Loading...
HomeMy WebLinkAboutContract 52483-A7CSC No. 52483-A7 AMENDMENT No . 7 TO CITY SECRETARY CONTRACT No. 52483 WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc. (ENGINEER) made and entered into City Secretary Contract No. 52483, (the CONTRACT) which was authorized by M&C No.C-29147 on the 11 day of June, 2019 in the amount of $ 930,000.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $27,000.00 which was administratively authorized on the 23 day of June, 2020; Amendment No. 2 in the amount of $37,000.00 which wasadministratively authorized on the 2 day of September, 2020; Amendment No. 3 in the amount of $35,945.00 which was administratively authorized on the 28 day of December, 2020; Amendment No. 4 in the amount of $36,700.00 which was authorized by M&C No.21-0219 on the 14 day of April, 2021; Amendment No. 5 in the amount of $56,841.00 which was administratively authorized on the 25 day of October, 2021; Amendment No. 6 in the amount of $428,665.00 which was authorized by M&C No.21-0996 on the 14 day of December, 2021, and WHEREAS, the CONTRACT involves engineering services for the following project: CentrePort Trail Phase I and Phase II project, CPN 100082; and WHEREAS, it has become necessary to execute Amendment No. 7 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by ENGINEER totals $22,000.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to ENGINEER for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,574,151.00. City of Fort Worth, Texas OFFICIAL RECORD CentrePort Trail Phase I & Phase II Prof Services Agreement Amendment Template 100082 Revision Date: November 23, 2021 CITY SECRETARY Page 1 of 4 FT. WORTH, TX 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: Feb 1, 2023 APPROVAL RECOMMENDED: )OP? fop-. of the date subscribed by the City's ENGINEER Halff Associates, Inc. Todd Woodson Vice President DATE: January 12, 2023 SL J� Dave Lewis Acting Director, Park & Recreation Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Ting Yang Landscape Architect Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas CentrePort Trail Phase I & Phase II Prof Services Agreement Amendment Template 100082 Revision Date: November 23, 2021 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: Jeremy Anato-Mensah Assistant City Attorney ATTEST: Jannette Goodall City Secretary M&C: None Date: None OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 3 of 4 CentrePcrt Trail Phase I & Phase II 100082 FUNDING BREAKDOWN SHEET City Secretary No. 52483 Amendment No. 7 Department I Fund -Account -Center I Amount 1 0800450 1 31001-5330500-0800450-100082-5030 1 $22,000.001 Total:1 $22,000.00 City of Fort Worth, Texas CentrePort Trail Phase I & Phase II Prof Services Agreement Amendment Template 100082 Revision Date: November 23, 2021 Page 4 of 4 MEN HALFF mom December 16, 2022 AVO 34838 City of Fort Worth Jing Yang, RLA, ASLA Park and Recreation Department 4200 South Freeway, Suite 2200 Fort Worth, TX 76115 RE: CentrePort Trail Phase 1—Trinity Blvd Design Dear Jing Yang, Centreport Trail Phase 1: 100% Revised Construction Documents City of Fort Worth December 16, 2022 Halff Associates, Inc. (Halff) is pleased to submit the following scope and fee proposal to provide trail design services for the CentrePort Trail Phase 1 within the City of Fort Worth city limits. This proposal includes the services as described in the Scope of Services (Attachment A). The Exclusions (Attachment B) list services which are not included in this proposal but can be provided by Halff upon request. We appreciate the opportunity to submit our proposal on this project. Please feel free to contact me at 214.217.6513 or at jviggiano@halff.com, if you have any questions or comments regarding the proposal. Sincerely, Jordan Viggiano Project Manager, Halff Associates, Inc. Page 1 MEN H A L F F Centreport Trail Phase 1 100% Revised Construction Documents MEN City of Fort Worth ■ ■ ■ December 16, 2022 ATTACHMENT A ENGINEERING SERVICES for CENTREPORT TRAIL PHASE 1: 100% REVISED CONSTRUCTION DOCUMENTS PURPOSE Halff Associates, Inc. (ENGINEER) will provide the additional engineering services listed in Task 1 for Centreport Trail Phase 1 (PROJECT) for the City of Fort Worth and TxDOT (ADMINISTRATOR). This contract amendment incorporates City of Fort Worth alignment updates received after the 100% package was submitted. The basic scope of services supplements the scope of services outlined in the Professional Services Agreement dated July 2, 2019. The services to be provided as part of this amendment are as follows: ASSUMPTIONS The scope of services for this proposal has been prepared using the following assumptions as a basis for its preparation: It is assumed that the following items are included in the proposed trail alignment and this scope confirmation: 1. The sidewalk adjacent to Trinity Boulevard will be widened to 10 feet, where applicable. It may be infeasible to provide a 10-foot wide sidewalk throughout the entire length along Trinity Boulevard due to existing constraints such as power poles, existing ROW, traffic signals, existing retaining walls, etc. Sidewalk crossings at the existing driveways will need to remain as designed on the 100% submittal due to existing driveway grades. 2. Drawings included in this Contract Amendment will be integrated with the trail construction drawings as a continuation of the scope of services stated in the Professional Services Agreement (PSA) dated July 2, 2019. 