the additional CA phase services. PROPOSED FEE Labor We propose to provide our services as identified in this proposal for the lump sum amount as follows. This amount is in addition to our original proposal. Architectural Services $24,297 Architectural Effort to Date- $1 1,097 Architectural Plan Revisions- $13,200 Civil Engineering (22,500 x 1.1) $24,750 Civil Engineering Effort to Date- $2,320 Civil Engineering Plan Revisions- $9,680 Additional Topographic Survey- $4,500 Urban Forestry Revisions- $6,000 Structural Engineering (6,140 x 1.1) 6,754 Structural Plan Revisions- $6,140 LABOR TOTAL ADD SERV 01 $55,801 Expenses We do not expect reimbursable expenses to be needed for these services and that we have adequate fee within our original scope. If you have any questions or need to discuss, please call me. Thank you for this opportunity to provide additional services to you and we look forward to working with you on this project. Sincerely, Debbie Fulwiler,AIA President Attachments: Structural Engineering Proposal by RLWA(9-19-2022) Civil Engineering Proposal by Carrillo(7-29-2022) Site Paving Exhibit'A'(Revised 10-24-2022) Page 2 of 2 Elements of Architecture, Inc. 11201 6'h Avenue, Suite 100, Fort Worth,Texas 76104 1 817.333.2880