HomeMy WebLinkAboutContract 58807CSC No. 58807
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality
("CITY"), and Larry O'Flinn, LLC., authorized to do business in Texas, ("ENGINEER"), for a
PROJECT generally described as: Conceptual Layout Study for Sports Complex at Walsh
Ranch — Project No. 104652.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A. Negotiated changes to this
Agreement, if any, are included in Attachment C.
Article II
Compensation
The ENGINEER's compensation shall be in the amount up to $15,000.00 as set forth
in Attachment B. Payment shall be considered full compensation for all labor (including all
benefits, overhead and markups), materials, supplies, and equipment necessary to
complete the Services.
The ENGINEER shall provide monthly invoices to CITY. ENGINEER shall provide
the CITY sufficient documentation, including but not limited to meeting the requirements set
forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices.
Payments for services rendered shall be made in accordance with the Texas
Prompt Payment Act (Texas Government Code Ch. 2251).
Acceptance by ENGINEER of said payment shall release CITY from all claims or
liabilities under this Agreement for anything related to, performed, or furnished in
connection with the Services for which payment is made, including any act or omission of
CITY in connection with such Services.
Article III
Term
Time is of the essence. Unless otherwise terminated pursuant to Article VI. D.
herein, this Agreement shall be for a term beginning upon the effective date, as described
below, and shall continue until the expiration of the funds or completion of the subject
matter contemplated herein pursuant to the schedule, whichever occurs first. Unless
specifically otherwise amended, the original term shall not exceed five years from the
original effective date.
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021 Page 1 of 15 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Article IV
Obligations of the ENGINEER
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing under the same or similar circumstances and
professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of competent engineers.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 2 of 15
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. ENGINEER's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the contract documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the contract
documents, nor shall anything in the contract documents or this
AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on -site inspections to discover
latent defects in the work or otherwise check the quality or quantity of the work
on the PROJECT. If the ENGINEER makes on -site observation(s) of a
deviation from the contract documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the contract documents.
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 3 of 15
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the contract
documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are no other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 4 of 15
Business Equity Participation
CITY has goals for the full and equitable participation of minority business
and/or women business enterprises in CITY contracts greater than
$100,000. In accordance with the CITY's Business Equity Ordinance No.
25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in
Chapter 20, Article X of the CITY's Code of Ordinances, as amended, and
any relevant policy or guidance documents), the CITY has goals for the full
and equitable participation of minority business and/or women business
enterprises in CITY contracts greater than $100,000. ENGINEER
acknowledges the MBE and WBE goals established for this contract and its
execution of this Agreement is ENGINEER's written commitment to meet the
prescribed MBE and WBE participation goals. Any misrepresentation of facts
(other than a negligent misrepresentation) and/or the commission of fraud by
the ENGINEER may result in the termination of this Agreement and
debarment from participating in CITY contracts for a period of time of not less
than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to reproduce such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of hard copies at the rate published in the Texas Administrative Code in
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 5 of 15
effect as of the time copying is performed.
K. INSURANCE
ENGINEER shall not commence work under this Agreement until it has
obtained all insurance required under Attachment F and CITY has approved
such insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondent superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 6 of 15
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the CITY
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 7 of 15
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of CITY, CITY hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at the construction site,
and provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 8 of 15
I. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
J. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
CITY and ENGINEER shall exercise their best efforts to meet their
respective duties and obligations as set forth in this Agreement, but shall
not be held liable for any delay or omission in performance due to force
majeure or other causes beyond their reasonable control, including, but not
limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters,
epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 9 of 15
D. Termination
(1) This AGREEMENT may be terminated
a.) by the CITY for its convenience upon 30 days' written notice to
ENGINEER.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the CITY, the
ENGINEER will be paid for termination expenses as follows:
a.) Reasonable cost of reproduction or electronic storage of partial or
complete studies, plans, specifications or other forms of ENGINEER'S
work product;
b.) The reasonable time requirements for the ENGINEER'S personnel to
document the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all projected termination
expenses. The CITY'S approval shall be obtained in writing prior to
proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the CITY against
liability for any damage committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control to the extent that the damage is caused by
or resulting from an act of negligence, intentional tort, intellectual
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 10 of 15
property infringement, or failure to pay a subcontractor or supplier. CITY
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
ENGINEER shall not assign all or any part of this AGREEMENT without the
prior written consent of CITY.
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all CITY ordinances and regulations which in
any way affect this AGREEMENT and the work hereunder, and shall observe
and comply with all orders, laws ordinances and regulations which may exist
or may be enacted later by governing bodies having jurisdiction or authority
for such enactment. No plea of misunderstanding or ignorance thereof shall
be considered. ENGINEER agrees to defend, indemnify and hold
harmless CITY and all of its officers, agents and employees from and
against all claims or liability arising out of the violation of any such
order, law, ordinance, or regulation, whether it be by itself or its
employees.
K. Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel,
have reviewed and revised Agreement and that the normal rule of contract
construction, to the effect that any ambiguities are to be resolved against
the drafting party, must not be employed in the interpretation of Agreement
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 11 of 15
or any amendments or exhibits hereto.
The failure of CITY or ENGINEER to insist upon the performance of any
term or provision of this Agreement or to exercise any right granted herein
shall not constitute a waiver of CITY's or ENGINEER's respective right to
insist upon appropriate performance or to assert any such right on any
future occasion.
L. Immigration Nationality Act
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will be
performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD
CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES
DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. CITY, upon written notice to ENGINEER, shall have the right
to immediately terminate this Agreement for violations of this provision by
ENGINEER.
M. Prohibition On Contracts With Companies Boycotting Israel
ENGINEER unless a sole proprietor, acknowledges that in accordance with
Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or
more full time -employees and the contract value is $100,000 or more, the
CITY is prohibited from entering into a contract with a company for goods
or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company"
shall have the meanings ascribed to those terms in Section 808.001 of the
Texas Government Code. By signing this contract, ENGINEER certifies
that ENGINEER'S signature provides written verification to the CITY
that if Chapter 2271, Texas Government Code applies, ENGINEER: (1)
does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
N. Prohibition on Boycotting Energy Companies
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 12 of 15
ENGINEER acknowledges that in accordance with Chapter 2274 of the
Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13,
§ 2), the CITY is prohibited from entering into a contract for goods or
services that has a value of $100,000 or more, which will be paid wholly or
partly from public funds of the CITY, with a company (with 10 or more full-
time employees) unless the contract contains a written verification from the
company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms
"boycott energy company" and "company" have the meaning ascribed to
those terms by Chapter 2274 of the Texas Government Code (as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274
of the Government Code is applicable to this Agreement, by signing
this Agreement, ENGINEER certifies that ENGINEER's signature
provides written verification to the CITY that ENGINEER: (1) does not
boycott energy companies; and (2) will not boycott energy companies
during the term of this Agreement.
O. Prohibition on Discrimination Against Firearm and Ammunition
Industries
ENGINEER acknowledges that except as otherwise provided by Chapter
2274 of the Texas Government Code (as added by Acts 2021, 87th Leg.,
R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more which will be paid
wholly or partly from public funds of the CITY, with a company (with 10 or
more full-time employees) unless the contract contains a written verification
from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate during the term of the contract
against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the
meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent
that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, ENGINEER certifies that
ENGINEER's signature provides written verification to the CITY that
ENGINEER: (1) does not have a practice, policy, guidance, or directive
that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 13 of 15
same instrument.
The following attachments and schedules are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B - Compensation
Attachment C - Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Attachment F - Insurance Requirements
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
Jesica McEachern
Assistant City Manager
Date: Jan 31, 2023 a44F Rr�Ila 0
F000 oo�o�a� o
�a
ATTEST: ono o=d
a0 * ,*o
�.r,�. � ��xs oan TEX A54pd
(J ��bppoo4
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
By:/a fo-,
Dave Lewis
Acting Director
Park & Recreation Department
APPROVED AS TO FORM AND LEGALITY
By:
Jeremy Anato-Mensah
Assistant City Attorney
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
Revised Date: November 23, 2021
Page 14 of 15
BY:
ENGINEER
Larry O'Flinn, LLC.
Larry P. 0'F (Jan 20, 2023 15:38 CST)
Larry O'Flinn
Principal
Date:
Form 1295 No. None
M&C No.: None
M&C Date: None
Conceptual Layout Study for Sports Complex at Walsh Ranch
104652
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
4
Jing Yang
Landscape Architect Manager
Park & Recreation Department
City of Fort Worth, Texas Conceptual Layout Study for Sports Complex at Walsh Ranch
Standard Agreement for Engineering Related Design Services 104652
Revised Date: November 23, 2021
Page 15 of 15
ATTACHMENT "A"
SCOPE OF SERVICES
Conceptual Layout Study for Sports Complex at Walsh Ranch
City Project No. 104652
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project. Under this scope, "ENGINEER"
is expanded to include any sub -ENGINEER, including surveyor, employed or contracted by
the ENGINEER.
PROJECT UNDERSTANDING
The City of Fort Worth Park & Recreation Department (PARD) is exploring the potential for
land acquisition and development of a 150-acre premier tournament level soccer complex in
the eastern portion of the Quail Valley section of Walsh Ranch. The sports complex will
include:
• 12 Full Size Soccer Fields with synthetic turf
• 7 Full Size Soccer Fields with natural turf
• 1 Premier Soccer Stadium with Full Size natural turf field, with seating for 4,000
spectators
• Bleachers with shade structures at each field
• Restrooms and Concessions as appropriate to serve the fields
• Parking and vehicular circulation to accommodate the facilities
• User Amenities such as Playgrounds, Picnic Pavilions, trails, etc. to accommodate the
facility users
SCOPE OF WORK
Concept Layout Plan
Kick-off Meeting and Detailed Scoping — ENGINEER will meet with PARD staff to refine
the scope of the program elements including field sizes, spectator capacities, parking
expectations, desired amenities, etc.
