HomeMy WebLinkAboutContract 57278-CO1 FORT WORTH City of Fort Worth CSC No. 57278-COI
Change Order Request
Project Name: Westside III/IVN(Markum Ranch Pump Station-PS&Ground Storage Tank-GST) City Sec No.: 57278
Project No.(s): 56020/0600430/001680 DOE No. N/A City Proj.No.: 103010 771
Project Description: PS Building;Three 4,750 gpm horizontal split case pumps w 400 HP motors;Three 7,000 gpm horizontal split case pumps w 300 HP motors;A
3 MG Concrete GST;Electrical&Controls, 1,600 kW generator,necessary piping,vaults and site work,etc.
Contractor: Crescent Constructors, Inc. I Change Order# 0 Date: F 1/9/2023
City Project Mgr.1 Farida Goderya, PE City Inspector: Ivan Rocha(KHA)
Phone Number: 817-392-8214 Phone Number: 682-234-2767
Dept. Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $20,993,000.00 $20,993,000.00 640
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $20,993,000.00 $20,993,000.00 640
Amount of Proposed Change Order $25,400.00 $25,400.00 09
Revised Contract Amount $21,018,400.00 $21,018,400.00 649
Original Funds Available for Change Orders $419,860.00 $419,860.00
Remaining Funds Available for this CO $419,860.00 $419,860.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.12%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2551o) $26,241,250.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
r
Change Order No. 1 will provide for the following additional pay items on the project:an additional swing gate,
light pale foundation modifications, pipe gallery and foundation control joints and ground storage tank mixer
breaker modifications.
Staff recommends the addition of 9 calendar days for the change order.
i
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date
Crescent Constructors, Inc. Ryan Glanz, PE 01 . 13 . 23
Ins t for __ Date Project Manager Date
1/16/23 Fo ri,ol, 6;o le-rya 117'23
Director Water Dept) Date Construction Supervisor Date
Jan 18,2023
Senior Assistant City Attorney Date Assistant City Manager Date
VA Jan 20,2023 .� Jan 20,2023
Council Action If Required)
M&C Number N/A M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
FO RT WO RT H City of Fort Worth
Change Order Additions
Project Name Westside III/IV/V(Markum Ranch Pump Station-PS&Ground Storage Tank-GST) City Sec No.: 57278
Project No.(s): 56020/0600430/001680 1 DOE No. N/A City Proj.No.: 1 103010
Project pumps w 300 HP motors;A 3 MG Concrete GST;Electrical&Controls, 1,600 kW generator, necessary piping,vaults
Description
Contractor Crescent Constructors, Inc. Change Order:= Date: 1/9/2023
City Project Mgr. Farida Goderya, PE City Inspector Ivan Rocha(KHA)
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
1 PCM 02-SWING GATE ADDITION Water 1.00 LS $6,50700 $6,500.00
2 PCM 03-LIGHT POLE FOUNDATION MODIFICATIONS Water 1.00 LS $5,900.00 $5,900.00
3 PCM 04-PIPE GALLERY AND FOUNDATION CONTROL JOINTS Water 1.00 LS $12,000.00 $12,000.00
4 CMR 02-GST MIXER BREAKER MODIFICATIONS Water 1.00 LS $1,000.00 $1,000.00
Water $25,400.00
Sewer
Page 1 of i Additions Sub Total $25,400.00
FO RT WC3 RT H City of Fort Worth
Im Change Order Deletions
Project Name Westside IIIIIVN(Markum Ranch Pump Station-PS&Ground Storage Tank-GST) City Sec No.: 57278
Project No.(s): 56020/0600430/001680 ==1 DOE No. = City Proj. No.: 103010
Project Description PS Building;Three 4,750 gpm horizontal split case pumps w 400 HP motors;Three 7,000 gpm horizontal split case
pumps w 300 HP motors;A 3 MG Concrete GST;Electrical&Controls, 1,600 kW generator,necessary piping,
Contractor Crescent Constructors, Inc. Change Order: F 1 1 Date 1/9/2023
City Project Mgr. Farida Goderya,PE City Inspector: Ivan Rocha(KHA)
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Page 1 of 1 IDeletions Sub Total
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Same as original Contract Miscellaneous $25,400.00
Total $25,400.00
Previous Change Orders
CO# DATE AMOUNT
1
2
3
Total $0.00
Page 1 of 1
CHANGE ORDER SUMMARY
Front Sheet
IVIARKUM PUMP STATION
CHANGE DESCRIPTION:
CONTRACT MODIFICATION REQUEST It PCM-02 Job#: 2020-02
Description Labor Material Equipment Subcontract Total
DIRECT COSTS 5564 6,400 6,964
LABOR BURDEN&FRINGES 65%
SUBTOTALS 564 - 5,400 5,964
CONTRACTOR MARKUP 15% _ 85
CONTRACTOR MARKUP 5% SUBS 270
BONDS&INSURANCE 3% 190
(B)
TOTALI1 6,600
CLARIFICATIONS:
1
2
3
4
f CHANGE ORDER SUMMARY
IFront Sheet
MARKUM PUMP STATION
CHANGE DESCRIPTION:
CONTRACT MODIFICATION REQUEST It PCM-03 Job it: 2020-02
Description Labor Material Equipment Subcontract Total
DIRECT COSTS 1,400 2,/'17 115 _ 4,232
LABOR BURDEN&FRINGES 55% 770 770
SUBTOTALS 2,170 2,717 - 115 5,002
_ CONTRACTOR MARKUP 15% 733
CONTRACTOR MARKUP 5%(SUBS) 6
BONDS&INSURANCE 3% 172
(13)
TOTAL
CLARIFICATIONS:
1
2
3
4
CHANGE ORDER SUMMARY
Front Sheet
MARKUM PUMP STATION
CHANGE DESCRIPTION:
CONTRACT MODIFICATION REQUEST It PCNI.04 Job#: 2022-01
Description Labor Material Equipment Subcontract Total
DIRECT COSTS 3,600 4,004 730 8,234
LABOR BURDEN&FRINGES 55% 1,92G 1,926
SUBTOTALS 5,425 4,004 730 - 10,159
CONTRACTOR MARKUP 15% 1,524
CONTRACTOR MARKUP 5%(SUBS) -
BONDS&INSURANCE 3% 350
(33)
TOTALI 12,000
CLARIFICATIONS:
1
2
3
4
CHANGE ORDER SUMMARY
Front Sheet
MARKUNI PUMP STATION
CHANGE DESCRIPTION:
CONTRACT MODIFICATION REQUEST ft CMR-02 Job 1h L2022-01
Description Labor Material Equipment Subcontract Total
DIRECT COSTS - - 895 896
LABOR BURDEN&FRINGES 66% -
SUBTOTALS - - 895 895
CONTRACTOR MARKUP15% -
CONTRACTOR MARKUP 5%(SUBS) 45
BONDS&INSURANCE 3% 28
32
_-- TOTALI1 1,000
CLARIFICATIONS:
1
2
3
4
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
—a t
Signature
Farida Goderya,PhD,PE
Name of Employee
Senior Project Manager