Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 57280-AR1
CSC No. 57280-AR1 T O City of Fort Worth Construction Allowance Request Project Name[ Westcliff Drainage Improvements Ph 1 and Contract 91 Pt 2 City Sec # 57280 Client Proiect #(s)l C01669 & C01957 TPW and Water Department partnership project constructing storm drain, water pipe, and sanitary sewer improvements in the Westcliff ContractorlCircle C Construction Company City Project Mgr. I Mike Bennett UNIT or DEPT I TPW Original Contract Amount Extras to Date Credits to Date Allowance Funds Previously Allocated Revised Allowance Balance CA#L1 J Date 1/19/2023 City Inspectorl Brian McGill Water Sewer UNIT 4 or Dept Totals IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request (with attachments): purpose for this allowance is to add construction items that were a) in the bid, but not included in a specific construction unit, or b) not included in the original bid. The are justifications for the additions: -The cement stabilized sand is necessary for water and sewer construction but was left off the bid items list in the Water Sewer Unit, but was included in the Stormwater unit. The Stormwater prices are going to be used for the Water / Sewer units. -Construction phasing for the water line on W. Seminary Dr. had to change to avoid a severe conflict with Westcliff Elementary School traffic. This change was required due to construction delays from shallow bedrock and further extended the construction schedule. This includes new construction items. -The items being added to Westcliff Drainage Improvements, Unit 3 are to facilitate the relocation of a franchise utility that is in conflict with storm drain construction. This will help the City contractor stay on schedule for a critical phase of construction that involves a temporary closure for Trail Lake Dr. This includes new construction items. Contract items and quantities being added with this allowance were found to be necessary during construction. Contract items and quantities have been evaluated by City staff and were found to be reasonable when compared to City standard prices, the City Stormwater projects Westcliff Drainage Improvements Ph. 2B and Loving Ave Channel and Culvert Improvements, and the City sewer project Sanitary Sewer Rehabilitation Contract 91 Pt. 1. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Circle C Construction Ingnector/Ingnection Supervisor Date Pro P& and Contract Compliance Manager D2tp -J� _�_ Jan 26, 2023 w-1,- a .Y Jan 26 2023 Vim.;"- Jan 27, 2023 Jan 30, 2023 Assistant Direclor (Dept) n;;tp Director Contracting Department (Dept) Date Jan 30, 2023 Jan 30, 2023 I Assistant City Attorney jE1__ Date M;in;iqer I natp_� b8 a k — Jan 30, 2023 Jan 31, 2023 ATTEST:^*` Jannette Goodall, City Secretary po444oIlgv� O� FORr�40 Ov8 a=0 P��*°°o 000*gip d Qtja4�=oOaxo?°�544,y OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Construction Allowance SUMMARY Page 1 of 4 FORT WORTH City of Fort Worth Construction Allowance Additions Project Name I Westcliff Drainage Improvements Ph 1 and Contract 91 Pt 2 City Sec # 57280 Client Project # F C01669 & C01957 Contractorl Circle C Construction Company PIVIJ Mike Bennett Inspector Brian McGill Construction Allowance Submittal # 77-1 Date ADDITIONS •'Cement Stabilized Sand1 11111111 1 11 11 11 Change• Water Line Phasing • 11111111 I 11 11 • 111 11 Contract ----- Cement • • SandI II111111� 111 1111 �^•�- • • • �11_i��01M 11� 71 l lul ME )t•1111A11I I railic Uontrol• • • ui ' 11 ���01 711� ENEW 111A11I 8oring Assistance/11�NEWEE`"' MEIN I ---- - ---- - ---- - ---- - ---- — ---- — ---- - ---- - ---- - ---- - ---- - ---- - ---- - ---- - ---- - ---- - ---- - ---- — ': 111 11 11 11 11 11 11 III I I Construction Allowance Additions Page 2 of 4 FORT WORTH,. City of Fort Worth Construction Allowance Value Project Name I Westcliff Draina a Improvements Ph 1 and Contract 91 Pt 2 City Sec # 57280 Client Project # F C01669 & CO1957 Contractorl Circle C Construction Company PMJ Mike Bennett Inspector Brian McGill Construction Allowance Submittal # Date CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total 63 Water Construction Allowance 1.00 LS $120,000.00 $120,000.00 55 Sewer Construction Allowance 1 1.00 1 LS $150,000.00 $150,000.00 72 �Drainage Improvements Construction Allowance 100,000.00 EA $1.00 $100,000.00 Note to Preparer: Delete example information in cells and add the CONSTRUCTION