Ste Analysis — ENGINEER will conduct a Site Analysis review noting such site
elements as topography, slopes, drainageways, wind directions, sun angles, gas well
sites and pipeline locations, adjacent property land uses, etc. to understand how these
features will affect the proposed project use and function. This will be a working
process and not a formal graphic.
City of Fort Worth, Texas
Attachment A — Scope of Services
Conceptual Layout Study for Sports Complex at Walsh Ranch
Page 1 of 2
Site Visit — ENGINEER will attend a site visit with PARD to review the site.
Initial Concept Layout Plan — ENGINEER will develop an initial concept plan indicating
the proposed program elements on the property considering the refined program and
site information. This plan may be produced in CAD or by hand.
ENGINEER will meet with PARD to review the Initial Concept Layout Plan and discuss
comments and refinements.
Final Concept Layout Plan — Based on input from the initial concept review meeting,
ENGINEER will prepare a Final Concept Layout Plan for the facility. This plan will be
produced in CAD and will be supplied to PARD at completion.
2. Cost Estimate
Cost Estimate — Based on the Final Concept Layout Plan, ENGINEER will produce an
"order of magnitude" conceptual cost estimate for the project. This cost estimate will
only be as detailed as the concept plan and preliminary work will allow. While this cost
estimate will begin the overview budgeting process, there will be many detailed
elements of the site development that will not be covered because they have not been
designed and engineered.
These documents will be conveyed to the Client in pdf format via email.
To be provided by the CITY and PARD: Digital files of the aerial topography, and surveys,
land use plans, layouts, site plans, utilities, etc. as may be provided to the CITY by the land
owner / developer.
Only those services specifically mentioned in the Scope of Work section are offered as part
of this proposal.
The following is a list of some, but not necessarily all, of the services that can be useful or
required for a project of this type. The listed services have not been included in this
proposal.
1. Surveys.
2. Construction document preparation.
3. Illustrative artistic renderings.
4. Zoning changes, land use changes or other CITY required processes for project
development.
City of Fort Worth, Texas
Attachment A — Scope of Services
Sports Complex at Walsh Ranch
Page 2 of 2
ATTACHMENT B
COMPENSATION
Conceptual Layout Study for Sports Complex at Walsh Ranch
City Project No. 104652
Lump Sum Project
Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $15,000 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies, and
equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Park & Recreation Department monthly progress reports and schedules in the
format required by the City.
City of Fort Worth, Texas
Attachment B - Compensation
Conceptual Layout Study for Sports Complex at Walsh Ranch
Page 1 of 3
AN
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime ENGINEER
O'FlinnDesign Conceptual Planning $11,500 77%
Proposed MWBE Sub-ENGINEERs
None
Non-MWBE ENGINEERs
Riddle & Goodnight, $3,500 23%
Inc.
TOTAL $ 15,000 100%
Project Number & Name
Total Fee
MWBE Fee
MWBE %
$15,000
$ 0
0%
City MWBE Goal = 0% ENGINEER Committed Goal = 0%
City of Fort Worth, Texas
Attachment B - Compensation
Conceptual Layout Study for Sports Complex at Walsh Ranch
Page 2 of 3
AM
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
N/A
City of Fort Worth, Texas
Attachment B - Compensation
Conceptual Layout Study for Sports Complex at Walsh Ranch
Page 3 of 3
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Conceptual Layout Study for Sports Complex at Walsh Ranch
City Project No. 104652
<List any changes to the Standard Agreement>
NONE
City of Fort Worth, Texas
Attachment C - Amendments
Conceptual Layout Study for Sports Complex at Walsh Ranch
Page I of I
ATTACHMENT "D"
PROJECT SCHEDULE
Conceptual Layout Study for Sports Complex at Walsh Ranch
City Project No. 104652
The ENGINEER will work in timely manner to meet the project delivery goals of the City.
The understanding of the project timing is as follows:
Task 1 — Concept Layout Plan
Task 2 — Cost Estimate
City of Fort Worth, Texas
Attachment D — Schedule of Services
Conceptual Layout Study for Sports Complex at Walsh Ranch
Page 1 of 1
4 weeks
1 week
ATTACHMENT "E"
PROJECT LOCATION & MAP
Conceptual Layout Study for Sports Complex at Walsh Ranch
City Project No. 104652
The PROJECT is located the Quail Valley area of the Walsh Ranch development north
of 1-30 and east of Walsh Ranch Parkway as shown on the exhibit below:
Waste
Management
,I ice 120{{{{{{I{{{I{aII
D6-- -
0,AC-
D?:
\ 75 AF.
J
42 1(
1-
N f 8�s
jF ,1 Cook Children's
; Medical Center W 1;
S
0 1,000 2,000
1 inch = 1,000 feet Feet
City of Fort Worth, Texas
Attachment E — Project Location & Map
Conceptual Layout Study for Sports Complex at Walsh Ranch
Page 1 of 1