Loading...
HomeMy WebLinkAboutContract 53813-A2AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 53813 CSC No. 53813-A2 WHEREAS, the City of Fort Worth (CITY) and The Fain Group, Inc., (Design -Builder) made and entered into City Secretary Contract No. 53813, (the CONTRACT) which was authorized by M&C 20-0140 on the 23 day of March, 2020 with a project amount of $ 2,303,000.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $530,000.00 which was authorized by City Council on March 23, 2021 (M&C 21-0220); and WHEREAS, the CONTRACT involves design -build services for the following project: PROJECT NAME Chisholm Trail Park Phase Two Development; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to provide for an increased scope of work and revised project amount. NOW THEREFORE, CITY and Design -Builder, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. The CONTRACT is amended to include the following elements: additional landscaping and concrete paving, as further described herein. 2. The CONTRACT is amended to provide funding in the amount of $71,234.48 for the additional elements, design and construction of which is to be performed by Design -Builder, so that the revised overall project amount shall be an amount of $2,904,234.48. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. City of Fort Worth Design -Build Agreement Amendment Revised: August 26, 2021 Page 1 of 5 of the date subscribed by the City's OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX APPROVED: City of Fort Worth Jesica L. McEachern Assistant City Manager DATE: Jan 27, 2023 Design -Builder The Fain Group, Inc. 4424 LarFy Ffdzier (hfi 6, 202311:54 CST) Larry Frazier President DATE: Jan 6, 2023 APPROVAL RECOMMENDED: Aq�e fo-, _h�_ jMV -/� Dave Lewis Acting Director, Park & Recreation Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Fo aix Carlos M Gonzalez Park Planner City of Fort Worth Design -Build Agreement Amendment Revised: August 26, 2021 Page 2 of 5 APPROVED AS TO FORM AND LEGALITY: t/4 A c Jeremy Anato-Mensah Assistant City Attorney I d� ATTEST: p160 vo 00 ° o �d °°000000°°°°°� aa� nexp5�ap Jannette Goodall City Secretary City of Fort Worth Design -Build Agreement Amendment Revised: August 26, 2021 Page 3 of 5 M&C : N/A Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Not Used City of Fort Worth Design -Build Agreement Amendment Revised: August 26, 2021 Page 4 of 5 FUNDING BREAKDOWN SHEET City Secretary No. 53813 Amendment No. 2 Department Fund -Account -Center Amount PARD 30110-0800450-5740010--104507-009180 $69,485.72 PARD 34018-0800450-5740010--101769-009180 $1,748.76 Total:1 $71,234.481 City of Fort Worth Design -Build Agreement Amendment Revised: August 26, 2021 Page 5 of 5 AMEDMENT No.2 CHISHOLM TRAIL PARK PHASE TWO GMP PROPOSAL UNIT PRICE BID Project Item Information Proposal Bidlist Item No. Description Spec. Section No. Unit of Measure Bid Quantity Unit Price Bid Value DESIGN COSTS LS LS LS LS LS LS LS LS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1-01 Project Management $11,500.00 $11,500.00 1-02 Site Survey - Too Mapping $16,500.00 $16,500.00 1-03 Easement Removal Northeast Property) $3,500.00 $3,500.00 1-04 Site Design and Layout $73,500.00 $73,500.00 1-05 lCivil Engineering $7,500.00 $7,500.00 1-06 Stuructural Engineering $5,000.00 $5,000.00 1-07 Skate ark Design $65,000.00 $65,000.00 1-08 Electrical Engineering $10,500.00 $10,500.00 1-09 Soccer Field