3. Utility adjustments necessary to accommodate the sidewalk widening will be coordinated by the City. 4. Existing survey will be utilized for the Trinity Boulevard sidewalk revisions. Page 2 ■■■ HAL F F CentreportTrai Phase 1: 100% Revised Construction Documents MEN City of Fort Worth ■ ■ ■ December 16, 2022 BASIC SCOPE OF SERVICES TASK 1— TRINITY SIDEWALK MODIFICATIONS ENGINEER will revise the Trinity Boulevard sidewalk to provide a 10-foot wide sidewalk except in areas where it is necessary to use a narrower width due to the existing constraints. The following tasks are included in this scope of services for this effort: • Revise the sidewalk width from the beginning of the project to the beginning of the 12-foot wide trail section. The current centerline and profile will be used for these revisions. Driveways will remain as designed on the previous submittal. • Revise the wall design for Wall A and Wall B to accommodate the 10-foot wide sidewalk. • Revise the Paving, Structural, Removal, and Erosion sheets to accommodate the 10-foot wide sidewalk. • Update the quantities and bid form to reflect the plan revisions. BASIS OF COMPENSATION (City of Fort Worth) CENTREPORT TRAIL PHASE 1: 100% REVISED CONSTRUCTION DOCUMENTS A. Basic Fee Services: The basis of compensation for Basic Fee services shall be as follows: Task 1— Trinity Sidewalk Modifications $22,000 OVERALL TOTAL: $22,000 Page 3 MEN H A L F F Centreport Trail Phase 1 100% Revised Construction Documents MEN City of Fort Worth ■ ■ ■ December 16, 2022 B. Billing Schedule: The compensation for tasks listed as Basic Services in the compensation schedule shall be Lump Sum, and the services for each Basic Service task shall be invoiced on a percent complete basis. The compensation for tasks listed as Special (hourly/unit) Services in the compensation schedule shall be on the basis of 2.3 times full (total) salary cost for the time each employee is engaged directly on the project. Total fees will not be exceeded without prior approval. Direct costs associated with Special Services, including printing and reproduction, postage, and courier/overnight service, will be considered reimbursable and will be billed at 1.1 times the direct cost incurred. The project will be billed to CLIENT/OWNER on a monthly basis. Page 4 MEN HALFF mom ATTACHMENT B EXCLUSIONS Centreport Trail Phase 1: 100% Revised Construction Documents City of Fort Worth December 16, 2022 The following services are not included in the scope or fees for this proposal; but can be provided by Halff Associates, Inc., subject to negotiation: General: 1. Any additional work not specifically included in the Proposed Scope of Work will be accomplished as Additional Services. 2. Client generated changes to the design once Construction Document Preparation is in progress. Time will be billed at fee base per task, per a proposal approved by the CLIENT, until the work is at the same level of completion as it was prior to the change. 3. Revisions to the plans requested by the CLIENT after the plans are approved, unless necessitated by discrepancy and inaccuracy in the surveys and plans. 4. Design of areas outside the limits of the defined project site. 5. Design of gas, telephone or other utility improvements. 6. Traffic engineering reports or studies. 7. Extra Public meetings or hearings not specified in the original scope of services described in the Professional Services Agreement dated June 11, 2019. 8. Additional graphic products. 9. Additional meetings or workshops not identified in the project scope of services. 10. Permit fees, filing fees, pro -rated fees, impact fees, taxes, federal and/or state regulatory agency review fees. 11. Printing of additional drawings, specification and contract documents not identified in the project scope of services. 12. Construction staking. 13. Permit fees, filing fees, pro -rated fees, impact fees, taxes, federal and/or state regulatory agency review fees. 14. Preparation and printing of As -Built Drawings. 15. Design/coordination of existing utility relocations or modifications, unless necessitated by discrepancy and inaccuracy in the surveys and plans. 16. Extra negotiations with adjacent property owners not specified in the original scope of services within the Professional Services Agreement dated June 11, 2019, or as described below within the "Trail Width Study/Easement Acquisition and Coordination" section. 17. Additional TxDOT or regulatory agency requirements not identified in the proposed scope of services. 18. Technical reports for the following items are excluded from this scope of services: noise, air quality, community impacts, indirect impacts, and cumulative impacts, unless necessitated by the completion of the CE process. 19. Effort to obtain right -of -entry from public or private landowners to allow for the completion of environmental services is not included in this scope of work. 20. This scope of work does not include threatened or endangered species surveys of Section 7 consultation with the USFWS under the Endangered Species Act, unless necessitated by the completion of the CE process. Page 5 MEN HALFF mom Centreport Trail Phase 1: 100% Revised Construction Documents City of Fort Worth December 16, 2022 21. If TxDOT or a regulatory agency requires additional information other than standard information and submittals required for the completion of this project, then a supplemental services agreement will be required. 22. Electrical Engineering is not included. 23. Traffic Signal modifications are not included. 24. Irrigation is not included. 25. Bridge Inspection Services. 26. Geospatial Survey services. 27. Additional Geotechnical Services including additional borings, direct shear testing, triaxial testing, global stability analyses, re -mobilization, and permitting are excluded. 28. Any redesign of driveways or sidewalk crossings, including addition of driveway profiles or updating spot grades are excluded. 29. Any additional easement or ROW documents needed from any of the above revisions are excluded. 30. Design of new walls and/or revisions to previously -design walls other than Wall A and B are excluded. Page 6