ALLOWANCE contract bid item number being used, description, UNIT or DEPT, Qty, Unit and Unit Cost in the lines above. Three lines are provided for those cases when up to 3 different Construction Allowance types are being impacted. In most cases only one Construction Allowance type will be impacted. Delete these instructions from the form. Construction Allowance Value 3 of 4 MISBE for this Construction Allowance Request Construction Allowance MSBE Data Page 4 of 4 C01669/C01957 Westcliff Drainage PH 1- Contract 91 PH2 CO 1 Final Audit Report Created: 2023-01-26 By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAWVkBd_pPD6f3hJP9bvRWfJA3LUgnnlw4 2023-01-30 "C01669/C01957 Westdiff Drainage PH 1-Contract 91 PH2 CO 1 " History Document created by Sadie.Ishmael@fortworthtexas.gov 2023-01-26 - 3:24:54 PM GMT- IP address: 204.10.90.100 Signer Sadie.Ishmael@fortworthtexas.gov entered name at signing as Sadie Ishmael 2023-01-26 - 3:35:50 PM GMT- IP address: 204.10.90.100 &0 Document approved by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov) Approval Date: 2023-01-26 - 3:35:52 PM GMT - Time Source: server- IP address: 204.10.90.100 24 Document emailed to Mike.Bennett@fortworthtexas.gov for signature 2023-01-26 - 3:36:20 PM GMT Email viewed by Mike.Bennett@fortworthtexas.gov 2023-01-26 - 6:26:35 PM GMT- IP address: 204.10.90.100 GS© Signer Mike.Bennett@fortworthtexas.gov entered name at signing as mike bennett 2023-01-26 - 6:29:12 PM GMT- IP address: 204.10.90.100 GS© Document e-signed by mike bennett (Mike.Bennett@fortworthtexas.gov) Signature Date: 2023-01-26 - 6:29:14 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Teresa Skelly (t.skelly@circlecconstruction.com) for signature 2023-01-26 - 6:29:16 PM GMT Email viewed by Teresa Skelly (t.skelly@circlecconstruction.com) 2023-01-26 - 6:31:26 PM GMT- IP address: 15.181.199.185 =, Document e-signed by Teresa Skelly (t.skelly@circlecconstruction.com) Signature Date: 2023-01-26 - 6:33:26 PM GMT - Time Source: server- IP address: 15.181.199.185 FDRTWORTHs I Paw m"Y Adobe Acrobat Sign Document emailed to Edward.Davila@fortworthtexas.gov for signature 2023-01-26 - 6:33:27 PM GMT Email viewed by Edward.Davila@fortworthtexas.gov 2023-01-26 - 9:59:06 PM GMT- IP address: 204.10.91.100 J Signer Edward.Davila@fortworthtexas.gov entered name at signing as Edward D'avila 2023-01-26 - 10:03:39 PM GMT- IP address: 204.10.90.100 J Document e-signed by Edward Davila (Edward.Davila@fortworthtexas.gov) Signature Date: 2023-01-26 - 10:03:41 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Linda Young(linda.young@fortworthtexas.gov) for signature 2023-01-26 - 10:03:43 PM GMT Email viewed by Linda Young(linda.young@fortworthtexas.gov) 2023-01-27 - 9:38:04 PM GMT- IP address: 204.10.90.100 J Document e-signed by Linda Young (Iinda.young@fortworthtexas.gov) Signature Date: 2023-01-27 - 9:38:47 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lissette.Acevedo@fortworthtexas.gov for signature 2023-01-27 - 9:38:48 PM GMT Email viewed by Lissette.Acevedo@fortworthtexas.gov 2023-01-30 - 3:04:13 PM GMT- IP address: 204.10.90.100 Document declined by Lissette.Acevedo@fortworthtexas.gov Decline reason: Please update title and language per our discussion, Lissette 2023-01-30 - 3:21:47 PM GMT- IP address: 204.10.90.100 FDRTWORTHs I P—led8y Adobe Acrobat Sign FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Westcliff Drainage Improvements Ph I and Contract 91 Pt 2 Construction Allowance 1 M&C: N/A CPN: C01669 & CSO: 57280 DOC#: C01957 Date: To: Name Department Initials Date Out 1. Mike Bennett TPW Wa Jan 26, 2023 2 Teri Skelly t.skell circlecconstruction.com Contractor -T-1 rs Jan 26, 2023 3. Edward Davila TPW -4 Jan 26, 2023 4. Linda Young TPW Jan 27, 2023 5. Lissette Acevedo TPW Jan 30, 2023 6. Michael Owen TPW ? Jan 30, 2023 7. Lauren Prieur TPWw Jan 30, 2023 8. Doug Black Legal Jan 30, 2023 9. William Johnson CMO Jan 31, 2023 10. Melissa Brunner CSO Feb 1, 2023 11. Jannette Goodall CSO Feb 1, 2023 12. Allison Tidwell CSO - Feb 3, 2023 13. TPW SW Contracts TPW SW CC: TPW BSPAP Recon Team — Cindy Sengathith, Assistant PM — Dillon Johns DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: DYES ®No RUSH: ❑YES ®No SAME DAY: DYES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File NEXT DAY: DYES ❑No ❑ Attach Signature, Initial and Notary Tabs Return to: tpw sw contracts(&fortworthtexas.gov Call 817-229-3283 with questions. Thank you!