Lighting Design Costs LS LS $50,000.00 $50,000.00 1-10 Drainage Study $10,000.00 $10,000.00 CONSTRUCTION COSTS Placeholder Bonds 2-01 LS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2-02 LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS $43,803.00 $43,803.00 2-03 Skate ark- Mobilization $36,250.00 $36,250.00 2-04 Skate ark- Drainage Installation $50,465.00 $50,465.00 2-05 Skate ark- Excavation/Prep $168,280.00 $168,280.00 2-06 Skate ark- Cast In Place Features $101,010.00 $101,010.00 2-07 Skate ark- Shotcrete Preparation $114,795.00 $114,795.00 2-08 Skate ark-Shotcrete $123,200.00 $123,200.00 2-09 Skate ark- Flatwork $66,000.00 $66,000.00 2-10 Skate ark - Management Fee $28,250.00 $28,250.00 2-11 Skate ark Lighting $135,850.00 $135,850.00 2-12 Soccer Field - Lighting (Light Pole Purchasing) $371,897.00 $371,897.00 2-13 Soccer Field - Service Upgrade New Box & Assembl $45,949.00 $45,949.00 2-14 Soccer Field - Pole Foundations $32,874.00 $32,874.00 2-15 Soccer Field - Light & Pole Assembly Pole & Fixtures Ass. $45,780.00 $45,780.00 2-16 Soccer Field - Underground Conduit, Bore, Wire $138,500.00 $138,500.00 2-17 Design Build Fee 1.00 $191,149.00 $191,149.00 CHISHOLM TRAILS PARK- NORTH North Parking Lot SF LS LS SF EA LS LS LS SF LS EA CY SF LS LF EA LS LS LS LS 3-01 28718.00 1.00 1.00 12042.00 2.00 1.00 1.00 1.00 2024.00 1.00 1.00 7380.00 40000.00 1.00 595.00 9.00 1.00 1.00 1.00 1.00 $5.80 $166,564.40 3-02 Playground -Accessible Equipment $173,289.00 $173,289.00 3-03 Playground Concrete $17,149.60 $17,149.60 3-04 Concrete Sidewalk $5.40 $65,026.80 3-05 Handicap Rams $1,852.00 $3,704.00 3-06 Lar a Pavilion $62,582.00 $62,582.00 3-07 Pavilion Slab $27,585.00 $27,585.00 3-08 Site Amenities $18,902.00 $18,902.00 3-09 Enhanced Walk Area $8.75 $17,710.00 3-10 SWPPP $7,058.00 $7,058.00 3-11 Light Poles $5,500.00 $5,500.00 3-12 Site Excavation $4.58 $33,800.40 3-13 Native Grasses $0.10 $4,000.00 3-14 Irrigation $14,235.00 $14,235.00 3-15 Dowel on Curb $4.00 $2,380.00 3-16 Trees $719.26 $6,473.34 3-17 Landscaping $18,357.45 $18,357.45 3-18 Flag Pole Allowance $7,796.00 $7,796.00 3-19 ISoccer Field Top Dressing $4,499.381 $4,499.38 3-20 lGenerall Conditions Staff, Temp. Facil, Main., Water, Etc. $210,739.001 $210,739.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Park Improvements at: Form Revised 20120120 102319,102321 AMEDMENT No.2 CHISHOLM TRAIL PARK PHASE TWO GMP PROPOSAL UNIT PRICE BID Project Item Information Proposal Bidlist Item Description Spec. Section Unit of Bid Unit Price Bid Value No. No. Measure LS Quantity 1.00 $18,596.63 $18,596.63 3-21 Design Build Fee Design -Built Amendment No. 1 - Total $2,833,000.00 AMENDMENT No- 2 4-20 Seeding Nature Areas LS LS LS SF 1.00 1.00 1.00 301.51 $47,459.56 $16,700.85 $47,459.56 $16,700.85 4-21 Watering 4-21 Design Build Fee $5 325.31 $5,325.31 4-23 North Parking Lot $5.80 $1,748.76 Design -Built Amendment No. 2 -Total 1 $71,234.48 REVISED TOTAL CONTRACT AMOUNTI $2,904,234.48 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Park Improvements at: Form Revised 20120120 102319,102321 AMEDMENT No.2 CHISHOLM TRAIL PARK PHASE TWO GMP PROPOSAL UNIT PRICE BID Project Item Information Proposal Bidlist Item No. Description Spec. Section No. Unit of Measure Bid Quantity Unit Price Bid Value DESIGN COSTS Project Management LS LS LS LS LS LS LS LS LS LS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1-01 $11,500.00 $11,500.00 