HomeMy WebLinkAboutContract 57552-CO3CSC No. 57252-COl FORT WORTH, City of Fort Worth Change Order Request Project Name 2022 CONCRETE RESTORATION CONTRACT 1 City Sec # 57252 Client Project #(s) 103445 Project Description] Repair and replacement of concrete pavement, curb & gutter, driveway, and sidewalks. Contracto Makou Inc Change Order# 1 Date 8/2/2022 City Project Mgr. Iretomiwa Otuyelu City Inspector James Ruiz Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date TPW Totals Contract Time (CD) $929.690.00 $929,690.00 180 $929,690.00 $929,690.00 180 Amount of Proposed Change order $0.00 Revised Contract Amount $929,690.00 Original Funds Available for Change Orders Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $929,690.00 180 $0.00 0.00% $1,162,112.50 JUSTIFICATION (REASONS) FOR CHANGE ORDER This Change Order is to increase the scope of work in Construction Contract 57252. The installation of curb and gutter on Churchill Rd (Rockwood Dr - City Limits) requires adding the new line item #33 to this contract. The change order also provides for the installation of approximately 1100 SF of driveways along this curb line. This increase in scope of work can be funded within the existing contract amount. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name Contractor (Name)l Contract Signature Date MAKOU INC Maqsood Khan for/Inspection Supervisor Date Aug 2, 2022'- Project and Contract Compliance Manager Date Aug 3, 2022 anager Date S roject Officer Date 7sistant Aug 3, 2022 Aug 3, 2022 irector (Dept) Date Director, Contracting Department (Dept) Date Ca�e�r �ier� Aug 3, 2022 Aug 4, 2022 Assistant City Attorney Date ity Manager Date Aug 8, 2022 Aug 9, 2022 Council Action (if required) M&C Number ATTEST: aaW)a& Jannette S. Goodall (Aug 9, 202210:38 CDT) Jannette Goodall, City Secretary 44400nny CF FORp0k v �0 °9.Id fig ovo o=d d�Q*oQ Y dan� nez 454g4 M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH City of Fort Worth —— Change Order Additions Project Name 2022 CONCRETE RESTORATION CONTRACT 1 City Sec # 57252 Client Project # 103445 Contractor Makou Inc PM Iretomiwa Otuyelu Inspector James Ruiz Change Order Submittal # 0 Date 8/2I2022 ADDITIONS FoeORTr1 City of Fort Worth Change Order Deletions Project Name 2022 CONCRETE RESTORATION CONTRACT 1 City Sec # 57252 Client Project # 103445 ------------- Contractor Makou Inc PM Iretomiwa Otuyelu Inspectorr James Ruiz Change Order Submittal # 0 Date 8/2/2022 DELETION5 ��KYSII•SIIYI �y7�:F.1�i��F.TJ'ddiWS ••r�r- 11 11111111 �' '11 '11 11 14 REFL Raised M, •11 11111I I II ' F.T. 1 . 11 ,. •11 11 111I I II ' '� 1 11 �aIIIIII, 1 Y 1-, 11 11 111I I I11 1 11 000111:IIIIIII1I11 000 11-��iTiT- Il(ITI��� 1 11 EMMUAI1nl1Id 1 1 • �• •1, •11 IIIIIIIKFlI� '� 1 11 MENUM IIAI17 1, 1 •11 iG7��� '� 11 MEELIM.U1,III11 ag • 11 Mm ff '� 11 NEELZ IIQII 3217.1001 Lane Legend RR 1111 111 000LU, ll, W" 3217.1003 Lane Legend Arrow 11 �i:IQQ1IQIT 1 1 , •11 11111111 �' '11 11 ��►w.11IlI1I11 RM III •11 • 11111111 11� ',:11 11 �.►I•IIIIIIIII :11 11 Change Order Deletions Page 3 of 5 M/SBE for this Change Order Previous Change Orders CO # DATE AMOUNT Total $0.00 FORTWORTH Routing and Transmittal Slip Transportation and Public Works Department DOCUMENT TITLE: Change Order # 1 — 2022 Concrete Restoration Contract 1 M&C 22-0116 Is] aki =[8IdL9 CSO # 57252 DOC#_C01_ Date: 810212022 FM Department Initials Date Out To: 1. Magsood Khan (Contractor) Makou Inc makouing@_Qmail.com rk Mak Aug 2, 2�22 2. James Ruiz (Inspector) TPW-Signature Aug 2, 2022 3. Iretomiwa Otuyelu (PM) TPW-Si nature 'r Aug 3, 2022 4. Omar Elbagalati (PgM) TPW-Reviewer 21 Aug 3, 2022 5. Lane Zarate (Sr CPO) TPW-Reviewer _7V_ Aug 3, 2022 6. Lauren Prieur (AD) TPW-Signature Z41 Aug 3, 2022 7. William Johnson Director TPW-Signature 4- Aug 4, 2022 8. Doug Black (ACA) LAW -Signature awn Aug 8, 2022 9. Dana Burghdoff (ACM) CMO-Signatures Aug 9, 2022 10. Jannette Goodall (CSO) CSO-Signature Aug 9, 2022 DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑ Yes X No RUSH: ❑ Yes X No SAME DAY: ❑ Yes X No NEXT DAY: ❑ Yes X No ROUTING TO CSO: ❑ Yes ❑ No Action Reguired: ❑ As Requested ❑ For Your Information X Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return to: Please call Iretomiwa Otuyelu at ext. 6747 for pick up when completed. Thank you.