HomeMy WebLinkAboutContract 53640-CO2 CSC No.53640-CO2
FORT WORTH,. City of Fort Worth
Change Order Request
Project Name Felix Street Bridge and Pavement Rehabilitation City Sec# 53640
Client Project#(s) 101385
Project Description Replacement of brige deck including bridge sidewalk,railing and steel member.
Contracto Rebcen,Inc Change Order# 2 Date 112 012 02 3
City Project Mgr. Christian Cardona City Inspector Steve Johnson
Dept TPW Contract Time
Totals (CD)
Original Contract Amount $3,989,272.40 $3,989,272.40 548
Extras to Date $632,495.57 $632,495.57
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $4,621,767.97 $4,621,767.97 548
Amount of Proposed Change Order $0.00 15
Revised Contract Amount $4,621,767.97 $4,621,767.97 563
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 15.85%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,986,590.50
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This change order is required for lead paint abatement of steel members of the bridge.Due to the deterioration of the bridge steel member,there will be a need for
replacement or repair of the steel members,but the steel bridge has tested positive for lead-based paint(hazardous material)and will need to be removed property before
the contractor can remove/repair steel members.Negotiations have been made with the contractor on the price and reasoning for the item amount.Since this item is special
and requires a certified lead paint abatement, there are no past bid items from the city to verify the cost per unit for the work,but the Contractor provided the City with the
subcontractor proposal with justification.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor(Name) Contract Signature Date
Rebcon LLC Danny Krieg a Jan 24,2023
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
,ftek9#J&f0# Jan 24,2023 Chrisfian cardona Jan 24,2023
Program Manager Date Senior Capital Project Officer Date
Jan 24,2023 wv-�_ Jan 24,2023
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
Jan 24,2023 Jan 24,2023
Assistant City Attorney Date Assistant City Manager Date
.�k
Jan 26,2023 Jan 26,2023
Council Action(if required)
M&C Number M&C Date Approved
ATTEST:
Q._A.emu
Jannette Goodall,City Secretary ppo4FORT��ap OFFICIAL RECORD
�OF..........Oa
pro °°0A0. CITY SECRETARY
0, °=d FT.WORTH,TX
aQ ! a
TiXA5o4.1
��nRA4'04
City of Fort Worth
Change Order Additions
Project Name Felix Street Bridge and Pavement Rehabilitation City Sec# 53640
Client Project# 101385
Contracto Rebcon,Inc PM Christian Cardona Inspector Steve Johnson
Change Order Submittal# Date 1120I2023
ADDITIONS
—ITEM DESCRIPTION DEPT City Unit UnitCost
Do UUW.UU4 Lead Abatement(Per DiaphragmBeam)
56 0170.0100 Mobilization and Remobilization TPW 3.00000000 Fro 3,300 00
TPW $47,340.00
Change Order Additions Page 2 of 7
Sub Total Additions $47,340.00
Change Order Additions Page 3 of 7
Fox r RTH City of Fort Worth
Change Order Deletions
Project Name Felix Street Bridge and Pavement Rehabilitation City Sec#
ClientProject# 101385
Contractor Reboon,Inc PM Christian Cardona Inspecto Steve Johnson
Change Order Submittal# O2 Date 112012023
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
onstructionAllowanoe TPW 47 4 L 47,4 .
TPW 47,340.00
Change Order Deletions Page 4 of 7
Sub Total Deletions $47,340.00
Change Order Deletions Page 5 of 7
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Change order#2—Felix Street Bridge Deck and Pavement
Rehabilitation
M&C: CPN: 101385 CSO: 53640 DOC#:
Date:
To: Name Department Initials Date Out
1. Filogonio Munoz TPW - signature FMJan 24,2023
2. Danny Krieg Rebcon, Inc - signature n Jan 24,2023
3. 1 Steve Johnson TPW - signature sZJE
Jan 24,2023
4. Mike Glover TPW- signature 41u- Jan 24,2023
5. Christian Cardona TPW - signature �� Jan 24 2023
6. Mary Hanna TPW- signature Jan 24,2023
7. Leon Wilson TPW - signature Jan 24,2023
8. Michael Owen TPW - signatures Jan 24,2023
9. Lauren Prieur TPW- signatureaw Jan 24,2023
10. Doug Black Legal - signature ,- Jan 26,2023
11. William Johnson CMO - signature W1. Jan 26,2023
12. Jannette Goodall CSO - signature ,- Jan 26,2023
13. TPW Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ®YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: TPWContracts(&,,FortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!