1-02 Site Survey - Topo Mapping $16,500.00 $16,500.00 1-03 Easement Removal (Northeast Property) $3,500.00 $3,500.00 1-04 Site Design and Layout $73,500.00 $73,500.00 1-05 Civil Engineering $7,500.00 $7,500.00 1-06 Stuructural Engineering $5,000.00 $5,000.00 1-07 Skatepark Design $65,000.00 $65,000.00 1-08 Electrical Engineering $10,500.00 $10,500.00 1-09 Soccer Field Lighting Design Costs $50,000.00 $50,000.00 1-10 Drainage Study $10,000.00 $10,000.00 CONSTRUCTION COSTS Placeholder 2-01 LS 1.00 2-02 Bonds LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 00 1rdt: $43,803.00 $43,803.00 2-03 Skatepark - Mobilization $36,250.00 $36,250.00 2-04 Skatepark - Drainage Installation $50,465.00 $50,465.00 2-05 Skatepark - Excavation/Prep $168,280.00 $168,280.00 2-06 Skatepark- Cast In Place Features $101,010.00 $101,010.00 2-07 Skatepark - Shotcrete Preparation $114,795.00 $114,795.00 2-08 Skatepark - Shotcrete $123,200.00 $123,200.00 2-09 Skatepark - Flatwork $66,000.00 $66,000.00 2-10 Skatepark - Management Fee $28,250.00 $28,250.00 2-11 Skatepark Lighting $135,850.00 $135,850.00 2-12 Soccer Field - Lighting (Light Pole Purchasing) $371,897.00 $371,897.00 2-13 Soccer Field - Service Upgrade (New Box & Assembly) $45,949.00 $45,949.00 2-14 Soccer Field - Pole Foundations $32,874.00 $32,874.00 2-15 Soccer Field - Light & Pole Assembly (Pole & Fixtures Ass.) $45,780.00 $45,780.00 2-16 Soccer Field - Underground Conduit, Bore, Wire $138,500.00 $138,500.00 2-17 Design Build Fee $191,149.00 $191,149.00 CHISHOLM TRAILS PARK - NORTH 3-01 North Parking Lot SF 28718.00 $5.80 $166,564.40 3-02 Playground -Accessible Equipment LS 1.00 1.00 12042.00 2.00 1.00 1.00 1.00 2024.00 1.00 1.00 7380.00 40000.00 1.00 595.00 9.00 1.00 1.00 1.00 1.00 $173,289.00 $173,289.00 3-03 Playground Concrete LS $17,149.60 $17,149.60 3-04 Concrete Sidewalk SF $5.40 $65,026.80 3-05 Handicap Ramps EA $1,852.00 $3,704.00 3-06 Large Pavilion LS $62,582.00 $62,582.00 3-07 Pavilion Slab LS $27,585.00 $27,585.00 3-08 Site Amenities LS $18,902.00 $18,902.00 3-09 Enhanced Walk Area SF $8.75 $17,710.00 3-10 SWPPP LS $7,058.00 $7,058.00 3-11 Light Poles EA $5,500.00 $5,500.00 3-12 Site Excavation CY SF LS LF EA LS LS LS LS $4.58 $33,800.40 3-13 Native Grasses $0.101 $4,000.00 3-14 Irrigation $14,235.00 $14,235.00 3-15 Dowel on Curb $4.00 $2,380.00 3-16 Trees $719.26 $6,473.34 3-17 Landscaping $18,357.45 $18,357.45 3-18 Flag Pole Allowance $7,796.00 $7,796.00 3-19 ISoccer Field Top Dressing $4,499.38 $4,499.38 3-20 JGeneral Conditions (Staff, Temp. Facil, Main., Water, Etc.) I $210,739.00 $210,739.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Park Improvements at: Form Revised 20120120 102319,102321 AMEDMENT No.2 CHISHOLM TRAIL PARK PHASE TWO GMP PROPOSAL UNIT PRICE BID Project Item Information Proposal Bidlist Item Description Spec. Section Unit of Bid Unit Price Bid Value No. No. I Measure Quantity 3-21 Design Build Fee LS 1.00 $18,596.63 $18,596.63 Design -Built Amendment No. 1 - Total $2,833,000.00 AMENDMENT No. 2 4-20 Seeding Nature Areas LS 1.00 $47,459.56 $47,459.56 4-21 Watering LS 1.00 $16,700.85 $16,700.85 4-21 Design Build Fee LS 1.00 $5,325.31 $5,325.31 4-23 North Parking Lot SF 301.51 $5.80 $1,748.76 Design -Built Amendment No. 2 -Total 1 $71,234.48 REVISED TOTAL CONTRACT AMOUNTI $2,904,234.48 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Park Improvements at: Form Revised 20120120 102319, 102321